(101,101Z)RS-1
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Ambraw Asphalt Materials, Inc. Low bidder | $925,196 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Ambraw Asphalt … |
|---|---|---|---|---|---|---|
| 1 | Z0049799 | PROT RESET SURVEY MRK | 9 | EACH | $1,398.77 | |
| 2 | 40600290 | BIT MATLS TACK CT | 12,797 | POUND | $0.7900 | |
| 3 | 40600370 | LONG JOINT SEALANT | 10,664 | FOOT | $3.98 | |
| 4 | 40600990 | TEMPORARY RAMP | 160 | SQ YD | $64.72 | |
| 5 | 40604052 | HMA SC IL-9.5 C N70 | 1,195 | TON | $159.97 | |
| 6 | 40604164 | P HMA SC IL-9.5 D N90 | 1,195 | TON | $189.66 | |
| 7 | 44000155 | HMA SURF REM 1 1/2 | 28,437 | SQ YD | $4.36 | |
| 8 | 44201789 | CL D PATCH T2 12 | 202 | SQ YD | $617.83 | |
| 9 | 44201794 | CL D PATCH T3 12 | 16 | SQ YD | $617.83 | |
| 10 | 48102100 | AGG WEDGE SHLD TYPE B | 262 | TON | $88.00 | |
| 11 | 67000400 | ENGR FIELD OFFICE A | 3 | CAL MO | $1,916.67 | |
| 12 | 67000600 | ENGR FIELD LAB | 3 | CAL MO | $1,300.00 | |
| 13 | 67100100 | MOBILIZATION | 1 | L SUM | $55,440.00 | |
| 14 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $17,600.00 | |
| 15 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $39,639.00 | |
| 16 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $162.80 | |
| 17 | 70300100 | SHORT TERM PAVT MKING | 1,066 | FOOT | $6.26 | |
| 18 | 70300150 | SHRT TRM PAVT MK REM | 355 | SQ FT | $7.69 | |
| 19 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 24,593 | FOOT | $0.0100 | |
| 20 | 78001110 | PAINT PVT MK LINE 4 | 24,593 | FOOT | $0.2300 | |
| 21 | 78100100 | RAISED REFL PAVT MKR | 134 | EACH | $49.48 | |
| 22 | 78300200 | RAISED REF PVT MK REM | 134 | EACH | $10.00 |