2021-077-B-R&FL
- Let date
- Friday, June 17, 2022
- Contract
- 62P14 · job page
- District
- District 1
- County
- Lake
- Highway
- Limits
- (2,344-Ft) Removal and construction of bridge deck, approach slab and pavement connector for bridge carrying over UPRR and bridge deck scarification and overlay for the bridge carrying over US 41 in the City of Park City and Village of Gurnee, Lake County.
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Lorig Construction Company Low bidder | $3,650,806 | ||
| 2 | Areatha Construction Co., Inc. | $3,761,853 | +3.0% | |
| 3 | Martam Construction Incorporated | $3,938,470 | +7.9% | |
| 4 | F. H. Paschen, S.N. Nielsen & Associates LLC | $4,637,503 | +27.0% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Lorig Construct… | #2 Areatha Constru… | #3 Martam Construc… | #4 F. H. Paschen, … |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0324256 | FIB OPTIC C SPLICE | 1 | EACH | $3,400.00 | $3,466.15 | $3,700.00 | $3,393.00 | |
| 2 | X0327032 | TEMP VIDEO DETECTION | 1 | EACH | $4,600.00 | $4,636.85 | $5,000.00 | $4,539.00 | |
| 3 | X1400450 | REBLD EX HD HANDHOLE | 5 | EACH | $2,900.00 | $2,937.00 | $3,000.00 | $2,875.00 | |
| 4 | X4400100 | PCC SURF REM VAR DP | 175 | SQ YD | $20.00 | $15.35 | $22.00 | $3.13 | |
| 5 | X4401198 | HMA SURF REM VAR DP | 460 | SQ YD | $10.00 | $10.25 | $12.00 | $10.00 | |
| 6 | X5030250 | BR DECK GROOVING LONG | 1,722 | SQ YD | $6.00 | $5.60 | $6.00 | $8.00 | |
| 7 | X6700407 | ENGR FLD OFF A D1 | 12 | CAL MO | $2,600.00 | $2,553.90 | $2,400.00 | $2,500.00 | |
| 8 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $150,000.00 | $128,511.00 | $380,000.00 | $125,000.00 | |
| 9 | X7010410 | SPEED DISPLAY TRAILER | 12 | CAL MO | $250.00 | $1,276.95 | $300.00 | $1,250.00 | |
| 10 | X7810300 | REC REF PVT MARKER | 18 | EACH | $300.00 | $306.50 | $440.00 | $400.00 | |
| 11 | X7810301 | REC REF PVT MARKER HMA | 12 | EACH | $400.00 | $403.55 | $440.00 | $380.00 | |
| 12 | Z0001700 | APPROACH SL REP (FD) | 1 | SQ YD | $3,000.00 | $2,097.44 | $5,500.00 | $6,000.00 | |
| 13 | Z0001903 | STRUCT STEEL REMOV | 3,430 | POUND | $12.00 | $14.30 | $9.00 | $7.00 | |
| 14 | Z0001905 | STRUCT STEEL REPAIR | 210 | POUND | $200.00 | $51.35 | $60.00 | $51.25 | |
| 15 | Z0005216 | HMA STAB 6 AT SPBGR | 53 | SQ YD | $67.00 | $68.45 | $75.00 | $67.00 | |
| 16 | Z0006016 | BR DK LTX C OLY 2 3/4 | 2,268 | SQ YD | $105.00 | $140.00 | $88.00 | $100.00 | |
| 17 | Z0012130 | BR DECK SCAR 3/4 | 2,268 | SQ YD | $40.00 | $65.00 | $36.00 | $43.00 | |
| 18 | Z0012754 | STR REP CON DP = < 5 | 133 | SQ FT | $275.00 | $134.65 | $210.00 | $235.63 | |
