(3,13)RS-6
- Let date
- Friday, June 17, 2022
- Contract
- 66L89 · job page
- District
- District 3
- County
- Ford
- Highway
- Limits
- This work is located at FAP 697 (IL 9) from Stockholm Road in Paxton to Vermillion County Line in Ford County (+/- 7.68 miles). This work consists of 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch grading, channel excavation and riprap placement.
- Classification
- 3P milling and resurfacing (designed overlay), and drainage improvements including culvert replacement, ditch
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Iroquois Paving Corporation Low bidder | $4,972,663 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Iroquois Paving… |
|---|---|---|---|---|---|---|
| 1 | X4401198 | HMA SURF REM VAR DP | 2,759 | SQ YD | $6.75 | |
| 2 | Z0000100 | ABANDON EX CULVERT | 1 | EACH | $5,000.00 | |
| 3 | Z0030850 | TEMP INFO SIGNING | 42 | SQ FT | $50.00 | |
| 4 | Z0034105 | MATL TRANSFER DEVICE | 27,618 | TON | $12.00 | |
| 5 | Z0076600 | TRAINEES | 1,000 | HOUR | $0.8000 | |
| 6 | Z0076604 | TRAINEES TPG | 1,000 | HOUR | $15.00 | |
| 7 | 20400800 | FURNISHED EXCAVATION | 72 | CU YD | $75.00 | |
| 8 | 20800150 | TRENCH BACKFILL | 100 | CU YD | $75.00 | |
| 9 | 21400100 | GRADING & SHAP DITCH | 3,620 | FOOT | $18.00 | |
| 10 | 25000210 | SEEDING CL 2A | 1 | ACRE | $5,300.00 | |
| 11 | 25000400 | NITROGEN FERT NUTR | 93 | POUND | $5.25 | |
| 12 | 25000500 | PHOSPHORUS FERT NUTR | 93 | POUND | $5.25 | |
| 13 | 25000600 | POTASSIUM FERT NUTR | 93 | POUND | $5.25 | |
| 14 | 25100630 | EROSION CONTR BLANKET | 4,939 | SQ YD | $1.70 | |
| 15 | 28100107 | STONE RIPRAP CL A4 | 68 | SQ YD | $175.00 | |
| 16 | 28200200 | FILTER FABRIC | 68 | SQ YD | $3.00 | |
| 17 | 40200800 | AGG SURF CSE B | 122 | TON | $85.00 | |
| 18 | 40600290 | BIT MATLS TACK CT | 90,014 | POUND | $1.25 | |
| 19 | 40600370 | LONG JOINT SEALANT | 40,442 | FOOT | $3.75 | |
| 20 | 40600400 | MIX CR JTS FLANGEWYS | 40 | TON | $0.0100 | |
| 21 | 40600900 | HMA BC HM N50 | 66 | TON | $0.0100 | |
| 22 | 40600990 | TEMPORARY RAMP | 242 | SQ YD | $0.0100 | |
| 23 | 40603080 | HMA BC IL-19.0 N50 | 16,571 | TON | $100.00 | |
| 24 | 40604050 | HMA SC IL-9.5 C N50 | 11,047 | TON | $105.00 | |
| 25 | 40800050 | INCIDENTAL HMA SURF | 406 | TON | $235.00 | |
| 26 | 44000164 | HMA SURF REM 3 3/4 | 131,516 | SQ YD | $5.45 | |
| 27 | 44201789 | CL D PATCH T2 12 | 32 | SQ YD | $285.00 | |
| 28 | 44201794 | CL D PATCH T3 12 | 45 | SQ YD | $285.00 | |
| 29 | 48102100 | AGG WEDGE SHLD TYPE B | 799 | TON | $36.50 | |
| 30 | 50102400 | CONC REM | 4 | CU YD | $1,500.00 | |
| 31 | 50105220 | PIPE CULVERT REMOV | 100 | FOOT | $40.00 | |
| 32 | 542A5479 | P CUL CL A 1 EQRS 24 | 80 | FOOT | $350.00 | |
| 33 | 542A5491 | P CUL CL A 1 EQRS 36 | 40 | FOOT | $450.00 | |
| 34 | 54262836 | METAL FL ES EQ RS 36" | 1 | EACH | $4,250.00 | |
| 35 | 54263424 | CONC ES 542011 24 1:4 | 4 | EACH | $10,000.00 | |
| 36 | 54263436 | CONC ES 542011 36 1:4 | 2 | EACH | $12,500.00 | |
| 37 | 60905305 | BOX CUL TO BE CLEANED | 115 | FOOT | $125.00 | |
| 38 | 66700205 | PERM SURV MKRS T1 | 11 | EACH | $750.00 | |
| 39 | 67000400 | ENGR FIELD OFFICE A | 4 | CAL MO | $0.0100 | |
| 40 | 67100100 | MOBILIZATION | 1 | L SUM | $298,000.00 | |
| 41 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $59,000.00 | |
| 42 | 70100455 | TRAF CONT-PROT 701206 | 1 | L SUM | $0.0100 | |
| 43 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $0.0100 | |
| 44 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $0.0100 | |
| 45 | 70300100 | SHORT TERM PAVT MKING | 8,740 | FOOT | $0.0100 | |
| 46 | 70300150 | SHRT TRM PAVT MK REM | 2,913 | SQ FT | $0.0100 | |
| 47 | 78001110 | PAINT PVT MK LINE 4 | 90,275 | FOOT | $0.1500 | |
| 48 | 78001130 | PAINT PVT MK LINE 6 | 10,110 | FOOT | $0.2000 | |
| 49 | 78100100 | RAISED REFL PAVT MKR | 506 | EACH | $37.50 | |
| 50 | 78300200 | RAISED REF PVT MK REM | 455 | EACH | $0.0100 |