| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 1-75663-1000 1756631000 | District 1 | IL-56 | Rehabilitation - Bridges Bridge New Deck, Bridge Substructure Rehab At Hankes Rd | $2,540,000 | Planned | ||
| — | 1-79357-0000 1793570000 | District 1 | IL-59Neltnor Blvd | Reconstruction - Bridges Bridge Replacement At Ill 38 (Roosevelt Rd) | $1,740,000 | Planned | ||
| — | 1-79395-0000 1793950000 | District 1 | Chicago StIL-53US-52 | Safety Intersection Improvement, Channelization, Drainage Patterson Rd to Mills Rd | $12,000,000 | Planned | ||
| — | 1-79395-0500 1793950500 | District 1 | Chicago StIL-53US-52 | Safety Utility Adjustment Patterson Rd to Arsenal Rd | $2,000,000 | Planned | ||
| — | 1-79395-1000 1793951000 | District 1 | Chicago StIL-53 | Safety Intersection Improvement, Channelization, Drainage Mills Rd to Arsenal Rd | $26,500,000 | Planned | ||
| — | 1-79433-2000 1794332000 | District 1 | IL-53 | Preservation - Bridges Bridge Painting At US 14 (Northwest Hwy) & At Industrial Ave | $7,600,000 | Planned | ||
| — | 1-79433-3000 1794333000 | District 1 | IL-53 | Rehabilitation - Bridges Bridge New Deck, Bridge Rehabilitation At US 14 (Northwest Hwy) | $20,000,000 | Planned | ||
| — | 1-79799-0000 1797990000 | District 1 | IL-59Neltnor Blvd | Reconstruction - Bridges Bridge Replacement At UP & CN RR 0.2 mi S of Main St | $9,550,000 | Planned | ||
| — | 1-79800-0000 1798000000 | District 1 | IL-59 | Reconstruction - Bridges Bridge Replacement At RR over Prairie Path | $1,958,000 | Planned | ||
| — | 1-79880-0000 1798800000 | District 1 | IL-59Sutton Rd | Rehabilitation - Pavement Standard Overlay, ADA Improvements, RR Flagger Cook Co Line to S of Heritage Woods Dr | $7,000,000 | Planned | ||
| — | 1-80098-0000 1800980000 | District 1 | Golf RdIL-58 | Rehabilitation - Pavement Standard Overlay, ADA Improvements Ill 59 (Sutton Rd) to Windsong Dr | $2,300,000 | Planned | ||
| — | 1-80319-0000 1803190000 | District 1 | IL-53Independence Blvd | Safety Intersection Improvement At Normantown Rd / Devonwood Ave | $2,545,000 | Planned | ||
| — | 1-80370-0000 1803700000 | District 1 | Front StIL-53 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, New Shoulders Water Street to Grundy Co Line | $5,500,000 | Planned | ||
| — | 1-80791-0000 1807910000 | District 1 | Cicero AveIL-50IL-83 | Reconstruction - Bridges Bridge Replacement At Cal Sag Channel | $20,000,000 | Planned | ||
| — | 1-80803-0000 1808030000 | District 1 | Governors HwyIL-50 | Miscellaneous Improvement Traf Signal Installation, Safety Improvements, Pavement Marking Wilmington-Peotone Rd to County Line Rd | $2,500,000 | Planned | ||
| — | 1-80958-1000 1809581000 | District 1 | IL-53 | Reconstruction - Pavement Reconstruction Hoff Rd to N of River Rd | $35,000,000 | Planned | ||
| — | 1-81121-0000 1811210000 | District 1 | IL-53Ruby St | Preservation - Bridges Bridge Painting, Bridge Repair At Des Plaines River | $10,000,000 | Planned | ||
