FAP 0338 22 BJ
- Let date
- Friday, September 22, 2023
- Contract
- 62T09 · job page
- District
- District 1
- County
- Will
- Highway
- Limits
- Length: 1106.9 ft (0.21 mi); Bridge Preservation Project: consist of bridge deck and approach slab repair, bridge deck scarification, placement of bridge deck latex concrete overlay, construction of hot-mix asphalt butt joint, hot- mix asphalt overlay of approach slab, curb and gutter replacement, corrugated median removal, hot-mix asphalt median pavement construction, sidewalk replacement of SN 099-0284 carrying IL 59 over DuPage River in Will County.
- Classification
- Bridge deck and approach slab repair, bridge deck scarification, placement of bridge deck latex concrete overl
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $1,148,722 | ||
| 2 | Martam Construction Incorporated | $1,155,907 | +0.6% | |
| 3 | Areatha Construction Co., Inc. | $1,265,860 | +10.2% | |
| 4 | Herlihy Mid-Continent Company | $1,293,967 | +12.6% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 Martam Construc… | #3 Areatha Constru… | #4 Herlihy Mid-Con… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0322102 | TEMP SIDEWALK RAMP | 1 | EACH | $4,000.00 | $900.00 | $1,829.70 | $2,000.00 | |
| 2 | X0327032 | TEMP VIDEO DETECTION | 1 | EACH | $27,500.00 | $25,000.00 | $25,000.00 | $25,000.00 | |
| 3 | X2010400 | STUMP REMOVAL ONLY | 8 | UNIT | $275.00 | $200.00 | $323.90 | $10.00 | |
| 4 | X5060700 | CLEAN/PAINT BEARINGS | 60 | EACH | $880.00 | $880.00 | $807.65 | $1,125.00 | |
| 5 | X6060500 | CORRUGATED MED REM | 1,796 | SQ FT | $3.00 | $6.00 | $25.05 | $12.50 | |
| 6 | X6700407 | ENGR FLD OFF A D1 | 12 | CAL MO | $5,000.00 | $280.00 | $2,500.00 | $3,630.00 | |
| 7 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $40,500.00 | $117,500.00 | $27,500.00 | $87,600.00 | |
| 8 | X7010238 | CHANGE MESSAGE SN SPL | 20 | CAL MO | $1,500.00 | $900.00 | $875.00 | $875.00 | |
| 9 | X7830050 | RAISD REF PM REFL REM | 84 | EACH | $10.00 | $10.00 | $15.00 | $12.00 | |
| 10 | X7830052 | RAISD REF PM REFL REPLMNT | 84 | EACH | $22.00 | $15.00 | $14.00 | $14.00 | |
| 11 | Z0001700 | APPROACH SL REP (FD) | 69 | SQ YD | $800.00 | $850.00 | $990.25 | $1,191.00 | |
| 12 | Z0001800 | APPROACH SL REP (PD) | 45 | SQ YD | $750.00 | $450.00 | $559.80 | $1,370.00 | |
| 13 | Z0001903 | STRUCT STEEL REMOV | 80 | POUND | $55.00 | $28.00 | $56.75 | $50.00 | |
| 14 | Z0006014 | BR DK LTX C OLY 2 1/2 | 1,770 | SQ YD | $120.00 | $112.00 | $131.70 | $120.00 | |
| 15 | Z0012130 | BR DECK SCAR 3/4 | 1,770 | SQ YD | $45.00 | $45.00 | $60.35 | $54.09 | |
| 16 | Z0012754 | STR REP CON DP = < 5 | 130 | SQ FT | $180.00 | $280.00 | $174.15 | $250.00 | |
| 17 | Z0012755 | STR REP CON DP OVER 5 | 5 | SQ FT | $600.00 | $298.00 | $435.90 | $300.00 | |
| 18 | Z0015500 | DEBRIS REMOVAL | 1 | L SUM | $5,000.00 | $6,000.00 | $16,059.40 | $9,500.00 | |
| 19 | Z0016001 | DECK SLAB REP (FD-T1) | 5 | SQ YD | $1,500.00 | $3,200.00 | $1,725.25 | $1,686.94 | |
| 20 | Z0030850 | TEMP INFO SIGNING | 78 | SQ FT | $25.00 | $22.00 | $20.00 | $20.00 | |
