2013-009B
- Let date
- Friday, June 17, 2022
- Contract
- 60W35 · job page
- District
- District 1
- County
- Will
- Highway
- Limits
- (1.19-Mile) Pavement reconstruction along I-80 WB from Gardner St to Rowell Ave, replacement and widening of bridges carrying WB I-80 over Hickory Creek and Rowell Ave/WCL RR, bridge deck patching at EB and WB I-80 over Raynor Ave., SB Center St to EB I-80 Ramps, Des Plaines River, IL 53, and Gardner St/BNSF RR/UP RR and lighting in the city of Joliet in Will County.
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. and P. T. Ferro Construction Company JV Low bidder | $38,303,613 | ||
| 2 | Dunnet Bay Construction Company | $45,256,987 | +18.2% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 Dunnet Bay Cons… |
|---|---|---|---|---|---|---|---|
| 1 | X0320051 | CROS SONIC LOG A DUCT | 478 | FOOT | $18.00 | $10.00 | |
| 2 | X0320052 | CROS SONIC LOG TEST | 8 | EACH | $2,050.00 | $2,025.00 | |
| 3 | X0321750 | REM TEMP CONC BAR SO | 382 | FOOT | $15.00 | $20.00 | |
| 4 | X0322916 | PRO SS CONN TO EX SS | 7 | EACH | $1,200.00 | $800.00 | |
| 5 | X0323879 | SERVICE PATROL | 764 | CAL DA | $3,600.00 | $60.00 | |
| 6 | X0325201 | SHOULDER RUM STRIP RM | 302 | SQ YD | $0.0100 | $65.00 | |
| 7 | X0325222 | WEED CONT BASAL TRTMT | 25 | GALLON | $968.00 | $1,150.00 | |
| 8 | X0325349 | TEMP CON BAR (PERM) | 527 | FOOT | $32.50 | $28.00 | |
| 9 | X0326275 | RR ROW ENTRY PERMIT | 1 | EACH | $1,500.00 | $5,000.00 | |
| 10 | X0327120 | WEED CTRL NTV LSCP EN | 5 | ACRE | $1,254.00 | $1,725.00 | |
| 11 | X0900075 | COFFERDAM TYP 1 IS WW | 7 | EACH | $0.0100 | $1.00 | |
| 12 | X0900092 | REPAIR BRIDGE RAIL | 135 | FOOT | $170.00 | $75.00 | |
| 13 | X1200206 | HMA SURFACE RMVL CMPLT | 8,928 | SQ YD | $15.00 | $18.00 | |
| 14 | X1400366 | TEMP TR SIG INSTAL SPL | 1 | L SUM | $5,335.00 | $5,028.19 | |
| 15 | X2700001 | TEMP RUMBLE STRIPS SP | 53 | EACH | $850.00 | $506.00 | |
| 16 | X5030250 | BR DECK GROOVING LONG | 4,587 | SQ YD | $6.50 | $5.67 | |
| 17 | X5210150 | HLMR BRG GUID EXP 400 | 20 | EACH | $7,900.00 | $6,736.22 | |
| 18 | X6700410 | ENGR FLD OFF A SPL | 36 | CAL MO | $5,000.00 | $4,000.00 | |
| 19 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $0.0100 | $51,500.00 | |
| 20 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $799,000.00 | $3,603,300.00 | |
| 21 | X7013820 | TR CONT SURVEIL EXPWY | 493 | CAL DA | $0.0100 | $25.00 | |
| 22 | X8211009 | TEMP LUM LED RDWY I | 10 | EACH | $1,078.00 | $999.79 | |
| 23 | X8250065 | TEMP LT CONTR 240 PM | 1 | EACH | $8,250.00 | $8,008.60 | |
| 24 | X8570000 | SMART TRAF MONIT SYS | 1 | L SUM | $752,719.00 | $605,000.00 | |
