Filtered by: Highway: IL-7 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 1-79352-0000 1793520000 | District 1 | IL-7Renwick Rd | Reconstruction - Bridges Bridge Replacement At Des Plaines River & Sanitary & Ship Canal | $30,000,000 | Planned | ||
| — | 1-79364-2000 1793642000 | District 1 | 143rd StIL-7 | Maintenance - Pavements Drainage, Culvert Rehabilitation Will-Cook Rd to 108th Ave - Long Run Creek | $4,000,000 | Planned | ||
| — | 1-79908-0000 1799080000 | District 1 | Higgins RdIL-72 | Miscellaneous Improvement Traf Signal Modernization, Turning Lanes, ADA Improvements At Huntington Blvd | $1,500,000 | Planned | ||
| — | 1-80188-0000 1801880000 | District 1 | IL-72Oak Knoll Dr | Rehabilitation - Pavement Designed Overlay, Milled Rumble Strip, New Shoulders DeKalb Co Line to Aurora Dr | $2,500,000 | Planned | ||
| — | 1-81137-0000 1811370000 | District 1 | Higgins RdIL-72 | Rehabilitation - Pavement Standard Overlay E of Fairview Ave to I-90 Ramp (WB) | $3,105,000 | Planned | ||
| — | 1-81159-0000 1811590000 | District 1 | Broadway StIL-53IL-7 | Miscellaneous Improvement Retaining Wall S of Caton Farm Rd | $1,000,000 | Planned | ||
| — | 1-81188-0000 1811880000 | District 1 | Higgins RdIL-72 | Preservation - Pavements Smart Overlay Orchard Pl to Ill 171 (Cumberland Ave) | $5,100,000 | Planned | ||
| — | 1-81199-0000 1811990000 | District 1 | 143rd StIL-7 | Rehabilitation - Pavement Widening & Resurfacing West Ave to Southwest Hwy | $2,000,000 | Planned | ||
| — | 1-81248-0000 1812480000 | District 1 | Higgins RdIL-72 | Preservation - Pavements Crack & Joint Sealing E of Sutton Rd to N of I-90 (Jane Addams Memorial Tollway) | $155,000 | Planned | ||
| — | 1-81250-0000 1812500000 | District 1 | Higgins RdIL-72 | Preservation - Pavements Crack & Joint Sealing E of Barrington Rd to Glen Lake Rd | $215,000 | Planned | ||
| — | 1-81418-0000 1814180000 | District 1 | Higgins RdIL-72 | Preservation - Pavements Smart Overlay E of I-90 (Jane Addams Memorial Tollway) to W of Barrington Rd | $1,050,000 | Planned | ||
| — | 1-81445-0000 1814450000 | District 1 | IL-72South Frontage Rd | Rehabilitation - Pavement Designed Overlay W of Ill 25 (Dundee Ave) | $120,000 | Planned | ||
| — | 1-81542-0000 1815420000 | District 1 | IL-7Southwest Hwy | Rehabilitation - Pavement Standard Overlay Ridgeland Ave to 111th St | $3,605,000 | Planned | ||
| — | 1-81589-0000 1815890000 | District 1 | IL-7Southwest Hwy | Rehabilitation - Pavement Standard Overlay Cal Sag Channel to 131st St | $4,000,000 | Planned | ||
| — | 1-81590-0000 1815900000 | District 1 | IL-7Southwest Hwy | Rehabilitation - Pavement Standard Overlay 135th St to N of US 45 | $650,000 | Planned | ||
| — | 1-81639-0000 1816390000 | District 1 | IL-7Larkin Ave | Rehabilitation - Pavement Standard Overlay S of US 30 (Plainfield Rd) to McDonough St | $7,300,000 | Planned | ||
| — | 2-01301-0000 2013010000 | District 2 | IL-78 | Rehabilitation - Pavement Designed Overlay, Cold Milling, Patching South St in Annawan to Kewanee NCL | $14,280,000 | Planned | ||
| — | 2-01302-0140 2013020140 | District 2 | IL-78US-34 | Reconstruction - Pavement Utility Adjustment Kewanee NCL to 0.4 Mi S of South St in Kewanee | $200,000 | Planned | ||
| — | 2-05350-0000 2053500000 | District 2 | IL-70 | Reconstruction - Bridges Bridge Replacement 0.1 MI N of Summerdale AVE in Rockford | $1,260,000 | Planned | ||
