| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 1-72414-0300 1724140300 | District 1 | Willow Rd | Reconstruction - Bridges Bridge Replacement at W Fork N Branch Chicago River | $9,400,000 | Planned | ||
| — | 1-75204-1010 1752041010 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges RR Separation Replacement At IHB RR 0.2 Mi W of 25th Ave Intchg | $50,000,000 | Planned | ||
| — | 1-75204-1020 1752041020 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges RR Separation Replacement at CSX RR & CTA | $81,566,000 | Planned | ||
| — | 1-75204-1021 1752041021 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement at CSX RR & CTA | $18,434,000 | Planned | ||
| — | 1-75204-1040 1752041040 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At Ridgeland Ave (Overhead) | $25,000,000 | Planned | ||
| — | 1-75746-0100 1757460100 | District 1 | Edens ExpwyI-94US-41 | Reconstruction - Bridges Bridge Replacement At Winnetka Rd (Overhead) | $7,000,000 | Planned | ||
| — | 1-77247-4350 1772474350 | District 1 | I-80 | Reconstruction - Bridges Bridge Replacement Ill 53 (Chicago St) to Gardner St (EB) | $39,086,000 | Planned | ||
| — | 1-77247-4351 1772474351 | District 1 | I-80 | Reconstruction - Bridges Miscellaneous Ill 53 (Chicago St) to Gardner St (EB) | $1,000,000 | Planned | ||
| — | 1-77247-6001 1772476001 | District 1 | I-80 | Reconstruction - Bridges Bridge Replacement At Gougar Rd | $9,300,000 | Planned | ||
| — | 1-77247-7000 1772477000 | District 1 | I-80 | Reconstruction - Bridges Bridge Replacement At Ill 53 (Chicago St) & UP RR | $5,091,000 | Planned | ||
| — | 1-79002-0000 1790020000 | District 1 | College DrIL-83 | Reconstruction - Bridges Culvert Replacement At Navajo Creek W of S Nagle Ave | $1,200,000 | Planned | ||
| — | 1-79003-0000 1790030000 | District 1 | 95th StUS-12US-20 | Reconstruction - Bridges Culvert Replacement At Drainage Ditch W of 54th Ave | $2,000,000 | Planned | ||
| — | 1-79339-0000 1793390000 | District 1 | I-55Stevenson Expwy | Reconstruction - Bridges Bridge Replacement (Outbound/WB) At Ill 50 (Cicero Ave) & At BRC RR 0.3 Mi E of ILL 50 | $11,000,000 | Planned | ||
| — | 1-79340-0000 1793400000 | District 1 | I-55Stevenson Expwy | Reconstruction - Bridges Bridge Replacement (Inbound/EB) At Ill 50 (Cicero Ave) & BRC RR 0.3 Mi E of Ill 50 (Cicero Ave) | $12,000,000 | Planned | ||
| — | 1-79352-0000 1793520000 | District 1 | IL-7Renwick Rd | Reconstruction - Bridges Bridge Replacement At Des Plaines River & Sanitary & Ship Canal | $30,000,000 | Planned | ||
| — | 1-79357-0000 1793570000 | District 1 | IL-59Neltnor Blvd | Reconstruction - Bridges Bridge Replacement At Ill 38 (Roosevelt Rd) | $1,740,000 | Planned | ||
| — | 1-79672-0001 1796720001 | District 1 | Lake StUS-20 | Reconstruction - Bridges Bridge Replacement At Shales Pkwy | $3,000,000 | Planned | ||
| — | 1-79748-0000 1797480000 | District 1 | I-57 | Reconstruction - Bridges Bridge Replacement At 183rd St (Overhead) | $10,000,000 | Planned | ||
| — | 1-79759-0000 1797590000 | District 1 | I-80 | Reconstruction - Bridges Bridge Replacement At 183rd St (Overhead) | $11,000,000 | Planned | ||
| — | 1-79763-0000 1797630000 | District 1 | I-290 | Reconstruction - Bridges Bridge Replacement At I-355 (Veterans Memorial Tollway) & At Spring Brook | $40,750,000 | Planned | ||
