IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Nov 9, 2018 64M99 VariousDistrict 2 Washing eight bridges at various locations. — Executed Nov 26 New All States Painting, Inc. $89,200 ·
Nov 9, 2018 64N13 VariousDistrict 2 Concrete sealer applied to bridge decks at various locations in District 2. — Executed Nov 26 New All States Painting, Inc. $48,997 ·
Nov 9, 2018 64N14 Rock IslandDistrict 2 Concrete sealer applied to bridge decks at various locations in Rock Island County. — Executed Nov 26 New All States Painting, Inc. $24,850 ·
Nov 9, 2018 64N15 VariousDistrict 2 Concrete sealer applied to bridge decks at various locations in District 2. — Executed Nov 26 New M & M Concrete, Inc. $90,000 ·
Nov 9, 2018 66956 KankakeeDistrict 3 Bridge replacement of SN 046-0081 with Sn 046-0150, CH8 (St. George Road) over I-57. — Executed Nov 26 New D. Construction, Inc. $4,251,258 ·
Nov 9, 2018 66A57 LaSalleDistrict 3 Bridge replacement of SN 050-0052 with SN 050-0259 over the Little Vermilion River, 3.1 miles east of IL 251. — Executed Nov 26 New D. Construction, Inc. $1,569,242 ·
Nov 9, 2018 66F12 LaSalleDistrict 3 Regrading a failed slope along IL 251 and stabilizing it with a soldier pile retaining wall. Work includes repairs to existing box culvert SN 050-8802. Project is located 2.1 miles south of I-80. — Executed Nov 26 New Rausch Infrastructure LLC_DO NOT USE $1,218,205 ·
Nov 9, 2018 66H31 LivingstonDistrict 3 Class B patching (SPECIAL) and partial depth concrete and hot mix asphalt patching of historic concrete pavement on Old Route 66 from IL 116 to the Mclean County line. — Executed Nov 26 New Kinney Contractors, Inc. $640,392 ·
Nov 9, 2018 66H50 LivingstonDistrict 3 0.318 mile of pavement reconstruction, 1.7 miles south of IL 17 to 1.4 miles south of IL 17. — Executed Nov 26 New D. Construction, Inc. $2,821,316 ·
Nov 9, 2018 66J49 LivingstonDistrict 3 Remove existing paved shoulders with curbs (HMA), earth excavation, granular subbase, contructing combination concrete curb and gutter, removal and replacement of all steel plate beam guardrail including terminals, erosion repairs, and other miscellaneous work. — Executed Nov 26 New Iroquois Paving Corporation $258,840 ·
Nov 9, 2018 66J52 VariousDistrict 3 Sealing bridge decks with the parapets/curbs on numerous structures throughout LaSalle and Putnam Counties. — Executed Nov 26 New M & M Concrete, Inc. $143,000 ·
Nov 9, 2018 66J60 LaSalleDistrict 3 Sparaying weeks along I-39 from the Marshal County line to the Lee County line. — Executed Nov 26 New The Daltons Inc. $34,988 ·
Nov 9, 2018 68185 PeoriaDistrict 4 Replacement of the structure carrying Farminton Road over Kickapoo Creek and reconstruction of the Farmington Road/Kickapoo Creek intersection, includes pavement improvements from west of the railroad tracks to west of Redbud Drive. — Executed Nov 26 New Stark Excavating, Inc. $10,061,876 ·
Nov 9, 2018 68D85 TazewellDistrict 4 Bridge repair project, approximately 500' in length, located in the US 24/IL 116 Interchange just east of the McClugage Bridge. — Executed Nov 26 New Halverson Construction Co., Inc. $1,885,363 ·
Nov 9, 2018 68E11 MarshallDistrict 4 Repair Bridge SN 062-0037 carrying IL 18 over Sandy Creek, 0.1 mile west of IL 26. — Executed Nov 26 New Stark Excavating, Inc. $523,628 ·
Nov 9, 2018 68E17 WoodfordDistrict 4 Bridge repairs to SN 102-0007 carrying US Route 24 over Walnut Creek, 0.5 miles west of IL Route 117. — Executed Nov 26 New Stark Excavating, Inc. $434,382 ·
Nov 9, 2018 68E25 HendersonDistrict 4 Bridge joint repoairs to SN 036-0035 carrying US Route 34 over Chinn Street. — Executed Nov 26 New Laverdiere Construction, Inc. $546,342 ·
Nov 9, 2018 68E61 VariousDistrict 4 District-wide weed spraying (off Road). — Executed Nov 26 New Endrizzi Contracting, Inc $187,960 ·
