IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Aug 3, 2018 78634 AlexanderDistrict 9 Surface preparation and application of bridge deck concrete sealer at SN 002-0022 carrying I-57 over the Mississippi River. — Executed Nov 26 New E. T. Simonds Construction Company $23,649 ·
Aug 3, 2018 78649 PopeDistrict 9 Excavation of slope failures and adding riprap at multiple locations: 1) Two locatins at the IL 145/IL 146 intersection; 2) four locations on IL 146 from 1 mile to 3 miles west of Galconda. — Executed Nov 26 New Roadworks, LLC $36,232 ·
Aug 3, 2018 78657 GallatinDistrict 9 2.2 miles of patching on IL 1 from just south of IL 13 to SN 030-0020. — Executed Nov 26 New G. M. Sipes Construction, Inc. $128,569 ·
Aug 3, 2018 78661 JeffersonSalineDistrict 9 Remove box culverts 041-7056 on IL 37 and 083-7059 on IL 142 and replace with elliptical pipes. — Executed Nov 26 New Haier Plumbing and Heating, Inc. $191,911 ·
Aug 3, 2018 78663 AlexanderDistrict 9 Approach and connector pavement replacement on SN 002-0023 and 002-0024 on I-57 at the Cairo interchange over IL 3, CNIC Railroad Outer Road and Levee Road. — Executed Nov 26 New E. T. Simonds Construction Company $775,259 ·
Aug 3, 2018 78665 JohnsonDistrict 9 Weed spraying along I-24 and I-57 in Johnson County. — Executed Nov 26 New The Daltons Inc. $54,842 ·
Aug 3, 2018 78666 VariousDistrict 9 Surface preparation and applicatin of bridge deck concrete sealer at various locations in Perry, Jackson and Jefferson County. — Executed Nov 26 New All States Painting, Inc. $95,200 ·
Aug 3, 2018 87642 GrundyDistrict 3 Rahabilitate the structure carrying Braceville Road over the Mazon river, 0.2 mile east of Gorman Road. — Executed Nov 26 New D. Construction, Inc. $984,309 ·
Aug 3, 2018 87643 GrundyDistrict 3 Replace the bridge carrying Grand Ridge Road over Johnny Run, 0.65 mile east of Illinois Route 47. — Executed Nov 26 New Riber Construction, Inc. $793,264 ·
Aug 3, 2018 89741 MercerDistrict 4 Extend six reinforced concrete box culverts, construction of one concrete box culvert, and the removal and replacement of ten corrugated metal pipe culverts on Joy Road between 160th Avenue and 130th Avenue. — Rejected Nov 26 New
Aug 3, 2018 89746 TazewellDistrict 4 Construction of a shared-use path along West Cruger Road from Nofsinger Road to Main Street in the City of Washington. — Executed Nov 26 New Stark Excavating, Inc. $359,285 ·
Aug 3, 2018 91556 VermilionDistrict 5 Sidewalk Construction along Webster Street from Northview Drive to West Vermilion Street in the Village of Catlin. — Executed Nov 26 New Duce Construction Company $157,300 ·
Aug 3, 2018 93679 SangamonDistrict 6 Construction of a 3-span, welded plate girder bridge to carry South Old Route 66 (Oak Street) over the Union Pacific Railroad and Elm Street, and the construction of a new roadway to connect Walnut Street to South Old Route 66, in the Village of Williamsville. — Executed Nov 26 New Halverson Construction Co., Inc. $7,094,815 ·
Aug 3, 2018 93717 LoganDistrict 6 Full depth pavement reclamation cape seal and aggregate shoulders on CH 25 from US 136 to the west corporate limits of Atlanta. — Executed Nov 26 New Dunn Company $1,497,997 ·
Aug 3, 2018 93718 LoganDistrict 6 Replace the bridge carrying Delavan Road over Prairie Creek Ditch, 4 miles northwest of Emden. — Executed Nov 26 New Otto Baum Company, Inc. $295,457 ·
Aug 3, 2018 99602 WhiteDistrict 9 Replace the bridge over unnamed creek, located one mile west of Epworth. — Executed Nov 26 New Dees, Inc. $171,534 ·
Aug 3, 2018 99606 HamiltonDistrict 9 20.5 miles of A-1 bituminous surface treatment on various routes in Hamilton County. — Rejected Nov 26 New Illini Asphalt Corporation $255,416 ·