| — | 1-79796-0000 1797960000 | District 1 | IL-83Kingery Hwy | Reconstruction - Bridges Bridge Replacement At Ill 56 (Butterfield Rd) | $12,875,000 | Planned | ||
| — | 1-79799-0000 1797990000 | District 1 | IL-59Neltnor Blvd | Reconstruction - Bridges Bridge Replacement At UP & CN RR 0.2 mi S of Main St | $9,550,000 | Planned | ||
| — | 1-79800-0000 1798000000 | District 1 | IL-59 | Reconstruction - Bridges Bridge Replacement At RR over Prairie Path | $1,958,000 | Planned | ||
| — | 1-79899-0000 1798990000 | District 1 | I-55Stevenson Expwy | Reconstruction - Bridges Retaining Wall At Ill 43 (Harlem Ave) (Overhead) | $24,493,000 | Planned | ||
| — | 1-79901-0000 1799010000 | District 1 | Algonquin RdIL-62 | Reconstruction - Bridges Bridge Replacement At Spring Creek 1.4 Mi W of ILL 59 | $5,630,000 | Planned | ||
| — | 1-79976-0000 1799760000 | District 1 | Washington Blvd | Reconstruction - Bridges Bridge Replacement Ill 171 (First Ave) to Thatcher Ave | $5,000,000 | Planned | ||
| — | 1-79987-0000 1799870000 | District 1 | Devon Ave | Reconstruction - Bridges Bridge Replacement at Des Plaines River | $3,000,000 | Planned | ||
| — | 1-80009-0000 1800090000 | District 1 | Eisenhower ExpwyI-290 | Reconstruction - Bridges Bridge Replacement at Independence Blvd (Overhead) | $40,000,000 | Planned | ||
| — | 1-80197-0000 1801970000 | District 1 | (eastbound)I-80 | Reconstruction - Bridges Bridge Replacement At I-294 (Tri-State Tollway) (NB) | $52,000,000 | Planned | ||
| — | 1-80267-0000 1802670000 | District 1 | IL-176Liberty St | Reconstruction - Bridges Culvert Replacement At Bangs Lake Outlet | $1,000,000 | Planned | ||
| — | 1-80288-0000 1802880000 | District 1 | Palatine Rd | Reconstruction - Bridges Culvert Replacement E of Williams Dr to E of Salt Creek & At Salt Creek 0.2 Mi W of Winston Dr W of Ill 53 | $1,700,000 | Planned | ||
| — | 1-80293-0000 1802930000 | District 1 | I-90I-94Kennedy Expwy | Reconstruction - Bridges Bridge Replacement At Fulton St (Overhead) | $20,000,000 | Planned | ||
| — | 1-80294-0000 1802940000 | District 1 | Forest Way Dr | Reconstruction - Bridges Culvert Replacement At Ditch N of Willow Rd | $1,200,000 | Planned | ||
| — | 1-80361-0000 1803610000 | District 1 | Belvidere StIL-120 | Reconstruction - Bridges Culvert Replacement, Intersection Improvement at Ditch 0.4 mi W of ILL 131 and At Knight/Ruth Wilcox Ave | $500,000 | Planned | ||
| — | 1-80590-0000 1805900000 | District 1 | 25th Ave | Reconstruction - Bridges Bridge Replacement at Salt Creek 0.3 Mi S of Cermak Rd | $5,500,000 | Planned | ||
| — | 1-80592-0000 1805920000 | District 1 | Eisenhower ExpwyI-290 | Reconstruction - Bridges Bridge Replacement at Ogden Ave (Overhead) | $17,740,000 | Planned | ||
| — | 1-80791-0000 1807910000 | District 1 | Cicero AveIL-50IL-83 | Reconstruction - Bridges Bridge Replacement At Cal Sag Channel | $20,000,000 | Planned | ||
| — | 1-80814-0000 1808140000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At Western Ave (Overhead) | $30,300,000 | Planned | ||
| — | 1-80832-0000 1808320000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At Circle Ave | $94,000,000 | Planned | ||
| — | 1-80833-0000 1808330000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At Des Plaines Ave | $9,300,000 | Planned | ||
| — | 1-80834-0000 1808340000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At Des Plaines River | $32,000,000 | Planned | ||
