| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Aug 4, 2023 | 78A11 | JacksonDistrict 9 | Installation of median crossovers for the eastbound lanes of IL 13 at SN 039-0075 carrying IL 13 over the Big Muddy River, east of Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $151,672 · | ||
| Aug 4, 2023 | 85744 | Rock IslandDistrict 2 | PCC Shared-Use path on 19th Street from Avenue of the Cities to 18th Avenue, and reduction of lanes on 19th street from 7th Avenue to River Drive in Moline. | — | Executed | Valley Construction Co. $3,136,598 · | ||
| Aug 4, 2023 | 87828 | IroquoisDistrict 3 | Resurfacing CH 47 from Ford County line to IL 54. | — | Executed | Iroquois Paving Corporation $495,258 · | ||
| Aug 4, 2023 | 87841 | DeKalbDistrict 3 | Streetscape improvements along US 30 from South Shabbona Road to Illini Road in Shabbona | — | Executed | Elliott and Wood, Inc. $1,654,900 · | ||
| Aug 4, 2023 | 89804 | TazewellDistrict 4 | Resurfacing and intersection improvements on Court Street from Stadium Drive to Hilltop Drive in Pekin. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $9,959,061 · | ||
| Aug 4, 2023 | 89829 | McDonoughDistrict 4 | Removal of existing pavement and construction of PCC pavement with curb and gutter, sidewalks, ADA ramps, storm sewer, step replacement and retaining walls from Charles Street to Johnson Street in the City of Macomb. | — | Rejected | Laverdiere Construction, Inc. $1,378,046 · | ||
| Aug 4, 2023 | 89849 | TazewellDistrict 4 | Re-align and reconstruct Nofsinger Road at the intersection of US 24 in the City of Washington. | — | Executed | Gensini Excavating, Inc. $6,846,974 · | ||
| Aug 4, 2023 | 93806 | MasonDistrict 6 | Installation of Plate Beam Guardrail and Traffic Terminals at various locations along CH 5. | — | Executed | Lovewell Fencing, Inc. $998,390 · | ||
| Aug 4, 2023 | 97805 | BondDistrict 8 | Sidewalk Construction along various routes in Greenville. | — | Executed | DMS Contracting, Inc. $377,775 · | ||
| Aug 4, 2023 | 97810 | MonroeDistrict 8 | HMA Resurfacing with PCC Base Course widening, storm sewers, curb and gutter, and ADA Ramps on Ghent Road from south of Palmer Road to Christina Court in Columbia | — | Executed | DMS Contracting, Inc. $1,215,909 · | ||
| Aug 4, 2023 | 97811 | MadisonDistrict 8 | Construction of a Shared-Use Path along Erwin Plegge Boulevard, from Old Bethalto Road to Ashbrook Street in Bethalto. | — | Executed | Baxmeyer Construction, Inc. $907,108 · | ||
| Aug 4, 2023 | 99704 | WilliamsonDistrict 9 | Pedestrian safety enhancements, lighting, landscaping, and resurfacing around the town square and along portions of Main street in Marion. | — | Executed | Samron Midwest Contracting, Inc. $3,131,313 · | ||
| Aug 4, 2023 | 99706 | GallatinDistrict 9 | Replace the bridge carrying Shawnee - New Haven Road over South Fork Cypress Creek, 3 miles north of IL 13 | — | Executed | Dees, Inc. $704,636 · | ||
| Sep 22, 2023 | 46618 | VariousDistrict 7 | Pavement marking rehabilitation throughout District 7. | — | Executed | Varsity Striping & Construction Co. $743,370 · | ||
| Sep 22, 2023 | 46632 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors on F This work consists of removing and replacing raised reflective pavement markers and reflectors on F.A.I Route 80 (1-80) in Bureau, LaSalle and_Grundy Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $519,668 · | ||
| Sep 22, 2023 | 46633 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectorsin Livingston, Grundy, Kankakee, Iroqu This work consists of removing and replacing raised reflective pavement markers and reflectorsin Livingston, Grundy, Kankakee, Iroquois and Ford Counties. | — | Executed | Precision Pavement Markings Inc. $309,545 · | ||
| Sep 22, 2023 | 46634 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors in Livingston, Iroquois, and Ford Cou This work consists of removing and replacing raised reflective pavement markers and reflectors in Livingston, Iroquois, and Ford Counties. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $289,980 · | ||