Sep 21, 2018 46475 VariousDistrict 1 Placing grooved pavement marking lines, letters, and symbols; removal of existing marking lines within the limits specified on individual work orders. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $2,301,185 ·
Sep 21, 2018 46500 VariousDistrict 7 Replacing reflectorized guardrail markers, terminal markers and placing linear delineator panels at various locations throughout District 7. — Executed Nov 26 New Endrizzi Contracting, Inc $71,610 ·
Sep 21, 2018 60T43 CookDistrict 1 Bridge deck replacement and approach slabs of the 167th Street bridge over I-57. Other improvements include underpass lighting, guardrail installation, pavment marking and storm sewers. — Executed Nov 26 New D. Construction, Inc. $3,986,073 ·
Sep 21, 2018 60V28 WillDistrict 1 Replace bridge 099-0170 carrying Illinois Route 102 over Rayn's Creek with a cast in place, 3 cell culvert, in Wesley Township. — Executed Nov 26 New Austin Tyler Construction, Inc. $1,055,878 ·
Sep 21, 2018 61C21 DuPageDistrict 1 Construction of a multi-use path from Butterfield Road to South of Butterfield Road in the City of Elmhurst. — Executed Nov 26 New Lorig Construction Company $650,954 ·
Sep 21, 2018 61E00 WillDistrict 1 Reconstruction of Moen Avenue from Mound Road to Larkin Avenue in the Village of Rockdale. — Executed Nov 26 New P. T. Ferro Construction Co. $4,999,401 ·
Sep 21, 2018 61E88 DuPageDistrict 1 Construction of a shared use path adjacent to Montgomery Road from Waubonsie Creek Trail to Middlebury Drive in the City of Aurora. — Executed Nov 26 New D. Construction, Inc. $588,452 ·
Sep 21, 2018 61E98 DuPageDistrict 1 Roadway resurfacing and sidewalk installation on Greenbrook Boulevard from County Farm Road to Lake Street. — Executed Nov 26 New J. A. Johnson Paving Company $885,885 ·
Sep 21, 2018 61F02 CookDistrict 1 Traffic signal installation at 99th Street and Ridgeland Avenue in the Village of Chicago Ridge. — Executed Nov 26 New City Lights, LTD. $578,285 ·
Sep 21, 2018 62A28 CookDistrict 1 Culvert replacement in the village of Calument. — Executed Nov 26 New D. Construction, Inc. $396,566 ·
Sep 21, 2018 62B63 CookDistrict 1 Pavement widening, resurfacing, traffic signal modernization, and pedestrian ramp improvement for Plainfield Road at Willow Springs Road in Countryside. — Executed Nov 26 New Alliance Contractors, Inc. $947,875 ·
Sep 21, 2018 62F52 VariousDistrict 1 Annual maintenance and operation of traffic signals, highway lighting, pump stations, surveillance, and other electrical systems in District 1. — Executed Nov 26 New Meade Inc. $26,979,205 ·
Sep 21, 2018 62G45 CookDistrict 1 Building demolition located at 1680 Sauk Trail Road in Sauk Village. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $85,529 ·
Sep 21, 2018 62G81 VariousDistrict 1 Repair and installation of guardrail along various expressways and arterial highways throughout District One. — Executed Nov 26 New Kujo, Inc. $1,878,925 ·
Sep 21, 2018 62G82 VariousDistrict 1 High tensin cable barrier repairs on various expressway medians district wide. — Executed Nov 26 New Fence Masters, Inc. $344,475 ·
Sep 21, 2018 64J48 Rock IslandDistrict 2 Installation of scour countermeasures at SN 081-9905 carrying US 67 over the Mississippi River. — Executed Nov 26 New Byrne & Jones Marine LLC $2,498,590 ·
Sep 21, 2018 64M77 OgleDistrict 2 Repair Bridge SN 071-0061 carrying Creston Road over FAI 39. — Executed Nov 26 New Sjostrom & Sons, Inc. $1,721,200 ·
Sep 21, 2018 66J47 VariousDistrict 3 On-Call tree removal along state maintained routes, district wide. — Executed Nov 26 New Homer Tree Service, Inc. $40,500 ·
