IDOT Jobs

All dates · 98 jobs · $1,625,751,000 Sign up free
★ My Jobs

Filtered by: Highway: I-55 Clear all

98 jobs · $1,625,751,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
— 1-77633-0100 1776330100 District 1 I-55 Reconstruction - Pavement Bridge Replacement At ILL 129 $54,000,000 Planned Nov 25 New
— 1-77633-0101 1776330101 District 1 I-55 Reconstruction - Pavement Utility Adjustment At ILL 129 $2,000,000 Planned Nov 25 New
— 1-77633-0200 1776330200 District 1 I-55 Reconstruction - Pavement Bridge Replacement At Lorenzo Rd $37,000,000 Planned Nov 25 New
— 1-77633-0250 1776330250 District 1 I-55 Reconstruction - Pavement Utility Adjustment At Lorenzo Rd $2,000,000 Planned Nov 25 New
— 1-77633-0300 1776330300 District 1 I-55 Rehabilitation - Pavement Standard Overlay, Widening Existing Pavement, Resurfacing (Int-1st) ILL 129 to Lorenzo Rd $14,375,000 Planned Nov 25 New
— 1-77633-0301 1776330301 District 1 I-55 Rehabilitation - Pavement Utility Adjustment ILL 129 to Lorenzo Rd $500,000 Planned Nov 25 New
— 1-77633-0350 1776330350 District 1 I-55 E Fr RdI-55 W Fr Rd Reconstruction - Pavement Reconstruction Kavanaugh Rd to Lorenzo Rd $15,000,000 Planned Nov 25 New
— 1-77633-0355 1776330355 District 1 I-55 E Fr RdI-55 W Fr Rd Reconstruction - Pavement Utility Adjustment ILL 129 to Lorenzo Rd $500,000 Planned Nov 25 New
— 1-77633-1300 1776331300 District 1 I-55 Initial Construction - Pa Add Auxiliary Lanes ILL 129 to Lorenzo Rd $14,375,000 Planned Nov 25 New
— 1-79214-0000 1792140000 District 1 I-55 Initial Construction - Pa Bridge Replacement At Airport Rd / Lockport Rd $85,500,000 Planned Nov 25 New
— 1-79214-0500 1792140500 District 1 I-55 Initial Construction - Pa Utility Adjustment At Airport Rd / Lockport Rd $1,000,000 Planned Nov 25 New
— 1-79214-1000 1792141000 District 1 I-55 Initial Construction - Pa Bridge Replacement At Ill 126 (Main St) $85,500,000 Planned Nov 25 New
— 1-79214-1500 1792141500 District 1 I-55 Initial Construction - Pa Utility Adjustment At Ill 126 (Main St) $4,000,000 Planned Nov 25 New
— 1-79339-0000 1793390000 District 1 I-55Stevenson Expwy Reconstruction - Bridges Bridge Replacement (Outbound/WB) At Ill 50 (Cicero Ave) & At BRC RR 0.3 Mi E of ILL 50 $11,000,000 Planned Nov 25 New
— 1-79339-0001 1793390001 District 1 I-55Stevenson Expwy Reconstruction - Pavement Reconstruction, Horizontal Realignment, Temporary Lighting (Outbound/WB) At Ill 50 (Cicero Ave) & At BRC RR 0.3 Mi E of ILL 50 $15,086,000 Planned Nov 25 New
— 1-79340-0000 1793400000 District 1 I-55Stevenson Expwy Reconstruction - Bridges Bridge Replacement (Inbound/EB) At Ill 50 (Cicero Ave) & BRC RR 0.3 Mi E of Ill 50 (Cicero Ave) $12,000,000 Planned Nov 25 New
— 1-79340-0001 1793400001 District 1 I-55Stevenson Expwy Reconstruction - Pavement Reconstruction, Horizontal Realignment, Ramp Modifications (Inbound/EB) At Ill 50 (Cicero Ave) & BRC RR 0.3 Mi E of Ill 50 (Cicero Ave) $14,086,000 Planned Nov 25 New
