15-00077-00-BT
- Let date
- Friday, January 20, 2023
- Contract
- 61H84 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- Construction of a shared-use path, includes a reinforced slope system, drainage improvements, culvert headwall modifications, guardrail installation and pavement markings on the east side of 104th Avenue to 159th Street to 163rd Place in Orland Park.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $2,171,956 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… |
|---|---|---|---|---|---|---|
| 1 | X0326268 | REINFORC SOIL SLP SYS | 9,842 | SQ FT | $58.25 | |
| 2 | X0900075 | COFFERDAM TYP 1 IS WW | 2 | EACH | $0.0100 | |
| 3 | X2510635 | HD EROS CONT BLANK SP | 725 | SQ YD | $2.42 | |
| 4 | X2511630 | EROS CONT BLANKET SPL | 4,088 | SQ YD | $1.87 | |
| 5 | X4240800 | DETECTABLE WARN SPL | 40 | SQ FT | $75.00 | |
| 6 | X5091725 | BICYCLE RAILING SPL | 1,260 | FOOT | $192.50 | |
| 7 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $48,000.00 | |
| 8 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $18,000.00 | |
| 9 | Z0023201 | SED CONT SILT CURTAIN | 2 | EACH | $2,000.00 | |
| 10 | Z0030850 | TEMP INFO SIGNING | 90 | SQ FT | $25.00 | |
| 11 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | |
| 12 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | |
| 13 | 20200100 | EARTH EXCAVATION | 3,425 | CU YD | $30.00 | |
| 14 | 20201200 | REM & DISP UNS MATL | 3,471 | CU YD | $28.00 | |
| 15 | 20400800 | FURNISHED EXCAVATION | 1,900 | CU YD | $20.00 | |
| 16 | 20800150 | TRENCH BACKFILL | 221 | CU YD | $50.00 | |
| 17 | 21001000 | GEOTECH FAB F/GR STAB | 137 | SQ YD | $5.00 | |
| 18 | 21101505 | TOPSOIL EXC & PLAC | 2,778 | CU YD | $20.00 | |
| 19 | 25000110 | SEEDING CL 1A | 1 | ACRE | $3,097.60 | |
| 20 | 25000310 | SEEDING CL 4 | 0.5 | ACRE | $2,899.60 | |
| 21 | 25000312 | SEEDING CL 4A | 0.5 | ACRE | $2,828.10 | |
| 22 | 25000314 | SEEDING CL 4B | 0.25 | ACRE | $5,249.20 | |
| 23 | 25000350 | SEEDING CL 7 | 2.25 | ACRE | $1,469.60 | |
| 24 | 25000400 | NITROGEN FERT NUTR | 90 | POUND | $3.30 | |
| 25 | 25000600 | POTASSIUM FERT NUTR | 90 | POUND | $3.30 | |
| 26 | 25000750 | MOWING | 2.25 | ACRE | $330.00 | |
| 27 | 25100125 | MULCH METHOD 3 | 2.25 | ACRE | $2,200.00 | |
| 28 | 25100900 | TURF REINF MAT | 3,369 | SQ YD | $5.17 | |
| 29 | 28000250 | TEMP EROS CONTR SEED | 225 | POUND | $5.50 | |
| 30 | 28000305 | TEMP DITCH CHECKS | 320 | FOOT | $4.62 | |
| 31 | 28000400 | PERIMETER EROS BAR | 1,072 | FOOT | $2.20 | |
