IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Sep 18, 2026 61M63 CookDistrict 1 HMA resurfacing on George Street from North Avenue (IL 64 to the north village limit of Melrose Park. Includes curb and gutter, sidewalk, water main installation and pavement markings. — Active Nov 25 New
Sep 18, 2026 61M64 CookDistrict 1 HMA resurfacing on Gilbert Avenue from 47th Street to Ogden Avenue in Western Springs. Includes patching, curb and gutter, sidewalks with ADA ramps, drainage improvements and flashing beacons. — Active Nov 25 New
Sep 18, 2026 61M66 CookDistrict 1 Pedestrian signing and pavement markings to upgrade existing shared-use paths and bicycle routes at various locations in Glenview. — Active Nov 25 New
Sep 18, 2026 61M67 KaneDistrict 1 HMA resurfacing on various routes in Aurora. Includes recessed pavement markings, sidewalk, curb and gutter. — Awarded Nov 25 New
Sep 18, 2026 61M68 KaneDistrict 1 HMA resurfacing n Douglas Avenue/Douglas Road from US 30 to Ashland Avenue in Montgomery. Includes curb and gutter, sidewalk, drainage improvements, and detector loop replacement. — Executed Nov 25 New D. Construction, Inc. $1,466,728 ·
Sep 18, 2026 62V55 CookDistrict 1 Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course Smart Overlay, ADA and APS improvements consist of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, installation of raised reflective pavement markers, placement of thermoplastic pavement marking. The project is located within the City of Harvey in Cook County. — Executed Nov 25 New Gallagher Asphalt Corporation $3,712,308 ·
Sep 18, 2026 62X09 CookDistrict 1 (1.33-Mile) Drainage Improvements of the Frontage Road Storm Sewers (FRS) in Harrison Street that include Open Cut Trenching and Jacking Sewer Installation for storm sewer size 66-, jacking and receiving chambers, pavement removal, backfilling, roadway reconstruction and patching, resurfacing, relocation of water main and combined sewers along Harrison Street, and jacking water main and combined sewers under I-290. Location is on Harrison Street and Bataan Dr. from West of 21st Ave. to East of 1 — Active Nov 25 New
Sep 18, 2026 62X38 VariousDistrict 1 Furnishing and installing landscaping including all incidental and ancillary work necessary to complete the pr (2.93-mile) This project consists of furnishing and installing landscaping including all incidental and ancillary work necessary to complete the project. Traffic will be maintained on I-80 using shoulder closures during the allowable off-peak hours. The improvement is in the Villages of Shorewood, and Minooka, within Grundy, Kendall and Will Counties. — Executed Nov 25 New Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $1,999,952 ·
Sep 18, 2026 62Y03 LakeDistrict 1 The placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of This Improvement consists of the placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs and inside and outside of dividing walls along walkways of the structure, both faces of parapet where parapet separates roadway from sidewalk. These improvements are located on various routes/ structures within the Lake County limits. — Executed Nov 25 New M & M Concrete, Inc. $262,641 ·
Sep 18, 2026 64T43 HenryDistrict 2 Bridge repairs and joint replacement of 10 bridges in Henry County. — Executed Nov 25 New D. Construction, Inc. $8,698,583 ·
Sep 18, 2026 64U88 WhitesideDistrict 2 0.87 miles of intermittent resurfacing from 5th St to US 30 in Whiteside County. — Executed Nov 25 New