| — | 1-81128-0000 1811280000 | District 1 | Butterfield RdIL-56 | Maintenance - Pavements Drainage, Erosion Control Technology Dr to Fountain Square Dr | $2,000,000 | Planned | ||
| — | 1-81159-0000 1811590000 | District 1 | Broadway StIL-53IL-7 | Miscellaneous Improvement Retaining Wall S of Caton Farm Rd | $1,000,000 | Planned | ||
| — | 1-81180-0000 1811800000 | District 1 | IL-53Rand Rd | Preservation - Pavements Smart Overlay Lake-Cook Rd to Ill 58 (Golf Rd) | $19,105,000 | Planned | ||
| — | 1-81204-0000 1812040000 | District 1 | Dundee RdIL-53IL-68 | Preservation - Pavements Smart Overlay Trailside Ct to Ill 53 | $6,000,000 | Planned | ||
| — | 1-81207-0000 1812070000 | District 1 | IL-43IL-58US-14 | Preservation - Pavements Smart Overlay Emerson St to US 14 (Caldwell Ave) | $2,430,000 | Planned | ||
| — | 1-81209-0000 1812090000 | District 1 | IL-56 | Preservation - Pavements Smart Overlay Ill 47 to W of Ramp At I-88 | $4,900,000 | Planned | ||
| — | 1-81227-0000 1812270000 | District 1 | Chicago StIL-53US-52 | Preservation - Pavements Smart Overlay US 52 (Doris Ave) to W Manhattan Rd | $8,500,000 | Planned | ||
| — | 1-81228-0000 1812280000 | District 1 | IL-59New Sutton Rd | Preservation - Pavements Smart Overlay Bartlett Rd to Spring Creek/Arboretum Blvd | $2,400,000 | Planned | ||
| — | 1-81229-0000 1812290000 | District 1 | Hawthorne RdIL-59IL-68 | Preservation - Pavements Smart Overlay Ill 68 (Dundee Rd) to Ill 62 (Algonquin Rd) | $1,600,000 | Planned | ||
| — | 1-81338-0000 1813380000 | District 1 | Cicero AveIL-50 | Miscellaneous Improvement Traf Signal Modernization, Turning Lanes, ADA Improvements At 147th St | $2,500,000 | Planned | ||
| — | 1-81376-0000 1813760000 | District 1 | Governors HwyIL-50 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At CN RR (S of Industrial Dr) | $3,400,000 | Planned | ||
| — | 1-81377-0000 1813770000 | District 1 | Cicero AveIL-50 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Ogden Ave | $1,250,000 | Planned | ||
| — | 1-81473-0000 1814730000 | District 1 | IL-59 | Maintenance - Pavements Patching Artesian Rd to English Row Ave | $5,000,000 | Planned | ||
| — | 1-81493-0000 1814930000 | District 1 | Governors HwyIL-50 | Rehabilitation - Pavement Designed Overlay Margaret St to S of Egyptian Trail | $750,000 | Planned | ||
| — | 1-81525-0000 1815250000 | District 1 | IL-53 | Rehabilitation - Pavement Designed Overlay E of Schaeffer Rd to Ill 83 | $800,000 | Planned | ||
| — | 1-81528-0000 1815280000 | District 1 | IL-53 | Rehabilitation - Pavement Designed Overlay S of South Arsenal Rd to River Rd | $500,000 | Planned | ||
| — | 1-81530-0000 1815300000 | District 1 | IL-59Sutton Rd | Rehabilitation - Pavement Designed Overlay Arboretum Blvd to Cook/DuPage Co Line | $19,800,000 | Planned | ||
| — | 1-81545-0000 1815450000 | District 1 | Governors HwyIL-50 | Rehabilitation - Pavement Standard Overlay Monee-Manhattan Rd to N of Wilson St | $600,000 | Planned | ||