| 19 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $40,000.00 | $9,000.00 | $24,000.00 | $316,000.00 | |
| 20 | Z0015802 | PLUG EX DK DRAINS | 4 | EACH | $275.00 | $492.65 | $300.00 | $500.00 | |
| 21 | Z0016200 | DECK SLAB REP (PART) | 4 | SQ YD | $1,000.00 | $911.70 | $800.00 | $2,000.00 | |
| 22 | Z0018002 | DRAINAGE SCUPPR DS-11 | 7 | EACH | $1,500.00 | $1,415.10 | $2,500.00 | $1,800.00 | |
| 23 | Z0018051 | DRAINAGE SCUPPERS ADJ | 12 | EACH | $700.00 | $1,561.11 | $500.00 | $500.00 | |
| 24 | Z0029090 | DIAMOND GRIND BR SEC | 2,091 | SQ YD | $9.00 | $10.80 | $9.00 | $13.00 | |
| 25 | Z0030850 | TEMP INFO SIGNING | 50 | SQ FT | $15.00 | $20.45 | $16.00 | $20.00 | |
| 26 | Z0033046 | RE-OPTIMIZE SIG SYS 2 | 5 | EACH | $1,200.00 | $1,190.15 | $1,300.00 | $1,165.00 | |
| 27 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $10,000.00 | $75,000.00 | $8,000.00 | $6,700.00 | |
| 28 | Z0062456 | TEMP PAVEMENT | 611 | SQ YD | $70.00 | $55.00 | $85.00 | $78.00 | |
| 29 | Z0073510 | TEMP TR SIGNAL TIMING | 3 | EACH | $1,100.00 | $1,078.00 | $1,200.00 | $1,055.00 | |
| 30 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | $0.8000 | |
| 31 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | $15.00 | |
| 32 | 20200100 | EARTH EXCAVATION | 8 | CU YD | $135.00 | $227.00 | $155.00 | $120.00 | |
| 33 | 21001000 | GEOTECH FAB F/GR STAB | 122 | SQ YD | $3.00 | $9.00 | $5.00 | $5.00 | |
| 34 | 21101615 | TOPSOIL F & P 4 | 451 | SQ YD | $6.00 | $9.20 | $8.00 | $7.25 | |
| 35 | 25000210 | SEEDING CL 2A | 0.25 | ACRE | $3,259.00 | $8,168.28 | $4,000.00 | $2,500.00 | |
| 36 | 25000400 | NITROGEN FERT NUTR | 30 | POUND | $3.00 | $3.00 | $4.00 | $4.50 | |
| 37 | 25000600 | POTASSIUM FERT NUTR | 30 | POUND | $3.00 | $3.00 | $4.00 | $3.00 | |
| 38 | 25100630 | EROSION CONTR BLANKET | 451 | SQ YD | $1.10 | $2.10 | $2.00 | $2.00 | |
| 39 | 28000400 | PERIMETER EROS BAR | 696 | FOOT | $2.50 | $3.10 | $3.00 | $4.00 | |
| 40 | 28000510 | INLET FILTERS | 14 | EACH | $180.00 | $245.20 | $190.00 | $175.00 | |
| 41 | 30300001 | AGG SUBGRADE IMPROVE | 41 | CU YD | $100.00 | $78.20 | $58.00 | $90.00 | |
| 42 | 30300112 | AGG SUBGRADE IMPR 12 | 541 | SQ YD | $30.00 | $51.30 | $18.00 | $25.00 | |
| 43 | 31101200 | SUB GRAN MAT B 4 | 892 | SQ YD | $2.00 | $20.70 | $9.00 | $10.00 | |
| 44 | 31200500 | STAB SUBBASE HMA 4 | 97 | SQ YD | $80.00 | $78.70 | $85.00 | $77.00 | |
| 45 | 40600290 | BIT MATLS TACK CT | 690 | POUND | $0.0100 | $0.0100 | $0.1000 | $0.0100 | |
| 46 | 40600982 | HMA SURF REM BUTT JT | 541 | SQ YD | $10.00 | $10.25 | $12.00 | $10.00 | |