— 1-79340-1000 1793401000 District 1 I-55Stevenson Expwy Reconstruction - Pavement Widening Existing Pavement, Intersection Improvement, Traf Signal Modernization At Ill 50 (Cicero Ave) $9,000,000 Planned Nov 25 New
— 1-79735-0000 1797350000 District 1 I-55 Initial Construction - Pa Add Auxiliary Lanes I-355 to Ill 53 (Bolingbrook Dr) $24,800,000 Planned Nov 25 New
— 1-79735-0400 1797350400 District 1 I-55 Initial Construction - Pa Utility Adjustment I-355 to Ill 53 (Bolingbrook Dr) $2,000,000 Planned Nov 25 New
— 1-79899-0000 1798990000 District 1 I-55Stevenson Expwy Reconstruction - Bridges Retaining Wall At Ill 43 (Harlem Ave) (Overhead) $24,493,000 Planned Nov 25 New
— 1-80894-0000 1808940000 District 1 I-55 Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Caton Farm Rd (Overhead) 3 Mi N of US 52 $1,000,000 Planned Nov 25 New
— 1-80959-0000 1809590000 District 1 I-55Stevenson Expwy Preservation - Bridges Bridge Deck Overlay Over Western Ave Viaduct (EB) $15,800,000 Planned Nov 25 New
— 1-80959-1000 1809591000 District 1 I-55Stevenson Expwy Preservation - Bridges Bridge Deck Overlay Over Western Ave Viaduct (WB) $15,800,000 Planned Nov 25 New
— 1-81129-0000 1811290000 District 1 I-55Stevenson Expwy Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (WB) $50,000,000 Planned Nov 25 New
— 1-81129-0010 1811290010 District 1 I-55Stevenson Expwy Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (WB) $4,250,000 Planned Nov 25 New
— 1-81129-1000 1811291000 District 1 I-55Stevenson Expwy Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Wolf Rd to Ill 50 (Cicero Ave) & DCM $50,000,000 Planned Nov 25 New
— 1-81129-2000 1811292000 District 1 I-55Stevenson Expwy Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (EB) $50,000,000 Planned Nov 25 New
— 1-81129-2010 1811292010 District 1 I-55Stevenson Expwy Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (EB) $2,000,000 Planned Nov 25 New
— 1-81219-0000 1812190000 District 1 I-55 Preservation - Pavements Smart Overlay N of Kennedy Dr to I-55 NB Ramp to Ill 129/Frontage Rd $7,000,000 Planned Nov 25 New
— 1-81374-0000 1813740000 District 1 I-55IL-171 Intchg Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Des Plaines River $5,500,000 Planned Nov 25 New
— 1-81438-0000 1814380000 District 1 E Frontage RdI-55 Rehabilitation - Pavement Designed Overlay Renwick Rd to S of Helen Rd $400,000 Planned Nov 25 New
— 1-81468-0000 1814680000 District 1 East Frontage RdI-55 Rehabilitation - Pavement Designed Overlay Bluff Rd to Front St $600,000 Planned Nov 25 New
— 1-81492-0000 1814920000 District 1 E Frontage RdI-55 Rehabilitation - Pavement Designed Overlay 143rd St to Lockport/Airport Rd $925,000 Planned Nov 25 New
— 1-81495-0000 1814950000 District 1 East Frontage RdI-55 Rehabilitation - Pavement Designed Overlay Ill 53 to Joliet Rd $1,400,000 Planned Nov 25 New
— 1-81504-0000 1815040000 District 1 Frontage RdI-55 Rehabilitation - Pavement Designed Overlay Cass Ave to Clarendon Hills Rd $1,750,000 Planned Nov 25 New
— 1-81646-0000 1816460000 District 1 East Frontage RdI-55 Rehabilitation - Pavement Designed Overlay S of McDonough St to County Farm Rd $205,000 Planned Nov 25 New