| Sep 22, 2023 | 61J66 | DuPageDistrict 1 | Construction of a Shared-Use Path on 22nd Street from Finley Road to Meyers Road in Lombard. | — | Executed | Triggi Construction, Inc. $1,298,699 · | ||
| Sep 22, 2023 | 61J68 | McHenryDistrict 1 | HMA Resurfacing with culvert replacement, and aggregate shoulders on Riverside Drive from Johnburtg Road to Running Brook Farm Boulevard in Johnsburg. | — | Rejected | Alliance Contractors, Inc. $2,849,871 · | ||
| Sep 22, 2023 | 61J72 | CookDistrict 1 | Resurfacing Edgewater Drive from Pulaski Road to Village Drive, and Village Drive from Edgewater to Briar Lane in Hazel Crest. | — | Executed | Iroquois Paving Corporation $417,548 · | ||
| Sep 22, 2023 | 61J75 | DuPageDistrict 1 | Resurfacing Conde Street from Joliet Street to IL 59 in West Chicago. | — | Executed | A Lamp Concrete Contractors, Inc. $679,999 · | ||
| Sep 22, 2023 | 61J76 | DuPageDistrict 1 | Resurfacing Lorraine Road from Hill Avenue to IL 38 in Wheaton. | — | Executed | A Lamp Concrete Contractors, Inc. $384,568 · | ||
| Sep 22, 2023 | 62D82 | CookDistrict 1 | (3.47-Mile) I-94 at Lake Ave, Tower Rd, Dundee Rd interchanges. Replace light towers with poles, LED luminaries, foundations, conduits/cables, restorations. Located in Villages of Northbrook, Northfield and Wilmette. | — | Executed | John Burns Construction Company $3,216,705 · | ||
| Sep 22, 2023 | 62P11 | WillDistrict 1 | Mechanical repairs including refurbishing operating machinery, replacing trunnion bearing bolts, and the clean (395-Ft) Bridge repair of IL 53 (Ruby St) over Desplains River consist of mechanical repairs including refurbishing operating machinery, replacing trunnion bearing bolts, and the cleaning and painting of all span drive and trunnion assemblies in the City of Joliet, Will County. | — | Executed | GRANITE CONSTRUCTION COMPANY $2,743,965 · | ||
| Sep 22, 2023 | 62R27 | WillDistrict 1 | The reconstruction of I-80 mainline pavement from west of Houbolt Road to west of Joliet Junction Trail The project consists of the reconstruction of I-80 mainline pavement from west of Houbolt Road to west of Joliet Junction Trail. The work also includes the superstructure replacement and widening of the EB/WB I-80 bridges over Houbolt Road and partial reconstruction of the entrance and exit ramps at the I-80 and Houbolt Road interchange. Other work includes drainage system improvements, signing, lighting, traffic signals, ITS improvements, and noise abatement walls The project is located in the | — | Executed | D. Construction, Inc. $78,889,799 · | ||
| Sep 22, 2023 | 62R29 | WillDistrict 1 | 14,465 feet (2.74 mile) project which includes widening and reconstruction of mainline I-80 from Rowell Ave. to Gougar Rd., reconstruction and traffic signal modernization at Briggs St ramps, lighting, noise abatement walls, and ITS in Joliet Township and the Village of New Lenox in Will County. | — | Executed | D. Construction, Inc. $79,968,962 · | ||
| Sep 22, 2023 | 62T08 | LakeDistrict 1 | This is a Bridge Preservation Project: bridge repair, joint replace/ repair and deck overlay on bridge carrying IL 60 (Townline Rd) over Des Plaines River. Located in the Villages of Vernon Hills and Mettawa in Lake County. The gross and net length is 0.39-miles (2,043-feet). | — | Executed | Martam Construction Incorporated $886,316 · | ||
| Sep 22, 2023 | 62T09 | WillDistrict 1 | Bridge deck and approach slab repair, bridge deck scarification, placement of bridge deck latex concrete overl Length: 1106.9 ft (0.21 mi); Bridge Preservation Project: consist of bridge deck and approach slab repair, bridge deck scarification, placement of bridge deck latex concrete overlay, construction of hot-mix asphalt butt joint, hot- mix asphalt overlay of approach slab, curb and gutter replacement, corrugated median removal, hot-mix asphalt median pavement construction, sidewalk replacement of SN 099-0284 carrying IL 59 over DuPage River in Will County. | — | Executed | D. Construction, Inc. $1,148,722 · | ||