Sep 21, 2018 68E47 PeoriaDistrict 4 Scour mitigation at SN 072-0034 carrying IL 90 over Prince Run. — Executed Nov 26 New Illinois Civil Contractors, Inc. $155,436 ·
Sep 21, 2018 68E65 TazewellDistrict 4 Patching and joint repair on the on-ramps and off-ramps at the westbound I-74 Morton interchange. — Executed Nov 26 New G. M. Sipes Construction, Inc. $261,656 ·
Sep 21, 2018 70D23 DeWittDistrict 5 Four spot locations of bridge painting on FAI 74 over US 150 and FAS 2495. — Executed Nov 26 New Venus Painting Co. $696,800 ·
Sep 21, 2018 70D35 DeWittMcLeanVermilionDistrict 5 Guardrail improvements at 111 locations on various routes in Vermilion, McLean, and Dewitt Counties. — Executed Nov 26 New Lovewell Fencing, Inc. $1,446,915 ·
Sep 21, 2018 72K68 SangamonDistrict 6 HMA surface removal and replacement on East Lke Shore Drive starting at just east of I-55 and proceeding east for 0.67 miles. — Executed Nov 26 New Truman L. Flatt & Sons Co., Inc. $161,777 ·
Sep 21, 2018 72K70 MasonDistrict 6 Installing a cross road pipe culvert, pavement patching and ditch improvements on US 136 between CR 3200E and Cr 3300E. — Executed Nov 26 New G. M. Sipes Construction, Inc. $36,717 ·
Sep 21, 2018 74870 MaconDistrict 7 Weed spraying along US 51 and I-72. — Executed Nov 26 New Endrizzi Contracting, Inc $90,538 ·
Sep 21, 2018 74871 EffinghamDistrict 7 Tree removal in the ROW and median of I-57 from mile marker 164 to the Shelby County line. — Executed Nov 26 New J.H. Moore, Inc. $89,200 ·
Sep 21, 2018 74872 RichlandDistrict 7 Construction of HMA safety shoulders, aggregate shoulder wedge and milled rumble strips on IL 250 beginning at Linn Street in Olney and extending southwest for 8.8 miles. — Executed Nov 26 New Howell Paving, Inc. $1,825,938 ·
Sep 21, 2018 76K66 St. ClairDistrict 8 Repair bridge SN 082-0299 carrying IL 13 over the ICG Railroad, 2.5 miles south of Freeburg. — Executed Nov 26 New The Kilian Corporation $387,792 ·
Sep 21, 2018 76L45 St. ClairDistrict 8 Structural repairs at the Bowman Pump Station on Exchange Avenue in East St. Louis. — Executed Nov 26 New Davinroy Mechanical Contractor, Inc. $124,142 ·
Sep 21, 2018 76L55 CalhounGreeneJerseyDistrict 8 Removal and replacement of the Kampsville and Brussels Ferry loading docks. — Executed Nov 26 New St. Louis Bridge Construction Company $614,599 ·
Sep 21, 2018 76L77 CalhounDistrict 8 Repair and maintenance of the electrical equipment on the Joe Page Bridge (SN 031-0001) in Hardin. — Executed Nov 26 New Wissehr Electric, Inc. $58,366 ·
Sep 21, 2018 76L78 VariousDistrict 8 Repair and maintenance of electrical equipment at various pump stations throughout District 8. — Executed Nov 26 New Electrico, Inc. $65,548 ·
Sep 21, 2018 76L79 St. ClairDistrict 8 Well treatment at various locations within District 8. — Rejected Nov 26 New Layne Christensen Company $689,885 ·
Sep 21, 2018 76L92 VariousDistrict 8 Weed spraying along I-64, I-55, I-55/70, I-255, I-270, and IL 255. — Executed Nov 26 New Endrizzi Contracting, Inc $99,284 ·
Sep 21, 2018 76L93 VariousDistrict 8 Weed spraying for Johnson Grass along I-64, I-55, I-55/70, I-255, I-270 and IL 255. — Executed Nov 26 New The Daltons Inc. $59,336 ·
Sep 21, 2018 76L94 VariousDistrict 8 Tree removal and mitigation at various locations throughout District 8. — Executed Nov 26 New Stutz Excavating, Inc. $151,861 ·
Sep 21, 2018 78615 JohnsonDistrict 9 Bridge repairs including joint reconstruction, overlay removal and replacement bearing removal and replacement, structural steel repairs and substructure repairs on SN 044-0035 carrying Tunnel Hill Road over I-24. — Executed Nov 26 New Sierra Bravo Contractors, LLC $297,796 ·
