| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 1-71097-0100 1710970100 | District 1 | Lake StUS-45 | Initial Construction - Pa Additional Lanes, ADA Improvements 0.1 Mi N of Ill 132 (Grand Ave) to Washington St | $18,000,000 | Planned | ||
| — | 1-71097-0102 1710970102 | District 1 | Lake StUS-45 | Initial Construction - Pa Utility Adjustment 0.1 Mi N of Ill 132 (Grand Ave) to Washington St | $1,000,000 | Planned | ||
| — | 1-71097-0800 1710970800 | District 1 | Lake StUS-45 | Initial Construction - Pa Miscellaneous 0.1 Mi N of Ill 132 (Grand Ave) to Washington St | $1,000,000 | Planned | ||
| — | 1-71354-0100 1713540100 | District 1 | Half Day RdIL-22 | Initial Construction - Pa Additional Lanes Quentin Rd to E of ILL 83 (Mundelein Rd) | $44,808,000 | Planned | ||
| — | 1-71621-1100 1716211100 | District 1 | IL-21Milwaukee Ave | Initial Construction - Pa Additional Lanes N of Sanders Rd to S of Euclid Ave / Lake Ave | $1,375,000 | Planned | ||
| — | 1-73626-0001 1736260001 | District 1 | Willow Rd | Initial Construction - Pa Utility Adjustment E of Des Plaines River to Waterview Dr / Protection Pkwy | $500,000 | Planned | ||
| — | 1-73626-3000 1736263000 | District 1 | Willow Rd | Initial Construction - Pa Additional Lanes E of Des Plaines River to Waterview Dr / Protection Pkwy | $11,400,000 | Planned | ||
| — | 1-75131-0500 1751310500 | District 1 | Green Bay RdIL-131 | Initial Construction - Pa Utility Adjustment Wadsworth Rd to Sunset Ave | $1,000,000 | Planned | ||
| — | 1-75131-2000 1751312000 | District 1 | Green Bay RdIL-131 | Initial Construction - Pa Additional Lanes, ADA Improvements Wadsworth Rd to Sunset Ave | $26,280,000 | Planned | ||
| — | 1-75131-2500 1751312500 | District 1 | Green Bay RdIL-131 | Initial Construction - Pa Utility Adjustment Wadsworth Rd to Sunset Ave | $1,000,000 | Planned | ||
| — | 1-77065-4000 1770654000 | District 1 | I-190Kennedy Expwy | Initial Construction - Pa Bridge Replacement At Bessie Coleman Intchg | $90,000,000 | Planned | ||
| — | 1-77065-5011 1770655011 | District 1 | I-190Kennedy Expwy | Initial Construction - Pa Add Auxiliary Lanes Des Plaines River Bridge to River Rd | $26,307,000 | Planned | ||
| — | 1-77065-5021 1770655021 | District 1 | I-190Kennedy Expwy | Initial Construction - Pa Add Auxiliary Lanes Bessie Coleman Intchg (EB) to I-294 (Tri-State Tollway) | $48,287,000 | Planned | ||
| — | 1-77065-5041 1770655041 | District 1 | (westbound)I-190Kennedy Expwy | Initial Construction - Pa Add Auxiliary Lanes Des Plaines River Rd to Bessie Coleman Intchg (WB) | $32,440,000 | Planned | ||
| — | 1-77065-5051 1770655051 | District 1 | I-190Kennedy Expwy | Initial Construction - Pa Add Auxiliary Lanes I-294 (Tri-State Tollway) to Des Plaines River Rd | $29,929,000 | Planned | ||
| — | 1-77065-5064 1770655064 | District 1 | I-190Kennedy Expwy | Initial Construction - Pa Add Auxiliary Lanes At US 12/45 (Mannheim Rd) Intchg | $34,394,000 | Planned | ||
| — | 1-77548-0000 1775480000 | District 1 | Skokie HwyUS-41 | Initial Construction - Pa Additional Lanes, Interchange Construction, ADA Improvements At ILL 176 (Rockland Rd) | $30,600,000 | Planned | ||