| — | 2-17080-0000 2170800000 | District 2 | IL-75 | Reconstruction - Bridges Bridge Replacement Rock River in Rockton | $15,250,000 | Planned | ||
| — | 2-20020-0000 2200200000 | District 2 | IL-73 | Rehabilitation - Pavement Designed Overlay, Culvert Replacement, Cold Milling 0.2 mi S of US 20 to 0.1 mi N of Garfield St in Pearl City | $11,025,000 | Planned | ||
| — | 2-20022-0000 2200220000 | District 2 | IL-75 | Rehabilitation - Pavement Standard Overlay, ADA Improvements, Patching Howard Ave to 0.3 Mi N of E River Rd NE of Freeport | $1,323,000 | Planned | ||
| — | 2-20022-0055 2200220055 | District 2 | IL-75 | Preservation - Pavements Crack & Joint Sealing Howard Ave to 0.3 Mi N of E River Rd NE of Freeport | $63,000 | Planned | ||
| — | 2-20108-0100 2201080100 | District 2 | IL-26IL-72 | Reconstruction - Pavement Reconstruction, Culvert Replacement 0.4 mi S of Rudy Rd S of Freeport to ILL 72 (W) | $18,900,000 | Planned | ||
| — | 2-20108-0104 2201080104 | District 2 | IL-26IL-72 | Reconstruction - Pavement Utility Adjustment 0.4 mi S of Rudy Rd S of Freeport to ILL 72 (W) | $100,000 | Planned | ||
| — | 2-20114-0100 2201140100 | District 2 | IL-76 | Safety Intersection Reconstn 0.1 mi N of Woodstock Rd to 0.2 mi S of Spring Creek Rd | $5,100,000 | Planned | ||
| — | 2-20124-0170 2201240170 | District 2 | IL-26IL-72 | Preservation - Pavements Crack & Joint Sealing S of ILL 72 (W) to 0.2 mi N of Magnolia St in Forreston | $116,000 | Planned | ||
| — | 2-20515-0000 2205150000 | District 2 | IL-2IL-72 | Preservation - Bridges Bridge Deck Repairs, Bridge Repair, Bridge Joint Replace/Repair Mill Creek at Byron WCL | $350,000 | Planned | ||
| — | 2-20610-0000 2206100000 | District 2 | IL-73 | Preservation - Bridges Bridge Deck Repairs, Bridge Repair, Bridge Joint Replace/Repair Trib Yellow Creek 0.5 MI S of US 20 | $277,000 | Planned | ||
| — | 2-21027-0010 2210270010 | District 2 | IL-73 | Preservation - Pavements Crack & Joint Sealing, Guardrail, Tree Removal Wisconsin State Line to Hickory Terrace in Lena | $280,000 | Planned | ||
| — | 2-21489-0000 2214890000 | District 2 | IL-70 | Reconstruction - Bridges Bridge Replacement Trib Pecatonica River 0.6 mi, 0.5 mi & 0.1 mi W of Cemetery Rd | $5,670,000 | Planned | ||
| — | 2-22940-0100 2229400100 | District 2 | IL-72IL-73 | Initial Construction - Br Culvert Replacement ILL 73: 0.4 Mi N & 0.3 & 0.8 Mi S of ILL 72 N of Lanark & ILL 72: 0.1 mi E of Apache Rd | $2,205,000 | Planned | ||
| — | 2-22950-0100 2229500100 | District 2 | IL-72 | Rehabilitation - Pavement Designed Overlay, Culvert Replacement, ADA Improvements Shannon Route to Stanton St in Shannon | $2,056,000 | Planned | ||
| — | 2-22950-0155 2229500155 | District 2 | IL-72 | Preservation - Pavements Crack & Joint Sealing Shannon Route to Stanton St in Shannon | $16,000 | Planned | ||
| — | 2-24075-0310 2240750310 | District 2 | Gardner AveIL-75US-51 | Rehabilitation - Pavement Utility Adjustment ILL 2 to South Beloit ECL | $300,000 | Planned | ||
| — | 2-24341-0100 2243410100 | District 2 | IL-78 | Reconstruction - Bridges Bridge Replacement Coal Creek 1.8 Mi N of Annawan NCL | $2,149,000 | Planned | ||
| — | 2-24360-0100 2243600100 | District 2 | IL-72 | Reconstruction - Bridges Bridge Replacement Mud Creek 0.1 mi E of Pond Rd E of Leaf River | $1,103,000 | Planned | ||