Sep 21, 2018 78645 JohnsonUnionWilliamsonDistrict 9 Inserting culvert liners at 3 locations: 1) SN 100-7038, located 2 miles NW of I-57 near Neber Road on IL 148 in Williamson County; 2) SN 091-7089 located 0.3 miles north of exit 40 along I-57 in Johnson County; 3) SN 044-7073 located at MP 27.9 along I-57 SB in Union County. — Executed Nov 26 New Samron Midwest Contracting, Inc. $271,925 ·
Sep 21, 2018 78679 VariousDistrict 9 Weed spraying on I-57 in Alexander, Pulaski and Union Counties. — Executed Nov 26 New Endrizzi Contracting, Inc $86,884 ·
Sep 21, 2018 85644 Rock IslandDistrict 2 Resurface 38th Street from 7th Avenue to Blackhawk Road in the City of Rock Island. — Executed Nov 26 New Brandt Construction Co. $2,330,106 ·
Sep 21, 2018 93711 AdamsDistrict 6 Construction of a multi-use trail from 18th Street to 24th Street along Cedar Creek in Quincy. — Rejected Nov 26 New Laverdiere Construction, Inc. $2,138,329 ·
Sep 21, 2018 93720 MorganDistrict 6 Mill and surface East Michigan Avenue from South Main Street to Hardin Avenue in the City of Jacksonville. — Executed Nov 26 New K. E. Vas Company $657,302 ·
Sep 21, 2018 97675 MarionDistrict 8 Replace the bridge carrying CH 5 over Jim's Creek, located 4.0 miles southeast of Patoka. — Executed Nov 26 New Sierra Bravo Contractors, LLC $790,284 ·
Sep 21, 2018 97676 BondDistrict 8 Replace the bridge carrying TR 82 over Elm Point Branch, located 2.0 miles south of Panama. — Executed Nov 26 New Depew and Owen Builders, Inc. $638,688 ·
Sep 21, 2018 99609 MassacDistrict 9 Resurface Grand Chain Road from CH 4 North Junction to CH 4 South Junction. — Executed Nov 26 New E. T. Simonds Construction Company $335,394 ·
Nov 9, 2018 46472 DuPageWillDistrict 1 Replacing damaged and deteriorated overhead sign structures, componenets, and supports, described in the schedule of locations. — Executed Nov 26 New Aldridge Electric, Inc. $3,199,710 ·
Nov 9, 2018 46473 CookDistrict 1 Repairing and replacing damaged or deteriorated overhead sign structures, components, and supports at locations described in the Schedule of Locations. — Executed Nov 26 New Kujo, Inc. $2,862,608 ·
Nov 9, 2018 46496 MadisonSt. ClairDistrict 8 Repairing of replacing damaged or deteriorated overhead sign structures, components, and supports, repairing and moving signal heads and controller units. — Executed Nov 26 New T.M.F. Construction Company $623,730 ·
Nov 9, 2018 46504 VariousDistrict 7 Repairing various widths of hot spray thermo, thermoplastic, modified urethane preformed plastic pavement marking lines, letters and sysmbols; grooving and the removal of existing pavement marking on a work order basis. — Executed Nov 26 New Varsity Striping & Construction Co. $876,636 ·
Nov 9, 2018 46903 WinnebagoDistrict 2 4.0 miles of HMA resurfacing to internal park roads, pavement widening, construction of a shared use path, lighting, removal and replacement of a 160' three span structure (SN 101-9974), box culvert installation, retaining wall construction, pavment marking and other miscellaneous in Rock Cut State Park in Winnebago County. — Executed Nov 26 New N-Trak Group, LLC and Sjostrom & Sons, Inc. Joint Venture $5,398,925 ·
Nov 9, 2018 46914 VermilionDistrict 5 Remove debris that has accumulated at the piers of SN 092-9904 carrying Skyline Drive over the Vermilion River in the Kickapoo State Recreation Area. — Executed Nov 26 New Kovilic Construction Company, Inc. $125,000 ·
