| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 17, 2022 | 60W35 | WillDistrict 1 | (1.19-Mile) Pavement reconstruction along I-80 WB from Gardner St to Rowell Ave, replacement and widening of bridges carrying WB I-80 over Hickory Creek and Rowell Ave/WCL RR, bridge deck patching at EB and WB I-80 over Raynor Ave., SB Center St to EB I-80 Ramps, Des Plaines River, IL 53, and Gardner St/BNSF RR/UP RR and lighting in the city of Joliet in Will County. | — | Executed | D. Construction, Inc. and P. T. Ferro Construction Company JV $38,303,613 · | ||
| Jun 17, 2022 | 60X98 | CookDistrict 1 | (1.39-Mile) Planting of various landscaping features within the 1-90 and 1-290 expressway corridors, installation of various aesthetics features as well as creation of green spaces at selected locations to enhance the overall corridor. | — | Rejected | Martam Construction Incorporated $8,491,788 · | ||
| Jun 17, 2022 | 61D99 | CookDistrict 1 | Rehabilitate Structure 016-0194 carrying IL 1 over the CSX Railroad and Stucture 016-0195 carrying IL 1 over the Indiana Harbor Belt Railroad. Includes construction of a shared use path. Project is located between Jackson Street and 142nd Street in Riverdale. | — | Rejected | |||
| Jun 17, 2022 | 61H26 | WillDistrict 1 | Reconstruction of Penfield Street from Gould Street to IL 1, and the reconstruction of Gould Street from Indiana Avenue to Penfield Street in Beecher. | — | Executed | Iroquois Paving Corporation $5,343,400 · | ||
| Jun 17, 2022 | 61H44 | CookDistrict 1 | Reconstruct Rand Road from Isabella Street to Albany Lane, reconstruct Mount Prospect Road to Westgate Road, and reconstruct Mount Prospect Road from Central Road to Rand Road. | — | Executed | Alliance Contractors, Inc. $8,264,103 · | ||
| Jun 17, 2022 | 61H51 | DuPageDistrict 1 | Construction of a bike path along the west side of Kuhn Road from Army Trail Road to 0.10 mile south of Lies Road in Carol Stream. | — | Executed | R. W. Dunteman Company $521,372 · | ||
| Jun 17, 2022 | 61H65 | CookDistrict 1 | Resurface National Parkway from Woodfield Road to Higgins Road in Schaumburg. | — | Rejected | A Lamp Concrete Contractors, Inc. $789,949 · | ||
| Jun 17, 2022 | 61H68 | CookDistrict 1 | Resurfacing, sidewalk construction, curb and gutter replace, pavement markings, on Springinsguth Road from Bode Road to Schaumburg Road in Schaumburg. | — | Executed | Plote Construction, Inc. $921,953 · | ||
| Jun 17, 2022 | 61H69 | CookDistrict 1 | Realignment of shared-use path, pavement reconstruction, and retaining wall along Green Bay Trail at Hazel Avenue in Glencoe. | — | Executed | Alliance Contractors, Inc. $570,570 · | ||
| Jun 17, 2022 | 61H70 | CookDistrict 1 | Resurface Washington Avenue from Hemman Avenue to Prairie Avenue in Brookfield. | — | Executed | K-Five Construction Corporation $1,451,412 · | ||
| Jun 17, 2022 | 61H72 | CookDistrict 1 | Resurfacing Bode Road from Barrington Road to North Springinsguth Road in Hoffman Estates and Schaumburg | — | Executed | Plote Construction, Inc. $1,760,185 · | ||
| Jun 17, 2022 | 61H75 | WillDistrict 1 | Resurfacng Court Street from Eastgate Avenue to Will Center Road in Monee. | — | Executed | Iroquois Paving Corporation $295,197 · | ||
| Jun 17, 2022 | 61H76 | WillDistrict 1 | Resurfacing Budler Road from Taylor Road to Airport Road in Romeoville. | — | Executed | Austin Tyler Construction, Inc. $683,544 · | ||
| Jun 17, 2022 | 61H77 | CookDistrict 1 | Resurface Biesterfield Road from west village limits to Meacham Road in Elk Grove Village. | — | Executed | R. W. Dunteman Company $829,750 · | ||
| Jun 17, 2022 | 61H78 | CookDistrict 1 | Construct an aggregate and PCC shared-use path, inlcudes curb and gutter, traffic signal enhancements, pavement markings and signing on the west side of East River Road at the intersection with Bryn Mawr Avenue to Devon Avenue in Chicago and Park Ridge. | — | Rejected | Landmark Contractors, Inc. $1,795,974 · | ||