| 25 | Z0004552 | APPROACH SLAB REM | 796 | SQ YD | $35.00 | $75.00 | |
| 26 | Z0012754 | STR REP CON DP = < 5 | 210 | SQ FT | $150.00 | $225.00 | |
| 27 | Z0012755 | STR REP CON DP OVER 5 | 40 | SQ FT | $200.00 | $360.00 | |
| 28 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $150,000.00 | $20,000.00 | |
| 29 | Z0016002 | DECK SLAB REP (FD-T2) | 860 | SQ YD | $700.00 | $730.00 | |
| 30 | Z0016200 | DECK SLAB REP (PART) | 2,109 | SQ YD | $300.00 | $330.00 | |
| 31 | Z0018002 | DRAINAGE SCUPPR DS-11 | 5 | EACH | $1,800.00 | $1,650.00 | |
| 32 | Z0018010 | DRAINAGE SCUPPR DS-33 | 10 | EACH | $3,000.00 | $2,775.00 | |
| 33 | Z0018700 | DRAINAGE STR REMOVED | 11 | EACH | $465.00 | $1,100.00 | |
| 34 | Z0021400 | EXPANSION JOINT SPL | 36 | FOOT | $725.00 | $400.00 | |
| 35 | Z0022800 | FENCE REMOVAL | 5,788 | FOOT | $11.78 | $8.00 | |
| 36 | Z0023201 | SED CONT SILT CURTAIN | 7 | EACH | $2,500.00 | $1.00 | |
| 37 | Z0026408 | TEMP SHT PILING SPL | 220 | SQ FT | $40.00 | $60.00 | |
| 38 | Z0029090 | DIAMOND GRIND BR SEC | 7,630 | SQ YD | $10.00 | $9.00 | |
| 39 | Z0030850 | TEMP INFO SIGNING | 730 | SQ FT | $30.00 | $40.00 | |
| 40 | Z0033020 | LUM SFTY CABLE ASMBLY | 33 | EACH | $198.00 | $124.82 | |
| 41 | Z0033028 | MAINT LIGHTING SYS | 24 | CAL MO | $715.00 | $1,000.00 | |
| 42 | Z0034390 | MODULAR EXPAN JT 6 | 61 | FOOT | $2,300.00 | $2,048.01 | |
| 43 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $5,665.00 | $5,000.00 | |
| 44 | Z0062456 | TEMP PAVEMENT | 7,178 | SQ YD | $60.00 | $69.50 | |
| 45 | Z0064600 | SELECTIVE CLEARING | 2.75 | ACRE | $11,000.00 | $10,000.00 | |
| 46 | Z0073500 | TEMP SUPPORT SYSTEM | 1 | L SUM | $14,000.00 | $1.00 | |
| 47 | Z0073510 | TEMP TR SIGNAL TIMING | 12 | EACH | $418.00 | $315.00 | |
| 48 | Z0076600 | TRAINEES | 2,500 | HOUR | $0.8000 | $0.8000 | |
| 49 | Z0076604 | TRAINEES TPG | 2,500 | HOUR | $15.00 | $15.00 | |
| 50 | 20100500 | TREE REMOV ACRES | 2.25 | ACRE | $11,000.00 | $10,000.00 | |
| 51 | 20200100 | EARTH EXCAVATION | 15,875 | CU YD | $20.00 | $35.00 | |
| 52 | 20200200 | ROCK EXCAVATION | 1,350 | CU YD | $50.00 | $85.00 | |
| 53 | 20201200 | REM & DISP UNS MATL | 2,419 | CU YD | $18.00 | $35.00 | |
| 54 | 20400800 | FURNISHED EXCAVATION | 522 | CU YD | $23.00 | $35.00 | |
| 55 | 20800150 | TRENCH BACKFILL | 465 | CU YD | $30.00 | $48.00 | |
| 56 | 20900110 | POROUS GRAN BACKFILL | 160 | CU YD | $48.00 | $127.31 | |
| 57 | 21001000 | GEOTECH FAB F/GR STAB | 7,258 | SQ YD | $2.00 | $2.00 | |
| 58 | 21101505 | TOPSOIL EXC & PLAC | 3,460 | CU YD | $16.50 | $32.00 | |
