| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 9, 2018 | 64M99 | VariousDistrict 2 | Washing eight bridges at various locations. | — | Executed | All States Painting, Inc. $89,200 · | ||
| Nov 9, 2018 | 64N13 | VariousDistrict 2 | Concrete sealer applied to bridge decks at various locations in District 2. | — | Executed | All States Painting, Inc. $48,997 · | ||
| Nov 9, 2018 | 64N14 | Rock IslandDistrict 2 | Concrete sealer applied to bridge decks at various locations in Rock Island County. | — | Executed | All States Painting, Inc. $24,850 · | ||
| Nov 9, 2018 | 64N15 | VariousDistrict 2 | Concrete sealer applied to bridge decks at various locations in District 2. | — | Executed | M & M Concrete, Inc. $90,000 · | ||
| Nov 9, 2018 | 66956 | KankakeeDistrict 3 | Bridge replacement of SN 046-0081 with Sn 046-0150, CH8 (St. George Road) over I-57. | — | Executed | D. Construction, Inc. $4,251,258 · | ||
| Nov 9, 2018 | 66A57 | LaSalleDistrict 3 | Bridge replacement of SN 050-0052 with SN 050-0259 over the Little Vermilion River, 3.1 miles east of IL 251. | — | Executed | D. Construction, Inc. $1,569,242 · | ||
| Nov 9, 2018 | 66F12 | LaSalleDistrict 3 | Regrading a failed slope along IL 251 and stabilizing it with a soldier pile retaining wall. Work includes repairs to existing box culvert SN 050-8802. Project is located 2.1 miles south of I-80. | — | Executed | Rausch Infrastructure LLC_DO NOT USE $1,218,205 · | ||
| Nov 9, 2018 | 66H31 | LivingstonDistrict 3 | Class B patching (SPECIAL) and partial depth concrete and hot mix asphalt patching of historic concrete pavement on Old Route 66 from IL 116 to the Mclean County line. | — | Executed | Kinney Contractors, Inc. $640,392 · | ||
| Nov 9, 2018 | 66H50 | LivingstonDistrict 3 | 0.318 mile of pavement reconstruction, 1.7 miles south of IL 17 to 1.4 miles south of IL 17. | — | Executed | D. Construction, Inc. $2,821,316 · | ||
| Nov 9, 2018 | 66J49 | LivingstonDistrict 3 | Remove existing paved shoulders with curbs (HMA), earth excavation, granular subbase, contructing combination concrete curb and gutter, removal and replacement of all steel plate beam guardrail including terminals, erosion repairs, and other miscellaneous work. | — | Executed | Iroquois Paving Corporation $258,840 · | ||
| Nov 9, 2018 | 66J52 | VariousDistrict 3 | Sealing bridge decks with the parapets/curbs on numerous structures throughout LaSalle and Putnam Counties. | — | Executed | M & M Concrete, Inc. $143,000 · | ||
| Nov 9, 2018 | 66J60 | LaSalleDistrict 3 | Sparaying weeks along I-39 from the Marshal County line to the Lee County line. | — | Executed | The Daltons Inc. $34,988 · | ||
| Nov 9, 2018 | 68185 | PeoriaDistrict 4 | Replacement of the structure carrying Farminton Road over Kickapoo Creek and reconstruction of the Farmington Road/Kickapoo Creek intersection, includes pavement improvements from west of the railroad tracks to west of Redbud Drive. | — | Executed | Stark Excavating, Inc. $10,061,876 · | ||
| Nov 9, 2018 | 68D85 | TazewellDistrict 4 | Bridge repair project, approximately 500' in length, located in the US 24/IL 116 Interchange just east of the McClugage Bridge. | — | Executed | Halverson Construction Co., Inc. $1,885,363 · | ||
| Nov 9, 2018 | 68E11 | MarshallDistrict 4 | Repair Bridge SN 062-0037 carrying IL 18 over Sandy Creek, 0.1 mile west of IL 26. | — | Executed | Stark Excavating, Inc. $523,628 · | ||
| Nov 9, 2018 | 68E17 | WoodfordDistrict 4 | Bridge repairs to SN 102-0007 carrying US Route 24 over Walnut Creek, 0.5 miles west of IL Route 117. | — | Executed | Stark Excavating, Inc. $434,382 · | ||
| Nov 9, 2018 | 68E25 | HendersonDistrict 4 | Bridge joint repoairs to SN 036-0035 carrying US Route 34 over Chinn Street. | — | Executed | Laverdiere Construction, Inc. $546,342 · | ||
