22-00046-00-SW
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | DMS Contracting, Inc. Low bidder | $377,775 | ||
| 2 | Kinney Contractors, Inc. | $398,906 | +5.6% | |
| 3 | Stutz Excavating, Inc. | $558,439 | +47.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 DMS Contracting… | #2 Kinney Contract… | #3 Stutz Excavatin… |
|---|---|---|---|---|---|---|---|---|
| 1 | K0026830 | SHRUB REMOVAL | 2 | EACH | $281.50 | $500.00 | $425.00 | |
| 2 | XX008958 | EARTH EXC SOIL MGMT | 1 | L SUM | $67,222.00 | $20,000.00 | $106,000.00 | |
| 3 | X0323256 | REM & REL FLAGPOLE | 1 | EACH | $970.00 | $1,500.00 | $950.00 | |
| 4 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $8,550.00 | $7,000.00 | $5,700.00 | |
| 5 | X8140115 | HANDHOLE TO BE ADJUST | 7 | EACH | $825.00 | $850.00 | $320.00 | |
| 6 | Z0022800 | FENCE REMOVAL | 55 | FOOT | $21.00 | $25.00 | $5.00 | |
| 7 | Z0075496 | CONC RETAIN WALL REM | 32 | FOOT | $35.50 | $62.00 | $9.00 | |
| 8 | 20100210 | TREE REMOV OVER 15 | 90 | UNIT | $45.50 | $80.00 | $225.00 | |
| 9 | 25000100 | SEEDING CL 1 | 0.75 | ACRE | $13,500.00 | $3,200.00 | $13,315.00 | |
| 10 | 28000400 | PERIMETER EROS BAR | 2,500 | FOOT | $0.0100 | $3.00 | $5.65 | |
| 11 | 42300200 | PCC DRIVEWAY PAVT 6 | 337 | SQ YD | $115.75 | $112.50 | $304.00 | |
| 12 | 42400100 | PC CONC SIDEWALK 4 | 15,318 | SQ FT | $6.40 | $9.75 | $10.00 | |
| 13 | 42400300 | PC CONC SIDEWALK 6 | 3,503 | SQ FT | $9.70 | $13.50 | $11.75 | |
| 14 | 42400800 | DETECTABLE WARNINGS | 177 | SQ FT | $66.30 | $45.00 | $45.00 | |
| 15 | 44000200 | DRIVE PAVEMENT REM | 728 | SQ YD | $24.40 | $33.00 | $30.00 | |
| 16 | 44000500 | COMB CURB GUTTER REM | 283 | FOOT | $31.30 | $25.00 | $22.00 | |
| 17 | 44000600 | SIDEWALK REM | 950 | SQ FT | $1.50 | $4.50 | $2.90 | |
| 18 | 56109210 | WATER VALVES ADJUST | 3 | EACH | $400.00 | $750.00 | $175.00 | |
| 19 | 56500300 | DOM MET VLTS ADJ | 18 | EACH | $741.50 | $235.00 | $500.00 | |
| 20 | 60609300 | COMB CC&G TM6.12 AEP | 283 | FOOT | $75.50 | $83.00 | $53.50 | |
| 21 | 67100100 | MOBILIZATION | 1 | L SUM | $19,580.00 | $23,000.00 | $26,000.00 | |
| 22 | 72000100 | SIGN PANEL T1 | 15 | SQ FT | $102.00 | $51.00 | $42.00 | |
| 23 | 72400500 | RELOC SIN PAN ASSY TA | 6 | EACH | $276.00 | $400.00 | $335.00 | |
| 24 | 72800100 | TELES STL SIN SUPPORT | 75 | FOOT | $48.00 | $35.00 | $34.00 | |
| 25 | 78001110 | PAINT PVT MK LINE 4 | 141 | FOOT | $36.00 | $45.00 | $45.00 |