| 59 | 21101615 | TOPSOIL F & P 4 | 21,835 | SQ YD | $5.50 | $4.05 | |
| 60 | 25000210 | SEEDING CL 2A | 2 | ACRE | $3,462.80 | $1,500.00 | |
| 61 | 25000310 | SEEDING CL 4 | 2.75 | ACRE | $2,718.10 | $2,800.00 | |
| 62 | 25000400 | NITROGEN FERT NUTR | 270 | POUND | $3.30 | $2.00 | |
| 63 | 25000600 | POTASSIUM FERT NUTR | 270 | POUND | $3.30 | $2.00 | |
| 64 | 25000775 | SELECT MOWING STAKES | 17 | EACH | $55.00 | $75.00 | |
| 65 | 25100115 | MULCH METHOD 2 | 2.75 | ACRE | $1,870.00 | $2,200.00 | |
| 66 | 25100630 | EROSION CONTR BLANKET | 17,315 | SQ YD | $1.10 | $1.03 | |
| 67 | 25100635 | HD EROS CONTR BLANKET | 4,753 | SQ YD | $2.20 | $1.48 | |
| 68 | 28000250 | TEMP EROS CONTR SEED | 452 | POUND | $5.50 | $8.00 | |
| 69 | 28000305 | TEMP DITCH CHECKS | 350 | FOOT | $4.29 | $6.00 | |
| 70 | 28000400 | PERIMETER EROS BAR | 5,685 | FOOT | $2.09 | $1.73 | |
| 71 | 28000510 | INLET FILTERS | 43 | EACH | $154.00 | $175.00 | |
| 72 | 28001100 | TEMP EROS CONTR BLANK | 5,335 | SQ YD | $0.8800 | $1.54 | |
| 73 | 28001200 | TEMP HD EROS CONTR BL | 4,753 | SQ YD | $1.76 | $1.64 | |
| 74 | 28100107 | STONE RIPRAP CL A4 | 1,244 | SQ YD | $75.00 | $125.00 | |
| 75 | 28200200 | FILTER FABRIC | 1,244 | SQ YD | $3.25 | $3.75 | |
| 76 | 30300001 | AGG SUBGRADE IMPROVE | 2,503 | CU YD | $32.00 | $29.00 | |
| 77 | 30300112 | AGG SUBGRADE IMPR 12 | 37,906 | SQ YD | $15.00 | $13.25 | |
| 78 | 31101200 | SUB GRAN MAT B 4 | 7,178 | SQ YD | $6.00 | $8.00 | |
| 79 | 31101400 | SUB GRAN MAT B 6 | 5,104 | SQ YD | $8.00 | $10.00 | |
| 80 | 31102100 | SUB GRAN MAT C 4 | 11,829 | SQ YD | $6.00 | $8.00 | |
| 81 | 31200500 | STAB SUBBASE HMA 4 | 25,673 | SQ YD | $18.00 | $19.00 | |
| 82 | 40600370 | LONG JOINT SEALANT | 8,493 | FOOT | $3.75 | $5.00 | |
| 83 | 40600982 | HMA SURF REM BUTT JT | 1,293 | SQ YD | $0.0100 | $25.00 | |
| 84 | 40603240 | P HMA BC IL19.0 N90 | 763 | TON | $95.00 | $115.00 | |
| 85 | 40605026 | P HMA SC SMA 9.5 F N80 | 1,608 | TON | $118.00 | $162.00 | |
| 86 | 40800029 | BIT MATLS TACK CT | 5,231 | POUND | $0.0100 | $1.00 | |
| 87 | 42000060 | WELDED WIRE REINF | 650 | SQ YD | $25.00 | $35.00 | |
| 88 | 42000080 | PVT CON PCC BR APP SL | 957 | SQ YD | $130.00 | $130.00 | |
| 89 | 42000401 | PCC PVT 9 JOINTED | 4,923 | SQ YD | $66.50 | $70.00 | |
| 90 | 42000416 | PCC PVT 9 3/4 JOINTD | 3,343 | SQ YD | $71.00 | $84.00 | |
| 91 | 42001300 | PROTECTIVE COAT | 36,455 | SQ YD | $1.00 | $0.2500 | |
| 92 | 42100360 | CONT REINF PCC PVT 13 | 19,454 | SQ YD | $65.50 | $74.00 | |
| 93 | 42100615 | PAVT REINFORCEMENT | 19,454 | SQ YD | $45.00 | $52.00 | |
| 94 | 42101436 | LUG SYSTEM COMPL 36 | 3 | EACH | $63,000.00 | $62,000.00 | |