| Nov 9, 2018 | 68E61 | VariousDistrict 4 | District-wide weed spraying (off Road). | — | Executed | Endrizzi Contracting, Inc $187,960 · | ||
| Nov 9, 2018 | 68E70 | VariousDistrict 4 | Repair and Maintenance of electrical facilities in District Four. | — | Executed | Laser Electric, Inc. $267,279 · | ||
| Nov 9, 2018 | 70752 | McLeanDistrict 5 | Remove and replace 7 culverts at various location from 0.4 miles south of US 136 to 3 miles north of Heyworth, and place riprap for scour mitigation at SN 057-0225. | — | Executed | Phoenix Corporation of the Quad Cities $1,368,849 · | ||
| Nov 9, 2018 | 70D07 | VermilionDistrict 5 | New shoulders and milled rumble strip from US 136 to Kennekuk Park northwest of Danville. | — | Executed | Open Road Paving Company LLC $1,883,244 · | ||
| Nov 9, 2018 | 70D24 | ChampaignDistrict 5 | Bridge painting on I-74; two crossing over IL 47, two crossing under Lindsey Road in Champaign; and one location at Staley Road on I-72 in Champaign. | — | Executed | ERA-Valdivia Contractors, Inc. $545,673 · | ||
| Nov 9, 2018 | 72B37 | SangamonDistrict 6 | 6.9 miles of resurfacing, shoulder reconstruction, culvert extension and bridge painting on IL 125 from east of Pleasant Plains to east of IL 97 (SN 084-0173, 084-2033, 084-7076, 084-7077) | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $10,931,547 · | ||
| Nov 9, 2018 | 72C29 | AdamsDistrict 6 | 4.4 miles of resurfacing, patching, shoulders, ADA improvements, bridge repair, bridge deck overlay, curlvert repair and riprap on IL 96 from Bear Creek to the Hancock County line (SN 001-0052, 0074, 7039, 7037) | — | Rejected | Diamond Construction Company $2,820,961 · | ||
| Nov 9, 2018 | 72J98 | PikeDistrict 6 | 3.6 miles of pavement patching, HMA surface removal, HMA resurfacing and bridge repairs on I-72 from the Sny Slough structures to east of the Trumpet Interchange at I-172. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $4,455,235 · | ||
| Nov 9, 2018 | 72K66 | PikeDistrict 6 | Bride joint repairs, base course widening, resurfacing and traffic control setup on I-72 approximately 1.8 miles northwest of Barry (SN 075-0098, 0099). | — | Executed | Freesen, a div of UCM, Inc. $1,184,709 · | ||
| Nov 9, 2018 | 72K71 | ChristianDistrict 6 | Resurfacing on Webster Street from north of Northern Avenue to north of Bidwell Street. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $146,669 · | ||
| Nov 9, 2018 | 72K86 | MenardDistrict 6 | Replace expansion joints, place a microsilica overlay and paint beam ends on SN 065-0004 carrying IL 97 over Tar Creek, 0.5 miles north of Oakford. | — | Executed | Freesen, a div of UCM, Inc. $453,745 · | ||
| Nov 9, 2018 | 72K87 | ChristianDistrict 6 | Milling and resurfcing on Mt. Auburn Road from 0.4 mile north of Buckhart Creek to south of 2100N. | — | Executed | P. H. Broughton & Sons, Inc. $424,927 · | ||
| Nov 9, 2018 | 72K89 | AdamsDistrict 6 | Patching in IL 96 from Locust Street to IL 104 Quincy. | — | Executed | Kinney Contractors, Inc. $112,230 · | ||
| Nov 9, 2018 | 72K92 | VariousDistrict 6 | Weed Spraying on various routes in various counties of District 6. | — | Executed | The Daltons Inc. $104,645 · | ||
| Nov 9, 2018 | 74358 | MoultrieDistrict 7 | Substructure repairs and widening, superstructure and deck replacement, bridge approach pavements, HMA resurfacing, guardrail, earthwork, tree removal and riprap on SN 070-0003 carrying IL 121 over Jonathon Creek approximently 3 miles east of Sullivan. | — | Executed | Howell Paving, Inc. $1,881,476 · | ||
| Nov 9, 2018 | 74619 | LawrenceDistrict 7 | Removal of SN 051-8000 on IL 1 approximately 1.5 miles south of Birds Road and replacing it with a cast-in-place double cell box culvert. | — | Executed | Allendale Gravel Co., Inc. $728,866 · | ||
| Nov 9, 2018 | 74875 | ClayRichlandDistrict 7 | Clean and paint four structures on US 50 (SN 013-0001, 080-0002, 0003, 0004). | — | Executed | Civil Coatings and Construction Inc. $665,000 · | ||