| Sep 22, 2023 | 62T25 | CookDistrict 1 | Bridge deck overlay and joint repairs of IL 58 (Dempster Street) at I-94 (Edens Expressway) in the Village of The proposed improvement consists of bridge deck overlay and joint repairs of IL 58 (Dempster Street) at I-94 (Edens Expressway) in the Village of Morton Grove and the Village of Skokie, Cook County. Total gross length= 1539 FT and net length= 361 FT. | — | Executed | Lorig Construction Company $1,452,432 · | ||
| Sep 22, 2023 | 62T64 | McHenryDistrict 1 | Crack routing, crack filling urethane PMK (7.92-Mile) FAP 324: US 14 / Division Street): Crack and Joint Sealing from North of IL 23 to Brink Street. Type of work consists of crack routing, crack filling urethane PMK. Net Length = 41,805-feet (7.92-miles) located within the City of Harvard and unincorporated McHenry County. | — | Executed | Peter Baker & Son Co. $4,282,507 · | ||
| Sep 22, 2023 | 62T71 | LakeDistrict 1 | (3.35-Mile) SMART Overlay and ADA improvements, accessible pedestrian signal additions on IL 43 (Waukegan Rd), from South of IL 22 (Half Day Road) to Lake Cook Road, located in the Villages of Deerfield and Bannockburn in Lake County. | — | Executed | Peter Baker & Son Co. $3,787,665 · | ||
| Sep 22, 2023 | 62U22 | McHenryDistrict 1 | The complete removal of all buildings at 4 different sites This is a building demolition and site clean-up project and the work to be performed consists of the complete removal of all buildings at 4 different sites. There are (2) two single family residences, (1) one industrial building and (1) one car-wash. The buildings are located along IL Route 47 and IL Route 31 within McHenry County. | — | Executed | Lima Contractors $289,250 · | ||
| Sep 22, 2023 | 62U32 | CookWillDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED of LED signal heads, traffic signal posts, installation of accessible pedestrian signals in various locations in District 1. | — | Executed | Hecker and Company, Inc. $2,055,975 · | ||
| Sep 22, 2023 | 62U36 | CookDistrict 1 | This is a bridge painting and lighting replacement of various structures along I-90/94 Westbound at Grand Ave, At Green St, at Hubbard St, at Kinzie St, and at Wayman St. Improvement is located in the City of Chicago in Cook County. Gross Length= Net Length= 2,112 Ft (0.40 Mile). | — | Executed | Capital Industrial Services, LLC $16,333,000 · | ||
| Sep 22, 2023 | 62U48 | CookDistrict 1 | I-57 from US30 to 183rd St., 3.53 miles length, replace light towers with poles LED luminaire upgrade, metal foundations, conduit and cables,. Located in Matteson and Country Club Hills. | — | Executed | John Burns Construction Company $3,452,919 · | ||
| Sep 22, 2023 | 62U61 | VariousDistrict 1 | Tree removal on various State routes within various counties in District One The improvement consists of tree removal on various State routes within various counties in District One. | — | Executed | Homer Tree Service, Inc. $547,456 · | ||
| Sep 22, 2023 | 62U92 | VariousDistrict 1 | Installing guardrail at new locations and repairing existing damaged guardrail and traffic barrier terminals o The work to be completed under this contract consists of installing guardrail at new locations and repairing existing damaged guardrail and traffic barrier terminals on a work order basis throughout District 1. | — | Executed | Industrial Fence, Inc. $2,509,742 · | ||
| Sep 22, 2023 | 62V15 | VariousDistrict 1 | Repairing and installing landscape materials and features along expressway and arterial routes of District One The roadside development work to be completed consists of repairing and installing landscape materials and features along expressway and arterial routes of District One. | — | Rejected | McGinty Bros., Inc. $606,706 · | ||