| — | 2-24410-0100 2244100100 | District 2 | IL-78 | Reconstruction - Bridges Bridge Replacement Muddy Plum River 2.5 Mi N of Carroll Co Line | $3,400,000 | Planned | ||
| — | 2-25790-0100 2257900100 | District 2 | IL-78 | Miscellaneous Improvement Culvert Extension 0.4 mi N of Apple Hill Rd to 0.4 Mi S of Ideal Rd (Various Culverts) | $4,830,000 | Planned | ||
| — | 2-29295-0100 2292950100 | District 2 | IL-2IL-75 | Reconstruction - Pavement Reconstruction, Cold Milling, ADA Improvements Winnebago Ave to Wisconsin State Line in South Beloit | $10,500,000 | Planned | ||
| — | 2-29295-0104 2292950104 | District 2 | IL-2IL-75 | Reconstruction - Pavement Utility Adjustment Prairie Hill Rd to Wisconsin State line in South Beloit | $179,000 | Planned | ||
| — | 2-29295-0106 2292950106 | District 2 | IL-2IL-75 | Reconstruction - Pavement RR Crossing Improvement, RR Flagger, RR Insurance Prairie Hill Rd to Wisconsin State line in South Beloit | $500,000 | Planned | ||
| — | 2-29295-0111 2292950111 | District 2 | IL-2IL-75 | Reconstruction - Pavement Rubblization, ADA Improvements, Sidewalks Prairie HIll Rd to Winnebago Ave in South Beloit | $5,000,000 | Planned | ||
| — | 2-29395-0100 2293950100 | District 2 | IL-2IL-75 | Reconstruction - Pavement Rubblization, Cold Milling 0.8 mi N of Roscoe Rd to Prairie Hill RD in South Beloit | $14,333,000 | Planned | ||
| — | 2-30020-0100 2300200100 | District 2 | IL-75 | Safety Intersection Reconstn At Church Rd 1 Mi W of Davis WCL | $3,087,000 | Planned | ||
| — | 2-30020-0102 2300200102 | District 2 | IL-75 | Safety Utility Adjustment At Church Rd 1 Mi W of Davis WCL | $20,000 | Planned | ||
| — | 2-30063-0059 2300630059 | District 2 | IL-78 | Safety RR Crossing Improvement UP RR in Morrison | $250,000 | Planned | ||
| — | 2-30063-0200 2300630200 | District 2 | IL-78Lincoln WayUS-30 | Reconstruction - Pavement Reconstruction, Intersection Improvement, Standard Overlay US 30: 0.1 mi W of ILL 78 (N) to 0.2 Mi E of Jackson St & ILL 78: US 30 to 0.1 mi s in Morrison | $15,225,000 | Planned | ||
| — | 2-30063-0204 2300630204 | District 2 | IL-78Lincoln WayUS-30 | Reconstruction - Pavement Utility Adjustment US 30: 0.1 mi W of ILL 78 (N) to 0.2 Mi E of Jackson St & ILL 78: US 30 to 0.1 Mi S in Morrison | $100,000 | Planned | ||
| — | 2-30071-0100 2300710100 | District 2 | IL-78 | Reconstruction - Bridges Bridge Replacement Davis Creek 0.5 Mi N of Carroll Co Line | $3,032,000 | Planned | ||
| — | 2-30138-0055 2301380055 | District 2 | IL-70Kilburn Ave | Preservation - Pavements Crack & Joint Sealing 0.1 Mi W of Safford Rd to Glenwood Ave in Rockford | $25,000 | Planned | ||
| — | 2-31025-0170 2310250170 | District 2 | IL-75 | Preservation - Pavements Crack & Joint Sealing 0.2 Mi E of Moate Rd to 0.4 Mi E of Meridian Rd | $210,000 | Planned | ||
| — | 2-53503-0000 2535030000 | District 2 | IL-64IL-73 | Safety ADA Improvements Various Locations in Lanark & Mt Morris | $2,080,000 | Planned | ||
| — | 2-53517-0000 2535170000 | District 2 | IL-72 | Rehabilitation - Pavement Standard Overlay, ADA Improvements, Cold Milling Blaine St to Davis Dr in Leaf River | $1,000,000 | Planned | ||
| — | 3-07150-0090 3071500090 | District 3 | IL-351IL-71 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Cedar Creek in Cedar Point to Walnut St in Oglesby | $3,900,000 | Planned | ||