| Nov 9, 2018 | 74876 | CumberlandDistrict 7 | Clean and paint SN 018-0056 on IL 130. | — | Executed | Civil Coatings and Construction Inc. $191,703 · | ||
| Nov 9, 2018 | 74877 | MaconDistrict 7 | Clean and paint SN 058-0054 and SN 058-0060 on I-72. | — | Executed | All States Painting, Inc. $274,840 · | ||
| Nov 9, 2018 | 74878 | FayetteDistrict 7 | Cleaning and painting two stuctures; SN 026-0032 at the I-70/US 51 interchange in Vandalia, and SN 026-0035 on US 51 1.5 miles south of US 40. | — | Executed | All States Painting, Inc. $543,000 · | ||
| Nov 9, 2018 | 76887 | ClintonDistrict 8 | Bridge replcement, culvert replacement and 3' grade raise for the roadway on IL 161 over Crooked Creek, 8.6 miles east of IL 127. | — | Executed | Plocher Construction Company, Inc. $12,725,625 · | ||
| Nov 9, 2018 | 76945 | St. ClairDistrict 8 | HMA overlay, joint replacement, super and sub structure repairs on the Poplar Street collector-distributor ramps.(SN 082-0141, 082-0144, 082-0253, 082-0254) | — | Executed | Keeley & Sons, Inc. $5,468,084 · | ||
| Nov 9, 2018 | 76L41 | MadisonDistrict 8 | Pavement removal and replacement at the intersection of IL 3 and Pontoon Road in Granite City. | — | Executed | Baxmeyer Construction, Inc. $1,684,988 · | ||
| Nov 9, 2018 | 76L97 | St. ClairDistrict 8 | Painting bridge SN 082-0198 carrying IL 13 over the Kaskaskia River. | — | Executed | Eagle Painting & Maintenance Company, Inc. $639,875 · | ||
| Nov 9, 2018 | 78363 | FranklinWilliamsonDistrict 9 | Expand approximately 4.4 miles of I-57 to add an additional lane in each direction, install a median barrier, sresurface existing lanes, update pavement markings, upgrade guardrails, and install raised relectors and rumble strip. | — | Executed | E. T. Simonds Construction Company $14,359,766 · | ||
| Nov 9, 2018 | 78653 | JohnsonDistrict 9 | Milling, HMA resurfacing and Class A patching on I-24 from the Williamson County line to the Massac County line. | — | Executed | G. M. Sipes Construction, Inc. $258,833 · | ||
| Nov 9, 2018 | 78674 | JacksonDistrict 9 | Paved shoulder removal, HMA shoulders and excavation to repair the existing slope on US 51 just north of the Big Muddy River bridge south of DeSoto. | — | Executed | E. T. Simonds Construction Company $135,433 · | ||
| Nov 9, 2018 | 78696 | VariousDistrict 9 | Tree removal at various locations: 1) SB I-57 from MP 76 to MP 73 in Franklin County; 2) SB I-57 Rend Lake Rest Area in Franklin County; 3) EB and WB I-64 Goshen Road Rest Area in Jefferson County; 4) I-64 Skeeter Mountain Rest Area in White County. | — | Executed | Homer Tree Service, Inc. $103,765 · | ||
| Nov 9, 2018 | 78697 | UnionDistrict 9 | Remove and replace damaged PCC pavement in the passing lane and inside PCC shoulder on southbound I-57 near mile-marker 33. | — | Executed | E. T. Simonds Construction Company $59,949 · | ||
| Nov 9, 2018 | 85672 | HenryDistrict 2 | Replace the bridge carrying FAS Route 238 (CH 14) over Mud Creek, located 5 miles south of Atkinson. | — | Executed | Curnyn Construction Co. $899,911 · | ||
| Nov 9, 2018 | 87665 | KendallDistrict 3 | Replace the bridge carrying East Main Street over Big Rock Creek, located 0.20 miles north of US 34 in the City of Plano. | — | Executed | Riber Construction, Inc. $1,162,974 · | ||
| Nov 9, 2018 | 87686 | BureauDistrict 3 | Remove deteriorated wingwalls of the three-barrel box culvert and a portion of the box culvert ends and replace with permanent steel sheet pile wingwalls along with replacing the concrete on the culvert ends, located on FAS 247 (CH 31) at Crow Creek, 6.0 miles east of Bradford | — | Executed | Miller Trucking & Excavating Company $1,092,510 · | ||