| — | 1-81551-0000 1815510000 | District 1 | Golf RdIL-58 | Rehabilitation - Pavement Standard Overlay US 45 (N River Rd) to College Dr | $400,000 | Planned | ||
| — | 1-81552-0000 1815520000 | District 1 | Golf RdIL-58 | Rehabilitation - Pavement Standard Overlay E River Rd to I-294 (Tri-State Tollway) | $150,000 | Planned | ||
| — | 1-81565-0000 1815650000 | District 1 | Cicero AveIL-50 | Rehabilitation - Pavement Standard Overlay 25th St to 34th St | $2,550,000 | Planned | ||
| — | 1-81567-0000 1815670000 | District 1 | Golf RdIL-58 | Rehabilitation - Pavement Standard Overlay 8th Ave to US 45 (Des Plaines River Rd) | $2,150,000 | Planned | ||
| — | 1-81592-0000 1815920000 | District 1 | Hough StIL-59 | Rehabilitation - Pavement Standard Overlay US 12 (Rand Rd) to Lake-Cook Rd | $10,000,000 | Planned | ||
| — | 1-81593-0000 1815930000 | District 1 | IL-53Rohlwing Rd | Rehabilitation - Pavement Standard Overlay S of Nerge Rd to Devon Ave | $500,000 | Planned | ||
| — | 1-81669-0000 1816690000 | District 1 | Dempster StIL-58 | Preservation - Pavements Smart Overlay Ill 43 (Waukegan Rd) to W of Niles Center Rd | $6,320,000 | Planned | ||
| — | 1-81674-0000 1816740000 | District 1 | IL-59 | Preservation - Pavements Smart Overlay N of Country Ridge Dr to N of Ferry Rd | $3,500,000 | Planned | ||
| — | 1-81680-0000 1816800000 | District 1 | IL-59 | Preservation - Pavements Smart Overlay Ill 173 to N of Beach Grove Rd | $1,100,000 | Planned | ||
| — | 2-25000-0000 2250000000 | District 2 | IL-5 | Reconstruction - Pavement Bridge Replacement ILL 5: 16th St to 0.2 mi W of 38th St | $22,000,000 | Planned | ||
| — | 2-25000-0200 2250000200 | District 2 | IL-5 | Initial Construction - Pa Additional Lanes E of 27th St to 0.2 mi w of 38th St in Moline | $2,750,000 | Planned | ||
| — | 3-05046-0070 3050460070 | District 3 | IL-50IL-50 A | Reconstruction - Pavement Pavement Replacement S of Brookmont Blvd to N of US 45/52 & Indiana Ave to Fair St in Kankakee | $17,000,000 | Planned | ||
| — | 3-05046-0075 3050460075 | District 3 | IL-50IL-50 A | Reconstruction - Pavement Utility Adjustment S of Brookmont Blvd to N of US 45/52 & Indiana Ave to Fair St in Kankakee | $500,000 | Planned | ||
| — | 3-05332-0000 3053320000 | District 3 | IL-53 | Rehabilitation - Pavement Designed Overlay 0.3 Mi W of I-55 in Gardner to Will Co Line | $4,500,000 | Planned | ||
| — | 3-05427-0000 3054270000 | District 3 | IL-54 | Rehabilitation - Pavement Designed Overlay ILL 9/47 IN GIBSON CITY TO CHAMPAIGN CO LINE | $3,600,000 | Planned | ||
| — | 3-27058-0000 3270580000 | District 3 | IL-54 | Miscellaneous Improvement Bridge Replacement Drainage Ditch 1.5 Mi N of Champaign Co Line | $700,000 | Planned | ||
| — | 5-53107-0000 5531070000 | District 5 | IL-10IL-54 | Rehabilitation - Pavement Standard Overlay, ADA Improvements US 54 / ILL 10: 0.3 MI W OF US 51 TO S SHERMAN ST IN CLINTON & ILL 10: ILL 54 TO MAGILL RD | $2,600,000 | Planned | ||