| 21 | Z0062458 | TEMP PAVEMT VAR DEPTH | 4 | TON | $1,000.00 | $800.00 | $899.00 | $900.00 | |
| 22 | Z0073510 | TEMP TR SIGNAL TIMING | 1 | EACH | $1,210.00 | $5,000.00 | $5,000.00 | $5,000.00 | |
| 23 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | $0.8000 | |
| 24 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | $15.00 | |
| 25 | 20200100 | EARTH EXCAVATION | 30 | CU YD | $100.00 | $115.00 | $52.40 | $71.00 | |
| 26 | 20201200 | REM & DISP UNS MATL | 2 | CU YD | $500.00 | $285.00 | $196.40 | $160.00 | |
| 27 | 28000510 | INLET FILTERS | 8 | EACH | $308.00 | $200.00 | $280.00 | $200.00 | |
| 28 | 30300112 | AGG SUBGRADE IMPR 12 | 9 | SQ YD | $100.00 | $126.00 | $135.75 | $95.00 | |
| 29 | 31101200 | SUB GRAN MAT B 4 | 60 | SQ YD | $20.00 | $12.00 | $38.10 | $25.00 | |
| 30 | 40600290 | BIT MATLS TACK CT | 836 | POUND | $0.0100 | $1.00 | $0.0100 | $0.0100 | |
| 31 | 40600982 | HMA SURF REM BUTT JT | 249 | SQ YD | $0.0100 | $30.00 | $27.00 | $27.00 | |
| 32 | 40600985 | PCC SURF REM BUTT JT | 249 | SQ YD | $0.0100 | $30.00 | $27.00 | $27.00 | |
| 33 | 40602985 | HMA BC IL-9.5 N70 | 20 | TON | $110.00 | $244.00 | $222.00 | $222.00 | |
| 34 | 40604062 | HMA SC IL-9.5 D N70 | 166 | TON | $110.00 | $244.00 | $222.00 | $222.00 | |
| 35 | 42001300 | PROTECTIVE COAT | 72 | SQ YD | $3.00 | $5.00 | $4.20 | $4.00 | |
| 36 | 42400200 | PC CONC SIDEWALK 5 | 537.5 | SQ FT | $10.00 | $15.00 | $18.05 | $15.00 | |
| 37 | 44000500 | COMB CURB GUTTER REM | 180 | FOOT | $10.00 | $10.00 | $21.70 | $8.50 | |
| 38 | 44000600 | SIDEWALK REM | 537.5 | SQ FT | $5.00 | $3.00 | $9.15 | $5.00 | |
| 39 | 50102400 | CONC REM | 24.6 | CU YD | $2,000.00 | $1,800.00 | $1,670.80 | $2,500.00 | |
| 40 | 50300255 | CONC SUP-STR | 27 | CU YD | $2,500.00 | $2,100.00 | $2,545.30 | $1,950.00 | |
| 41 | 50300260 | BR DECK GROOVING | 1,748 | SQ YD | $8.25 | $7.50 | $6.90 | $8.00 | |
| 42 | 50300300 | PROTECTIVE COAT | 1,825 | SQ YD | $1.50 | $1.00 | $3.25 | $1.50 | |
| 43 | 50500405 | F & E STRUCT STEEL | 130 | POUND | $75.00 | $117.00 | $31.60 | $82.63 | |
| 44 | 50800205 | REINF BARS, EPOXY CTD | 3,490 | POUND | $2.50 | $2.00 | $2.80 | $3.53 | |
| 45 | 50800515 | BAR SPLICERS | 12 | EACH | $50.00 | $58.00 | $104.45 | $86.50 | |
| 46 | 52000110 | PREF JT STRIP SEAL | 158 | FOOT | $235.00 | $225.00 | $354.75 | $250.00 | |
| 47 | 52100520 | ANCHOR BOLTS 1 | 6 | EACH | $100.00 | $100.00 | $275.10 | $207.00 | |
| 48 | 60250200 | CB ADJUST | 6 | EACH | $600.00 | $600.00 | $850.00 | $500.00 | |
| 49 | 60255500 | MAN ADJUST | 2 | EACH | $750.00 | $600.00 | $850.00 | $500.00 | |
| 50 | 60605000 | COMB CC&G TB6.24 | 158.5 | FOOT | $35.00 | $59.00 | $126.40 | $80.00 | |
| 51 | 60611811 | COMB CC&G TM MOD | 21 | FOOT | $50.00 | $65.00 | $267.55 | $174.00 | |
| 52 | 63200310 | GUARDRAIL REMOV | 37.5 | FOOT | $25.25 | $30.00 | $22.95 | $22.95 | |
| 53 | 64300240 | IMP ATTEN FRD NAR TL2 | 1 | EACH | $16,974.10 | $17,000.00 | $15,431.00 | $15,431.00 | |
| 54 | 66900200 | NON SPL WASTE DISPOSL | 30 | CU YD | $90.00 | $99.00 | $131.00 | $70.50 | |