| — | 3-18006-0040 3180060040 | District 3 | I-180IL-26IL-71 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-2nd) ILL 29 to 0.6 Mi E of ILL 26 in Hennepin | $14,000,000 | Planned | ||
| — | 3-23200-1800 3232001800 | District 3 | IL-71 | Safety ADA Improvements Douglas St to 0.2 Mi S of US 34 (Oswego HS Ent) | $500,000 | Planned | ||
| — | 3-50180-0000 3501800000 | District 3 | IL-23IL-71 | Rehabilitation - Bridges Bridge New Deck Illinois River & Access Rd 1 Mi S of US 6 in Ottawa | $20,000,000 | Planned | ||
| — | 3-50182-0000 3501820000 | District 3 | IL-23 BIL-71 A | Reconstruction - Bridges Bridge Replacement 1 Mi S of US 6 (Parking Lot Ent) | $2,500,000 | Planned | ||
| — | 4-02922-0000 4029220000 | District 4 | IL-100IL-78US-136 | Rehabilitation - Pavement Designed Overlay US 24 to Illinois River | $5,600,000 | Planned | ||
| — | 4-02922-0300 4029220300 | District 4 | IL-78 | Rehabilitation - Pavement Designed Overlay Big Creek Park to ILL 9 (Locust St) in Canton | $5,000,000 | Planned | ||
| — | 4-02924-0000 4029240000 | District 4 | IL-78IL-9 | Rehabilitation - Pavement Designed Overlay E of 1st Ave to 5th Ave in Canton | $800,000 | Planned | ||
| — | 4-02926-0000 4029260000 | District 4 | IL-78 | Rehabilitation - Pavement Standard Overlay ILL 78: N of Alder St to S of Big Creek Park in Canton; Old ILL 78: ILL 78 (N) to ILL 78 (S) in Canton | $3,750,000 | Planned | ||
| — | 4-07217-0500 4072170500 | District 4 | IL-78 | Reconstruction - Bridges Bridge Replacement Spoon River 3 mi N of Laura | $11,400,000 | Planned | ||
| — | 4-09460-0100 4094600100 | District 4 | IL-78 | Reconstruction - Bridges Bridge Replacement W Branch of Copperas Creek 0.5 Mi N of Norris | $1,300,000 | Planned | ||
| — | 6-00413-0000 6004130000 | District 6 | IL-78IL-97US-136 | Reconstruction - Pavement Reconstruction, ADA Improvements, Vertical Realignment US 136: ILLINOIS RIVER BRIDGE TO S OF RANDOLPH ST; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO S OF ILLINOIS ST (ALL IN HAVANA) | $8,100,000 | Planned | ||
| — | 6-00413-0002 6004130002 | District 6 | IL-78IL-97US-136 | Reconstruction - Pavement Utility Adjustment US 136: ILLINOIS RIVER BRIDGE TO E OF CHARLOTTE AVE; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO N OF IM RR (ALL IN HAVANA) | $250,000 | Planned | ||
| — | 6-00413-0200 6004130200 | District 6 | IL-78 | Rehabilitation - Pavement Standard Overlay, Curb And Gutter, ADA Improvements S OF ILLINOIS ST TO 0.1 MI N OF IM RR IN HAVANA | $1,700,000 | Planned | ||
| — | 6-00485-0000 6004850000 | District 6 | IL-78 | Reconstruction - Bridges Bridge Replacement SNAKE CREEK 3.4 MI N OF JACKSONVILLE NCL | $2,800,000 | Planned | ||
| — | 6-00778-0000 6007780000 | District 6 | IL-78 | Rehabilitation - Pavement Designed Overlay, ADA Improvements 0.1 MI N OF OAK ST TO ILL 104 IN JACKSONVILLE | $4,700,000 | Planned | ||
| FY 2025 | 1-79287-0000 1792870000 | District 1 | IL-7Theodore St | Rehabilitation - Pavement Designed Overlay, ADA Improvements US 30 (Plainfield Rd) to Ill 53 (Broadway St) | $1,650,000 | Planned | ||
| FY 2025 | 1-80137-0000 1801370000 | District 1 | IL-7Southwest Hwy | Miscellaneous Improvement Traf Signal Modernization, Left Turn Lanes At Ill 43 (Harlem Ave) | $1,400,000 | Planned | ||
| FY 2025 | 1-81185-0000 1811850000 | District 1 | IL-72 | Preservation - Pavements Smart Overlay Reinking Rd to Industrial Dr | $1,240,000 | Planned | ||