Sep 18, 2026 64V24 OgleDistrict 2 0.57 miles of pavmement patching and 770' of Standard overlay on IL 251 from 0.3 miles south of IL 38 to 5th Ave in Ogle County. — Executed Nov 25 New
Sep 18, 2026 64V52 WinnebagoDistrict 2 The reconstruction of the Cemetery Loop Rd 0.31 miles of reconstruction of Mill Road from US 20 to 0.2 miles north of US 20 and construction of Service Rd 0.3 miles west of Mill Road. The project also consists of the reconstruction of the Cemetery Loop Rd. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,930,601 ·
Sep 18, 2026 64V85 VariousDistrict 2 On-call maintenance of electrical facilities along state maintained routes in the eastern half of District 2. — Executed Nov 25 New Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $514,056 ·
Sep 18, 2026 64V86 VariousDistrict 2 On-call maintenance of electrical facilities along State Maintained Routes in the western half of District 2. — Executed Nov 25 New Davenport Electric Contract Company $457,266 ·
Sep 18, 2026 64W06 WinnebagoDistrict 2 0.32 miles of pavement patching along IL 2 at the Bauer Pkwy intersection. — Executed Nov 25 New
Sep 18, 2026 64W42 Rock IslandDistrict 2 Beam fabrication for proposed SN 081-0174 carrying IL 5 over 27th St in Moline. — Executed Nov 25 New DeLong's Inc. of Missouri $2,611,633 ·
Sep 18, 2026 66863 KankakeeDistrict 3 Reconstructing the interchange to provide a single point urban diamond interchange This project is located on FAI 57 (I-57) at IL-17 interchange in Kankakee. Work consists of reconstructing the interchange to provide a single point urban diamond interchange. The proposed interchange will accommodate a future six lane section on I-57. Bridges SN 046-0006 (NB) and SN 046-0007 (SB) will be replaced with SN 046-0154, and SN 046-0005 carrying the KBandS RR over I-57 with SN 046-9904. The work consists of reconstruction of 1.6 miles of I-57, and 0.73 miles of IL 17. Work includes pa — Executed Nov 25 New
Sep 18, 2026 66926 LaSalleDistrict 3 IL 23 deck replacement (SN 050-0047) at Covel Creek 3.4 miles south of IL 71 and bridge replacement (SN 050-0048) at Covel Creek 5.0 miles south of IL 71. — Executed Nov 25 New D. Construction, Inc. $4,253,399 ·
Sep 18, 2026 66B81 IroquoisDistrict 3 Culvert replacement (SN 038-2517) at stream under IL 1, located 0.3 miles south of US 24. — Active Nov 25 New
Sep 18, 2026 66M67 LaSalleDistrict 3 Removing and replacing SN 050-0124 carrying IL 71 over Cedar Creek, located approximately 3 miles west of I-39 in LaSalle County. — Executed Nov 25 New D. Construction, Inc. $868,946 ·
Sep 18, 2026 68E86 PeoriaDistrict 4 Bridge replacement to SN 072-0123 at Closen Rd over I-474 in Bellevue. — Executed Nov 25 New Stark Excavating, Inc. $4,389,144 ·
Sep 18, 2026 68H60 TazewellDistrict 4 Converting the existing two-way stop controlled condition to all-way stop control with red-flashing beacons, stop ahead signs with dual flashing beacons, lighting upgrades, widening the radii at the intersection, construction of 4-foot wide Hot-Mix Asphalt shoulder along the curve radii with 2-foot aggregate wedge shoulders, new pavement marking, removing and replacing an 18-inch pipe culvert and related collateral work necessary to complete the project. This project is located at the intersecti — Executed Nov 25 New Otto Baum Company, Inc. $649,800 ·
Sep 18, 2026 68K53 VariousDistrict 4 128.7 miles of placing, grading and compacting an aggregate shoulder wedge level with adjacent hot-mix asphalt (HMA) pavement or shoulder on various route routes in various counties throughout the western section of District 4. — Executed Nov 25 New