| Jun 17, 2022 | 61H79 | LakeDistrict 1 | Resurface Barclay Boulevard from Aptaksic Road to Half Day Road in Lincolnshire . | — | Executed | Peter Baker & Son Co. $1,206,851 · | ||
| Jun 17, 2022 | 61H80 | McHenryDistrict 1 | Reconstruct Souwanas Trail from Oceola Street to Sanbloom Road, and the reconstruction of Schuett Street from Scott Street to Hubbard Street in Algonquin. | — | Rejected | Benchmark Construction Co., Inc. $8,448,000 · | ||
| Jun 17, 2022 | 61H82 | CookDistrict 1 | Construction of an HMA shared-use path, PCC sidewalk, sheet pile wall, pedestrian traffic signals, storm sewer, guardrail, and pavement markings along Oakton Street from Caldwell Avenue to Lehigh Avenue, and along Caldwell Avenue from Oakton Street to Vapor Lane in Morton, Skokie and Niles. | — | Executed | A Lamp Concrete Contractors, Inc. $1,639,752 · | ||
| Jun 17, 2022 | 61H84 | CookDistrict 1 | Construction of a shared-use path, includes a reinforced slope system, drainage improvements, culvert headwall modifications, guardrail installation and pavement markings on the east side of 104th Avenue to 159th Street to 163rd Place in Orland Park. | — | Rejected | D. Construction, Inc. $2,171,956 · | ||
| Jun 17, 2022 | 62H15 | WillDistrict 1 | (2.5-Mile) Interchange reconstruction of I-55 from I-80 to US 52 ; adding auxiliary lanes on I-55 ; intersection improvement; new traffic signals; retaining and noise abatement walls; drainage improvement; shared- use path; roadway lighting; ITS; and aesthetic landscaping located in Joliet and Shorewood. | — | Executed | D. Construction, Inc. $59,259,179 · | ||
| Jun 17, 2022 | 62H16 | WillDistrict 1 | Bridge rehabilitation, channelization and traffic signal modernization at US 52 (Jefferson St) and 1-55 interc (1,778-Ft.) Improvement consists of bridge rehabilitation, channelization and traffic signal modernization at US 52 (Jefferson St) and 1-55 interchange, located in Village of Shorewood, Will County. | — | Executed | D. Construction, Inc. $6,157,939 · | ||
| Jun 17, 2022 | 62L11 | CookDistrict 1 | (2,568-Ft) Standard Overlay, ADA ramp improvements and new HMA Shoulders, located from Willow Rd to Old Willow Rd in the Villages of Northbrook and Glenview in Cook County. | — | Executed | J. A. Johnson Paving Company $654,540 · | ||
| Jun 17, 2022 | 62N43 | CookDistrict 1 | (5,878-Ft) SMART overlay and ADA improvements on US 12/20/45 (La Grange Rd) from 31st St to north of Cermak Rd, located in the Village of La Grange Park and Westchester in Cook County. | — | Executed | K-Five Construction Corporation $1,190,920 · | ||
| Jun 17, 2022 | 62N47 | WillDistrict 1 | (1.198-Mile) SMART Overlay and ADA ramp improvements from E o f I-80 to E of Church St. Work also includes sidewalk removal, removal and replacement of combination concrete curb and gutter, installation of PCC sidewalk, detectable warnings, adjustment of drainage structures, and pavement markings located in the Village of New Lenox. | — | Executed | P. T. Ferro Construction Co. $1,638,840 · | ||
| Jun 17, 2022 | 62N50 | WillDistrict 1 | (1.71-Mile) SMART Overlay and ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK FAP 876: IL 1 (Main St), from Burville Road to Union Avenue, located in the Village of Crete. | — | Executed | Iroquois Paving Corporation $1,316,006 · | ||
| Jun 17, 2022 | 62N72 | CookDistrict 1 | (2.211-Mile)Designed Overlay, Shoulders, Milled Rumble Strips and ADA Improvements, Location of work: Project located from Muskegon Ave to State Line Rd in the Village of Burnham and the City of Chicago in Cook County. | — | Executed | D. Construction, Inc. $3,486,258 · | ||