| Nov 9, 2018 | 89747 | McDonoughDistrict 4 | Replace superstructure on the bridge carrying CH 26 over Hogwallow Branch, 3.5 miles east of the Hancock County Line. | — | Executed | County Contractors, Inc. $429,858 · | ||
| Nov 9, 2018 | 91550 | ChampaignDistrict 5 | remove guardrail and terminals and the installation of new steel plate beam guardrail and terminals at various locations in Champaign County. | — | Executed | Midwest Fence Corporation $1,958,373 · | ||
| Nov 9, 2018 | 91555 | PiattDistrict 5 | Replace the bridge carrying TR 105 over Lake Fork Creek, located 2.0 miles east of Cisco. | — | Executed | Newell Construction Co., Inc. $293,766 · | ||
| Nov 9, 2018 | 91576 | ChampaignDistrict 5 | Construction of a shared use path along the south side of Crystal Lake Park and the north side of Park Street in the City of Urbana. | — | Executed | Stark Excavating, Inc. $442,510 · | ||
| Nov 9, 2018 | 91580 | PiattDistrict 5 | Resurfacing, HMA shoulders and rumble strips on CH 5, located 1.4 miles south of Deland to 2.1 miles north of the I-72 interchange at Monticello. | — | Executed | Open Road Paving Company LLC $703,482 · | ||
| Nov 9, 2018 | 93721 | LoganDistrict 6 | Replace the bridge carrying Primm Road over Dees Creek, 1.1 miles south of Lincoln. | — | Executed | Freesen, a div of UCM, Inc. $1,921,914 · | ||
| Jan 18, 2019 | 46470 | VariousDistrict 2 | Repairing or replacing damaged or deteriorated overhead sign structures, structure components, and supports at locations described in the schedule of locations. | — | Rejected | COLLINS & HERMANN, INC. $1,139,658 · | ||
| Jan 18, 2019 | 46476 | VariousDistrict 1 | Removal of existing pavement marking and placing various widths of thermoplastic pavement marking lines, letters, and symbols within the limits specified on each individual work order. | — | Executed | Superior Road Striping, Inc. $762,500 · | ||
| Jan 18, 2019 | 46481 | LakeDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. | — | Executed | Superior Road Striping, Inc. $278,325 · | ||
| Jan 18, 2019 | 46482 | DuPageDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement markeer castings. | — | Executed | Superior Road Striping, Inc. $1,114,319 · | ||
| Jan 18, 2019 | 46483 | CookDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $579,619 · | ||
| Jan 18, 2019 | 46484 | KaneDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $357,144 · | ||
| Jan 18, 2019 | 46485 | WillDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $371,419 · | ||
| Jan 18, 2019 | 46486 | VariousDistrict 1 | Removal of existing pavement marking and placing hot spray thrermoplastic pavement and modified urethane marking lines, letters, and sysmbols within the limits specified on individual work orders. | — | Executed | Superior Road Striping, Inc. $649,500 · | ||
| Jan 18, 2019 | 46503 | VariousDistrict 3 | Pavement marking grooving, placing thermoplastic, epoxy, polyurea, modified urethane, preformed plastic, and hot spray thermoplastic pavement marking lines, letter, numbers, and symbols and the removal of exiswting pavement markings within the limits specified. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,523,875 · | ||
| Jan 18, 2019 | 60484 | CookDistrict 1 | Removal of existing bridge structure carrying 135th Street over Ashland Avenue, also, storm sewer installation, integral retaining wall, sidewalk and concrete barrier wall construction. | — | Executed | D. Construction, Inc. $1,519,602 · | ||
| Jan 18, 2019 | 60M99 | WillDistrict 1 | Bridge deck repairs and thin polymer overlay of the existing bridge deck of SN 099-0263 carrying US 30 (Cass Street) over Spring Creek in the City of Joliet. | — | Executed | MYS, Incorporated $88,200 · | ||
| Jan 18, 2019 | 60Y68 | CookDistrict 1 | Landscaping within the following boundaries of I-90/94: Roosevelt Road to Washington Blvd. and Peoria St. to Clinton St., and I-290: Roosevelt Rd. to Van Buren St. and Ashland Ave. to Clinton St. | — | Executed | Copenhaver Construction, Inc. $131,623 · | ||