| — | 1-80837-0000 1808370000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At 9th Ave (Overhead) | $9,550,000 | Planned | ||
| — | 1-80838-0000 1808380000 | District 1 | Eisenhower ExpwyI-290IL-110 | Reconstruction - Bridges Bridge Replacement At 17th Ave (Overhead) | $9,680,000 | Planned | ||
| — | 1-80954-0000 1809540000 | District 1 | Ogden AveUS-34 | Reconstruction - Bridges Culvert Replacement, Scour Mitigation At Cress Creek W of Benedetti Dr | $550,000 | Planned | ||
| — | 1-80955-0000 1809550000 | District 1 | IL-1Route 1 Cutoff | Reconstruction - Bridges Culvert Replacement Thorn Creek Trib 0.6 Mi N of US 30 | $1,500,000 | Planned | ||
| — | 1-80956-0000 1809560000 | District 1 | IL-47 | Reconstruction - Bridges Culvert Replacement Over Pingree Creek (3.6 Mi S of US 20/ILL 72) | $300,000 | Planned | ||
| — | 1-81124-0000 1811240000 | District 1 | US-20 | Reconstruction - Bridges Culvert Replacement At Drainage Ditch E of Thorne Rd | $5,000,000 | Planned | ||
| — | 1-81125-0000 1811250000 | District 1 | 96th AveUS-45US-52 | Reconstruction - Bridges Bridge Replacement Rock Creek (S Branch of Forked Creek) | $1,500,000 | Planned | ||
| — | 1-81777-0000 1817770000 | District 1 | I-90I-94Kennedy Expwy | Reconstruction - Bridges Bridge New Deck Under Hubbard St | $4,000,000 | Planned | ||
| — | 1-89992-0100 1899920100 | District 1 | Pershing Rd | Reconstruction - Bridges Bridge Replacement Racine Ave & CN RR 1.3 Mi W of I-94 | $56,000,000 | Planned | ||
| — | 2-03130-0100 2031300100 | District 2 | I-80 | Reconstruction - Bridges Bridge Replacement Mineral Creek 2.9 Mi E of I-74 | $4,410,000 | Planned | ||
| — | 2-05350-0000 2053500000 | District 2 | IL-70 | Reconstruction - Bridges Bridge Replacement 0.1 MI N of Summerdale AVE in Rockford | $1,260,000 | Planned | ||
| — | 2-05376-0000 2053760000 | District 2 | IL-251 | Reconstruction - Bridges Culvert Replacement N Branch Willow Creek 0.3 MI S of ILL 173 | $1,000,000 | Planned | ||
| — | 2-12400-0100 2124000100 | District 2 | US-67 | Reconstruction - Bridges Bridge Replacement ILL 92, RR & Mississippi River in Rock Island | $300,000,000 | Planned | ||
| — | 2-13500-0100 2135000100 | District 2 | 27th St | Reconstruction - Bridges Bridge Rehabilitation At Rock River & Over I-280; 52nd Ave to Airport Rd in Moline | $51,607,000 | Planned | ||
| — | 2-13500-0104 2135000104 | District 2 | 27th St | Reconstruction - Bridges Utility Adjustment At Rock River & Over I-280; 52nd Ave to Airport Rd in Moline | $200,000 | Planned | ||
| — | 2-13880-0100 2138800100 | District 2 | 38th Ave N | Reconstruction - Bridges Bridge Replacement, Bridge Approach Roadway Ditch 0.8 Mi W of I-88 | $900,000 | Planned | ||
| — | 2-14660-0100 2146600100 | District 2 | Andalusia Rd | Reconstruction - Bridges Culvert Replacement 0.7 mi E of ILL 92 in Rock Island | $1,103,000 | Planned | ||
| — | 2-15230-0400 2152300400 | District 2 | US-20 BUS | Reconstruction - Bridges Bridge Replacement Belvidere Byp: At Poplar Grove Rd (Overhead) | $3,150,000 | Planned | ||
| — | 2-15790-0100 2157900100 | District 2 | IL-84 | Reconstruction - Bridges Bridge Replacement Plum River 1 Mi S of US 52 / Ill 64 S of Savanna | $3,500,000 | Planned | ||
| — | 2-17080-0000 2170800000 | District 2 | IL-75 | Reconstruction - Bridges Bridge Replacement Rock River in Rockton | $15,250,000 | Planned | ||