| Jun 17, 2022 | 62P14 | LakeDistrict 1 | (2,344-Ft) Removal and construction of bridge deck, approach slab and pavement connector for bridge carrying over UPRR and bridge deck scarification and overlay for the bridge carrying over US 41 in the City of Park City and Village of Gurnee, Lake County. | — | Executed | Lorig Construction Company $3,650,806 · | ||
| Jun 17, 2022 | 62P33 | LakeDistrict 1 | (1.02-Mile) Designed Overlay, ADA Improvements: HMA removal and resurfacing, Class D patching, ADA curb ramps improvements, PMK. FAP 330: IL 21 (Milwaukee Ave) from Church Street to South of Finstad Drive in the Village of Libertyville. | — | Executed | Peter Baker & Son Co. $2,379,343 · | ||
| Jun 17, 2022 | 62P54 | CookDistrict 1 | (2,370-Ft) Retaining wall repair and concrete barrier wall replacement located along EB-I-290 between South Central Ave. and South Laramie St. in the City of Chicago. | — | Executed | Plote Construction, Inc. $2,296,339 · | ||
| Jun 17, 2022 | 62P55 | CookDistrict 1 | (2007.6-Ft) Structural rehabilitation and substructure repairs of three bridges earring 1-94 over Little Calumet River and over CSXTand IHB Railroad in the City of Dolton and the City of Calumet City. | — | Executed | ICC Group Inc. $697,200 · | ||
| Jun 17, 2022 | 62P58 | DuPageDistrict 1 | (1.40-Mile) Bridge joint repairs and approach slab replacements at the structures earring 1-290 EB over IL 83 and Wooddale Road located in the City of Elmhurst and Village of Addison in DuPage County. | — | Executed | Alliance Contractors, Inc. $2,248,890 · | ||
| Jun 17, 2022 | 62P59 | CookDistrict 1 | Improvement is located at the IDOT I-57 maintenance yard at 16010 S. Crawford Ave. within the City of Markham in Cook County includes pavement removal, pavement patching, new drainage structures and storm sewer and installation of hot-mix asphalt and pcc pavement and final pavement markings. | — | Executed | Gallagher Asphalt Corporation $720,206 · | ||
| Jun 17, 2022 | 62P72 | CookDuPageDistrict 1 | Trombone Mast Arm Replacement at various locations in District 1. | — | Executed | H & H Electric Co. $993,648 · | ||
| Jun 17, 2022 | 62P84 | CookDistrict 1 | A culvert repair and rock fill of the culvert culvert carrying IL 171 0 This improvement consists of a culvert repair and rock fill of the culvert culvert carrying IL 171 0.4 miles west of 95th St in the Village of Willow Springs in Cook County. | — | Executed | Scanlon Excavating & Concrete, Inc. $96,015 · | ||
| Jun 17, 2022 | 62R32 | CookDistrict 1 | Bridge beam repairs for structure located on Touhy Avenue over Des Plaines River in the City of Park Ridge, Co (263.3-Ft) Improvement consist of bridge beam repairs for structure located on Touhy Avenue over Des Plaines River in the City of Park Ridge, Cook County. | — | Executed | Path Construction Company, Inc. $458,553 · | ||
| Jun 17, 2022 | 62R48 | VariousDistrict 1 | Cleaning (nighttime sweeping) various expressways throughout District One in various counties (332.1-Mile) Improvement consists of cleaning (nighttime sweeping) various expressways throughout District One in various counties. | — | Executed | Elgin Sweeping Services, Inc. $4,903,360 · | ||
| Jun 17, 2022 | 62R49 | VariousDistrict 1 | Cleaning (daytime sweeping) various expressways throughout District One in various counties (116.5-Mile) Improvement consists of cleaning (daytime sweeping) various expressways throughout District One in various counties. | — | Rejected | |||
| Jun 17, 2022 | 64K62 | Jo DaviessDistrict 2 | The proposed southern culvert (PSN 043-1117) will be replaced (ESN 043-1024). The proposed structure skews the alignment and adds riprap to control erosion. The proposed northern culvert (PSN 043-1118) will be replaced (ESN 043-1021). The proposed structure uses a dropbox on the upstream end, skews the alignment, and adds riprap to control erosion. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,281,460 · | ||