| Sep 22, 2023 | 62V19 | VariousDistrict 1 | Dead tree removal work along expressway and arterial routes of District One. This work includes pruning and/or removing dead, dying, diseased, and hazardous trees and limbs. | — | Executed | McGinty Bros., Inc. $1,796,484 · | ||
| Sep 22, 2023 | 64S50 | Rock IslandDistrict 2 | Bridge deck repairs carrying SN 081-0011 over Mississippi River. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $953,837 · | ||
| Sep 22, 2023 | 64S56 | Rock IslandDistrict 2 | 1.2 miles of pavement patching. U.S. 67: Airport Rd to 3rd Ave in Milan and Airport Rd: I-280 ramp to US 67. | — | Executed | G. M. Sipes Construction, Inc. $378,959 · | ||
| Sep 22, 2023 | 64S60 | Rock IslandDistrict 2 | 1 mile of pavement patching from 52nd St. to 64th St. | — | Executed | G. M. Sipes Construction, Inc. $357,679 · | ||
| Sep 22, 2023 | 64S83 | VariousDistrict 2 | Upgrade and installation of horizontal alignment signing along curves at various locations. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $429,400 · | ||
| Sep 22, 2023 | 66N33 | FordDistrict 3 | This project consists of 3.2 miles of shoulder widening and rumble strip installation on IL 9 from 160 ft east of Fall St in Paxton to just west of N 2300 E Rd in Ford County. | — | Executed | Iroquois Paving Corporation $1,340,112 · | ||
| Sep 22, 2023 | 68804 | MercerDistrict 4 | Bridge replacement: S.N. 066-0003(Exist.), S.N. 066-0019(new),carrying US Route 67 over Pope Creek, 3.0 miles South of Viola in Mercer County. | — | Executed | Brandt Construction Co. $2,820,000 · | ||
| Sep 22, 2023 | 68886 | PeoriaDistrict 4 | Replace structure 072-0126 carrying Airport Road over 1-474, 0.5 miles NE of the Greater Peoria Airport. | — | Executed | Stark Excavating, Inc. $9,467,746 · | ||
| Sep 22, 2023 | 68G66 | KnoxDistrict 4 | Repairs 2 box culverts (headwalls, wingwalls, guardrail) 0.49 mi. E of Warren Co. Line and 0.15 mi. E of 325th St. | — | Executed | Otto Baum Company, Inc. $964,700 · | ||
| Sep 22, 2023 | 68H73 | VariousDistrict 4 | Section D4 Interstate Delineators 2024; Replace flexible delineators along interstates at various locations in Woodford, Tazewell, Peoria and Knox Counties. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $296,884 · | ||
| Sep 22, 2023 | 68H74 | PutnamTazewellDistrict 4 | Remove and replace guardrail and end sections. | — | Executed | Midwest Fence Corporation $878,935 · | ||
| Sep 22, 2023 | 68H75 | TazewellDistrict 4 | Building demolition at three locations between Cedar Street and Ravine Street in East Peoria, Tazewell County. 607 S. Main St. (Parcel #4ABL008), 627 S. Main St. (Parcel #4ABL005) and 711 S. Main St. (Parcel #4ABL002). | — | Executed | JIMAX Landscape LLC $80,207 · | ||
| Sep 22, 2023 | 68H76 | PeoriaDistrict 4 | Replacement of pedestrian push buttons with APS push buttons at various locations in Peoria County. | — | Executed | Laser Electric, Inc. $1,708,934 · | ||
| Sep 22, 2023 | 70G26 | VariousDistrict 5 | Lighting upgrades at 14 rural intersections throughout District 5. | — | Executed | Gerstner Electric, Inc. $1,362,873 · | ||
| Sep 22, 2023 | 70G86 | EdgarDistrict 5 | 3.06 miles of patching on Elliott St in Paris; at various locations between 2100th Rd and 1800th Rd South of Chrisman. | — | Executed | Beniach Construction Co., Inc. $202,417 · | ||
| Sep 22, 2023 | 72716 | HancockDistrict 6 | Smart overlay on IL 9 from 0.10 miles south to 0.10 miles north of the Toledo and Peoria West Railroad viaduct. | — | Executed | W. L. Miller Company $149,632 · | ||
| Sep 22, 2023 | 72718 | MacoupinSangamonDistrict 6 | Bituminous surface treatment at the Carlinville and Springfield Maintenance Yards. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,132,809 · | ||
| Sep 22, 2023 | 74359 | LawrenceDistrict 7 | Bridge replacement of SN 051-0007 carrying IL 1 over Indian Creek, 2 miles south of Lawrenceville. | — | Executed | Sangamo Construction Company $3,629,755 · | ||