Nov 9, 2018 60R79 LakeDistrict 1 Bridge deck overlay and bridge joint repairs at two structures carrying US 12 over Nippersink Lake Channel and over Pistkee Lake Channel. — Executed Nov 26 New Lorig Construction Company $2,241,247 ·
Nov 9, 2018 60T13 McHenryDistrict 1 Channelization and traffic signal installation at the intersection of IL Route 173 and Wilmot Road. — Executed Nov 26 New Campanella and Sons, Inc. $1,983,425 ·
Nov 9, 2018 60X79 CookDistrict 1 Widening, realignment, and reconstruction of eastbound I-290 ramp to I-90/94 northbound of the Jane Byrne Interchange, includes construction of five concrete retaining walls, drainage work and ITS in the City of Chicago. — Executed Nov 26 New James McHugh Construction Co. $33,852,455 ·
Nov 9, 2018 60X93 CookDistrict 1 Reconstruction of five major system center ramps of Jane Byrne Interchange, some are on structures with retaining walls, ITS and signing, in the City of Chicago. — Executed Nov 26 New James McHugh Construction Co. $63,047,568 ·
Nov 9, 2018 61E06 DuPageDistrict 1 Intersection improvement with signal timing progression and resurfacing on FAU Route 1504 (55th Street) from Dunham Road to Clerendon Hills Road. — Executed Nov 26 New R. W. Dunteman Company $8,525,282 ·
Nov 9, 2018 61E67 KaneDistrict 1 Reconstruct the intersection of Main Street and Deerpath Road in the City of Batavia. — Executed Nov 26 New R. W. Dunteman Company $1,716,769 ·
Nov 9, 2018 61E99 KaneDistrict 1 Traffic signal improvement on Randall Road from Silver Glen Road to County Line Road. — Executed Nov 26 New Thorne Electric, Inc. $4,681,132 ·
Nov 9, 2018 61F03 CookDistrict 1 Sidewalk construction on 26th Street from Harlem Avenue to Riverside Drive; Riverside Drive from Maple Avenue to 27th Street; and Riverside Drive from 26th Street to Home Avenue in the City of Berwyn. — Rejected Nov 26 New Davis Concrete Construction Co. $181,996 ·
Nov 9, 2018 61F04 KaneDistrict 1 construct a portion of Long Meadow Parkway on a new alignment, widen and reconstruct IL 25, including the intersection with Bolz Road. Located near the intersection of IL 25 and Bolz Road in the Village of Carpentersville. — Executed Nov 26 New Plote Construction, Inc. $5,591,043 ·
Nov 9, 2018 61F05 DuPageDistrict 1 Install conduit, handholes and fiber optic interconnect cable to connect existing traffic signal controllers to the existing DuPage County Central System Network, located at various locations in DuPage County. — Executed Nov 26 New Thorne Electric, Inc. $3,355,558 ·
Nov 9, 2018 61F07 CookDistrict 1 Resurfacing Kirchoff Road from Hicks Road to New Wilke Road in the City of Rolling Meadows. — Executed Nov 26 New Arrow Road Construction Co. $2,073,879 ·
Nov 9, 2018 61F11 KaneDistrict 1 Resurfcing Aucutt Road from Orchard Road to IL Route 31 in the Village of Montgomery. — Executed Nov 26 New D. Construction, Inc. $522,896 ·
Nov 9, 2018 61F14 CookDistrict 1 Resurfacing and ADA sidewalk improvements on Smith Street from Palatine Road to Dundee Road in the Village of Palatine. — Executed Nov 26 New Arrow Road Construction Co. $1,357,145 ·
Nov 9, 2018 61F16 CookDistrict 1 Roadway reconstruction on FAU Route 1076 (Locust Road) from Lake Avenue to Wilmette Avenue in the Village of Wilmette. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $4,089,411 ·
Nov 9, 2018 61F19 WillDistrict 1 Reconstruction and resurfacing on Sioux Drive and Dove Drive from Sunset Drive to West Eames Street and from Navajo Drive to Sunsewt Drive in the Village of Channahon. — Executed Nov 26 New P. T. Ferro Construction Co. $1,607,993 ·
Nov 9, 2018 62A36 CookDistrict 1 Intersection improvement, drainage, traffic modernization, shared-use path and watermain relocation on IL 68 in the Villages of Barrington and Inverness. — Executed Nov 26 New Martam Construction Incorporated $2,526,633 ·