| Jun 17, 2022 | 64L13 | HenryRock IslandDistrict 2 | ADA Ramps at various locations in Henry and Rock Island Counties. | — | Executed | Phoenix Corporation of the Quad Cities $2,774,444 · | ||
| Jun 17, 2022 | 64N64 | WinnebagoDistrict 2 | 0.14 Miles, Sidewalk ADA Ramp Improvements, From New Milford School Rd to Toms Rd. in the VIllage of New Milford . | — | Executed | Sjostrom & Sons, Inc. $292,528 · | ||
| Jun 17, 2022 | 64N77 | WhitesideDistrict 2 | The removal and replacement of pedestrian (ADA) curb ramps, curb and gutter, and grading and shaping The replacement of non-compliant pedestrian (ADA) curb ramps along IL 136 from 4th Street to 0.1-mile West of IL 84 in Fulton. The proposed improvement generally consists of the removal and replacement of pedestrian (ADA) curb ramps, curb and gutter, and grading and shaping. Update curb ramps, sidewalks, and crosswalks (no changes to roadway). | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $976,105 · | ||
| Jun 17, 2022 | 64P15 | WhitesideDistrict 2 | 2.985 miles - From IandM Feeder Canal 0.3 Mi East of IL 40 in Rock Falls to the Lee County Line - Cold Milling, Pavement Patching, and HMA Resurfacing. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $3,018,594 · | ||
| Jun 17, 2022 | 64P89 | WhitesideDistrict 2 | Bridge deck sealing on SN 098-6003 carrying US 30 over the Mississippi River 1.0 miles West of IL 84. | — | Executed | M & M Concrete, Inc. $20,971 · | ||
| Jun 17, 2022 | 64P95 | WhitesideDistrict 2 | 0.049 miles (261 ft), intersection improvements at US 30 and Emerson Road intersections. Approved HSIP Location. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $145,965 · | ||
| Jun 17, 2022 | 64R40 | WhitesideDistrict 2 | Full cleaning and painting of structural steel of SN 098-0005 carrying US 30 over UP RR 2.5 miles West of Morrison. | — | Executed | Civil Coatings and Construction Inc. $335,125 · | ||
| Jun 17, 2022 | 64R45 | VariousDistrict 2 | Removal of dead trees along State maintained routes. | — | Rejected | Homer Tree Service, Inc. $250,750 · | ||
| Jun 17, 2022 | 64R47 | Rock IslandDistrict 2 | IL 5 from 7th Street to 16th Street pavement patching. | — | Executed | G. M. Sipes Construction, Inc. $1,143,160 · | ||
| Jun 17, 2022 | 64R59 | VariousDistrict 2 | Traffic signal cabinet and controller upgrades at nine (9) railroad interconnected intersection: US 6 at Patriot Way (Annawan); US 20 EB Ramp at S. Appleton Road (Belvidere); IL 92118th Ave at IL 84119th St (Silvis); IL 9214th Ave at 15th, 17th, 19th, and 23rd Streets (Moline); IL 9211st Ave at 17th and 18th Streets (Rock Island). | — | Executed | Davenport Electric Contract Company $258,944 · | ||
| Jun 17, 2022 | 64R62 | OgleDistrict 2 | Approximately 600 ft. of Concrete Pavement with the Installation of a New Weigh-In-Motion Sensors. | — | Executed | G. M. Sipes Construction, Inc. $1,134,110 · | ||
| Jun 17, 2022 | 64R69 | HenryRock IslandDistrict 2 | Maintenance of signs along State maintained routes in Henry and Rock Island Counties. | — | Executed | Western Remac, Inc. $253,662 · | ||
| Jun 17, 2022 | 66616 | LaSalleDistrict 3 | Milling and resurfacing 3 Project consists of milling and resurfacing 3.75" on IL 23, from N. of I-80 in Ottawa to S. of US 52 (W. Junction) in LaSalle for a total of 6.31 miles. The scope of work includes some traffic signal upgrades, guardrail, and drainage improvements. | — | Executed | Advanced Asphalt Company $4,883,010 · | ||
| Jun 17, 2022 | 66957 | KankakeeDistrict 3 | Widening and resurfacing of the intersection with Armour Road. Other items include storm sewer, shared use path, sidewalk, curb and gutter, roadway lighting, traffic signals, and landscape restoration. (0.72 miles) | — | Executed | Kankakee Valley Construction Company, Inc. $13,879,194 · | ||