| 47 | 40600985 | PCC SURF REM BUTT JT | 627 | SQ YD | $25.00 | $8.20 | $16.00 | $3.13 | |
| 48 | 40603090 | HMA BC IL-19.0 N90 | 84 | TON | $112.00 | $112.40 | $121.00 | $110.00 | |
| 49 | 40604172 | P HMA SC IL-9.5 E N70 | 114 | TON | $181.00 | $181.85 | $195.00 | $178.00 | |
| 50 | 42000070 | PVT CON HMA BR APP SL | 445 | SQ YD | $90.00 | $88.90 | $95.00 | $87.00 | |
| 51 | 42000411 | PCC PVT 9 1/2 JOINTD | 97 | SQ YD | $125.00 | $148.85 | $112.00 | $334.54 | |
| 52 | 44000100 | PAVEMENT REM | 3,869 | SQ YD | $1.00 | $1.00 | $18.00 | $25.00 | |
| 53 | 44000152 | HMA SURF REM 3/4 | 165 | SQ YD | $24.00 | $24.55 | $30.00 | $24.00 | |
| 54 | 44000500 | COMB CURB GUTTER REM | 890 | FOOT | $14.00 | $9.05 | $7.00 | $9.00 | |
| 55 | 44003100 | MEDIAN REMOVAL | 6,418 | SQ FT | $3.00 | $3.00 | $3.00 | $4.00 | |
| 56 | 50102400 | CONC REM | 62.7 | CU YD | $1,900.00 | $994.90 | $1,300.00 | $1,255.00 | |
| 57 | 50104650 | SLOPE WALL REMOV | 344 | SQ YD | $80.00 | $85.90 | $80.00 | $55.00 | |
| 58 | 50104720 | REM EXIST CONC DECK | 1 | EACH | $250,000.00 | $257,232.00 | $250,000.00 | $566,000.00 | |
| 59 | 50157300 | PROTECTIVE SHIELD | 1,700 | SQ YD | $30.00 | $5.00 | $63.00 | $150.00 | |
| 60 | 50200100 | STRUCTURE EXCAVATION | 212 | CU YD | $50.00 | $53.87 | $49.00 | $60.00 | |
| 61 | 50300225 | CONC STRUCT | 89.2 | CU YD | $1,350.00 | $1,000.00 | $1,250.00 | $750.00 | |
| 62 | 50300255 | CONC SUP-STR | 467.1 | CU YD | $950.00 | $1,250.00 | $1,100.00 | $1,350.00 | |
| 63 | 50300260 | BR DECK GROOVING | 2,080 | SQ YD | $7.00 | $6.45 | $7.00 | $7.00 | |
| 64 | 50300300 | PROTECTIVE COAT | 4,579 | SQ YD | $0.2500 | $1.75 | $1.00 | $8.00 | |
| 65 | 50301350 | CONC SUPSTR APP SLAB | 236.2 | CU YD | $500.00 | $325.00 | $385.00 | $350.00 | |
| 66 | 50500405 | F & E STRUCT STEEL | 3,160 | POUND | $20.00 | $20.55 | $24.00 | $11.79 | |
| 67 | 50500505 | STUD SHEAR CONNECTORS | 6,300 | EACH | $4.25 | $3.80 | $4.00 | $4.00 | |
| 68 | 50800205 | REINF BARS, EPOXY CTD | 217,980 | POUND | $1.80 | $1.70 | $1.70 | $1.70 | |
| 69 | 50800515 | BAR SPLICERS | 858 | EACH | $3.00 | $45.30 | $42.00 | $50.64 | |
| 70 | 51100100 | SLOPE WALL 4 | 344 | SQ YD | $150.00 | $150.00 | $125.00 | $125.00 | |
| 71 | 51500100 | NAME PLATES | 1 | EACH | $800.00 | $668.65 | $800.00 | $2,000.00 | |
| 72 | 52000110 | PREF JT STRIP SEAL | 348 | FOOT | $185.00 | $320.00 | $215.00 | $165.00 | |
| 73 | 52200010 | TEMP SHT PILING | 270 | SQ FT | $1.00 | $85.00 | $45.00 | $125.00 | |
| 74 | 58600101 | GRANULAR BACKFILL STR | 212 | CU YD | $100.00 | $72.00 | $58.00 | $85.00 | |