Nov 9, 2018 68E70 VariousDistrict 4 Repair and Maintenance of electrical facilities in District Four. — Executed Nov 26 New Laser Electric, Inc. $267,279 ·
Nov 9, 2018 70752 McLeanDistrict 5 Remove and replace 7 culverts at various location from 0.4 miles south of US 136 to 3 miles north of Heyworth, and place riprap for scour mitigation at SN 057-0225. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $1,368,849 ·
Nov 9, 2018 70D07 VermilionDistrict 5 New shoulders and milled rumble strip from US 136 to Kennekuk Park northwest of Danville. — Executed Nov 26 New Open Road Paving Company LLC $1,883,244 ·
Nov 9, 2018 70D24 ChampaignDistrict 5 Bridge painting on I-74; two crossing over IL 47, two crossing under Lindsey Road in Champaign; and one location at Staley Road on I-72 in Champaign. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $545,673 ·
Nov 9, 2018 72B37 SangamonDistrict 6 6.9 miles of resurfacing, shoulder reconstruction, culvert extension and bridge painting on IL 125 from east of Pleasant Plains to east of IL 97 (SN 084-0173, 084-2033, 084-7076, 084-7077) — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $10,931,547 ·
Nov 9, 2018 72C29 AdamsDistrict 6 4.4 miles of resurfacing, patching, shoulders, ADA improvements, bridge repair, bridge deck overlay, curlvert repair and riprap on IL 96 from Bear Creek to the Hancock County line (SN 001-0052, 0074, 7039, 7037) — Rejected Nov 26 New Diamond Construction Company $2,820,961 ·
Nov 9, 2018 72J98 PikeDistrict 6 3.6 miles of pavement patching, HMA surface removal, HMA resurfacing and bridge repairs on I-72 from the Sny Slough structures to east of the Trumpet Interchange at I-172. — Rejected Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $4,455,235 ·
Nov 9, 2018 72K66 PikeDistrict 6 Bride joint repairs, base course widening, resurfacing and traffic control setup on I-72 approximately 1.8 miles northwest of Barry (SN 075-0098, 0099). — Executed Nov 26 New Freesen, a div of UCM, Inc. $1,184,709 ·
Nov 9, 2018 72K71 ChristianDistrict 6 Resurfacing on Webster Street from north of Northern Avenue to north of Bidwell Street. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $146,669 ·
Nov 9, 2018 72K86 MenardDistrict 6 Replace expansion joints, place a microsilica overlay and paint beam ends on SN 065-0004 carrying IL 97 over Tar Creek, 0.5 miles north of Oakford. — Executed Nov 26 New Freesen, a div of UCM, Inc. $453,745 ·
Nov 9, 2018 72K87 ChristianDistrict 6 Milling and resurfcing on Mt. Auburn Road from 0.4 mile north of Buckhart Creek to south of 2100N. — Executed Nov 26 New P. H. Broughton & Sons, Inc. $424,927 ·
Nov 9, 2018 72K89 AdamsDistrict 6 Patching in IL 96 from Locust Street to IL 104 Quincy. — Executed Nov 26 New Kinney Contractors, Inc. $112,230 ·
Nov 9, 2018 72K92 VariousDistrict 6 Weed Spraying on various routes in various counties of District 6. — Executed Nov 26 New The Daltons Inc. $104,645 ·
Nov 9, 2018 74358 MoultrieDistrict 7 Substructure repairs and widening, superstructure and deck replacement, bridge approach pavements, HMA resurfacing, guardrail, earthwork, tree removal and riprap on SN 070-0003 carrying IL 121 over Jonathon Creek approximently 3 miles east of Sullivan. — Executed Nov 26 New Howell Paving, Inc. $1,881,476 ·
Nov 9, 2018 74619 LawrenceDistrict 7 Removal of SN 051-8000 on IL 1 approximately 1.5 miles south of Birds Road and replacing it with a cast-in-place double cell box culvert. — Executed Nov 26 New Allendale Gravel Co., Inc. $728,866 ·
Nov 9, 2018 74875 ClayRichlandDistrict 7 Clean and paint four structures on US 50 (SN 013-0001, 080-0002, 0003, 0004). — Executed Nov 26 New Civil Coatings and Construction Inc. $665,000 ·