| 95 | 44000100 | PAVEMENT REM | 24,800 | SQ YD | $15.00 | $22.50 | |
| 96 | 44000300 | CURB REM | 1,265 | FOOT | $10.00 | $7.00 | |
| 97 | 44000500 | COMB CURB GUTTER REM | 494 | FOOT | $14.00 | $7.00 | |
| 98 | 44004250 | PAVED SHLD REMOVAL | 11,581 | SQ YD | $15.00 | $12.00 | |
| 99 | 44201803 | CL D PATCH T2 13 | 605 | SQ YD | $115.00 | $180.00 | |
| 100 | 44201807 | CL D PATCH T3 13 | 907 | SQ YD | $115.00 | $180.00 | |
| 101 | 44201809 | CL D PATCH T4 13 | 907 | SQ YD | $115.00 | $180.00 | |
| 102 | 48101200 | AGGREGATE SHLDS B | 1,171 | TON | $25.00 | $33.00 | |
| 103 | 48300415 | PCC SHOULDERS 9 3/4 | 1,226 | SQ YD | $63.00 | $82.00 | |
| 104 | 48300800 | PCC SHOULDERS 13 | 12,308 | SQ YD | $68.50 | $71.00 | |
| 105 | 50100100 | REM EXIST STRUCT | 1 | EACH | $510,000.00 | $1,775,000.00 | |
| 106 | 50101500 | REM EXIST SUP-STR | 1 | EACH | $400,000.00 | $750,000.00 | |
| 107 | 50102400 | CONC REM | 121.3 | CU YD | $825.00 | $250.00 | |
| 108 | 50104400 | CONC HDWL REM | 1 | EACH | $1,000.00 | $940.00 | |
| 109 | 50104650 | SLOPE WALL REMOV | 1,386 | SQ YD | $30.00 | $20.00 | |
| 110 | 50157300 | PROTECTIVE SHIELD | 1,119 | SQ YD | $0.0100 | $0.0100 | |
| 111 | 50200100 | STRUCTURE EXCAVATION | 5,162 | CU YD | $25.00 | $15.00 | |
| 112 | 50200300 | COFFERDAM EXCAVATION | 405 | CU YD | $50.00 | $0.0100 | |
| 113 | 50200400 | ROCK EXC STRUCT | 760 | CU YD | $250.00 | $110.00 | |
| 114 | 50300225 | CONC STRUCT | 1,394.6 | CU YD | $800.00 | $800.00 | |
| 115 | 50300255 | CONC SUP-STR | 3,366.6 | CU YD | $800.00 | $900.00 | |
| 116 | 50300280 | CONCRETE ENCASEMENT | 9.8 | CU YD | $500.00 | $800.00 | |
| 117 | 50300300 | PROTECTIVE COAT | 10,638 | SQ YD | $1.00 | $2.50 | |
| 118 | 50301350 | CONC SUPSTR APP SLAB | 424.3 | CU YD | $400.00 | $500.00 | |
| 119 | 50500105 | F & E STRUCT STEEL | 1 | L SUM | $8,450,118.00 | $11,010,000.00 | |
| 120 | 50500505 | STUD SHEAR CONNECTORS | 37,280 | EACH | $4.00 | $4.30 | |
| 121 | 50800105 | REINFORCEMENT BARS | 53,530 | POUND | $1.52 | $1.90 | |
| 122 | 50800205 | REINF BARS, EPOXY CTD | 1,240,250 | POUND | $1.50 | $1.87 | |
| 123 | 50800515 | BAR SPLICERS | 3,844 | EACH | $49.00 | $15.00 | |
| 124 | 50800530 | MECHANICAL SPLICERS | 20 | EACH | $180.00 | $131.05 | |
| 125 | 51100100 | SLOPE WALL 4 | 2,319 | SQ YD | $90.00 | $100.00 | |
| 126 | 51100300 | SLOPE WALL 6 | 639 | SQ YD | $110.00 | $170.00 | |
| 127 | 51201600 | FUR STL PILE HP12X53 | 2,749 | FOOT | $85.00 | $82.00 | |
| 128 | 51202305 | DRIVING PILES | 2,749 | FOOT | $0.0100 | $0.0100 | |
| 129 | 51203600 | TEST PILE ST HP12X53 | 2 | EACH | $5,000.00 | $10,000.00 | |