| Sep 22, 2023 | 74828 | MaconDistrict 7 | Overlay with ADA, signal and intersection improvements on US 51 from 0.1 miles miles north of Forsyth Road to I-72 in Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $13,973,388 · | ||
| Sep 22, 2023 | 74978 | ClayDistrict 7 | 0.8 miles of HMA resurfacing and ADA work on Main Street in Clay City from N 1st Street to US 50. | — | Executed | Howell Paving, Inc. $1,266,058 · | ||
| Sep 22, 2023 | 74C27 | CumberlandDistrict 7 | Tree removal on I-70 eastbound from station 60+90 to 653+57 and on US 40 from County Road 700E to County Road 2275E. | — | Executed | Thor General Contracting LLC $241,020 · | ||
| Sep 22, 2023 | 74C38 | RichlandDistrict 7 | Emulsion tank installation at the Olney Maintenance Yard. | — | Active | Samron Midwest Contracting, Inc. $222,222 · | ||
| Sep 22, 2023 | 76J97 | WashingtonDistrict 8 | 0.29 miles; Bridge replacement over Lunte Creek, 3.6 miles west of IL 127. | — | Executed | Plocher Construction Company, Inc. $1,919,510 · | ||
| Sep 22, 2023 | 76M43 | JerseyDistrict 8 | Culvert repairs on SN 042-2417 carrying Old US 67 over a Tributary to Little Piasa Creek, 0.1 miles north of New Delhi Road. | — | Executed | Stutz Excavating, Inc. $574,652 · | ||
| Sep 22, 2023 | 76P57 | MonroeDistrict 8 | 1.6 miles of resurfacing on Market Street / IL 156 in Waterloo from 0.1 miles north of Plaza Drive to IL 156 South Junction. | — | Executed | Christ Bros. Asphalt, Inc. $2,271,959 · | ||
| Sep 22, 2023 | 76R55 | VariousDistrict 8 | Repair and maintenance of electrical equipment at various pump stations at various locations in District 8. | — | Executed | Electrico, Inc. $169,753 · | ||
| Sep 22, 2023 | 76R56 | CalhounDistrict 8 | Repair and maintenance of electrical equipment at the Joe Page Bridge in Hardin (SN 031-0001). | — | Active | |||
| Sep 22, 2023 | 76R57 | MadisonSt. ClairDistrict 8 | Well treatment at various locations in East St. Louis and Venice. | — | Executed | Layne Christensen Company $856,535 · | ||
| Sep 22, 2023 | 76R64 | ClintonDistrict 8 | Bridge joint replacement and repair on SN 014-0015 carrying IL 127 over NS Railroad, 0.2 miles north of IL 161. | — | Executed | Keeley & Sons, Inc. $429,291 · | ||
| Sep 22, 2023 | 78924 | MassacDistrict 9 | Resurfacing on US 45 from Belgrade Road to the Ohio River bridge in Brookport. Also includes ADA improvements on US 45 at 2nd Street and US 45 at 3rd Street. | — | Executed | Samron Midwest Contracting, Inc. $1,930,021 · | ||
| Sep 22, 2023 | 78928 | PerryDistrict 9 | 2.6 miles of patching, HMA surface removal, resurfacing and shoulder work on US 51 from a butt joint near Raven Road, north of Tamaroa, to a butt joint near the Washington County line. | — | Executed | Samron Midwest Contracting, Inc. $1,876,543 · | ||
| Sep 22, 2023 | 78970 | UnionDistrict 9 | 2.6 miles of HMA surface removal and resurfacing on IL 146 / IL 127 from the Jonesboro Square to the IL 146 and IL 127 intersection. | — | Executed | E. T. Simonds Construction Company $1,974,043 · | ||
| Sep 22, 2023 | 78A03 | VariousDistrict 9 | Bridge deck sealing of various structures in Franklin, Hamilton and White Counties. | — | Executed | All States Painting, Inc. $98,240 · | ||
| Sep 22, 2023 | 89767 | PeoriaDistrict 4 | Conversion of Jefferson Avenue and Adams Street to Two-Way Traffic, from Walnumt Street to Fayette Street in Peoria. | — | Executed | Otto Baum Company, Inc. $14,887,600 · | ||
| Sep 22, 2023 | 91635 | ChampaignDistrict 5 | Shoulder widening, grading and shaping ditches, Cold-in-place recycling, HMA resurfacing, HMA and aggregate shoulders, extend box culverts, pipe culverts, and pavement markings and signing. | — | Executed | Open Road Paving Company LLC $8,174,434 · | ||
| Sep 22, 2023 | 95923 | WayneDistrict 7 | Replace existing structure with a single-cell concrete box culvert to carry 1550 N. Road over Skillet Fork Tributary. | — | Executed | Samron Midwest Contracting, Inc. $297,705 · | ||