| — | 2-17500-0100 2175000100 | District 2 | IL-92 | Reconstruction - Bridges Bridge Replacement Fancy Creek 0.5 Mi E of Andalusia | $1,654,000 | Planned | ||
| — | 2-18583-0100 2185830100 | District 2 | CH-15Harrison Rd | Reconstruction - Bridges Culvert Replacement Stream 0.9 Mi N of ILL 75 | $1,000,000 | Planned | ||
| — | 2-20078-0100 2200780100 | District 2 | I-280I-74I-80 | Reconstruction - Bridges Bridge Replacement At Intchg I-74/80/280 | $16,868,000 | Planned | ||
| — | 2-20095-0100 2200950100 | District 2 | IL-40 | Reconstruction - Bridges Culvert Replacement Skunk Creek 3.5 mi E of Coleta | $500,000 | Planned | ||
| — | 2-20115-0100 2201150100 | District 2 | I-80 | Reconstruction - Bridges Culvert Replacement 1.6 mi E of ILL 78 | $2,205,000 | Planned | ||
| — | 2-20348-0000 2203480000 | District 2 | I-74 | Reconstruction - Bridges Bridge Replacement Camp Creek 2 mi N of ILL 81 | $3,969,000 | Planned | ||
| — | 2-20353-0000 2203530000 | District 2 | W Lincolnway | Reconstruction - Bridges Bridge Replacement UP RR 1.3 mi N of US 30 | $1,874,000 | Planned | ||
| — | 2-20541-0000 2205410000 | District 2 | US-20 | Reconstruction - Bridges Bridge Replacement Yellow Creek 1.5 mi W of ILL 73 | $1,200,000 | Planned | ||
| — | 2-21489-0000 2214890000 | District 2 | IL-70 | Reconstruction - Bridges Bridge Replacement Trib Pecatonica River 0.6 mi, 0.5 mi & 0.1 mi W of Cemetery Rd | $5,670,000 | Planned | ||
| — | 2-22908-0000 2229080000 | District 2 | Canyon Rd | Reconstruction - Bridges Bridge Replacement Clear Creek 3.4 mi W of ILL 78 | $3,150,000 | Planned | ||
| — | 2-24341-0100 2243410100 | District 2 | IL-78 | Reconstruction - Bridges Bridge Replacement Coal Creek 1.8 Mi N of Annawan NCL | $2,149,000 | Planned | ||
| — | 2-24360-0100 2243600100 | District 2 | IL-72 | Reconstruction - Bridges Bridge Replacement Mud Creek 0.1 mi E of Pond Rd E of Leaf River | $1,103,000 | Planned | ||
| — | 2-24410-0100 2244100100 | District 2 | IL-78 | Reconstruction - Bridges Bridge Replacement Muddy Plum River 2.5 Mi N of Carroll Co Line | $3,400,000 | Planned | ||
| — | 2-25000-0300 2250000300 | District 2 | I-74US-6 | Reconstruction - Bridges Bridge Replacement 0.9 Mi S of 23rd Ave (Ave of The Cities) in Moline to 0.5 mi S of ILL 5 | $16,310,000 | Planned | ||
| — | 2-26070-0105 2260700105 | District 2 | I-39US-51 | Reconstruction - Bridges Utility Adjustment Kishwaukee River 0.8 Mi S of Blackhawk Rd | $250,000 | Planned | ||
| — | 2-30040-0100 2300400100 | District 2 | I-74 | Reconstruction - Bridges Culvert Replacement Drainage Ditch 2.5 mi N of ILL 81 | $3,749,000 | Planned | ||
| — | 2-30043-0100 2300430100 | District 2 | IL-251 | Reconstruction - Bridges Bridge Replacement UP RR 2.5 mi S of ILL 75 & Rockton Rd 2.6 Mi S of ILL 75 | $12,600,000 | Planned | ||
| — | 2-30045-0100 2300450100 | District 2 | US-20 BUSW State St | Reconstruction - Bridges Bridge Replacement Kent Creek 0.1 Mi W of Kilburn Ave in Rockford | $2,121,000 | Planned | ||
| — | 2-30070-0100 2300700100 | District 2 | Osco Rd | Reconstruction - Bridges Bridge Replacement N Branch Camp Creek 1.3 Mi N of ILL 81 | $1,200,000 | Planned | ||
| — | 2-30071-0100 2300710100 | District 2 | IL-78 | Reconstruction - Bridges Bridge Replacement Davis Creek 0.5 Mi N of Carroll Co Line | $3,032,000 | Planned | ||