| 130 | 51204650 | PILE SHOES | 58 | EACH | $200.00 | $130.00 | |
| 131 | 51500100 | NAME PLATES | 3 | EACH | $700.00 | $550.00 | |
| 132 | 51602000 | PERMANENT CASING | 105 | FOOT | $350.00 | $450.00 | |
| 133 | 51603000 | DRILLED SHAFT IN SOIL | 54 | CU YD | $650.00 | $2,450.00 | |
| 134 | 51604000 | DRILLED SHAFT IN ROCK | 101.4 | CU YD | $2,800.00 | $3,500.00 | |
| 135 | 52000030 | PREF JOINT SEAL 2 1/2 | 266 | FOOT | $82.00 | $45.00 | |
| 136 | 52000110 | PREF JT STRIP SEAL | 76 | FOOT | $218.00 | $235.00 | |
| 137 | 52100010 | ELAST BEARING ASSY T1 | 22 | EACH | $3,600.00 | $3,280.00 | |
| 138 | 52100020 | ELAST BEARING ASSY T2 | 10 | EACH | $4,800.00 | $4,555.00 | |
| 139 | 52100030 | ELAST BEARING ASSY T3 | 10 | EACH | $4,500.00 | $4,345.00 | |
| 140 | 52100520 | ANCHOR BOLTS 1 | 208 | EACH | $150.00 | $190.00 | |
| 141 | 52100540 | ANCHOR BOLTS 1 1/2 | 40 | EACH | $200.00 | $235.00 | |
| 142 | 52200010 | TEMP SHT PILING | 765 | SQ FT | $25.00 | $0.0100 | |
| 143 | 52200020 | TEMP SOIL RETEN SYSTM | 2,339 | SQ FT | $45.00 | $0.0100 | |
| 144 | 52200500 | MECH ST EARTH RET WL | 7,266 | SQ FT | $75.00 | $85.00 | |
| 145 | 52200505 | TMP MEC ST ERT RET WL | 671 | SQ FT | $70.00 | $80.00 | |
| 146 | 52318802 | DRAINAGE SYSTEM FOR STRUCTURES | 1 | L SUM | $85,000.00 | $35,000.00 | |
| 147 | 54213657 | PRC FLAR END SEC 12 | 2 | EACH | $1,000.00 | $1,700.00 | |
| 148 | 550A0050 | STORM SEW CL A 1 12 | 395 | FOOT | $50.00 | $115.00 | |
| 149 | 550A0340 | STORM SEW CL A 2 12 | 582 | FOOT | $60.00 | $115.00 | |
| 150 | 55100500 | STORM SEWER REM 12 | 242 | FOOT | $18.00 | $80.00 | |
| 151 | 55101200 | STORM SEWER REM 24 | 89 | FOOT | $25.00 | $80.00 | |
| 152 | 58600101 | GRANULAR BACKFILL STR | 679 | CU YD | $45.00 | $35.00 | |
| 153 | 58700300 | CONCRETE SEALER | 1,718 | SQ FT | $2.00 | $3.54 | |
| 154 | 59100100 | GEOCOMPOSITE WALL DR | 529 | SQ YD | $30.00 | $20.00 | |
| 155 | 60100060 | CONC HDWL FOR P DRAIN | 18 | EACH | $450.00 | $900.00 | |
| 156 | 60108100 | PIPE UNDERDRAIN 4 SP | 13 | FOOT | $25.00 | $100.00 | |
| 157 | 60108200 | PIPE UNDERDRAIN 6 SP | 693 | FOOT | $28.00 | $28.00 | |
| 158 | 60108206 | PIPE UNDERDR T 2 6 | 12,609 | FOOT | $18.00 | $24.00 | |
| 159 | 60146304 | P UNDR FOR STRUCT 4 | 908 | FOOT | $25.00 | $35.00 | |
| 160 | 60201005 | CB TA 4 DIA T10F&G | 3 | EACH | $3,400.00 | $3,700.00 | |
| 161 | 60201310 | CB TA 4 DIA T20F&G | 9 | EACH | $3,500.00 | $3,700.00 | |
| 162 | 60250200 | CB ADJUST | 22 | EACH | $325.00 | $1,400.00 | |
| 163 | 60252800 | CB RECONST | 9 | EACH | $645.00 | $1,500.00 | |
| 164 | 60602500 | CONC GUTTER TA | 655 | FOOT | $26.50 | $38.00 | |