Nov 9, 2018 74876 CumberlandDistrict 7 Clean and paint SN 018-0056 on IL 130. — Executed Nov 26 New Civil Coatings and Construction Inc. $191,703 ·
Nov 9, 2018 74877 MaconDistrict 7 Clean and paint SN 058-0054 and SN 058-0060 on I-72. — Executed Nov 26 New All States Painting, Inc. $274,840 ·
Nov 9, 2018 74878 FayetteDistrict 7 Cleaning and painting two stuctures; SN 026-0032 at the I-70/US 51 interchange in Vandalia, and SN 026-0035 on US 51 1.5 miles south of US 40. — Executed Nov 26 New All States Painting, Inc. $543,000 ·
Nov 9, 2018 76887 ClintonDistrict 8 Bridge replcement, culvert replacement and 3' grade raise for the roadway on IL 161 over Crooked Creek, 8.6 miles east of IL 127. — Executed Nov 26 New Plocher Construction Company, Inc. $12,725,625 ·
Nov 9, 2018 76945 St. ClairDistrict 8 HMA overlay, joint replacement, super and sub structure repairs on the Poplar Street collector-distributor ramps.(SN 082-0141, 082-0144, 082-0253, 082-0254) — Executed Nov 26 New Keeley & Sons, Inc. $5,468,084 ·
Nov 9, 2018 76L41 MadisonDistrict 8 Pavement removal and replacement at the intersection of IL 3 and Pontoon Road in Granite City. — Executed Nov 26 New Baxmeyer Construction, Inc. $1,684,988 ·
Nov 9, 2018 76L97 St. ClairDistrict 8 Painting bridge SN 082-0198 carrying IL 13 over the Kaskaskia River. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $639,875 ·
Nov 9, 2018 78363 FranklinWilliamsonDistrict 9 Expand approximately 4.4 miles of I-57 to add an additional lane in each direction, install a median barrier, sresurface existing lanes, update pavement markings, upgrade guardrails, and install raised relectors and rumble strip. — Executed Nov 26 New E. T. Simonds Construction Company $14,359,766 ·
Nov 9, 2018 78653 JohnsonDistrict 9 Milling, HMA resurfacing and Class A patching on I-24 from the Williamson County line to the Massac County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $258,833 ·
Nov 9, 2018 78674 JacksonDistrict 9 Paved shoulder removal, HMA shoulders and excavation to repair the existing slope on US 51 just north of the Big Muddy River bridge south of DeSoto. — Executed Nov 26 New E. T. Simonds Construction Company $135,433 ·
Nov 9, 2018 78696 VariousDistrict 9 Tree removal at various locations: 1) SB I-57 from MP 76 to MP 73 in Franklin County; 2) SB I-57 Rend Lake Rest Area in Franklin County; 3) EB and WB I-64 Goshen Road Rest Area in Jefferson County; 4) I-64 Skeeter Mountain Rest Area in White County. — Executed Nov 26 New Homer Tree Service, Inc. $103,765 ·
Nov 9, 2018 78697 UnionDistrict 9 Remove and replace damaged PCC pavement in the passing lane and inside PCC shoulder on southbound I-57 near mile-marker 33. — Executed Nov 26 New E. T. Simonds Construction Company $59,949 ·
Nov 9, 2018 85672 HenryDistrict 2 Replace the bridge carrying FAS Route 238 (CH 14) over Mud Creek, located 5 miles south of Atkinson. — Executed Nov 26 New Curnyn Construction Co. $899,911 ·
Nov 9, 2018 87665 KendallDistrict 3 Replace the bridge carrying East Main Street over Big Rock Creek, located 0.20 miles north of US 34 in the City of Plano. — Executed Nov 26 New Riber Construction, Inc. $1,162,974 ·
Nov 9, 2018 87686 BureauDistrict 3 Remove deteriorated wingwalls of the three-barrel box culvert and a portion of the box culvert ends and replace with permanent steel sheet pile wingwalls along with replacing the concrete on the culvert ends, located on FAS 247 (CH 31) at Crow Creek, 6.0 miles east of Bradford — Executed Nov 26 New Miller Trucking & Excavating Company $1,092,510 ·
Nov 9, 2018 89747 McDonoughDistrict 4 Replace superstructure on the bridge carrying CH 26 over Hogwallow Branch, 3.5 miles east of the Hancock County Line. — Executed Nov 26 New County Contractors, Inc. $429,858 ·