| Jun 17, 2022 | 66A80 | DeKalbDistrict 3 | Milling and resurfacing 4 Work consists of milling and resurfacing 4.25" on IL 72 from Bull Run Creek in Kirkland to State St. in Genoa in Dekalb County. Additional work includes resurfacing parking lanes in Kirkland, guardrail upgrades, and drainage improvements. The total length of the job is 8.1 miles. | — | Executed | Curran Contracting Company $4,683,751 · | ||
| Jun 17, 2022 | 66B77 | FordDistrict 3 | 3P milling and resurfacing (design overlay) This work is located on FAP 796 (IL 115) from South Corporate Limits of Cabery to IL 116 (+/-7.83 miles) in Ford County. This work consists of 3P milling and resurfacing (design overlay). | — | Executed | Kankakee Valley Construction Company, Inc. $4,357,980 · | ||
| Jun 17, 2022 | 66E48 | GrundyDistrict 3 | Milling and resurfacing 3 Project consists of milling and resurfacing 3.75" on IL 113 from Lincoln St to Will Rd in Grundy County. The project length is 1.60 miles. Additional work includes ADA improvements and traffic signal upgrades. Minor drainage repairs are also proposed. | — | Executed | D. Construction, Inc. $1,189,717 · | ||
| Jun 17, 2022 | 66E49 | LaSalleDistrict 3 | Milling and resurfacing 3 3/4" of mainline, pavement marking, and raised reflectors This 3P project is located on FAP 68 (US 34) from IL 23 North to IL 23 South in Leland, IL. The length is 4.33 miles, and the work consists of milling and resurfacing 3 3/4" of mainline, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $2,310,316 · | ||
| Jun 17, 2022 | 66E53 | LivingstonDistrict 3 | Milling 3 Project consists of milling 3.50" and resurfacing 3.75" on IL 116, 100' East of the intersection of IL 23 in Pontiac for a total of 1.71 miles. The scope of work includes some traffic signal upgrades, pavement patching, ADA ramp improvements, and minor drainage maintenance work. | — | Executed | Kankakee Valley Construction Company, Inc. $2,680,230 · | ||
| Jun 17, 2022 | 66H07 | DeKalbDistrict 3 | This work is located on FAP 573 (US 30) from the Lee County line to 0.5 miles East of Shabbona Road in Shabbona. This work consists of 3.96 miles of 3-3/4" milling and hot-mix asphalt resurfacing. The project also_includes the reconstruction of several ADA sidewalk ramps throughout Shabbona. | — | Executed | Builders Paving, LLC $2,738,000 · | ||
| Jun 17, 2022 | 66J62 | GrundyDistrict 3 | Spot improvements to remove SN 032-0052 carrying Nettle Creek Road over I-80, 8.2 miles West of IL 47. | — | Executed | D. Construction, Inc. $1,320,668 · | ||
| Jun 17, 2022 | 66J71 | KendallDistrict 3 | Milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, rai LaSalle County Line to 0.2 MI W of IL 47 in Yorkville. This work consists of milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, raised reflectors, and ADA ramps. | — | Executed | D. Construction, Inc. $4,944,149 · | ||
| Jun 17, 2022 | 66K68 | IroquoisDistrict 3 | 3P milling and resurfacing (designed overlay) and ADA improvements This work is located on FAS 1324 (US 45) from First South Street in Chebanse to Third Ave in Clifton in Iroquois County (+/-4.73 miles). This work consists of 3P milling and resurfacing (designed overlay) and ADA improvements. | — | Executed | Iroquois Paving Corporation $4,264,818 · | ||
| Jun 17, 2022 | 66K76 | LivingstonDistrict 3 | Milling and resurfacing (designed overlay) with ADA sidewalk work This work is located at FAP 326 (IL 47) from US 24 in Forrest to Ford County line in Livingston County (+/-9.35 miles). This work consists of milling and resurfacing (designed overlay) with ADA sidewalk work. | — | Executed | Kankakee Valley Construction Company, Inc. $6,277,406 · | ||