Sep 18, 2026 68L11 VariousDistrict 4 100 miles of placing, grading, and compacting an aggregate shoulder wedge level with adjacent hot-mix asphalt (HMA) pavement or shoulder consistent with the locations and details in the plans; on various routes in various counties in the eastern section of District 4. — Executed Nov 25 New J.C. Dillon, Inc. $563,520 ·
Sep 18, 2026 70J35 VariousDistrict 5 Districtwide installation, maintenance, and removal of Smart Work Zone technology throughout District 5. — Executed Nov 25 New ROADSAFE TRAFFIC SYSTEMS, INC. $350,000 ·
Sep 18, 2026 70J42 VariousDistrict 5 Removal and disposal of trees on state maintained routes within District 5. — Awarded Nov 25 New
Sep 18, 2026 72222 SangamonDistrict 6 Bridge deck overlay, bridge repairs, and bridge painting on SN 084-0207 carrying IL 29 over the Sangamon River, 2.7 miles north of IL 4 in Springfield. — Executed Nov 25 New
Sep 18, 2026 72406 AdamsDistrict 6 Bridge deck overlay, bridge electrical work, bridge joint replacement, bridge repair and navigation lighting repairs on the Quincy Bayview Bridge over the Mississippi River. — Executed Nov 25 New Freesen, a div of UCM, Inc. $6,962,525 ·
Sep 18, 2026 72C80 MacoupinDistrict 6 Culvert replacement on IL 4 over a ditch north of West North Street in Girard. (SN 059-7007) — Executed Nov 25 New
Sep 18, 2026 72E59 LoganDistrict 6 Bridge deck overlay, bridge repairs, and bridge painting on SN 054-0075 carrying TR 33 over I-155 at the Hartsburg Interchange. — Executed Nov 25 New Otto Baum Company, Inc. $1,485,400 ·
Sep 18, 2026 72E83 AdamsDistrict 6 Bridge deck overlay and miscellaneous bridge repairs on SN 001-0008 carrying IL 96 over Rock Creek, 2 miles south of IL 61 in Ursa. — Executed Nov 25 New County Contractors, Inc. $719,190 ·
Sep 18, 2026 72E88 SchuylerDistrict 6 Pipe culvert removal and replacement on IL 99, 0.8 miles south of CH 5 (Camden Road / La Prairie Road), south of Camden. — Executed Nov 25 New Rees Construction Company of Quincy $81,487 ·
Sep 18, 2026 74636 MaconDistrict 7 2.09 miles of patching, milling, resurfacing and detector loops on Old US 51 Business from IL 48 / IL 121 to US 36. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $6,043,453 ·
Sep 18, 2026 74650 ColesDistrict 7 Superstructure replacement and bridge widening of 2 structures on I-57 over IC Railroad and TR 86 at Jones Switch. (SN 015-0003 and 015-0004) — Executed Nov 25 New Sangamo Construction Company $11,526,296 ·
Sep 18, 2026 74A10 MaconDistrict 7 Replacement of SN 058-0021 carrying US 36 over Long Creek tributary approximately 1.6 miles east of IL 121. — Awarded Nov 25 New
Sep 18, 2026 74B73 MoultrieShelbyDistrict 7 10.3 miles of HMA shoulders, aggregate wedge shoulders, rumble strips and pavement marking on IL 32 from Hydro Gear Drive in Sullivan to IL 16 in Windsor. — Executed Nov 25 New Howell Paving, Inc. $3,605,567 ·
Sep 18, 2026 74D06 WayneDistrict 7 Bridge repair, patching, resurfacing and profile improvements on IL 242 from 0.3 miles north of I-64 to the Hamilton County line. — Executed Nov 25 New Samron Midwest Contracting, Inc. $3,376,083 ·
Sep 18, 2026 74D71 LawrenceDistrict 7 Bridge joint replacement, bridge deck overlay, bridge deck repairs and bridge approach improvements on SN 051-0056 carrying Old US 50 over Beaver Pond Ditch, 0.6 miles east of 1500E. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $773,773 ·
Sep 18, 2026 74D73 MoultrieDistrict 7 Bridge deck overlay, bridge joint replacement, bridge deck repairs and guardrail replacement on SN 070-0049 carrying IL 32 over the West Okaw River, 1.1 miles northwest of Foster Road, northwest of Lovington. — Executed Nov 25 New