Nov 9, 2018 91550 ChampaignDistrict 5 remove guardrail and terminals and the installation of new steel plate beam guardrail and terminals at various locations in Champaign County. — Executed Nov 26 New Midwest Fence Corporation $1,958,373 ·
Nov 9, 2018 91555 PiattDistrict 5 Replace the bridge carrying TR 105 over Lake Fork Creek, located 2.0 miles east of Cisco. — Executed Nov 26 New Newell Construction Co., Inc. $293,766 ·
Nov 9, 2018 91576 ChampaignDistrict 5 Construction of a shared use path along the south side of Crystal Lake Park and the north side of Park Street in the City of Urbana. — Executed Nov 26 New Stark Excavating, Inc. $442,510 ·
Nov 9, 2018 91580 PiattDistrict 5 Resurfacing, HMA shoulders and rumble strips on CH 5, located 1.4 miles south of Deland to 2.1 miles north of the I-72 interchange at Monticello. — Executed Nov 26 New Open Road Paving Company LLC $703,482 ·
Nov 9, 2018 93721 LoganDistrict 6 Replace the bridge carrying Primm Road over Dees Creek, 1.1 miles south of Lincoln. — Executed Nov 26 New Freesen, a div of UCM, Inc. $1,921,914 ·
Jan 18, 2019 46470 VariousDistrict 2 Repairing or replacing damaged or deteriorated overhead sign structures, structure components, and supports at locations described in the schedule of locations. — Rejected Nov 26 New COLLINS & HERMANN, INC. $1,139,658 ·
Jan 18, 2019 46476 VariousDistrict 1 Removal of existing pavement marking and placing various widths of thermoplastic pavement marking lines, letters, and symbols within the limits specified on each individual work order. — Executed Nov 26 New Superior Road Striping, Inc. $762,500 ·
Jan 18, 2019 46481 LakeDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. — Executed Nov 26 New Superior Road Striping, Inc. $278,325 ·
Jan 18, 2019 46482 DuPageDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement markeer castings. — Executed Nov 26 New Superior Road Striping, Inc. $1,114,319 ·
Jan 18, 2019 46483 CookDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. — Executed Nov 26 New Superior Road Striping, Inc. $579,619 ·
Jan 18, 2019 46484 KaneDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. — Executed Nov 26 New Superior Road Striping, Inc. $357,144 ·
Jan 18, 2019 46485 WillDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. — Executed Nov 26 New Superior Road Striping, Inc. $371,419 ·
Jan 18, 2019 46486 VariousDistrict 1 Removal of existing pavement marking and placing hot spray thrermoplastic pavement and modified urethane marking lines, letters, and sysmbols within the limits specified on individual work orders. — Executed Nov 26 New Superior Road Striping, Inc. $649,500 ·
Jan 18, 2019 46503 VariousDistrict 3 Pavement marking grooving, placing thermoplastic, epoxy, polyurea, modified urethane, preformed plastic, and hot spray thermoplastic pavement marking lines, letter, numbers, and symbols and the removal of exiswting pavement markings within the limits specified. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,523,875 ·
Jan 18, 2019 60484 CookDistrict 1 Removal of existing bridge structure carrying 135th Street over Ashland Avenue, also, storm sewer installation, integral retaining wall, sidewalk and concrete barrier wall construction. — Executed Nov 26 New D. Construction, Inc. $1,519,602 ·
Jan 18, 2019 60M99 WillDistrict 1 Bridge deck repairs and thin polymer overlay of the existing bridge deck of SN 099-0263 carrying US 30 (Cass Street) over Spring Creek in the City of Joliet. — Executed Nov 26 New MYS, Incorporated $88,200 ·
Jan 18, 2019 60Y68 CookDistrict 1 Landscaping within the following boundaries of I-90/94: Roosevelt Road to Washington Blvd. and Peoria St. to Clinton St., and I-290: Roosevelt Rd. to Van Buren St. and Ashland Ave. to Clinton St. — Executed Nov 26 New Copenhaver Construction, Inc. $131,623 ·