| 32 | 28000510 | INLET FILTERS | 15 | EACH | $166.10 | |
| 33 | 28100105 | STONE RIPRAP CL A3 | 30 | SQ YD | $100.00 | |
| 34 | 30300001 | AGG SUBGRADE IMPROVE | 46 | CU YD | $55.00 | |
| 35 | 30300112 | AGG SUBGRADE IMPR 12 | 2,725 | SQ YD | $21.00 | |
| 36 | 35101600 | AGG BASE CSE B 4 | 22 | SQ YD | $11.00 | |
| 37 | 35101800 | AGG BASE CSE B 6 | 1,519 | SQ YD | $11.00 | |
| 38 | 35501316 | HMA BASE CSE 8 | 168 | SQ YD | $41.00 | |
| 39 | 35600708 | HMA BC WID 8 | 574 | SQ YD | $50.00 | |
| 40 | 40600275 | BIT MATLS PR CT | 7,617 | POUND | $0.0100 | |
| 41 | 40600290 | BIT MATLS TACK CT | 129 | POUND | $0.0100 | |
| 42 | 40603080 | HMA BC IL-19.0 N50 | 370 | TON | $90.00 | |
| 43 | 40603085 | HMA BC IL-19.0 N70 | 81 | TON | $90.00 | |
| 44 | 40604060 | HMA SC IL-9.5 D N50 | 241 | TON | $90.00 | |
| 45 | 40604062 | HMA SC IL-9.5 D N70 | 49 | TON | $100.00 | |
| 46 | 42400410 | PC CONC SIDEWALK 8 | 195 | SQ FT | $20.00 | |
| 47 | 44000100 | PAVEMENT REM | 839 | SQ YD | $16.00 | |
| 48 | 44000200 | DRIVE PAVEMENT REM | 168 | SQ YD | $10.00 | |
| 49 | 44000500 | COMB CURB GUTTER REM | 102 | FOOT | $10.00 | |
| 50 | 44000600 | SIDEWALK REM | 1,083 | SQ FT | $4.00 | |
| 51 | 44003100 | MEDIAN REMOVAL | 126 | SQ FT | $5.00 | |
| 52 | 44004250 | PAVED SHLD REMOVAL | 1,178 | SQ YD | $14.00 | |
| 53 | 44200942 | CL B PATCH T3 8 | 16 | SQ YD | $200.00 | |
| 54 | 44213200 | SAW CUTS | 2,558 | FOOT | $3.00 | |
| 55 | 48101498 | AGGREGATE SHLDS B 4 | 684 | SQ YD | $9.00 | |
| 56 | 48203029 | HMA SHOULDERS 8 | 500 | SQ YD | $44.00 | |
| 57 | 50104400 | CONC HDWL REM | 4 | EACH | $300.00 | |
| 58 | 50300225 | CONC STRUCT | 5 | CU YD | $3,000.00 | |
| 59 | 50300300 | PROTECTIVE COAT | 15 | SQ YD | $5.00 | |
| 60 | 50800205 | REINF BARS, EPOXY CTD | 1,293 | POUND | $3.00 | |
| 61 | 542A0223 | P CUL CL A 1 18 | 43 | FOOT | $100.00 | |
| 62 | 542A0277 | P CUL CL A 1 72 | 7 | FOOT | $450.00 | |
| 63 | 54213657 | PRC FLAR END SEC 12 | 7 | EACH | $1,200.00 | |
| 64 | 54213660 | PRC FLAR END SEC 15 | 1 | EACH | $1,500.00 | |
| 65 | 54213663 | PRC FLAR END SEC 18 | 1 | EACH | $1,800.00 | |
| 66 | 54213717 | PRC FLAR END SEC 72 | 1 | EACH | $10,000.00 | |
| 67 | 550A0050 | STORM SEW CL A 1 12 | 585 | FOOT | $70.00 | |
| 68 | 550A0070 | STORM SEW CL A 1 15 | 47 | FOOT | $75.00 | |
| 69 | 60100060 | CONC HDWL FOR P DRAIN | 6 | EACH | $450.00 | |
| 70 | 60108206 | PIPE UNDERDR T 2 6 | 23 | FOOT | $40.00 | |
| 71 | 60201340 | CB TA 4 DIA T24F&G | 5 | EACH | $3,900.00 | |
| 72 | 60208240 | CB TC T24F&G | 8 | EACH | $2,900.00 | |