| 75 | 58700300 | CONCRETE SEALER | 3,827 | SQ FT | $4.00 | $1.49 | $5.00 | $1.50 | |
| 76 | 59000200 | EPOXY CRACK INJECTION | 440 | FOOT | $50.00 | $42.88 | $66.00 | $55.00 | |
| 77 | 59100100 | GEOCOMPOSITE WALL DR | 117 | SQ YD | $27.00 | $55.00 | $36.00 | $15.00 | |
| 78 | 59300100 | CONTR LOW-STRENG MATL | 275 | CU YD | $200.00 | $150.00 | $140.00 | $155.00 | |
| 79 | 60100060 | CONC HDWL FOR P DRAIN | 4 | EACH | $750.00 | $664.00 | $400.00 | $3,000.00 | |
| 80 | 60146304 | P UNDR FOR STRUCT 4 | 236 | FOOT | $25.00 | $45.00 | $32.00 | $45.00 | |
| 81 | 60260100 | INLETS ADJUST | 1 | EACH | $805.00 | $665.00 | $600.00 | $800.00 | |
| 82 | 60605000 | COMB CC&G TB6.24 | 890 | FOOT | $80.00 | $5.00 | $31.00 | $36.15 | |
| 83 | 60618730 | CONC MED TM2.06 | 5,266 | SQ FT | $22.00 | $12.00 | $16.00 | $14.00 | |
| 84 | 63000001 | SPBGR TY A 6FT POSTS | 240 | FOOT | $41.00 | $57.45 | $62.00 | $56.20 | |
| 85 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $4,500.00 | $4,768.60 | $5,000.00 | $4,668.00 | |
| 86 | 63200310 | GUARDRAIL REMOV | 781 | FOOT | $8.00 | $5.15 | $8.00 | $8.00 | |
| 87 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,000.00 | $2,247.00 | $3,000.00 | $2,200.00 | |
| 88 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $900.00 | $1,838.80 | $1,000.00 | $1,800.00 | |
| 89 | 66901006 | REG SUB MON | 4 | CAL DA | $1,300.00 | $899.00 | $700.00 | $880.00 | |
| 90 | 67100100 | MOBILIZATION | 1 | L SUM | $175,000.00 | $225,000.00 | $236,000.00 | $278,000.00 | |
| 91 | 70103815 | TR CONT SURVEILLANCE | 90 | CAL DA | $25.00 | $51.00 | $30.00 | $50.00 | |
| 92 | 70107025 | CHANGEABLE MESSAGE SN | 180 | CAL DA | $28.00 | $51.00 | $30.00 | $50.00 | |
| 93 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $100.00 | $550.00 | $8,000.00 | $0.0100 | |
| 94 | 70300100 | SHORT TERM PAVT MKING | 888 | FOOT | $0.5000 | $1.00 | $1.00 | $1.10 | |
| 95 | 70300150 | SHRT TRM PAVT MK REM | 6,702 | SQ FT | $0.3000 | $1.00 | $1.00 | $1.10 | |
| 96 | 70307100 | TEMP PVT MK LTR & SYM T4 TAPE | 775 | SQ FT | $3.50 | $2.05 | $4.00 | $2.00 | |
| 97 | 70307120 | TEMP PVT MK L4 T4 TAPE | 19,856 | FOOT | $1.10 | $0.4000 | $1.20 | $0.4000 | |
| 98 | 70307130 | TEMP PVT MK L6 T4 TAPE | 3,026 | FOOT | $1.60 | $0.6500 | $1.80 | $0.6000 | |
| 99 | 70307210 | TEMP PVT MK L24 T4 TAPE | 368 | FOOT | $6.60 | $2.00 | $7.00 | $2.00 | |
| 100 | 70400100 | TEMP CONC BARRIER | 1,775 | FOOT | $22.00 | $16.00 | $22.00 | $30.00 | |
| 101 | 70400200 | REL TEMP CONC BARRIER | 1,762.5 | FOOT | $4.00 | $5.00 | $4.00 | $6.00 | |
| 102 | 70600255 | IMP ATTN TEMP FRN TL2 | 8 | EACH | $7,100.00 | $5,536.80 | $5,500.00 | $5,420.00 | |