Jan 18, 2019 61E15 KaneDistrict 1 Reconstructin of Chicago Street from Center Street to Liberty Street, in the City of Elgin. — Executed Nov 26 New Martam Construction Incorporated $7,616,826 ·
Jan 18, 2019 61E44 CookDistrict 1 Replace the superstructure and repair the abutments on the structure carrying Barker Avenue over Salt Creek in the City of Rolling Meadows. — Executed Nov 26 New Martam Construction Incorporated $613,257 ·
Jan 18, 2019 61E74 KaneDistrict 1 Modifications at 27 intersections in Aurora, Batavia, Geneva, North Aurora and unincorporated Kane County. — Rejected Nov 26 New H & H Electric Co. $6,338,791 ·
Jan 18, 2019 61E97 KaneDistrict 1 Intersection improvement and the construction of a shared-use path at Kirk Rd. — Executed Nov 26 New D. Construction, Inc. $9,936,023 ·
Jan 18, 2019 61F00 CookDistrict 1 Roadway reconstruction with drainage and lighting work on State and National Parkway from PLum Grove Road to IL Route 58 in Schaumburg. — Executed Nov 26 New Plote Construction, Inc. $5,761,331 ·
Jan 18, 2019 61F08 McHenryDistrict 1 Replace the bridge carrying Union Road over the Kishwaukee River, located 0.80 mile north of IL 176. — Executed Nov 26 New Civil Constructors, Inc. $1,671,611 ·
Jan 18, 2019 61F12 WillDistrict 1 Rehabilitate the bridge carrying IL 7 Frontage Road over the Des Plaines River in the City of Lockport. — Rejected Nov 26 New ICC Group Inc. $2,191,000 ·
Jan 18, 2019 61F13 KaneDistrict 1 High friction surface treatment, signing, pavement markings, rumble strips and traffic signal upgrades on Kisk Road from IL 56 to Cherry Lane. — Executed Nov 26 New H & H Electric Co. $1,295,729 ·
Jan 18, 2019 61F20 DuPageDistrict 1 Resurfacing west Avenue from First Street to St. Charles Road in Elmhurst. — Executed Nov 26 New K-Five Construction Corporation $310,996 ·
Jan 18, 2019 61F21 CookDistrict 1 Pavement reconstruction, widening and resurfacing, traffic signal replacement at the intersection of US 6 and Van Dam Road in the Village of South Holland. — Executed Nov 26 New Gallagher Asphalt Corporation $1,793,572 ·
Jan 18, 2019 61F22 CookDistrict 1 Roadway reconstructioon with sidewalk, curb and gutter, and drainage work on Walnut Lane from Schaumburg Lane to Weathersfield Way in Schaumburg. — Executed Nov 26 New Alliance Contractors, Inc. $2,692,563 ·
Jan 18, 2019 61F23 McHenryDistrict 1 Pavement widening, resurfacing, traffic signal installation, street lighting, and construction of a bike/pedestrian path at the intersection of US 14 and Virginia Road in the City of Crystal Lake. — Executed Nov 26 New Curran Contracting Company $1,193,351 ·
Jan 18, 2019 61F24 CookDistrict 1 Resurfacing on Lively Boulevard from Devon Avenue to Landmeier Road in the Village of Elk Grove Village. — Executed Nov 26 New K-Five Construction Corporation $1,295,822 ·
Jan 18, 2019 61F27 McHenryDistrict 1 Replace the superstructure, repair abutments, reconstruct approaches to the structure carrying O'Brien Road over Nippecsink Creek, 1.5 miles west of IL 47. — Executed Nov 26 New Dunnet Bay Construction Company $717,499 ·
Jan 18, 2019 61F28 KaneDistrict 1 Intersection improvement on Randall Road at Stearns Road; includes pavement widening, resurfacing, curb and gutter, street lighting and traffic signal improvements. — Executed Nov 26 New Curran Contracting Company $4,183,052 ·
Jan 18, 2019 61F30 DuPageDistrict 1 Resurfacing on Lies Road from Gary Avenue to Schmale Road in Carol Stream. — Executed Nov 26 New Plote Construction, Inc. $1,031,758 ·
Jan 18, 2019 61F31 KaneDistrict 1 Replace the bridge carrying TR 189A over Indian Creek, 0.10 mile west of Farnsworth. — Executed Nov 26 New D. Construction, Inc. $896,612 ·