| 73 | 60219540 | MAN TA 4 DIA T24F&G | 1 | EACH | $3,000.00 | |
| 74 | 60224469 | MAN TA 9 DIA T1F CL | 1 | EACH | $17,000.00 | |
| 75 | 60237470 | INLETS TA T24F&G | 1 | EACH | $2,000.00 | |
| 76 | 60600605 | CONC CURB TB | 59 | FOOT | $40.00 | |
| 77 | 60605000 | COMB CC&G TB6.24 | 2,591 | FOOT | $32.00 | |
| 78 | 60618300 | CONC MEDIAN SURF 4 | 109 | SQ FT | $8.00 | |
| 79 | 63000001 | SPBGR TY A 6FT POSTS | 1,462.5 | FOOT | $37.40 | |
| 80 | 63000035 | BCK SD PROT OF GRDRL | 1,475 | FOOT | $18.70 | |
| 81 | 63000370 | LSG OVER CUL 25' SPAN | 50 | FOOT | $44.00 | |
| 82 | 63100045 | TRAF BAR TERM T2 | 1 | EACH | $1,980.00 | |
| 83 | 63100167 | TR BAR TRM T1 SPL TAN | 2 | EACH | $3,740.00 | |
| 84 | 63200310 | GUARDRAIL REMOV | 1,405 | FOOT | $4.95 | |
| 85 | 66900200 | NON SPL WASTE DISPOSL | 15 | CU YD | $150.00 | |
| 86 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,800.00 | |
| 87 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,200.00 | |
| 88 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,200.00 | |
| 89 | 66901006 | REG SUB MON | 2 | CAL DA | $850.00 | |
| 90 | 67000400 | ENGR FIELD OFFICE A | 9 | CAL MO | $4,500.00 | |
| 91 | 67100100 | MOBILIZATION | 1 | L SUM | $122,940.74 | |
| 92 | 70107005 | PAVT MK BLKOUT TAPE 5 | 5,745 | FOOT | $4.00 | |
| 93 | 70107007 | PAVT MK BLKOUT TAPE 7 | 620 | FOOT | $4.00 | |
| 94 | 70300150 | SHRT TRM PAVT MK REM | 5,789 | SQ FT | $2.50 | |
| 95 | 70306100 | TEMP PVT MK LTR & SYM T3 TAPE | 48 | SQ FT | $20.00 | |
| 96 | 70306120 | TEMP PVT MK L4 T3 TAPE | 9,174 | FOOT | $2.00 | |
| 97 | 70306210 | TEMP PVT MK L24 T3 TAPE | 20 | FOOT | $20.00 | |
| 98 | 70400100 | TEMP CONC BARRIER | 1,662.5 | FOOT | $30.00 | |
| 99 | 70600250 | IMP ATTN TEMP NRD TL3 | 1 | EACH | $5,000.00 | |
| 100 | 70600251 | IMP ATTN TEMP NRN TL3 | 1 | EACH | $5,000.00 | |
| 101 | 72000100 | SIGN PANEL T1 | 13 | SQ FT | $49.50 | |
| 102 | 72400500 | RELOC SIN PAN ASSY TA | 6 | EACH | $192.50 | |
| 103 | 72501000 | TERMINAL MARKER - DA | 3 | EACH | $55.00 | |
| 104 | 72800100 | TELES STL SIN SUPPORT | 55 | FOOT | $16.50 | |
| 105 | 78009000 | MOD URETH PM LTR-SYM | 50 | SQ FT | $15.04 | |
| 106 | 78009004 | MOD URETH PM LINE 4 | 548 | FOOT | $2.75 | |
| 107 | 78009006 | MOD URETH PM LINE 6 | 168 | FOOT | $4.13 | |
| 108 | 78009012 | MOD URETH PM LINE 12 | 143 | FOOT | $8.25 | |
| 109 | 78200005 | GRDRAIL REF TYPE A | 60 | EACH | $11.00 | |
| 110 | 78200011 | BARR WALL REF TYPE C | 69 | EACH | $15.00 | |
| 111 | 78300202 | PAVMT MRKG REM WTR BL | 50 | SQ FT | $49.50 |