| — | 1-77633-1300 1776331300 | District 1 | I-55 | Initial Construction - Pa Add Auxiliary Lanes ILL 129 to Lorenzo Rd | $14,375,000 | Planned | ||
| — | 1-79214-0000 1792140000 | District 1 | I-55 | Initial Construction - Pa Bridge Replacement At Airport Rd / Lockport Rd | $85,500,000 | Planned | ||
| — | 1-79214-0500 1792140500 | District 1 | I-55 | Initial Construction - Pa Utility Adjustment At Airport Rd / Lockport Rd | $1,000,000 | Planned | ||
| — | 1-79214-1000 1792141000 | District 1 | I-55 | Initial Construction - Pa Bridge Replacement At Ill 126 (Main St) | $85,500,000 | Planned | ||
| — | 1-79214-1500 1792141500 | District 1 | I-55 | Initial Construction - Pa Utility Adjustment At Ill 126 (Main St) | $4,000,000 | Planned | ||
| — | 1-79735-0000 1797350000 | District 1 | I-55 | Initial Construction - Pa Add Auxiliary Lanes I-355 to Ill 53 (Bolingbrook Dr) | $24,800,000 | Planned | ||
| — | 1-79735-0400 1797350400 | District 1 | I-55 | Initial Construction - Pa Utility Adjustment I-355 to Ill 53 (Bolingbrook Dr) | $2,000,000 | Planned | ||
| — | 1-79967-2001 1799672001 | District 1 | Jefferson StUS-52 | Initial Construction - Pa Additional Lanes River Rd to Houbolt Rd | $45,600,000 | Planned | ||
| — | 1-79967-2600 1799672600 | District 1 | Jefferson StUS-52 | Initial Construction - Pa Utility Adjustment River Rd to Houbolt Rd | $4,000,000 | Planned | ||
| — | 1-80552-0000 1805520000 | District 1 | I-57 | Initial Construction - Pa Interchange (New) at Eagle Lake Rd | $150,000,000 | Planned | ||
| — | 1-80552-0400 1805520400 | District 1 | I-57 | Initial Construction - Pa Utility Adjustment at Eagle Lake Rd | $2,000,000 | Planned | ||
| — | 1-80552-0500 1805520500 | District 1 | I-57 | Initial Construction - Pa RR Crossing Construction at Eagle Lake Rd | $2,000,000 | Planned | ||
| — | 1-80558-0000 1805580000 | District 1 | Belvidere RdIL-120 | Initial Construction - Pa Additional Lanes Ashford Ln to US 45 | $13,410,000 | Planned | ||
| — | 1-80558-0400 1805580400 | District 1 | Belvidere RdIL-120 | Initial Construction - Pa Utility Adjustment Ashford Ln to US 45 | $500,000 | Planned | ||
| — | 1-88560-0000 1885600000 | District 1 | IL-60IL-83 | Initial Construction - Pa Additional Lanes ILL 176 (Maple Ave) to Midlothian Rd | $33,000,000 | Planned | ||
| — | 1-88560-0106 1885600106 | District 1 | IL-60IL-83 | Initial Construction - Pa Utility Adjustment ILL 176 (Maple Ave) to CN RR | $6,000,000 | Planned | ||
| — | 1-88560-0116 1885600116 | District 1 | IL-60IL-83 | Initial Construction - Pa Utility Adjustment ILL 176 (Maple Ave) to Midlothian Rd | $3,000,000 | Planned | ||
| — | 1-88560-1115 1885601115 | District 1 | IL-60IL-83 | Initial Construction - Pa Additional Lanes Midlothian Rd to 0.1 mi W of Diamond Lake Rd | $22,461,000 | Planned | ||
| — | 2-06700-0200 2067000200 | District 2 | IL-2N Main St | Initial Construction - Pa Culvert Replacement 0.4 Mi N of Latham Rd to 0.8 mi N of Roscoe Rd | $35,000,000 | Planned | ||
| — | 2-11540-0100 2115400100 | District 2 | US-20 BUS | Initial Construction - Pa Additional Lanes Shaw Rd E of Winnebago Co Line to 0.1 Mi NE of State St in Belvidere | $25,530,000 | Planned | ||