| Jun 17, 2022 | 66K78 | IroquoisDistrict 3 | Milling and resurfacing (designed overlay), ADA ramps, pavement marking, and raised reflectors This project is located on FAS 317 (US 45), beginning at North St in Danforth to US 24, for a total of 4.09 miles. The work consists of milling and resurfacing (designed overlay), ADA ramps, pavement marking, and raised reflectors. | — | Executed | Iroquois Paving Corporation $2,398,343 · | ||
| Jun 17, 2022 | 66L45 | KankakeeDistrict 3 | 1.7 Miles, Milling and Resurfacing (SMART OVERLAY) and ADA. Work begins 0.35 miles West of Roosevelt Ave and ends just West of 5th Ave in Kankakee. | — | Executed | Kankakee Valley Construction Company, Inc. $2,504,023 · | ||
| Jun 17, 2022 | 66L48 | GrundyDistrict 3 | Rest area and renovations, I-80 Three Rivers Rest Stop. | — | Executed | D. Construction, Inc. $2,364,030 · | ||
| Jun 17, 2022 | 66L58 | DeKalbKendallDistrict 3 | 5.41 miles, Milling and Resurfacing (Designed Overlay) and ADA 0.2 miles East of Somonauk Rd in Somonauk to Chilton Way in Plano. | — | Executed | D. Construction, Inc. $6,075,158 · | ||
| Jun 17, 2022 | 66L88 | KankakeeDistrict 3 | 3P milling and resurfacing (designed overlay), ADA This work is located at FAP 631 (IL 102) from Will County line to US 45/52 in Bourbonnais in Kankakee County (+/-8.14 miles). This work consists of 3P milling and resurfacing (designed overlay), ADA. | — | Executed | P. T. Ferro Construction Co. $8,398,082 · | ||
| Jun 17, 2022 | 66L89 | FordDistrict 3 | 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch This work is located at FAP 697 (IL 9) from Stockholm Road in Paxton to Vermillion County Line in Ford County (+/- 7.68 miles). This work consists of 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch grading, channel excavation and riprap placement. | — | Executed | Iroquois Paving Corporation $4,972,663 · | ||
| Jun 17, 2022 | 66M02 | DeKalbDistrict 3 | This work is located at Structure No. 019-0012 carrying FAP Route 17 (IL 64) over the Kishwaukee River approximately 1.5 miles West of Jct. IL 23 (Sycamore) This work consists riprap placement, guardrail removal and replacement, expansion joint replacement, deck patching, pavement striping, and other related construction items. | — | Executed | Sjostrom & Sons, Inc. $370,683 · | ||
| Jun 17, 2022 | 66M05 | IroquoisDistrict 3 | Replacing the high mast light towers This project is located at the Mainline Rest Areas in Buckley on I-57. The work consists of replacing the high mast light towers. | — | Executed | Van-Mack Electric Co. $785,218 · | ||
| Jun 17, 2022 | 66M13 | PutnamDistrict 3 | Cleaning and painting all structural and non-structural steel components of the structure This project is located at Structure No. 078-0022 carrying CH 1 over I-180, approximately 0.46 miles west of the I-180 and IL Route 26 Interchange near Hennepin. This project consists of cleaning and painting all structural and non-structural steel components of the structure. | — | Executed | Venus Painting Co. $258,968 · | ||
| Jun 17, 2022 | 66M15 | LaSalleDistrict 3 | The installation of an overhead flashing beacon at the intersection of IL 71 and US 52 in LaSalle County This project consists of the installation of an overhead flashing beacon at the intersection of IL 71 and US 52 in LaSalle County. An additional flashing beacon will be installed adjacent to each of the four legs at the existing intersection warning sign location. | — | Executed | D. Construction, Inc. $200,000 · | ||
| Jun 17, 2022 | 66M16 | LaSalleDistrict 3 | This project consists of 6.8 miles of shoulder widening and rumble strip installation on IL 170 from N 16th Rd to N 21st Rd in LaSalle County. | — | Executed | Advanced Asphalt Company $1,512,236 · | ||