| — | 2-45620-0100 2456200100 | District 2 | IL-64 | Reconstruction - Bridges Culvert Replacement 0.6 Mi W of Chana Rd to 0.4 Mi W of Chamberlain Rd (Various Culverts) | $3,780,000 | Planned | ||
| — | 2-45800-0200 2458000200 | District 2 | I-80 | Reconstruction - Bridges Bridge Replacement Mississippi River, ILL 84 & RR | $400,000,000 | Planned | ||
| — | 2-81001-0100 2810010100 | District 2 | IL-84US-20 | Reconstruction - Bridges Bridge Replacement Smallpox Creek at Glen Hollow Rd 3.8 Mi SE of Galena | $6,300,000 | Planned | ||
| — | 2-99420-0100 2994200100 | District 2 | IL-251 | Reconstruction - Bridges Bridge Replacement Dry Creek 0.3 Mi N of McCurry Rd; N & S Kinnikinnick Creek 0.1 mi & 0.8 mi S of Hononegah Rd | $12,600,000 | Planned | ||
| — | 3-01964-2004 3019642004 | District 3 | IL-64 | Reconstruction - Bridges Culvert Replacement Drainage Ditch 0.6 Mi W of Five Points Rd | $1,250,000 | Planned | ||
| — | 3-05746-0020 3057460020 | District 3 | I-57 | Reconstruction - Bridges Bridge Replacement At ILL 17 Intchg in Kankakee | $20,000,000 | Planned | ||
| — | 3-05746-0120 3057460120 | District 3 | I-57 | Reconstruction - Bridges RR Separation Replacement KB&S RR (Overhead) 0.5 Mi S of ILL 17 in Kankakee | $14,000,000 | Planned | ||
| — | 3-06043-0000 3060430000 | District 3 | (northbound)I-180 | Reconstruction - Bridges Bridge Replacement Brush Creek 1.1 Mi N of ILL 26 | $4,500,000 | Planned | ||
| — | 3-06044-0000 3060440000 | District 3 | (southbound)I-180 | Reconstruction - Bridges Bridge Replacement Brush Creek 1.1 Mi N of ILL 26 | $4,600,000 | Planned | ||
| — | 3-06045-0000 3060450000 | District 3 | (southbound)I-180 | Reconstruction - Bridges Bridge Replacement Over ILL 26 2 Mi NW of Bureau Junction | $5,000,000 | Planned | ||
| — | 3-06046-0000 3060460000 | District 3 | (northbound)I-180 | Reconstruction - Bridges Bridge Replacement Over ILL 26 2 Mi NW of Bureau Junction | $5,000,000 | Planned | ||
| — | 3-06049-0000 3060490000 | District 3 | (southbound)I-180 | Reconstruction - Bridges Bridge Replacement IAIS RR & I&M Canal 0.7 Mi S of ILL 26 | $15,000,000 | Planned | ||
| — | 3-06050-0000 3060500000 | District 3 | (northbound)I-180 | Reconstruction - Bridges Bridge Replacement IAIS RR & I&M Canal 0.7 Mi S of ILL 26 | $15,000,000 | Planned | ||
| — | 3-06132-0000 3061320000 | District 3 | I-80 | Reconstruction - Bridges Bridge Replacement At CH 19 (Overhead) 3 Mi E of I-180 | $4,100,000 | Planned | ||
| — | 3-19005-0000 3190050000 | District 3 | IL-23 | Reconstruction - Bridges Bridge Replacement CC&P RR 0.7 Mi S of ILL 72 in Genoa | $3,500,000 | Planned | ||
| — | 3-19007-0100 3190070100 | District 3 | IL-23 | Reconstruction - Bridges Bridge Replacement Drainage Ditch 0.6 Mi S of Keslinger Rd | $2,000,000 | Planned | ||
| — | 3-19035-0000 3190350000 | District 3 | IL-23 | Reconstruction - Bridges Bridge Replacement Trib Deer Creek 1 Mi N of ILL 72 | $1,200,000 | Planned | ||
| — | 3-32053-0100 3320530100 | District 3 | I-80 | Reconstruction - Bridges Bridge Replacement E 30th Rd (Overhead) 0.9 Mi W of Nettle Creek Rd | $4,000,000 | Planned | ||
| — | 3-32054-0100 3320540100 | District 3 | I-80 | Reconstruction - Bridges Bridge Replacement At TR 70 (Overhead) 5.2 Mi W of ILL 47 | $4,000,000 | Planned |
1–100 of 377Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.