Nov 9, 2018 62B31 KaneDistrict 1 Removal and replacement of existing box culverts over Harmony Creek and over Eakin Creek West. This project includes new culverts, pavement markings, signage, and new guardrail. — Executed Nov 26 New Rausch Infrastructure LLC_DO NOT USE $2,373,225 ·
Nov 9, 2018 62C71 CookDistrict 1 Resurfacing on IL 7/US 6 (Wolf Road from just north of Southwest Highway to approximately 75 ft north of 151 Street in the Village of Orland Park. — Executed Nov 26 New D. Construction, Inc. $1,200,451 ·
Nov 9, 2018 62D35 LakeDistrict 1 Drainage improvements along IL 59 and IL 22 in the village of North Barrington. Includes storm sewer, culvert lining and partial culvert barrel replacement. — Executed Nov 26 New Martam Construction Incorporated $889,433 ·
Nov 9, 2018 62D43 KaneKendallDistrict 1 Bridge repair and overlay at IL 31 over BNSF railroad structure. Work includes deck scarification, concrete joint repair and construction, structural repair of concrete and approach slab replacement. — Executed Nov 26 New D. Construction, Inc. $2,429,071 ·
Nov 9, 2018 62F16 KaneDistrict 1 Intersection reconstruction with installation of a roundabout at IL 47 and Plato Road. — Executed Nov 26 New Curran Contracting Company $3,377,730 ·
Nov 9, 2018 62F57 DuPageDistrict 1 4.5 miles of resurfacing (3P) and pedestrian ramps on IL 64 from Gary Avenue to IL 53. — Executed Nov 26 New R. W. Dunteman Company $6,955,644 ·
Nov 9, 2018 62G32 CookDistrict 1 Bridge repair that includes structural steel repair to the structure carrying 79th Street over the CSX Railroad in the Village of Bridgeview. — Executed Nov 26 New Sumit Construction Co., Inc. $103,465 ·
Nov 9, 2018 62G84 CookDistrict 1 Cleaning and painting designated steel surfaces of SN 016-0669 carrying Addison Street over I-90/94 in the City of Chicago. — Executed Nov 26 New Capital Industrial Services $899,933 ·
Nov 9, 2018 62G89 CookDistrict 1 Cleaning and painting 2 structures on I-90/94 in Chicago: 1) SN 016-0204 - eastbound ramp to Ohio; 2) SN 016-2551 - reversible to Ohio. — Executed Nov 26 New Capital Industrial Services $733,300 ·
Nov 9, 2018 62G91 WillDistrict 1 Resurfacing on Blodgett Road from Kelly Road to 1.8 miles east of Kelly Road in Wilmington Township. — Executed Nov 26 New Iroquois Paving Corporation $389,562 ·
Nov 9, 2018 64B87 WinnebagoDistrict 2 Interchange reconstruction and bridge replacment on US 20 from Simpson Road to Rock River and IL2, south of Southrock Drive to south of US 20 Interchange. — Executed Nov 26 New William Charles Construction Company, LLC $24,199,990 ·
Nov 9, 2018 64M78 HenryDistrict 2 Deck repair, latex modified concrete overlay, expansion joint replacement, and bearing replacement for I-80 under US 6 in Colona. — Executed Nov 26 New Brandt Construction Co. $774,304 ·
Nov 9, 2018 64M95 Rock IslandDistrict 2 Washing two bridges over the Mississippi River (SN 081-001 and SN 081-0106). — Executed Nov 26 New Interstate Maintenance, Incorporated $190,800 ·
Nov 9, 2018 64M96 CarrollRock IslandWhitesideDistrict 2 Washing three bridges over the Mississippi River (SN 008-0052, 081-9905 and 098-6003). — Executed Nov 26 New Interstate Maintenance, Incorporated $120,650 ·
Nov 9, 2018 64M97 HenryWhitesideDistrict 2 Washing six bridges over the Rock River. — Executed Nov 26 New All States Painting, Inc. $83,710 ·
Nov 9, 2018 64M98 HenryRock IslandDistrict 2 Washing five bridges over the Rock River at various locations. — Executed Nov 26 New All States Painting, Inc. $73,560 ·
701–800 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.