Sep 18, 2026 74E40 EffinghamDistrict 7 New guardrail installation along US 40 at Cips Lake in Effingham. — Executed Nov 25 New Midwest Fence Corporation $64,995 ·
Sep 18, 2026 76R96 RandolphDistrict 8 Bridge painting, joint repair/replacement and deck overlay on SN 079-0013 carrying IL 154 over the Kaskaskia River. — Awarded Nov 25 New
Sep 18, 2026 76V26 ClintonDistrict 8 4.4 miles of resurfacing on US 50 from 11th Street in Carlyle to Huey Road. — Executed Nov 25 New
Sep 18, 2026 76V40 VariousDistrict 8 Pavement patching at various call-out locations throughout District 8. — Executed Nov 25 New Keeley & Sons, Inc. $2,792,065 ·
Sep 18, 2026 76V43 VariousDistrict 8 Culvert cleaning and culvert liners at various locations in various counties of District 8. — Executed Nov 25 New Stutz Excavating, Inc. $2,175,825 ·
Sep 18, 2026 76V44 VariousDistrict 8 Various partial depth pavement patching call-out locations throughout District 8. — Executed Nov 25 New
Sep 18, 2026 76W01 WashingtonDistrict 8 8 miles of patching on I-64 from 0.9 miles west of CH 11 to the Jefferson County line. — Executed Nov 25 New The Kilian Corporation $1,302,632 ·
Sep 18, 2026 76W04 VariousDistrict 8 Various partial depth pavement patching call-out locations throughout District 8. — Executed Nov 25 New
Sep 18, 2026 78989 AlexanderDistrict 9 Replacement of SN 002-0027 carrying IL 127 over Hartline Creek northeast of Elco. — Executed Nov 25 New
Sep 18, 2026 78990 FranklinDistrict 9 Replace box culvert (SN 028-7068) on IL 149 over the Green River. — Executed Nov 25 New Samron Midwest Contracting, Inc. $539,518 ·
Sep 18, 2026 78A98 SalineDistrict 9 Removal and replacement of 2 box culverts: 1) SN 083-7053 carrying IL 142 over a creek, 1 mile southeast of US 45 in Eldorado; 2) SN 083-7054 carrying IL 142 over a creek, 2.1 miles southeast of US 45 in Eldorado. — Executed Nov 25 New
Sep 18, 2026 78B55 JacksonDistrict 9 This project has 5 locations. Location 1: Resurfacing and ADA upgrades on Old 13 (Murphysboro Road) from Tower Road to New IL 13 in Carbondale; Location 2: Resurfacing and ADA upgrades on IL 127 / Old 13 from Old Brick Road to the Big Muddy River Bridge; Location 3: Pavement replacement on IL 127 / Old IL 13 from the Big Muddy River Bridge to Shomaker Drive in Murphysboro; Location 4: Pavement replacement at the intersection of IL 127 / Old IL 13 and Shomaker Shomaker Drive in Murphysboro; Locat — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,308,150 ·
Sep 18, 2026 78B76 WhiteDistrict 9 ADA improvements, traffic signal modernization and cabinet replacement, APS push button installation, ground mount services installation and video detection installation on IL 1 / IL 14 in Carmi, at the Main Cross Street, Walnut Street and Church Street intersections. — Active Nov 25 New
Sep 18, 2026 78C29 GallatinSalineDistrict 9 Location 1 - 2.08 miles of HMA surface removal, HMA resurfacing, HMA shoulders, patching and ADA ramps on IL 13 from Poplar Street to US 45 in Harrisburg. Location 2 - 0.74 miles of HMA surface removal, HMA resurfacing, aggregate shoulders and patching on IL 13 from the Gallatin County line to IL 142. — Executed Nov 25 New E. T. Simonds Construction Company $2,354,550 ·
Sep 18, 2026 78C30 JacksonDistrict 9 Traffic signal modernization at the intersection of IL 13 and Giant City Road. — Executed Nov 25 New Gerstner Electric, Inc. $212,000 ·
Sep 18, 2026 78C34 FranklinDistrict 9 Tree removal along the east side of I-57 from 3 miles south of the West Frankfort interchange (at mile marker 62) to 3 miles south of the West City interchange (at mile marker 68). — Executed Nov 25 New Homer Tree Service, Inc. $1,824,386 ·