| Jun 17, 2022 | 66M17 | KankakeeDistrict 3 | This project consists of 4.3 miles of shoulder widening and rumble strip installation on IL 115 from S 3000W Rd to 0.5 mi west of Curtis Ave in Kankakee County. | — | Executed | Gallagher Asphalt Corporation $1,297,408 · | ||
| Jun 17, 2022 | 66M18 | IroquoisDistrict 3 | This project consists of 2.9 miles of shoulder widening and rumble strip installation on IL 54 from N 200E Rd to 0.22 mi west of N 500E Rd in Iroquois County. | — | Executed | Iroquois Paving Corporation $1,212,384 · | ||
| Jun 17, 2022 | 66M21 | LivingstonDistrict 3 | Cleaning all structural steel and other steel components of the structures This project is located at three structures: Structure No. 053-0123 carrying E1400N Rd. over I-55 and Mazon River, 3 miles Southwest of Pontiac; SN 053-0047 carrying IL 47 over Five Mile Creek, 0.3 miles North of IL 116; SN 053-0168 carrying IL 47 over the Vermilion River, 0.4 miles South of US 24. This project consists of cleaning all structural steel and other steel components of the structures. | — | Executed | Venus Painting Co. $710,553 · | ||
| Jun 17, 2022 | 66M25 | LaSalleDistrict 3 | Of cleaning and painting all structural and non-structural steel components of the structure This project is located at Structure No. 050-0233 carrying FAS 1265 (Old US 34, W. Union Street) over Indian Creek in Earlville. This work consists of of cleaning and painting all structural and non-structural steel components of the structure. | — | Executed | ERA-Valdivia Contractors, Inc. $189,647 · | ||
| Jun 17, 2022 | 66M35 | BureauLaSalleDistrict 3 | Washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, to This project is located at five structures spanning the Illinois River in IDOT District 3. This work consists of washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, tops of piers, deck drains and scuppers. | — | Executed | All States Painting, Inc. $378,400 · | ||
| Jun 17, 2022 | 66M40 | LaSalleDistrict 3 | Class A and B patching, pavement marking, and shoulder reconstruction This project is located on I-39 beginning at the Marshall Co line and ending at 0.3 mi S of the Lee Co line (36.2 miles); I-80 interchange ramps._The work shall consist of Class A and B patching, pavement marking, and shoulder reconstruction. | — | Executed | G. M. Sipes Construction, Inc. $2,515,927 · | ||
| Jun 17, 2022 | 66M44 | VariousDistrict 3 | One year contract repair damaged High Tension Cable Median Barrier, Guard Rail Attenuators, etc., caused by motorists along various routes in District 3. | — | Executed | Northern Contracting, Inc. $1,767,718 · | ||
| Jun 17, 2022 | 66M50 | KankakeeDistrict 3 | Milling and resurfacing, striping, and pavement markers This project is located on F.A.P. Route 332 (IL 71) beginning approximately 630 feet North of the intersection of IL Route 1 and IL Route 17 on the East side of Grant Park and ending approximately 650 feet North of The intersection of IL Route 1 and 9000N Rd. This work consists of milling and resurfacing, striping, and pavement markers. | — | Executed | Gallagher Asphalt Corporation $607,878 · | ||
| Jun 17, 2022 | 66M58 | VariousDistrict 3 | Districtwide, Vegetation Control - Tree Removal. | — | Executed | Nettle Creek Nursery, Inc. $396,348 · | ||
| Jun 17, 2022 | 66M59 | IroquoisLivingstonDistrict 3 | At Buckley interchange; at Limestone rest area south of Pontiac Vegetation Control - Tree Removal. | — | Executed | CSD Environmental Services, Inc. $456,330 · | ||
| Jun 17, 2022 | 66M60 | FordDistrict 3 | Class A Pavement Patching and related construction work This work is located on FAI Route 57 (I-57) beginning at the Champaign County Line (M.M. 257.08) and ending at the Iroquois County Line (M.M. 263.51). This work consists of Class A Pavement Patching and related construction work. | — | Executed | G. M. Sipes Construction, Inc. $231,790 · | ||