| Jan 18, 2019 | 61E15 | KaneDistrict 1 | Reconstructin of Chicago Street from Center Street to Liberty Street, in the City of Elgin. | — | Executed | Martam Construction Incorporated $7,616,826 · | ||
| Jan 18, 2019 | 61E44 | CookDistrict 1 | Replace the superstructure and repair the abutments on the structure carrying Barker Avenue over Salt Creek in the City of Rolling Meadows. | — | Executed | Martam Construction Incorporated $613,257 · | ||
| Jan 18, 2019 | 61E74 | KaneDistrict 1 | Modifications at 27 intersections in Aurora, Batavia, Geneva, North Aurora and unincorporated Kane County. | — | Rejected | H & H Electric Co. $6,338,791 · | ||
| Jan 18, 2019 | 61E97 | KaneDistrict 1 | Intersection improvement and the construction of a shared-use path at Kirk Rd. | — | Executed | D. Construction, Inc. $9,936,023 · | ||
| Jan 18, 2019 | 61F00 | CookDistrict 1 | Roadway reconstruction with drainage and lighting work on State and National Parkway from PLum Grove Road to IL Route 58 in Schaumburg. | — | Executed | Plote Construction, Inc. $5,761,331 · | ||
| Jan 18, 2019 | 61F08 | McHenryDistrict 1 | Replace the bridge carrying Union Road over the Kishwaukee River, located 0.80 mile north of IL 176. | — | Executed | Civil Constructors, Inc. $1,671,611 · | ||
| Jan 18, 2019 | 61F12 | WillDistrict 1 | Rehabilitate the bridge carrying IL 7 Frontage Road over the Des Plaines River in the City of Lockport. | — | Rejected | ICC Group Inc. $2,191,000 · | ||
| Jan 18, 2019 | 61F13 | KaneDistrict 1 | High friction surface treatment, signing, pavement markings, rumble strips and traffic signal upgrades on Kisk Road from IL 56 to Cherry Lane. | — | Executed | H & H Electric Co. $1,295,729 · | ||
| Jan 18, 2019 | 61F20 | DuPageDistrict 1 | Resurfacing west Avenue from First Street to St. Charles Road in Elmhurst. | — | Executed | K-Five Construction Corporation $310,996 · | ||
| Jan 18, 2019 | 61F21 | CookDistrict 1 | Pavement reconstruction, widening and resurfacing, traffic signal replacement at the intersection of US 6 and Van Dam Road in the Village of South Holland. | — | Executed | Gallagher Asphalt Corporation $1,793,572 · | ||
| Jan 18, 2019 | 61F22 | CookDistrict 1 | Roadway reconstructioon with sidewalk, curb and gutter, and drainage work on Walnut Lane from Schaumburg Lane to Weathersfield Way in Schaumburg. | — | Executed | Alliance Contractors, Inc. $2,692,563 · | ||
| Jan 18, 2019 | 61F23 | McHenryDistrict 1 | Pavement widening, resurfacing, traffic signal installation, street lighting, and construction of a bike/pedestrian path at the intersection of US 14 and Virginia Road in the City of Crystal Lake. | — | Executed | Curran Contracting Company $1,193,351 · | ||
| Jan 18, 2019 | 61F24 | CookDistrict 1 | Resurfacing on Lively Boulevard from Devon Avenue to Landmeier Road in the Village of Elk Grove Village. | — | Executed | K-Five Construction Corporation $1,295,822 · | ||
| Jan 18, 2019 | 61F27 | McHenryDistrict 1 | Replace the superstructure, repair abutments, reconstruct approaches to the structure carrying O'Brien Road over Nippecsink Creek, 1.5 miles west of IL 47. | — | Executed | Dunnet Bay Construction Company $717,499 · | ||
| Jan 18, 2019 | 61F28 | KaneDistrict 1 | Intersection improvement on Randall Road at Stearns Road; includes pavement widening, resurfacing, curb and gutter, street lighting and traffic signal improvements. | — | Executed | Curran Contracting Company $4,183,052 · | ||
| Jan 18, 2019 | 61F30 | DuPageDistrict 1 | Resurfacing on Lies Road from Gary Avenue to Schmale Road in Carol Stream. | — | Executed | Plote Construction, Inc. $1,031,758 · | ||
| Jan 18, 2019 | 61F31 | KaneDistrict 1 | Replace the bridge carrying TR 189A over Indian Creek, 0.10 mile west of Farnsworth. | — | Executed | D. Construction, Inc. $896,612 · | ||