Sep 18, 2026 78C49 JohnsonDistrict 9 3.7 miles of patching on IL 146 from IL 37 in West Vienna to 11th Street in Vienna. — Executed Nov 25 New
Sep 18, 2026 80B49 DuPageDistrict 1 (3,716-Ft) Bridge Repairs (S.N. 022-0161) includes bridge deck scarification, latex concrete overlay, joint reconstruction, and patching, butt joints, HMA overlay of the approach pavement, concrete curb and gutter replacement, concrete median replacement, drainage structure adjustments, and pavement marking replacement. The project is located along IL Route 38 (Roosevelt Road) over the East Branch DuPage River in the Village of Glen Ellyn in DuPage County, Illinois. — Executed Nov 25 New Martam Construction Incorporated $759,267 ·
Sep 18, 2026 80C95 WillDistrict 1 SMART Overlay up to the omission and Designed Overlay includes pavement patches hot-mix asphalt (HMA) surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, curb ramps for sidewalk (ADA) improvement installation of raised reflective pavement markers, and minor traffic signal improvements. The project is locat — Executed Nov 25 New Gallagher Asphalt Corporation $1,094,428 ·
Sep 18, 2026 80D08 VariousDistrict 1 Removing trees, as well as all incidental and collateral work necessary to complete the project This Project consists of removing trees, as well as all incidental and collateral work necessary to complete the project. This project is in several locations throughout District One. — Executed Nov 25 New Homer Tree Service, Inc. $215,809 ·
Sep 18, 2026 80D23 VariousDistrict 1 Impact attenuators removal and replacement, sand modules replacement located on various state maintained expre The work to be completed under this contract consists of impact attenuators removal and replacement, sand modules replacement located on various state maintained expressways and arterial routes within the counties of Cook, DuPage, Will, Lake, McHenry and Kane. — Executed Nov 25 New Maintenance Coatings Co. $2,315,690 ·
Sep 18, 2026 80D33 CookDistrict 1 (3.44-Mile) SMART Overlay, bridge latex overlay, and ADA improvement includes (HMA) removal, pavement patching, resurfacing with (HMA), drainage structure adjustment and cleaning, pavement markings, raised reflective markers, ADA ramps, sidewalk replacement, curb and gutter replacement, pedestrian signals, detector loops, hydro-scarification, deck slab repair, diamond grinding, joint replacement with strip seals, replace diaphragms, approach slab repair, concrete sealer, asphalt butt joints, rel — Executed Nov 25 New K-Five Construction Corporation $6,437,242 ·
Sep 18, 2026 80D39 CookDistrict 1 (2.46-Mile) Crack and Joint Sealant improvement consisting of routing, cleaning and sealing of longitudinal cracks and joints within the hot-mix asphalt pavement, restriping with modified urethane pavement marking. This improvement is located within the City of Berwyn and the Town of Cicero in Cook County. — Executed Nov 25 New
Sep 18, 2026 80D70 VariousDistrict 1 Repairing high tension cable median barrier systems this work includes removing and replacing damaged high ten This project consists of repairing high tension cable median barrier systems this work includes removing and replacing damaged high tension cable barrier system components and replacing with new material furnished by the Contractor. All high-tension cable barrier system components shall be repaired, replaced and tensioned. Locations on various State maintained routes in Various Counties — Executed Nov 25 New Fence Masters, Inc. $1,325,071 ·