Jan 18, 2019 61F33 LakeDistrict 1 Pavement reconstruction, construction of a shared use path, and lighting improvements on 14th Street from Green Bay Road to Sheridan Road in North Chicago. — Executed Nov 26 New Berger Excavating Contractors, Inc. $16,525,114 ·
Jan 18, 2019 61F35 CookDistrict 1 Sidewalk Construction and traffic signal improvement on Archer Road from 68th Street to 66th Place, and on State Road from Lavergne Avenue to Cicero Avenue in Bedford Park. — Executed Nov 26 New Triggi Construction, Inc. $191,631 ·
Jan 18, 2019 61F38 DuPageDistrict 1 Resufacing on York Road from Grand Avenue to Green Street in Bensenville. — Executed Nov 26 New K-Five Construction Corporation $1,878,875 ·
Jan 18, 2019 61F42 McHenryDistrict 1 Resurfacing from Silver Lake Road to South Rawson Bridge Road in Cary. — Executed Nov 26 New Curran Contracting Company $1,758,945 ·
Jan 18, 2019 61F43 CookDistrict 1 Rehabilitate the bridges carrying Oak Street and Cherry Street over the UP Railroad in the Village of Winnetka. — Executed Nov 26 New Dunnet Bay Construction Company $3,345,570 ·
Jan 18, 2019 62B68 KendallDistrict 1 Realignment and widening project on US 30 at the intersections with Harvey Rd. and Treasure Drive, includes intersection improvement and traffic signals. — Executed Nov 26 New D. Construction, Inc. $786,115 ·
Jan 18, 2019 62C07 CookDistrict 1 Traffic signal modernization at Central Park Avenue. Channelization and traffic signal modernization at Crawford/Pulaski Road, and Kedzie Avenue. — Executed Nov 26 New Iroquois Paving Corporation $8,882,487 ·
Jan 18, 2019 62C51 CookDistrict 1 Resurfacing and pedestrian ramp improvement project on IL 83 (Torrence Ave.) from Glenwood Dyer Rd. to south of I-80. — Executed Nov 26 New D. Construction, Inc. $1,892,784 ·
Jan 18, 2019 62C77 LakeDistrict 1 Resurfacing on US 41 (Skokie Hwy) from 1000 feet north of IL 176 (Rockland Rd) to 100 feet north of IL 120 (Belvidere Rd.). — Executed Nov 26 New Peter Baker & Son Co. $6,097,098 ·
Jan 18, 2019 62F03 CookDistrict 1 Bridge rehabilitation in Northfield. — Executed Nov 26 New Dunnet Bay Construction Company $1,994,113 ·
Jan 18, 2019 62F23 CookDistrict 1 Resurfacing Palatine Road from US 12 to IL 21, and patching on Dundee Road from east of Kennicott Ave to First Street. — Executed Nov 26 New J. A. Johnson Paving Company $5,278,586 ·
Jan 18, 2019 62F30 CookDistrict 1 Superstructure replacement, retaining wall modifications, approach slab replacement, HMA resurfcing and ADA ramp installation on IL 171 over CSX RR/Ingredion RR spur. — Executed Nov 26 New D. Construction, Inc. $1,337,721 ·
Jan 18, 2019 62F48 LakeDistrict 1 Resurfacing, pedestrian ramp improvement, and culvert repair on US 41 from Park Ave. West to Il 176 (Rockland Rd.); and on IL 22 from Tennyson Lane to US 41. 8.29 miles. — Executed Nov 26 New Peter Baker & Son Co. and Plote Construction, Inc JV $13,226,577 ·
Jan 18, 2019 62G07 CookDistrict 1 Removal and replacement of headwalls and wingwalls on either side of the existing double cell box culvert crossing Burnham Ave., 40 ft north of 202nd St. in Lynwood. — Executed Nov 26 New MYS, Incorporated $188,874 ·
Jan 18, 2019 62G14 WillDistrict 1 Insatallation of a fiber optic line to provide local centralized control and operation of 6 moveable bridges over the Des Plaines River in Joliet. — Executed Nov 26 New John Burns Construction Company $1,900,000 ·
Jan 18, 2019 62G66 DuPageWillDistrict 1 Installation of seven truss mounted LED dynamic message signs, CCTBV, fiber optic networks and roadside bluetooth detectors at various locations. — Executed Nov 26 New John Burns Construction Company $5,592,292 ·
801–900 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.