| Sep 22, 2023 | 95942 | MoultrieDistrict 7 | Replace existing structure with a single span prestressed precast concrete deck beam bridge to carry 1400 North Road over Wilborn Creek. | — | Executed | C-Hill Civil Contractors, Inc. $477,777 · | ||
| Sep 22, 2023 | 99709 | JacksonDistrict 9 | HMA resurfacing and shoulders on Royalton Road from US 51 to the Franklin County Line. | — | Executed | Samron Midwest Contracting, Inc. $1,048,899 · | ||
| Sep 22, 2023 | 99714 | JeffersonDistrict 9 | HMA overlay with HMA and Aggregate Shoulders, drainage improvements and signage on Richview Road from East Pleasant Road to North Shiloh Drive. | — | Executed | E. T. Simonds Construction Company $3,038,200 · | ||
| Nov 17, 2023 | 46629 | MadisonSt. ClairDistrict 8 | Installation of new ground-mounted signs on various routes in Madison and St. Clair Counties. | — | Executed | Kujo, Inc. $358,351 · | ||
| Nov 17, 2023 | 46635 | VariousDistrict 3 | Repairing various widths of pavement marking including, lines, letters, numbers, and symbols on various roads throughout District 3. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,782,850 · | ||
| Nov 17, 2023 | 46636 | VariousDistrict 2 | Placing various widths of Preformed Plastic and Modified_Urethane pavement marking lines, letters and symbols within the limits specified on each individual work order. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $3,497,990 · | ||
| Nov 17, 2023 | 46637 | VariousDistrict 0 | Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in regions 2 adn 3. | — | Executed | Kujo, Inc. $2,875,921 · | ||
| Nov 17, 2023 | 61H25 | WillDistrict 1 | Remove existing dual metal pipe culverts and replace with double-barrel box culvert to carry Indian Boundary Road over Spring Hole Creek in Plainfield. | — | Executed | D. Construction, Inc. $1,850,558 · | ||
| Nov 17, 2023 | 61J45 | CookDistrict 1 | Pavement widening and traffic signal modifications on 71st Street at Harlem Avenue in Bedford Park. | — | Executed | Alliance Contractors, Inc. $1,423,429 · | ||
| Nov 17, 2023 | 61J69 | KaneDistrict 1 | Shoulder widening, rumble strips, ditch reshaping and pavement markings on Plank Road from Engel Road to Waughon Road. | — | Executed | Curran Contracting Company $1,684,391 · | ||
| Nov 17, 2023 | 61J77 | DuPageDistrict 1 | Resurfacing Edgewater Drive from Bloomingdale Road to Glen Ellyn Road, and Lakeview Lane from Edgewater Drive to South Circle Avenue in Bloomingdale. | — | Executed | Builders Paving, LLC $1,498,000 · | ||
| Nov 17, 2023 | 61J78 | WillDistrict 1 | Resurfacing 191st Street from Wolf Road to LaGrange Road in Mokena. | — | Executed | Iroquois Paving Corporation $2,384,949 · | ||
| Nov 17, 2023 | 61J79 | McHenryDistrict 1 | Removal and replacement of strutures carrying Milstream Road over the Kishwaukee River and the South Branch of the Kishwaukee River. The proposed structures are three span, 27" PPC IL Beams with an 8" concrete deck on solid wall piers and integral abutments. Also included will be HMA resurfacing, HMA shoulders, guardrail, driveways, pavment markings, landscaping and other necessary work. | — | Executed | Dunnet Bay Construction Company $9,617,881 · | ||
| Nov 17, 2023 | 61J80 | WillDistrict 1 | HMA resurfacing with patching, sidewalks, ADA improvements, multi-use path construction, traffic signal modifications, lighting, drainage adjustments, pavement markings, and other necessary work on 135th Street from Weber Road to IL 53 in the Village of Romeoville. | — | Executed | K-Five Construction Corporation $2,885,523 · | ||
| Nov 17, 2023 | 61J81 | CookDistrict 1 | HMA resurfacing with patching, driveway replacement, sidewalks, drainage adjustments, and pavement markings on Kostner Avenue from 123rd Street to 127th Street in Alsip. | — | Executed | Iroquois Paving Corporation $448,478 · | ||