| — | 2-11540-0104 2115400104 | District 2 | US-20 BUS | Initial Construction - Pa Utility Adjustment Shaw Rd E of Winnebago Co Line to 0.1 Mi NE of State St in Belvidere | $250,000 | Planned | ||
| — | 2-15230-0100 2152300100 | District 2 | US-20 BUS | Initial Construction - Pa Additional Lanes Belvidere Byp: ILL 76 to US 20 in Belvidere | $12,600,000 | Planned | ||
| — | 2-20270-0050 2202700050 | District 2 | I-39US-51 | Initial Construction - Pa Utility Adjustment Lee Co Line to 0.8 Mi N of Blackhawk Rd | $250,000 | Planned | ||
| — | 2-25000-0200 2250000200 | District 2 | IL-5 | Initial Construction - Pa Additional Lanes E of 27th St to 0.2 mi w of 38th St in Moline | $2,750,000 | Planned | ||
| — | 2-25000-0400 2250000400 | District 2 | I-74US-6 | Initial Construction - Pa Additional Lanes 0.9 Mi S of 23rd Ave (Ave of The Cities) in Moline to 0.5 mi S of ILL 5 | $2,750,000 | Planned | ||
| — | 2-98030-0300 2980300300 | District 2 | IL-251IL-38 | Initial Construction - Pa Additional Lanes ILL 251: 0.3 mi N of Flagg Rd to 0.2 mi S of ILL 38 (E) & ILL 38: ILL 251 to 0.1 mi E in Rochelle | $2,839,000 | Planned | ||
| — | 3-04747-0010 3047470010 | District 3 | IL-47 | Initial Construction - Pa Additional Lanes ILL 71 to Caton Farm Rd | $20,000,000 | Planned | ||
| — | 3-20627-5180 3206275180 | District 3 | E 494th Rd | Initial Construction - Pa New Construction ILL 71 to 0.2 mi NE (Dead End) | $500,000 | Planned | ||
| — | 3-36940-0100 3369400100 | District 3 | US-6 | Initial Construction - Pa Additional Lanes Ashton Rd to ILL 47 in Morris | $25,000,000 | Planned | ||
| — | 3-36940-0109 3369400109 | District 3 | US-6 | Initial Construction - Pa Utility Adjustment Ashton Rd to ILL 47 in Morris | $2,000,000 | Planned | ||
| — | 4-00018-0100 4000180100 | District 4 | IL-6 | Initial Construction - Pa Interchange (New) At Proposed Pioneer Pkwy Ext in Peoria | $70,000,000 | Planned | ||
| — | 4-03623-0000 4036230000 | District 4 | US-34 | Initial Construction - Pa New Construction 0.9 Mi W of Carman Rd to 1350 E Rd (TR 111) | $155,000,000 | Planned | ||
| — | 4-03623-0050 4036230050 | District 4 | US-34 | Initial Construction - Pa Utility Adjustment 0.9 Mi W of Carman Rd to 1350 E Rd (TR 111) | $500,000 | Planned | ||
| — | 4-04510-0100 4045100100 | District 4 | IL-9US-24 | Initial Construction - Pa Additional Lanes Banner to E of Romine Rd | $49,000,000 | Planned | ||
| — | 4-04510-0102 4045100102 | District 4 | IL-9US-24 | Initial Construction - Pa Utility Adjustment Banner to E of Romine Rd | $700,000 | Planned | ||
| — | 4-04510-0203 4045100203 | District 4 | IL-9US-24 | Initial Construction - Pa Utility Adjustment E of Romine Rd to Kingston Mines | $700,000 | Planned | ||
| — | 4-04510-0400 4045100400 | District 4 | IL-9US-24 | Initial Construction - Pa Additional Lanes E of Romine Rd to Kingston Mines | $62,000,000 | Planned | ||
| — | 4-04510-0403 4045100403 | District 4 | IL-9US-24 | Initial Construction - Pa Utility Adjustment E of Romine Rd to Kingston Mines | $600,000 | Planned | ||
| — | 6-00200-0000 6002000000 | District 6 | I-55 | Initial Construction - Pa Additional Lanes 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE | $15,000,000 | Planned | ||