| 165 | 60602800 | CONC GUTTER TB | 540 | FOOT | $30.00 | $40.00 | |
| 166 | 60605000 | COMB CC&G TB6.24 | 560 | FOOT | $40.00 | $45.00 | |
| 167 | 63000001 | SPBGR TY A 6FT POSTS | 2,413 | FOOT | $45.13 | $32.00 | |
| 168 | 63100045 | TRAF BAR TERM T2 | 3 | EACH | $1,763.06 | $1,600.00 | |
| 169 | 63100070 | TRAF BAR TERM T5 | 2 | EACH | $1,625.56 | $1,350.00 | |
| 170 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $5,230.37 | $4,200.00 | |
| 171 | 63100167 | TR BAR TRM T1 SPL TAN | 5 | EACH | $4,645.98 | $3,600.00 | |
| 172 | 63200310 | GUARDRAIL REMOV | 3,843 | FOOT | $9.56 | $7.00 | |
| 173 | 63500105 | DELINEATORS | 31 | EACH | $61.70 | $100.00 | |
| 174 | 63800920 | MOD GLAR SCR SYS TEMP | 6,563 | FOOT | $7.00 | $8.00 | |
| 175 | 66400105 | CH LK FENCE 4 | 5,508 | FOOT | $38.42 | $29.00 | |
| 176 | 66400305 | CH LK FENCE 6 | 280 | FOOT | $55.87 | $41.00 | |
| 177 | 66900200 | NON SPL WASTE DISPOSL | 8,290 | CU YD | $67.50 | $66.00 | |
| 178 | 66900530 | SOIL DISPOSAL ANALY | 7 | EACH | $1,375.00 | $1,800.00 | |
| 179 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,750.00 | $3,250.00 | |
| 180 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,750.00 | $2,000.00 | |
| 181 | 66901006 | REG SUB MON | 125 | CAL DA | $880.00 | $910.00 | |
| 182 | 67100100 | MOBILIZATION | 1 | L SUM | $1,340,000.00 | $2,720,000.00 | |
| 183 | 70107025 | CHANGEABLE MESSAGE SN | 2,763 | CAL DA | $30.00 | $23.00 | |
| 184 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $20,000.00 | $10,000.00 | |
| 185 | 70300150 | SHRT TRM PAVT MK REM | 2,344 | SQ FT | $3.00 | $1.20 | |
| 186 | 70301100 | TEMP PVT MK LTR & SYM EPOXY | 42 | SQ FT | $7.70 | $3.00 | |
| 187 | 70301120 | TEMP PVT MK L4 EPOXY | 2,232 | FOOT | $2.20 | $2.00 | |
| 188 | 70301125 | TEMP PVT MK L5 EPOXY | 443 | FOOT | $4.40 | $2.00 | |
| 189 | 70301140 | TEMP PVT MK L8 EPOXY | 1,728 | FOOT | $6.60 | $2.00 | |
| 190 | 70301160 | TEMP PVT MK L12 EPOXY | 221 | FOOT | $8.80 | $3.00 | |
| 191 | 70307100 | TEMP PVT MK LTR & SYM T4 TAPE | 42 | SQ FT | $10.00 | $4.00 | |
| 192 | 70307120 | TEMP PVT MK L4 T4 TAPE | 2,232 | FOOT | $3.00 | $1.15 | |
| 193 | 70307140 | TEMP PVT MK L8 T4 TAPE | 1,728 | FOOT | $2.00 | $2.30 | |
| 194 | 70307160 | TEMP PVT MK L12 T4 TAPE | 221 | FOOT | $8.00 | $3.45 | |
| 195 | 70400100 | TEMP CONC BARRIER | 16,875 | FOOT | $25.00 | $22.00 | |
| 196 | 70400125 | PIN TEMP CONC BARRIER | 1,953 | EACH | $20.00 | $21.00 | |
| 197 | 70400200 | REL TEMP CONC BARRIER | 16,700 | FOOT | $10.00 | $6.00 | |
| 198 | 70400600 | REL TEMP CONC BAR SO | 1,375 | FOOT | $10.00 | $6.00 | |