| Jun 17, 2022 | 66M61 | IroquoisDistrict 3 | This project includes a small native planting project at the Ashkum Maintenance Yard using wildflower seeding. | — | Rejected | |||
| Jun 17, 2022 | 68G43 | McDonoughWarrenDistrict 4 | Bridge deck overlay, bridge approach roadway and bridge repair to SN 094-0037, SN SN 094-0038 over Big Negro Creek, SN 094-0039, SN 094-0040 over Swan Creek, SN 055-0031, SN 055-0032 over East Fork Crooked Creek. Total Length = 0.39 miles. | — | Executed | Freesen, a div of UCM, Inc. $2,042,711 · | ||
| Jun 17, 2022 | 68G65 | WoodfordDistrict 4 | Bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along w This project consists of bridge repairs on SN 102-0034, including bearing replacement at abutments and some substructure repair along with other related collateral work necessary to complete the project as shown in the plans and as described herein. Structure carrying TR 134 over 1-74. | — | Executed | Stark Excavating, Inc. $157,836 · | ||
| Jun 17, 2022 | 68G69 | PeoriaDistrict 4 | Bridge repairs on SN 072-0148, including the replacement of the existing expansion joints with strip seals and This project consists of bridge repairs on SN 072-0148, including the replacement of the existing expansion joints with strip seals and plating all beam ends at both abutments along with other related work necessary to complete the project as shown in the plans and as described herein. Structure carrying Mossville Rd. over IL 6. | — | Executed | Stark Excavating, Inc. $278,003 · | ||
| Jun 17, 2022 | 68G72 | PeoriaDistrict 4 | Patching on IL 6 from US 150 to I-74. | — | Executed | Kinney Contractors, Inc. $627,541 · | ||
| Jun 17, 2022 | 68G89 | VariousDistrict 4 | Weed spraying (off road) in various counties on various routes. | — | Executed | The Daltons Inc. $138,418 · | ||
| Jun 17, 2022 | 68G90 | VariousDistrict 4 | Lighting, traffic signals, and ITS upgrades at various locations within District 4. | — | Executed | Laser Electric, Inc. $266,565 · | ||
| Jun 17, 2022 | 68G92 | KnoxDistrict 4 | 1.90 miles of HMA patching at the I-74 interchange from CR 1925 N. | — | Executed | Gunther Construction, a div of UCM, Inc. $208,605 · | ||
| Jun 17, 2022 | 68G93 | WarrenDistrict 4 | 6.22 miles of HMA patching from 20th Street to US 67. | — | Executed | Gunther Construction, a div of UCM, Inc. $435,978 · | ||
| Jun 17, 2022 | 68G94 | KnoxDistrict 4 | 1.15 miles of Class B Patching from Swing Blvd to Main Street in Galesburg, IL. | — | Executed | G. M. Sipes Construction, Inc. $169,342 · | ||
| Jun 17, 2022 | 68G95 | KnoxDistrict 4 | 9.62 miles of PCC Patching from US 150/IL 97 Interchange to the Spoon River Rest Area. | — | Executed | G. M. Sipes Construction, Inc. $289,794 · | ||
| Jun 17, 2022 | 68G96 | KnoxDistrict 4 | 0.87 miles of HMA Patching from US 150/IL 97 Interchange with I-74 to CH 17/CR 1290N. | — | Executed | Gunther Construction, a div of UCM, Inc. $165,743 · | ||
| Jun 17, 2022 | 68G97 | KnoxDistrict 4 | 1.34 miles of HMA Patching from Allens Ave to Michigan Ave in Galesburg, IL. | — | Executed | Brandt Construction Co. $496,110 · | ||
| Jun 17, 2022 | 68G98 | KnoxDistrict 4 | 2.45 miles of PCC Patching from I-74/US 34 Interchange to US 150/US 34 Interchange. | — | Executed | G. M. Sipes Construction, Inc. $193,563 · | ||
| Jun 17, 2022 | 68G99 | MercerDistrict 4 | 4.02 miles of HMA Patching from US 67 to 5th Ave in Sherrard, IL. | — | Executed | Langman Construction, Inc. $188,376 · | ||
| Jun 17, 2022 | 68H03 | McDonoughDistrict 4 | 17.20 miles of HMA Patching from McDonough County Line to US 67. | — | Rejected | Gunther Construction, a div of UCM, Inc. $359,699 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.