| — | 6-00779-0100 6007790100 | District 6 | IL-125IL-97 | Initial Construction - Pa Bridge (New) 0.5 MI W OF ILL 97/125 JCT TO OLD COVERED BRIDGE LN | $16,500,000 | Planned | ||
| — | 6-01048-0100 6010480100 | District 6 | E Cook StS Grand Ave ETansey Ave | Initial Construction - Pa New Construction E COOK ST 0.4 MI E OF I-55 TO S GRAND AVE E / TANSEY AVE 0.2 MI N OF ILL 29 E OF SPRINGFIELD | $1,400,000 | Planned | ||
| — | 6-01048-0101 6010480101 | District 6 | E Cook StS Grand Ave ETansey Ave | Initial Construction - Pa Utility Adjustment E COOK ST 0.4 MI E OF I-55 TO S GRAND AVE E / TANSEY AVE 0.2 MI N OF ILL 29 E OF SPRINGFIELD | $300,000 | Planned | ||
| — | 8-00176-0000 8001760000 | District 8 | US-40 | Initial Construction - Pa Additional Lanes, Intersection Reconstn, Bi-Direct Left Turn Lane E of Formosa Rd in Troy to ILL 162 | $48,200,000 | Planned | ||
| — | 8-00176-0040 8001760040 | District 8 | US-40 | Initial Construction - Pa Utility Adjustment E of Formosa Rd in Troy to ILL 162 | $2,000,000 | Planned | ||
| — | 8-00522-3000 8005223000 | District 8 | IL-3 CONNECTOR | Initial Construction - Pa New Construction, Retaining Wall Fairmont City Blvd in Fairmont City to ILL 3/203 in Madison | $34,000,000 | Planned | ||
| — | 8-05082-0000 8050820000 | District 8 | Lebanon Byp | Initial Construction - Pa Bridge (New) ILL 4 to US 50 0.1 mi W of Old US 50 | $77,800,000 | Planned | ||
| — | 8-81050-0200 8810500200 | District 8 | IL-3Relocation | Initial Construction - Pa Bridge (New) 0.1 Mi S of River Park Connector to 0.1 Mi S of Trendley Ave Connector in East St Louis | $95,000,000 | Planned | ||
| — | 8-81050-0212 8810500212 | District 8 | IL-3Relocation | Initial Construction - Pa Bridge (New) 0.1 Mi S of Trendley Ave Connector in East St Louis to Monsanto Ave in Sauget | $68,000,000 | Planned | ||
| — | 8-81050-0240 8810500240 | District 8 | IL-3Relocation | Initial Construction - Pa Utility Adjustment 0.1 Mi S of River Park Connector to 0.1 Mi S of Trendley Ave Connector in East St Louis | $1,500,000 | Planned | ||
| — | 8-81050-0260 8810500260 | District 8 | IL-3Relocation | Initial Construction - Pa Bridge (New) 0.1 Mi S of River Park Connector to 0.1 Mi S of Trendley Ave Connector in East St Louis | $75,000,000 | Planned | ||
| — | 8-81050-0262 8810500262 | District 8 | IL-3Relocation | Initial Construction - Pa Bridge (New) 0.1 Mi S of Trendley Ave Connector in East St Louis to Monsanto Ave in Sauget | $45,000,000 | Planned | ||
| — | 8-81050-4212 8810504212 | District 8 | IL-3Relocation | Initial Construction - Pa Utility Adjustment 0.1 Mi S of Trendley Ave Connector in East St Louis to Monsanto Ave in Sauget | $5,000,000 | Planned | ||
| — | 8-82220-5020 8822205020 | District 8 | I-270 | Initial Construction - Pa Additional Lanes Chain of Rocks Canal in Granite City to 0.1 mi E of St. Thomas Rd | $11,000,000 | Planned | ||
| — | 8-89500-0000 8895000000 | District 8 | Greenmount Rd | Initial Construction - Pa Additional Lanes ILL 161 to ILL 158/177 in Belleville | $11,000,000 | Planned | ||