| FY 2025 | 1-81231-0000 1812310000 | District 1 | Higgins RdIL-72 | Preservation - Pavements Smart Overlay N Meacham Rd to I-290 Ramps (NB) | $2,000,000 | Planned | ||
| FY 2025 | 1-81638-0000 1816380000 | District 1 | 159th StIL-7 | Rehabilitation - Pavement Standard Overlay Robson Dr to Adellman Dr | $1,200,000 | Planned | ||
| FY 2025 | 2-12925-0000 2129250000 | District 2 | IL-78IL-92 | Rehabilitation - Pavement Standard Overlay, Cold In-Place Recycling, Cold Milling ILL 78: 0.2 mi N of ILL 92 to N of W 8th St in Prophetstown & ILL 92: ILL 78 to Bureau Co Line | $8,000,000 | Planned | ||
| FY 2025 | 2-20351-0000 2203510000 | District 2 | IL-72 | Preservation - Bridges Bridge Deck Repairs, Bridge Repair, Bridge Joint Replace/Repair Drainage Ditch 3.5 mi W & Leaf River 0.3 mi E of Mt Morris Rd | $420,000 | Planned | ||
| FY 2025 | 2-21340-0200 2213400200 | District 2 | IL-75 | Preservation - Bridges Bridge Deck Repairs, Bridge Repair, Bridge Joint Replace/Repair Pecatonica River in Freeport | $525,000 | Planned | ||
| FY 2025 | 2-22905-0000 2229050000 | District 2 | IL-78 | Preservation - Bridges Bridge Deck Repairs, Bridge Repair, Bridge Joint Replace/Repair Coon Creek 1.8 mi S of Prophetstown SCL | $210,000 | Planned | ||
| FY 2025 | 2-53512-0000 2535120000 | District 2 | IL-2IL-72 | Safety ADA Improvements ILL 2: Market St to Lincoln St & ILL 72: ILL 2 to Diamond St in Byron | $1,601,000 | Planned | ||
| FY 2025 | 2-77140-0112 2771400112 | District 2 | IL-73US-20 | Safety Utility Adjustment US 20: 0.4 mi W of ILL 73 to 1 mi E (Rees Rd) & ILL 73: 0.4 mi N to 0.2 mi S of US 20 | $500,000 | Planned | ||
| FY 2025 | 3-47071-2514 3470712514 | District 3 | IL-71 | Miscellaneous Improvement Culvert Removal Stream 0.1 Mi SW of Fennel Rd in Newark | $200,000 | Planned | ||
| FY 2025 | 3-50124-0000 3501240000 | District 3 | IL-71 | Reconstruction - Bridges Bridge Replacement Cedar Creek 3 Mi W of I-39 | $1,000,000 | Planned | ||
| FY 2025 | 4-00015-0100 4000150100 | District 4 | IL-78IL-97US-136 | Preservation - Bridges Bridge Painting, Bridge Repair Illinois River at Havana | $15,000,000 | Planned | ||
| FY 2025 | 4-00840-0200 4008400200 | District 4 | IL-78Old Ill 78 | Rehabilitation - Pavement Standard Overlay, Designed Overlay ILL 78: Fort St in Farmington to 0.2 Mi N of Alder St in Canton; Old ILL 78: ILL 78 (N) to ILL 78 (S) in Norris | $8,500,000 | Planned | ||
| FY 2025 | 4-02024-2409 4020242409 | District 4 | E Fort StIL-116IL-78 | Preservation - Pavements Crack & Joint Sealing ILL 78/116 (Fort St): N Lightfoot RD to S Main ST & ILL 78 (S Main St): Fort St to S of E Spring St in Farmington | $100,000 | Planned | ||
| FY 2025 | 4-02024-2410 4020242410 | District 4 | IL-78IL-97US-24 | Preservation - Pavements Crack & Joint Sealing US 24: Maple St in Lewistown to Little America; ILL 78/97: US 24 to S of Clark Rd | $250,000 | Planned | ||
| FY 2025 | 4-07224-0000 4072240000 | District 4 | IL-78IL-8 | Rehabilitation - Pavement Designed Overlay US 150 to ILL 8 | $8,000,000 | Planned | ||
| FY 2025 | 4-07224-0200 4072240200 | District 4 | IL-78US-150 | Rehabilitation - Pavement Standard Overlay 0.1 mi N of N Jct ILL 78 / US 150 to 0.1 mi N of I-74 | $5,000,000 | Planned |
1–89 of 89
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.