| 199 | 70500100 | TEMP SPBGR TY A | 813 | FOOT | $27.97 | $26.00 | |
| 200 | 70500615 | TEMP TR BAR TERM T1 | 2 | EACH | $3,686.17 | $4,300.00 | |
| 201 | 70500625 | TEMP TR BAR TERM T2 | 1 | EACH | $1,515.18 | $2,200.00 | |
| 202 | 70500670 | TEMP TR BAR TERM T6A | 2 | EACH | $4,029.92 | $5,300.00 | |
| 203 | 70600251 | IMP ATTN TEMP NRN TL3 | 1 | EACH | $5,000.00 | $5,000.00 | |
| 204 | 70600260 | IMP ATTN TEMP FRN TL3 | 1 | EACH | $5,500.00 | $11,000.00 | |
| 205 | 70600332 | IMP ATTN REL FRN TL3 | 4 | EACH | $1,750.00 | $2,500.00 | |
| 206 | 72000100 | SIGN PANEL T1 | 35 | SQ FT | $36.30 | $33.00 | |
| 207 | 72000200 | SIGN PANEL T2 | 51 | SQ FT | $29.70 | $27.00 | |
| 208 | 72000300 | SIGN PANEL T3 | 1,187 | SQ FT | $33.66 | $30.60 | |
| 209 | 72400100 | REMOV SIN PAN ASSY TA | 8 | EACH | $97.90 | $89.00 | |
| 210 | 72400200 | REMOV SIN PAN ASSY TB | 11 | EACH | $259.60 | $236.00 | |
| 211 | 72400310 | REMOV SIGN PANEL T1 | 57 | SQ FT | $23.10 | $21.00 | |
| 212 | 72400320 | REMOV SIGN PANEL T2 | 60 | SQ FT | $13.20 | $12.00 | |
| 213 | 72400330 | REMOV SIGN PANEL T3 | 1,319 | SQ FT | $9.90 | $9.00 | |
| 214 | 72500300 | OBJECT MARKER T3 | 2 | EACH | $335.50 | $500.00 | |
| 215 | 72501000 | TERMINAL MARKER - DA | 6 | EACH | $61.70 | $35.00 | |
| 216 | 72600100 | MILEPOST MKR ASSEMBLY | 2 | EACH | $335.50 | $1.00 | |
| 217 | 72700100 | STR STL SIN SUP BA | 4,126 | POUND | $5.23 | $4.75 | |
| 218 | 72800100 | TELES STL SIN SUPPORT | 76 | FOOT | $18.32 | $16.65 | |
| 219 | 73000100 | WOOD SIN SUPPORT | 179 | FOOT | $36.30 | $33.00 | |
| 220 | 73100100 | BASE TEL STL SIN SUPP | 1 | EACH | $550.00 | $500.00 | |
| 221 | 73300100 | OVHD SIN STR-SPAN T1A | 155 | FOOT | $1,493.80 | $1,358.00 | |
| 222 | 73400100 | CONC FOUNDATION | 26 | CU YD | $1,909.60 | $1,736.00 | |
| 223 | 73400200 | DRILL SHAFT CONC FDN | 10 | CU YD | $1,773.20 | $1,612.00 | |
| 224 | 73700100 | REM GR MT SIN SUPPORT | 8 | EACH | $396.00 | $360.00 | |
| 225 | 73700200 | REM CONC FDN-GR MT | 8 | EACH | $661.10 | $601.00 | |
| 226 | 78000100 | THPL PVT MK LTR & SYM | 115 | SQ FT | $8.80 | $6.00 | |
| 227 | 78000200 | THPL PVT MK LINE 4 | 10,034 | FOOT | $1.27 | $0.8000 | |
| 228 | 78000300 | THPL PVT MK LINE 5 | 1,340 | FOOT | $1.60 | $1.20 | |
| 229 | 78000400 | THPL PVT MK LINE 6 | 92 | FOOT | $1.93 | $1.25 | |
| 230 | 78000500 | THPL PVT MK LINE 8 | 6,827 | FOOT | $2.64 | $1.75 | |
| 231 | 78000600 | THPL PVT MK LINE 12 | 732 | FOOT | $4.29 | $3.00 | |
| 232 | 78004355 | PREF PL PM TC INL L5 | 443 | FOOT | $17.60 | $8.50 | |
| 233 | 78004640 | PREF PL PM TD L 8 | 417 | FOOT | $22.00 | $16.00 | |
