(115,116)RS-3
- Let date
- Friday, June 17, 2022
- Contract
- 66H07 · job page
- District
- District 3
- County
- Dekalb
- Highway
- Limits
- This work is located on FAP 573 (US 30) from the Lee County line to 0.5 miles East of Shabbona Road in Shabbona. This work consists of 3.96 miles of 3-3/4" milling and hot-mix asphalt resurfacing. The project also_includes the reconstruction of several ADA sidewalk ramps throughout Shabbona.
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Builders Paving, LLC Low bidder | $2,738,000 | ||
| 2 | Curran Contracting Company | $2,906,662 | +6.2% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Builders Paving… | #2 Curran Contract… |
|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $17,187.44 | $8,970.00 | |
| 2 | X0327693 | HIGH FRICT SURF TREAT | 3,053 | SQ YD | $42.00 | $45.00 | |
| 3 | X4401198 | HMA SURF REM VAR DP | 3,835 | SQ YD | $20.00 | $7.75 | |
| 4 | X5619210 | WATER VALVES ADJ SPL | 4 | EACH | $943.00 | $1,400.00 | |
| 5 | X6024250 | INLETS SPL N5 | 3 | EACH | $10,472.00 | $9,700.00 | |
| 6 | X6030310 | FR & LIDS ADJUST SPL | 21 | EACH | $702.00 | $1,400.00 | |
| 7 | Z0030850 | TEMP INFO SIGNING | 42 | SQ FT | $22.00 | $22.00 | |
| 8 | Z0034105 | MATL TRANSFER DEVICE | 14,230 | TON | $0.0100 | $2.50 | |
| 9 | 25200100 | SODDING | 156 | SQ YD | $25.00 | $36.00 | |
| 10 | 40200800 | AGG SURF CSE B | 34 | TON | $90.00 | $32.00 | |
| 11 | 40600290 | BIT MATLS TACK CT | 48,013 | POUND | $0.0100 | $0.0100 | |
| 12 | 40600370 | LONG JOINT SEALANT | 23,822 | FOOT | $2.50 | $2.50 | |
| 13 | 40600400 | MIX CR JTS FLANGEWYS | 22 | TON | $500.00 | $360.00 | |
| 14 | 40600900 | HMA BC HM N50 | 34 | TON | $275.00 | $280.00 | |
| 15 | 40600990 | TEMPORARY RAMP | 409 | SQ YD | $32.00 | $25.00 | |
| 16 | 40603080 | HMA BC IL-19.0 N50 | 8,390 | TON | $76.00 | $90.00 | |
| 17 | 40604000 | HMA SC IL-9.5FG C N50 | 253 | TON | $110.00 | $117.00 | |
| 18 | 40604050 | HMA SC IL-9.5 C N50 | 5,587 | TON | $82.00 | $100.00 | |
| 19 | 40800050 | INCIDENTAL HMA SURF | 437 | TON | $175.00 | $185.00 | |
| 20 | 42400100 | PC CONC SIDEWALK 4 | 5,687 | SQ FT | $20.00 | $12.50 | |
| 21 | 42400800 | DETECTABLE WARNINGS | 301 | SQ FT | $25.00 | $38.00 | |
| 22 | 44000100 | PAVEMENT REM | 394 | SQ YD | $26.00 | $45.00 | |
| 23 | 44000155 | HMA SURF REM 1 1/2 | 3,015 | SQ YD | $6.00 | $5.25 | |
| 24 | 44000164 | HMA SURF REM 3 3/4 | 66,530 | SQ YD | $6.00 | $4.35 | |
| 25 | 44000500 | COMB CURB GUTTER REM | 1,057 | FOOT | $28.00 | $24.00 | |
| 26 | 44000600 | SIDEWALK REM | 3,372 | SQ FT | $4.50 | $7.00 | |
| 27 | 48102100 | AGG WEDGE SHLD TYPE B | 977 | TON | $35.00 | $32.00 | |