| — | 5-53108-0000 5531080000 | District 5 | IL-54 | Rehabilitation - Pavement Standard Overlay ILL 48 to McLean Co Line | $2,800,000 | Planned | ||
| — | 5-53164-0000 5531640000 | District 5 | IL-54 | Rehabilitation - Pavement Standard Overlay Ford Co Line to 0.1 mi SW of State St in Bellflower | $4,000,000 | Planned | ||
| — | 5-53527-0000 5535270000 | District 5 | IL-54 | Preservation - Pavements Cape Seal Logan Co Line to 0.3 Mi W of US 51 at Clinton | $2,200,000 | Planned | ||
| — | 5-93980-2000 5939802000 | District 5 | IL-54 | Preservation - Bridges Bridge Deck Overlay At Trib Salt Creek E of Farmer City | $1,500,000 | Planned | ||
| — | 6-00420-0000 6004200000 | District 6 | IL-57 | Rehabilitation - Pavement Designed Overlay, New Shoulders, Standard Overlay 0.3 MI S OF MILL CREEK AT MARBLEHEAD TO 0.2 MI SE OF I-172 | $7,000,000 | Planned | ||
| — | 6-01103-0000 6011030000 | District 6 | IL-104IL-57US-24 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, Patching US 24: MISSISSIPPI RIVER BRIDGES TO 0.1 MI N OF GARDNER PARK DR & ILL 57: W OF 4TH ST TO BROADWAY ST IN QUINCY & ILL 104: 3RD ST TO E OF 4TH ST | $9,300,000 | Planned | ||
| FY 2025 | 1-79279-0000 1792790000 | District 1 | Chicago-ottawa ConIL-53US-6 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Jackson St to Chicago St (SB) | $2,500,000 | Planned | ||
| FY 2025 | 1-79433-0001 1794330001 | District 1 | Eisenhower ExpwyI-290IL-53 | Preservation - Bridges Bridge Repair, Bridge Joint Replace/Repair Ill 62 (Algonquin Rd) to Ill 72 (Higgins Rd) and At I-90 (Jane Addams Memorial Tollway), Ill 58 (Golf Rd), Woodfield Rd & Ill 72 (Higgins Rd) | $3,000,000 | Planned | ||
| FY 2025 | 1-79433-0002 1794330002 | District 1 | Eisenhower ExpwyI-290IL-53 | Preservation - Pavements Smart Overlay, Standard Overlay, Miscellaneous Ill 62 (Algonquin Rd) to Ill 72 (Higgins Rd) and At I-90 (Jane Addams Memorial Tollway), Ill 58 (Golf Rd), Woodfield Rd & Ill 72 (Higgins Rd) | $40,000,000 | Planned | ||
| FY 2025 | 1-79840-0000 1798400000 | District 1 | Eisenhower ExpwyI-290IL-53 | Maintenance - Pavements Shoulder Repair, Signing (New), Pavement Marking Lake-Cook Rd to Des Plaines Ave - (Bus On Shoulder) | $22,100,000 | Planned | ||
| FY 2025 | 1-79858-0000 1798580000 | District 1 | IL-59 | Rehabilitation - Pavement Standard Overlay, ADA Improvements, Milled Rumble Strip N of Ill 132 (Grand Ave) to Longwood Dr | $2,115,000 | Planned | ||
| FY 2025 | 1-79892-0800 1798920800 | District 1 | Baltimore StIL-53 | Maintenance - Pavements Drainage Strip Mine Rd to Markle Rd | $241,000 | Planned | ||
| FY 2025 | 1-79906-0000 1799060000 | District 1 | Cicero AveIL-50 | Miscellaneous Improvement Traf Signal Modernization, Channelization, Traf Signal Installation At Governors Hwy & At Dralle Rd | $2,295,000 | Planned | ||