| 103 | 70600322 | IMP ATTN REL FRN TL2 | 8 | EACH | $3,400.00 | $1,978.00 | $2,200.00 | $1,936.00 | |
| 104 | 72000100 | SIGN PANEL T1 | 20 | SQ FT | $22.00 | $51.00 | $25.00 | $50.00 | |
| 105 | 72400200 | REMOV SIN PAN ASSY TB | 2 | EACH | $100.00 | $151.00 | $110.00 | $150.00 | |
| 106 | 72800100 | TELES STL SIN SUPPORT | 25 | FOOT | $18.00 | $20.45 | $20.00 | $20.00 | |
| 107 | 73100100 | BASE TEL STL SIN SUPP | 2 | EACH | $195.00 | $510.80 | $210.00 | $500.00 | |
| 108 | 78000200 | THPL PVT MK LINE 4 | 1,982 | FOOT | $1.75 | $2.30 | $4.00 | $2.25 | |
| 109 | 78000300 | THPL PVT MK LINE 5 | 1,340 | FOOT | $2.50 | $2.80 | $5.00 | $2.81 | |
| 110 | 78000600 | THPL PVT MK LINE 12 | 34 | FOOT | $5.00 | $10.25 | $7.00 | $6.74 | |
| 111 | 78004620 | PREF PL PM TD LN 4 | 1,239 | FOOT | $5.25 | $10.25 | $10.00 | $6.70 | |
| 112 | 78004630 | PREF PL PM TD L 6 | 1,967 | FOOT | $7.10 | $12.75 | $11.00 | $10.40 | |
| 113 | 78006100 | PREF THPL PM LTR-SYM | 463 | SQ FT | $32.00 | $33.18 | $15.00 | $35.00 | |
| 114 | 78006180 | PREF THPL PM LINE 24 | 296 | FOOT | $32.00 | $35.74 | $18.00 | $51.15 | |
| 115 | 78009004 | MOD URETH PM LINE 4 | 4,405 | FOOT | $0.8500 | $1.00 | $1.60 | $1.72 | |
| 116 | 78009005 | MOD URETH PM LINE 5 | 4,220 | FOOT | $0.9500 | $1.20 | $2.15 | $2.15 | |
| 117 | 78009012 | MOD URETH PM LINE 12 | 64 | FOOT | $2.50 | $5.15 | $4.40 | $5.33 | |
| 118 | 78100300 | REPLACEMENT REFLECTOR | 91 | EACH | $18.00 | $20.45 | $25.00 | $91.00 | |
| 119 | 78200005 | GRDRAIL REF TYPE A | 11 | EACH | $13.00 | $10.25 | $12.00 | $10.00 | |
| 120 | 78200011 | BARR WALL REF TYPE C | 285 | EACH | $8.00 | $12.25 | $8.00 | $12.00 | |
| 121 | 78300202 | PAVMT MRKG REM WTR BL | 6,279 | SQ FT | $0.2000 | $1.55 | $0.3000 | $1.50 | |
| 122 | 81028200 | UNDRGRD C GALVS 2 | 263 | FOOT | $30.00 | $30.00 | $32.00 | $29.40 | |
| 123 | 81400100 | HANDHOLE | 2 | EACH | $2,000.00 | $1,997.15 | $2,200.00 | $1,955.00 | |
| 124 | 85000200 | MAIN EX TR SIG INSTAL | 5 | EACH | $925.00 | $939.85 | $1,000.00 | $920.00 | |
| 125 | 85000400 | MAIN TEMP TR SIG INST | 2 | EACH | $5,800.00 | $5,873.91 | $6,200.00 | $5,750.00 | |
| 126 | 87900200 | DRILL EX HANDHOLE | 2 | EACH | $500.00 | $487.30 | $550.00 | $477.00 | |
| 127 | 88600700 | PREFORM DETECT LOOP | 76 | FOOT | $44.00 | $44.65 | $48.00 | $43.70 | |
| 128 | 89000100 | TEMP TR SIG INSTALL | 1 | EACH | $60,000.00 | $61,225.00 | $65,000.00 | $59,933.00 | |
| 129 | 89501250 | RELOC EX TS EQUIP | 2 | EACH | $475.00 | $470.00 | $500.00 | $460.00 | |
| 130 | 89502350 | REM & RE ELCBL FR CON | 260 | FOOT | $10.50 | $10.65 | $11.00 | $10.40 |