| 28 | 550A0050 | STORM SEW CL A 1 12 | 7 | FOOT | $1,270.60 | $200.00 | |
| 29 | 60218400 | MAN TA 4 DIA T1F CL | 2 | EACH | $11,945.00 | $7,000.00 | |
| 30 | 60224446 | MAN TA 7 DIA T1F CL | 1 | EACH | $24,890.00 | $20,000.00 | |
| 31 | 60500090 | REM INLET- MAIN FLOW | 3 | EACH | $2,217.00 | $3,500.00 | |
| 32 | 60605000 | COMB CC&G TB6.24 | 1,162 | FOOT | $69.00 | $87.00 | |
| 33 | 66700205 | PERM SURV MKRS T1 | 6 | EACH | $1,800.00 | $750.00 | |
| 34 | 66900200 | NON SPL WASTE DISPOSL | 126 | CU YD | $100.00 | $65.00 | |
| 35 | 66900530 | SOIL DISPOSAL ANALY | 4 | EACH | $1,250.00 | $1,250.00 | |
| 36 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,800.00 | $2,800.00 | |
| 37 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,100.00 | $2,100.00 | |
| 38 | 66901006 | REG SUB MON | 5 | CAL DA | $840.00 | $840.00 | |
| 39 | 67000400 | ENGR FIELD OFFICE A | 4 | CAL MO | $3,500.00 | $3,200.00 | |
| 40 | 67100100 | MOBILIZATION | 1 | L SUM | $203,056.80 | $300,000.00 | |
| 41 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $1.00 | $1.00 | |
| 42 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $6,100.00 | $6,100.00 | |
| 43 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $6,100.00 | $6,100.00 | |
| 44 | 70300100 | SHORT TERM PAVT MKING | 6,377 | FOOT | $0.5000 | $0.4000 | |
| 45 | 70300150 | SHRT TRM PAVT MK REM | 2,126 | SQ FT | $1.50 | $1.50 | |
| 46 | 78000100 | THPL PVT MK LTR & SYM | 140 | SQ FT | $4.90 | $4.90 | |
| 47 | 78000200 | THPL PVT MK LINE 4 | 11,204 | FOOT | $0.8400 | $0.8400 | |
| 48 | 78000400 | THPL PVT MK LINE 6 | 1,085 | FOOT | $1.23 | $1.23 | |
| 49 | 78000500 | THPL PVT MK LINE 8 | 744 | FOOT | $1.63 | $1.63 | |
| 50 | 78000600 | THPL PVT MK LINE 12 | 2,549 | FOOT | $2.65 | $2.65 | |
| 51 | 78000650 | THPL PVT MK LINE 24 | 239 | FOOT | $4.90 | $4.90 | |
| 52 | 78004630 | PREF PL PM TD L 6 | 1,962 | FOOT | $7.85 | $7.85 | |
| 53 | 78009004 | MOD URETH PM LINE 4 | 74,915 | FOOT | $0.6200 | $0.6200 | |
| 54 | 78009006 | MOD URETH PM LINE 6 | 7,935 | FOOT | $0.9000 | $0.9000 | |
| 55 | 78011000 | GRV RCSD PM LTR & SYM | 140 | SQ FT | $5.00 | $5.00 | |
| 56 | 78011025 | GRV RCSD PVT MRKG 5 | 11,204 | FOOT | $0.4500 | $0.4500 | |
| 57 | 78011035 | GRV RCSD PVT MRKG 7 | 1,085 | FOOT | $0.7500 | $0.7500 | |
| 58 | 78011045 | GRV RCSD PVT MRKG 9 | 744 | FOOT | $1.25 | $1.25 | |
| 59 | 78011065 | GRV RCSD PVT MRKG 13 | 2,549 | FOOT | $2.50 | $2.50 | |
| 60 | 78011125 | GRV RCSD PVT MRKG 25 | 239 | FOOT | $5.00 | $5.00 | |
| 61 | 78100100 | RAISED REFL PAVT MKR | 271 | EACH | $41.50 | $41.50 | |
| 62 | 78300200 | RAISED REF PVT MK REM | 209 | EACH | $15.00 | $25.00 |