| 55 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,815.00 | $1,700.00 | $1,600.00 | $1,600.00 | |
| 56 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,475.00 | $3,700.00 | $3,400.00 | $3,400.00 | |
| 57 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,475.00 | $600.00 | $500.00 | $500.00 | |
| 58 | 66901006 | REG SUB MON | 5 | CAL DA | $990.00 | $750.00 | $675.00 | $675.00 | |
| 59 | 67100100 | MOBILIZATION | 1 | L SUM | $40,000.00 | $66,000.00 | $75,945.00 | $77,000.47 | |
| 60 | 70300150 | SHRT TRM PAVT MK REM | 7,488 | SQ FT | $0.5000 | $0.5000 | $0.3500 | $0.3500 | |
| 61 | 70307100 | TEMP PVT MK LTR & SYM T4 TAPE | 437 | SQ FT | $10.00 | $7.00 | $6.00 | $6.00 | |
| 62 | 70307120 | TEMP PVT MK L4 T4 TAPE | 11,608 | FOOT | $4.00 | $1.40 | $1.25 | $1.24 | |
| 63 | 70307130 | TEMP PVT MK L6 T4 TAPE | 2,189 | FOOT | $6.00 | $1.80 | $1.70 | $1.69 | |
| 64 | 70307210 | TEMP PVT MK L24 T4 TAPE | 259 | FOOT | $20.00 | $7.00 | $6.00 | $6.00 | |
| 65 | 70400100 | TEMP CONC BARRIER | 625 | FOOT | $25.00 | $38.00 | $60.90 | $15.00 | |
| 66 | 70400200 | REL TEMP CONC BARRIER | 625 | FOOT | $12.00 | $10.00 | $9.40 | $10.00 | |
| 67 | 70600241 | IMP ATTN TEMP NRN TL2 | 2 | EACH | $6,000.00 | $4,500.00 | $4,200.00 | $4,200.00 | |
| 68 | 70600341 | IMP ATTN REL NRN TL2 | 3 | EACH | $1,500.00 | $1,400.00 | $1,200.00 | $1,200.00 | |
| 69 | 72400600 | RELOC SIN PAN ASSY TB | 1 | EACH | $137.50 | $1,000.00 | $900.00 | $900.00 | |
| 70 | 78000100 | THPL PVT MK LTR & SYM | 73 | SQ FT | $16.50 | $7.00 | $6.00 | $6.00 | |
| 71 | 78000200 | THPL PVT MK LINE 4 | 4,491 | FOOT | $1.27 | $1.30 | $1.20 | $1.20 | |
| 72 | 78000400 | THPL PVT MK LINE 6 | 652 | FOOT | $2.04 | $1.60 | $1.50 | $1.50 | |
| 73 | 78000600 | THPL PVT MK LINE 12 | 18 | FOOT | $3.25 | $3.30 | $3.00 | $3.00 | |
| 74 | 78000650 | THPL PVT MK LINE 24 | 83 | FOOT | $16.50 | $6.60 | $6.00 | $6.00 | |
| 75 | 78004635 | PREF PL PM TD STD L 7 | 402 | FOOT | $12.16 | $16.00 | $15.00 | $15.00 | |
| 76 | 78009004 | MOD URETH PM LINE 4 | 1,683 | FOOT | $2.04 | $2.80 | $2.55 | $2.55 | |
| 77 | 78009006 | MOD URETH PM LINE 6 | 204 | FOOT | $4.35 | $4.40 | $4.00 | $4.00 | |
| 78 | 78009012 | MOD URETH PM LINE 12 | 102 | FOOT | $8.42 | $8.80 | $8.00 | $8.00 | |
| 79 | 78009024 | MOD URETH PM LINE 24 | 26 | FOOT | $12.16 | $18.00 | $16.00 | $16.00 | |
| 80 | 78011040 | GRV RCSD PVT MRKG 8 | 402 | FOOT | $1.10 | $7.00 | $6.25 | $6.25 | |
| 81 | 78100100 | RAISED REFL PAVT MKR | 14 | EACH | $280.50 | $300.00 | $275.00 | $275.00 | |
| 82 | 78200011 | BARR WALL REF TYPE C | 48 | EACH | $30.00 | $20.00 | $15.00 | $20.00 | |
| 83 | 78300200 | RAISED REF PVT MK REM | 30 | EACH | $10.00 | $25.00 | $20.00 | $25.00 | |
| 84 | 78300202 | PAVMT MRKG REM WTR BL | 2,897 | SQ FT | $3.00 | $1.80 | $3.90 | $1.68 | |
| 85 | 85000200 | MAIN EX TR SIG INSTAL | 1 | EACH | $12,000.00 | $10,000.00 | $10,000.00 | $10,000.00 | |
| 86 | 89502378 | REBLD EX HH TO HD HH | 1 | EACH | $11,000.00 | $1,000.00 | $10,000.00 | $10,000.00 |