| — | 8-89500-0400 8895000400 | District 8 | Greenmount Rd | Initial Construction - Pa Utility Adjustment ILL 161 to ILL 158/177 in Belleville | $1,500,000 | Planned | ||
| FY 2025 | 1-71354-0200 1713540200 | District 1 | Half Day RdIL-22 | Initial Construction - Pa Tree Removal Quentin Rd to W of ILL 83 (Mundelein Rd) | $200,000 | Planned | ||
| FY 2025 | 1-75939-0000 1759390000 | District 1 | Front StIL-31 | Initial Construction - Pa Additional Lanes Ill 120 to Bull Valley Rd | $29,650,000 | Planned | ||
| FY 2025 | 1-75939-0200 1759390200 | District 1 | Front StIL-31 | Initial Construction - Pa Additional Lanes, ADA Improvements Bull Valley Rd to ILL 176 (Terra Cotta Ave) | $40,000,000 | Planned | ||
| FY 2025 | 1-75939-0201 1759390201 | District 1 | Front StIL-31 | Initial Construction - Pa Utility Adjustment S of ILL 120 (Belvidere Rd) to N of ILL 176 (Terra Cotta Ave) | $4,000,000 | Planned | ||
| FY 2025 | 1-75939-0202 1759390202 | District 1 | Front StIL-31 | Initial Construction - Pa Utility Adjustment S of ILL 120 (Belvidere Rd) to N of ILL 176 (Terra Cotta Ave) | $4,000,000 | Planned | ||
| FY 2025 | 1-77727-0000 1777270000 | District 1 | IL-47US-30 | Initial Construction - Pa Additional Lanes, ADA Improvements Cross St to Jericho Rd | $24,771,000 | Planned | ||
| FY 2025 | 1-77727-2000 1777272000 | District 1 | IL-47US-30 | Initial Construction - Pa Additional Lanes Jericho Rd to 0.4 Mi S of Galena Rd | $24,600,000 | Planned | ||
| FY 2025 | 1-77727-2400 1777272400 | District 1 | IL-47US-30 | Initial Construction - Pa Utility Adjustment Jericho Rd to 0.4 Mi S of Galena Rd | $2,500,000 | Planned | ||
| FY 2025 | 1-90013-1151 1900131151 | District 1 | IL-47Seminary St | Initial Construction - Pa Utility Adjustment 0.1 Mi N of ILL 120 (McHenry Ave) to US 14 | $1,400,000 | Planned | ||
| FY 2025 | 1-90013-4001 1900134001 | District 1 | IL-47Seminary St | Initial Construction - Pa Additional Lanes Lake Ave to McConnell Rd | $5,000,000 | Planned | ||
| FY 2025 | 2-15970-0415 2159700415 | District 2 | Harrison AveUS-20 | Initial Construction - Pa Additional Lanes Mill Rd to 0.3 mi E of Kishwaukee River | $3,315,000 | Planned | ||
| FY 2025 | 4-50401-1100 4504011100 | District 4 | US-34 | Initial Construction - Pa Additional Lanes TR 190 E of Biggsville to 20th St S of Kirkwood | $60,000,000 | Planned | ||
| FY 2025 | 4-50401-1150 4504011150 | District 4 | US-34 | Initial Construction - Pa Utility Adjustment TR 190 E of Biggsville to 20th St S of Kirkwood | $500,000 | Planned | ||
| FY 2025 | 7-50239-0000 7502390000 | District 7 | IL-33US-40US-45 | Initial Construction - Pa Additional Lanes, Storm Sewer (New), Curb And Gutter Banker St to Salt Creek in Effingham | $4,220,000 | Planned | ||
| FY 2025 | 9-05550-2000 9055502000 | District 9 | (proposed)AccessWalkers Bluff | Initial Construction - Pa New Construction Herrin Rd to Meridian Rd at Walkers Bluff | $19,000,000 | Planned | ||
| FY 2025 | 9-05550-2004 9055502004 | District 9 | (proposed)AccessWalkers Bluff | Initial Construction - Pa Utility Adjustment Herrin Rd to Meridian Rd at Walkers Bluff | $500,000 | Planned |
1–88 of 88
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.