Sep 18, 2026 80F22 VariousDistrict 1 New Guardrail project and repair of damaged guardrail, removing damaged guardrail components and replacing all removed guardrail components with new material also includes removing damaged traffic barrier terminal components and replacing all removed traffic barrier terminal components with new material furnished by the Contractor. This work is located on various State maintained arterial and expressway routes within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. — Executed Nov 25 New Kujo, Inc. $3,121,608 ·
Sep 18, 2026 87918 KankakeeDistrict 3 HMA surface removal, HMA overlay and shoulders on CH 17 from Will County line to E 9000 N Road. — Executed Nov 25 New
Sep 18, 2026 97892 St. ClairDistrict 8 PCC pavement widening and construction of a three-span steel beam bridge with PCC deck carrying North Green Mount Rd. over Richland Creek in the village of Shiloh. Additional work includes sidewalks, drainage improvements, traffic signal modifications and other required work. — Executed Nov 25 New Plocher Construction Company, Inc. $7,655,061 ·
Sep 18, 2026 97894 St. ClairDistrict 8 Resurfacing, patching, sidewalk replacement, curb and gutter replacement, and pedestrian signal installation on West Main Street from 28th Street to 49th Street in Belleville. — Executed Nov 25 New Hank's Excavating & Landscaping, Inc. $4,145,137 ·
Sep 18, 2026 97908 MadisonDistrict 8 Replacement of PPC Deck Beams on SN 060-6113 carrying Pebble Creek Drive over Black Creek in Alton. Includes concrete wearing surface, HMA approach pavement, and drainage improvements. — Awarded Nov 25 New
Sep 18, 2026 99776 SalineDistrict 9 PCC sidewalk construction along US 45 from IL 142 to the Tunnel Hill State Trail Extention parking lot in Eldorado. — Rejected Nov 25 New
Sep 18, 2026 99778 FranklinDistrict 9 Crack sealing, HMA binder, A-2 bituminous surface treatment, curb and gutter, and aggregate shoulders on various roadways in the Gun Creek Recreational Area. — Executed Nov 25 New E. T. Simonds Construction Company $301,965 ·
— 1-70428-5001 1704285001 District 1 Bishop Ford ExpwyI-94 Maintenance - Pavements Drainage W of Martin Luther King Dr to US 6 (159th St) $35,000,000 Planned Nov 25 New
— 1-71097-0100 1710970100 District 1 Lake StUS-45 Initial Construction - Pa Additional Lanes, ADA Improvements 0.1 Mi N of Ill 132 (Grand Ave) to Washington St $18,000,000 Planned Nov 25 New
— 1-71097-0102 1710970102 District 1 Lake StUS-45 Initial Construction - Pa Utility Adjustment 0.1 Mi N of Ill 132 (Grand Ave) to Washington St $1,000,000 Planned Nov 25 New
— 1-71097-0800 1710970800 District 1 Lake StUS-45 Initial Construction - Pa Miscellaneous 0.1 Mi N of Ill 132 (Grand Ave) to Washington St $1,000,000 Planned Nov 25 New
— 1-71097-1000 1710971000 District 1 Lake StUS-45 Reconstruction - Pavement Reconstruction 0.1 Mi N of Ill 132 (Grand Ave) to Washington St $12,000,000 Planned Nov 25 New
— 1-71354-0100 1713540100 District 1 Half Day RdIL-22 Initial Construction - Pa Additional Lanes Quentin Rd to E of ILL 83 (Mundelein Rd) $44,808,000 Planned Nov 25 New
— 1-71354-1000 1713541000 District 1 Half Day RdIL-22 Reconstruction - Pavement Reconstruction, Retaining Wall, Sanitary Sewer Quentin Rd to E of ILL 83 (Mundelein Rd) $34,112,000 Planned Nov 25 New
— 1-71354-2000 1713542000 District 1 Half Day RdIL-22 Initial Construction - Br Culvert (New) Quentin Rd to E of ILL 83 (Mundelein Rd) $1,800,000 Planned Nov 25 New