| Nov 17, 2023 | 61J83 | CookDistrict 1 | Full depth HMA pavment with curb and gutter, drainage improvements, water mains , sidewalks and pavement markings on Balmoral Avenue from Roosevelt Road to Canterbury Street in Westchester. | — | Executed | PirTano Holdings, LLC $3,253,659 · | ||
| Nov 17, 2023 | 61J85 | DuPageDistrict 1 | Resurfacing Fullerton Avenue from Schmale Road to Bloomingdale Road in Glendale Heights. | — | Executed | K-Five Construction Corporation $1,717,494 · | ||
| Nov 17, 2023 | 61J88 | CookDistrict 1 | Pavement widening and resurfacing, construction of a bike path, bridge modifications and traffic signal modernization on Beverly Road from Prairie Stone Parkway to Beacon Pointe Drive in Hoffman Estates. | — | Executed | Plote Construction, Inc. $3,491,000 · | ||
| Nov 17, 2023 | 61J89 | CookDistrict 1 | Reconstruction of Dubois Boulevard from Ogden Avenue to Burlington Avenue, and the reconstruction of Burlington Avenue from Dubois Boulevard to Grove Ave. in Brookfield. | — | Executed | Lima Contractors $4,266,599 · | ||
| Nov 17, 2023 | 61J92 | KaneDistrict 1 | Improve the intersection of Farnsworth Avenue at Marshal Boulevard and at the Illinois Prairie Path intersection in Aurora. | — | Executed | Builders Paving, LLC $381,189 · | ||
| Nov 17, 2023 | 62H25 | McHenryDistrict 1 | Culvert removal and replacement of the structure located on IL 23 over Drainage Ditch (0 The proposed improvement consists of culvert removal and replacement of the structure located on IL 23 over Drainage Ditch (0.1 Mile N of IL 176) in the City of Marengo in McHenry County. Total gross length and net length = 164 FT ( 0.031 MI) | — | Executed | Herlihy Mid-Continent Company $1,178,350 · | ||
| Nov 17, 2023 | 62H63 | WillDistrict 1 | Parking lot and drainage improvement. Full depth removal and replacement of existing pavement. Location: I-55 Maintenance Yard (151 E South Frontage Rd, Bolingbrook) in Will County. | — | Executed | P. T. Ferro Construction Co. $492,298 · | ||
| Nov 17, 2023 | 62K70 | CookDistrict 1 | (0.2-Mile) Bridge Replacement and Roadway Improvement. The work includes of replacing the bridge that carries FAU 1332 (Oakton Street) over FAI 94 (Edens Expressway) in Cook County. | — | Executed | Lorig Construction Company $11,757,321 · | ||
| Nov 17, 2023 | 62N37 | CookDistrict 1 | Traffic signal modernization and ADA ramp improvements at the intersection of Touhy Avenue and Kostner Avenue The proposed improvement consists of traffic signal modernization and ADA ramp improvements at the intersection of Touhy Avenue and Kostner Avenue in the Village of Lincolnwood, Cook County. Total gross length= 526 FT (0.10 Ml) and net length = 526 FT (0.10 Ml). | — | Executed | Home Towne Electric, Inc. $814,156 · | ||
| Nov 17, 2023 | 62N96 | CookDistrict 1 | This is a Bridge Preservation Project: bridge repair, joint replace/ repair and deck overlay on bridges carrying I-80 over Cicero Ave, 175th St and Kedzie Ave. Located in the Villages of Country Club Hills and Hazel Crest in Cook County. The gross and net length of the project is 2.33-miles (12,308-feet) and 0.35- miles (1,852-feet) respectively. | — | Executed | D. Construction, Inc. $7,092,387 · | ||
| Nov 17, 2023 | 62P09 | LakeDistrict 1 | Bridge deck replacement of the structures carrying IL 120 over Des Plaines River The proposed improvement consists of bridge deck replacement of the structures carrying IL 120 over Des Plaines River. Also includes bridge overlay and substructure repairs of the structures carrying Belvidere Road Tributary over IL 120 and IL 120 NW ramp at IL 21. It also includes minor substructure repair and riprap placement at IL 21 over Belvidere Road tributary. The project is in the Village of Gurnee in Lake County. Total gross length and net length 1033 (0.2 Mile) and 625 Feet (0.12 Mile) | — | Executed | Dunnet Bay Construction Company $5,544,296 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.