| FY 2025 | 1-79921-0000 1799210000 | District 1 | Cicero AveIL-50 | Reconstruction - Pavement Bridge Repair At I-55 (Stevenson Expwy) | $8,750,000 | Planned | ||
| FY 2025 | 1-80370-1010 1803701010 | District 1 | Baltimore StIL-53 | Rehabilitation - Pavement Designed Overlay, Patching, ADA Improvements Kankakee St to W of Forked Creek | $1,300,000 | Planned | ||
| FY 2025 | 1-80882-0000 1808820000 | District 1 | IL-53 | Preservation - Pavements Smart Overlay 75th St to Will Co Line | $3,900,000 | Planned | ||
| FY 2025 | 1-81205-0000 1812050000 | District 1 | Cicero AveIL-50US-41 | Preservation - Pavements Smart Overlay N of Golf Rd to Devon Ave | $9,100,000 | Planned | ||
| FY 2025 | 1-81206-0000 1812060000 | District 1 | Governors HwyIL-50 | Preservation - Pavements Smart Overlay Beecher Rd to Tucker Rd | $1,010,000 | Planned | ||
| FY 2025 | 1-81480-0000 1814800000 | District 1 | IL-59 | Maintenance - Pavements Patching McCoy Dr to Artesian Rd | $5,000,000 | Planned | ||
| FY 2025 | 1-81506-0000 1815060000 | District 1 | Broadway StIL-53 | Rehabilitation - Pavement Designed Overlay Teale Woods Trail (S of Ill 7) to Ruby St | $1,620,000 | Planned | ||
| FY 2025 | 1-81591-0000 1815910000 | District 1 | Columbine AveIL-53 | Rehabilitation - Pavement Standard Overlay S of St Charles Rd (Phillps Ct) to Bryant Ave | $1,850,000 | Planned | ||
| FY 2025 | 1-81645-0000 1816450000 | District 1 | IL-43IL-58Waukegan Rd | Rehabilitation - Pavement Designed Overlay Ill 58 (Golf Rd) to Emerson St | $800,000 | Planned | ||
| FY 2025 | 2-25000-0030 2250000030 | District 2 | 27th St36th AveIL-5 | Reconstruction - Pavement Utility Adjustment ILL 5: 16th St to 0.2 mi W of 38th St; 27th St: 0.1 mi N of 36th Ave to S of ILL 5; 36th Ave: 0.2 Mi W to 27th St; 38th Ave: 27th St to 0.3 Mi E in Moline | $200,000 | Planned | ||
| FY 2025 | 2-25000-1051 2250001051 | District 2 | IL-5 | Miscellaneous Improvement Tree Removal ILL 5: 16th St to 0.2 mi W of 38th St | $100,000 | Planned | ||
| FY 2025 | 3-00927-0080 3009270080 | District 3 | IL-47IL-54IL-9 | Preservation - Pavements Crack & Joint Sealing ILL 47 in Gibson City to 900E Rd; ILL 115 to Baltimore Dr in Paxton | $200,000 | Planned | ||
| FY 2025 | 6-01420-0000 6014200000 | District 6 | IL-54 | Rehabilitation - Pavement Designed Overlay, Miscellaneous 0.2 MI E OF PRAIRIE SCHOOL RD TO N OF TR 137D (BISSELL RD) NE OF SPRINGFIELD | $5,500,000 | Planned | ||
| FY 2025 | 6-01420-0200 6014200200 | District 6 | IL-54 | Miscellaneous Improvement New Shoulders, Guardrail, Milled Rumble Strip 0.3 MI E OF MAIN ST IN SPAULDING TO N OF TR 137D (BISSELL RD) NE OF SPRINGFIELD | $2,800,000 | Planned | ||
| FY 2025 | 6-60104-0000 6601040000 | District 6 | IL-54Mcdonald St | Rehabilitation - Pavement Designed Overlay, ADA Improvements ILL 54: DEWITT CO LINE TO N OF ILL 121; MCDONALD ST: ILL 54 TO ILL 121 IN MT PULASKI | $6,100,000 | Planned |
1–80 of 80
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.