| Jan 18, 2019 | 61F33 | LakeDistrict 1 | Pavement reconstruction, construction of a shared use path, and lighting improvements on 14th Street from Green Bay Road to Sheridan Road in North Chicago. | — | Executed | Berger Excavating Contractors, Inc. $16,525,114 · | ||
| Jan 18, 2019 | 61F35 | CookDistrict 1 | Sidewalk Construction and traffic signal improvement on Archer Road from 68th Street to 66th Place, and on State Road from Lavergne Avenue to Cicero Avenue in Bedford Park. | — | Executed | Triggi Construction, Inc. $191,631 · | ||
| Jan 18, 2019 | 61F38 | DuPageDistrict 1 | Resufacing on York Road from Grand Avenue to Green Street in Bensenville. | — | Executed | K-Five Construction Corporation $1,878,875 · | ||
| Jan 18, 2019 | 61F42 | McHenryDistrict 1 | Resurfacing from Silver Lake Road to South Rawson Bridge Road in Cary. | — | Executed | Curran Contracting Company $1,758,945 · | ||
| Jan 18, 2019 | 61F43 | CookDistrict 1 | Rehabilitate the bridges carrying Oak Street and Cherry Street over the UP Railroad in the Village of Winnetka. | — | Executed | Dunnet Bay Construction Company $3,345,570 · | ||
| Jan 18, 2019 | 62B68 | KendallDistrict 1 | Realignment and widening project on US 30 at the intersections with Harvey Rd. and Treasure Drive, includes intersection improvement and traffic signals. | — | Executed | D. Construction, Inc. $786,115 · | ||
| Jan 18, 2019 | 62C07 | CookDistrict 1 | Traffic signal modernization at Central Park Avenue. Channelization and traffic signal modernization at Crawford/Pulaski Road, and Kedzie Avenue. | — | Executed | Iroquois Paving Corporation $8,882,487 · | ||
| Jan 18, 2019 | 62C51 | CookDistrict 1 | Resurfacing and pedestrian ramp improvement project on IL 83 (Torrence Ave.) from Glenwood Dyer Rd. to south of I-80. | — | Executed | D. Construction, Inc. $1,892,784 · | ||
| Jan 18, 2019 | 62C77 | LakeDistrict 1 | Resurfacing on US 41 (Skokie Hwy) from 1000 feet north of IL 176 (Rockland Rd) to 100 feet north of IL 120 (Belvidere Rd.). | — | Executed | Peter Baker & Son Co. $6,097,098 · | ||
| Jan 18, 2019 | 62F03 | CookDistrict 1 | Bridge rehabilitation in Northfield. | — | Executed | Dunnet Bay Construction Company $1,994,113 · | ||
| Jan 18, 2019 | 62F23 | CookDistrict 1 | Resurfacing Palatine Road from US 12 to IL 21, and patching on Dundee Road from east of Kennicott Ave to First Street. | — | Executed | J. A. Johnson Paving Company $5,278,586 · | ||
| Jan 18, 2019 | 62F30 | CookDistrict 1 | Superstructure replacement, retaining wall modifications, approach slab replacement, HMA resurfcing and ADA ramp installation on IL 171 over CSX RR/Ingredion RR spur. | — | Executed | D. Construction, Inc. $1,337,721 · | ||
| Jan 18, 2019 | 62F48 | LakeDistrict 1 | Resurfacing, pedestrian ramp improvement, and culvert repair on US 41 from Park Ave. West to Il 176 (Rockland Rd.); and on IL 22 from Tennyson Lane to US 41. 8.29 miles. | — | Executed | Peter Baker & Son Co. and Plote Construction, Inc JV $13,226,577 · | ||
| Jan 18, 2019 | 62G07 | CookDistrict 1 | Removal and replacement of headwalls and wingwalls on either side of the existing double cell box culvert crossing Burnham Ave., 40 ft north of 202nd St. in Lynwood. | — | Executed | MYS, Incorporated $188,874 · | ||
| Jan 18, 2019 | 62G14 | WillDistrict 1 | Insatallation of a fiber optic line to provide local centralized control and operation of 6 moveable bridges over the Des Plaines River in Joliet. | — | Executed | John Burns Construction Company $1,900,000 · | ||
| Jan 18, 2019 | 62G66 | DuPageWillDistrict 1 | Installation of seven truss mounted LED dynamic message signs, CCTBV, fiber optic networks and roadside bluetooth detectors at various locations. | — | Executed | John Burns Construction Company $5,592,292 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.