| 234 | 78005110 | EPOXY PVT MK LINE 4 | 87,221 | FOOT | $0.9400 | $0.6000 | |
| 235 | 78005120 | EPOXY PVT MK LINE 5 | 7,884 | FOOT | $1.21 | $0.7500 | |
| 236 | 78005140 | EPOXY PVT MK LINE 8 | 6,725 | FOOT | $1.93 | $1.20 | |
| 237 | 78005150 | EPOXY PVT MK LINE 12 | 1,530 | FOOT | $4.40 | $2.00 | |
| 238 | 78008210 | POLYUREA PM T1 LN 4 | 23,604 | FOOT | $3.30 | $0.9800 | |
| 239 | 78008220 | POLYUREA PM T1 LN 5 | 3,060 | FOOT | $4.68 | $1.20 | |
| 240 | 78008240 | POLYUREA PM T1 LN 8 | 7,615 | FOOT | $6.60 | $1.80 | |
| 241 | 78008250 | POLYUREA PM T1 LN 12 | 4,830 | FOOT | $8.80 | $3.00 | |
| 242 | 78011030 | GRV RCSD PVT MRKG 6 | 443 | FOOT | $4.40 | $5.00 | |
| 243 | 78011045 | GRV RCSD PVT MRKG 9 | 417 | FOOT | $6.60 | $7.00 | |
| 244 | 78100100 | RAISED REFL PAVT MKR | 91 | EACH | $165.00 | $91.00 | |
| 245 | 78200005 | GRDRAIL REF TYPE A | 31 | EACH | $15.07 | $25.00 | |
| 246 | 78200011 | BARR WALL REF TYPE C | 1,127 | EACH | $15.00 | $6.50 | |
| 247 | 78300200 | RAISED REF PVT MK REM | 91 | EACH | $20.00 | $5.00 | |
| 248 | 78300201 | PAVMT MRKG REM GRIND | 7,667 | SQ FT | $2.00 | $1.00 | |
| 249 | 78300202 | PAVMT MRKG REM WTR BL | 47,925 | SQ FT | $3.03 | $1.15 | |
| 250 | 80400100 | ELECT SERV INSTALL | 1 | EACH | $4,950.00 | $3,999.10 | |
| 251 | 80400200 | ELECT UTIL SERV CONN | 1 | L SUM | $7,000.00 | $7,000.00 | |
| 252 | 81028240 | UNDRGRD C GALVS 4 | 420 | FOOT | $71.50 | $75.55 | |
| 253 | 81200230 | CON EMB STR 2 PVC | 1,746 | FOOT | $17.60 | $9.92 | |
| 254 | 81300550 | JUN BX SS AS 12X12X6 | 5 | EACH | $2,145.00 | $2,175.28 | |
| 255 | 81603081 | UD 3#2#4GXLPUSE 1.5 P | 8,340 | FOOT | $22.00 | $20.74 | |
| 256 | 81702140 | EC C XLP USE 1C 4 | 2,005 | FOOT | $2.20 | $7.40 | |
| 257 | 81702150 | EC C XLP USE 1C 2 | 6,015 | FOOT | $2.97 | $5.36 | |
| 258 | 81800190 | A CBL 2-1C2 MESS WIRE | 2,560 | FOOT | $6.60 | $6.37 | |
| 259 | 82110008 | LUM LED RDWY H | 33 | EACH | $814.00 | $775.88 | |
| 260 | 83050710 | LT P A 47.5MH 6MA | 5 | EACH | $6,490.00 | $4,968.76 | |
| 261 | 83050810 | LT P A 47.5MH 15MA | 28 | EACH | $6,875.00 | $5,171.57 | |
| 262 | 83057435 | LT P WD 80 CL3 15MA | 11 | EACH | $6,050.00 | $5,303.20 | |
| 263 | 83600200 | LIGHT POLE FDN 24D | 238 | FOOT | $363.00 | $258.16 | |
| 264 | 83800205 | BKWY DEV TR B 15BC | 25 | EACH | $605.00 | $565.50 | |
| 265 | 84100110 | REM TEMP LIGHT UNIT | 17 | EACH | $1,188.00 | $1,005.64 | |
| 266 | 84200500 | REM LT UNIT SALV | 9 | EACH | $1,023.00 | $558.69 | |
| 267 | 84200804 | REM POLE FDN | 9 | EACH | $462.00 | $628.52 | |
| 268 | 85000200 | MAIN EX TR SIG INSTAL | 1 | EACH | $4,950.00 | $18,000.00 |