— 1-71387-0200 1713870200 District 1 Algonquin RdIL-62 Rehabilitation - Pavement Widening Existing Pavement E of Fox River to Sandbloom Rd $2,075,000 Planned Nov 25 New
— 1-71621-0100 1716210100 District 1 IL-21Milwaukee Ave Safety Intersection Improvement, Reconstruction, Traf Signal Modernization N of Sanders Rd to S of Euclid Ave / Lake Ave $12,000,000 Planned Nov 25 New
— 1-71621-1100 1716211100 District 1 IL-21Milwaukee Ave Initial Construction - Pa Additional Lanes N of Sanders Rd to S of Euclid Ave / Lake Ave $1,375,000 Planned Nov 25 New
— 1-72414-0300 1724140300 District 1 Willow Rd Reconstruction - Bridges Bridge Replacement at W Fork N Branch Chicago River $9,400,000 Planned Nov 25 New
— 1-73626-0000 1736260000 District 1 Willow Rd Reconstruction - Pavement Wing Wall Repair E of Des Plaines River to Waterview Dr / Protection Pkwy $12,600,000 Planned Nov 25 New
— 1-73626-0001 1736260001 District 1 Willow Rd Initial Construction - Pa Utility Adjustment E of Des Plaines River to Waterview Dr / Protection Pkwy $500,000 Planned Nov 25 New
— 1-73626-3000 1736263000 District 1 Willow Rd Initial Construction - Pa Additional Lanes E of Des Plaines River to Waterview Dr / Protection Pkwy $11,400,000 Planned Nov 25 New
— 1-75131-0500 1751310500 District 1 Green Bay RdIL-131 Initial Construction - Pa Utility Adjustment Wadsworth Rd to Sunset Ave $1,000,000 Planned Nov 25 New
— 1-75131-2000 1751312000 District 1 Green Bay RdIL-131 Initial Construction - Pa Additional Lanes, ADA Improvements Wadsworth Rd to Sunset Ave $26,280,000 Planned Nov 25 New
— 1-75131-2010 1751312010 District 1 Green Bay RdIL-131 Reconstruction - Pavement Reconstruction Wadsworth Rd to Sunset Ave $40,520,000 Planned Nov 25 New
— 1-75131-2011 1751312011 District 1 Green Bay RdIL-131 Reconstruction - Pavement Pump Station Wadsworth Rd to Sunset Ave $13,000,000 Planned Nov 25 New
— 1-75131-2500 1751312500 District 1 Green Bay RdIL-131 Initial Construction - Pa Utility Adjustment Wadsworth Rd to Sunset Ave $1,000,000 Planned Nov 25 New
— 1-75204-1010 1752041010 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Bridges RR Separation Replacement At IHB RR 0.2 Mi W of 25th Ave Intchg $50,000,000 Planned Nov 25 New
— 1-75204-1020 1752041020 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Bridges RR Separation Replacement at CSX RR & CTA $81,566,000 Planned Nov 25 New
— 1-75204-1021 1752041021 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Bridges Bridge Replacement at CSX RR & CTA $18,434,000 Planned Nov 25 New
— 1-75204-1040 1752041040 District 1 Eisenhower ExpwyI-290IL-110 Reconstruction - Bridges Bridge Replacement At Ridgeland Ave (Overhead) $25,000,000 Planned Nov 25 New
— 1-75385-1000 1753851000 District 1 Peterson Rd Preservation - Pavements Smart Overlay N of Northwind Blvd to ILL 137 (Buckley Rd Ramps) $400,000 Planned Nov 25 New
— 1-75611-0100 1756110100 District 1 Skokie HwyUS-41 Miscellaneous Improvement Storm Sewer (New), Drainage, Storm Sewer Inspection At UP RR S of ILL 60 (Townline Rd) $8,000,000 Planned Nov 25 New
— 1-75663-1000 1756631000 District 1 IL-56 Rehabilitation - Bridges Bridge New Deck, Bridge Substructure Rehab At Hankes Rd $2,540,000 Planned Nov 25 New
— 1-75682-0100 1756820100 District 1 Glenwood Rd Preservation - Bridges Bridge Repair, Bridge Joint Replace/Repair, Bridge Deck Overlay Butterfield Creek 1.3 Mi N of ILL 1 (N Halsted St) $2,300,000 Planned Nov 25 New
— 1-75746-0100 1757460100 District 1 Edens ExpwyI-94US-41 Reconstruction - Bridges Bridge Replacement At Winnetka Rd (Overhead) $7,000,000 Planned Nov 25 New
8,201–8,300 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.