— 1-81768-0000 1817680000 District 1 I-55Stevenson Expwy Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-2nd) County Line Rd to Kedzie Ave (WB) $30,000,000 Planned Nov 25 New
— 1-81768-1000 1817681000 District 1 I-55Stevenson Expwy Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-2nd) County Line Rd to Kedzie Ave (EB) $30,000,000 Planned Nov 25 New
— 3-05553-0170 3055530170 District 3 I-55 Preservation - Pavements Smart Overlay McLean Co Line to 1.7 Mi S of ILL 116 $11,317,000 Planned Nov 25 New
— 3-05553-0210 3055530210 District 3 I-55 Preservation - Pavements Smart Overlay 1.7 Mi S of ILL 116 to 0.8 Mi N of Wolf Creek $17,000,000 Planned Nov 25 New
— 5-53315-1000 5533151000 District 5 I-55 Preservation - Bridges Bridge Deck Overlay At Timber Creek 1 mi N of Funks Grove $2,500,000 Planned Nov 25 New
— 5-53364-0000 5533640000 District 5 I-55 Reconstruction - Bridges Bridge Replacement AT TOWANDA AVE (Overhead) 1.7 MI E OF US 51 $6,500,000 Planned Nov 25 New
— 5-53400-0000 5534000000 District 5 I-55 Preservation - Bridges Bridge Deck Overlay At CH 8 (Overhead) 1 mi W of Lexington $3,000,000 Planned Nov 25 New
— 5-53492-0000 5534920000 District 5 I-55 BUSVeterans Pkwy Preservation - Bridges Bridge Deck Overlay At US 51 & NS RR S of Bloomington $6,500,000 Planned Nov 25 New
— 5-53511-0000 5535110000 District 5 I-55 BUSVeterans Pkwy Preservation - Bridges Bridge Deck Overlay At UP RR & Old Route 66 2.8 mi N of ILL 9 $8,600,000 Planned Nov 25 New
— 5-53523-0000 5535230000 District 5 I-55 Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-3rd) 0.9 mi N of Pipeline Rd NE of Normal to 0.4 mi S of CH 8 S of Lexington $26,000,000 Planned Nov 25 New
— 6-00200-0000 6002000000 District 6 I-55 Initial Construction - Pa Additional Lanes 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE $15,000,000 Planned Nov 25 New
— 6-00200-0050 6002000050 District 6 I-55 Reconstruction - Pavement Reconstruction, Ramp Repair 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE $110,000,000 Planned Nov 25 New
— 6-00200-0400 6002000400 District 6 I-55 Reconstruction - Bridges Bridge Replacement OVER I-55 BUS & UP RR AT SHERMAN INTCHG $18,000,000 Planned Nov 25 New
— 6-00200-0440 6002000440 District 6 I-55 Reconstruction - Bridges Bridge Replacement AT TR 33 (SUDDUTH RD) (OVERHEAD) 0.6 MI N OF I-55 BUS AT SHERMAN INTCHG $3,000,000 Planned Nov 25 New
— 6-00200-0500 6002000500 District 6 I-55 Rehabilitation - Bridges Bridge New Deck, Bridge Widening AT FANCY CREEK 1.1 MI N OF I-55 BUS AT SHERMAN INTCHG $4,400,000 Planned Nov 25 New
— 6-00291-0000 6002910000 District 6 6th StI-55 BUSI-55 BUSA Reconstruction - Pavement Reconstruction, Intersection Reconstn, Turning Lanes 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD $14,000,000 Planned Nov 25 New
— 6-00291-0100 6002910100 District 6 6th StI-55 BUSI-55 BUSA Miscellaneous Improvement Turning Lanes, Sidewalks, Bikeway 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD $8,000,000 Planned Nov 25 New
— 6-00770-0000 6007700000 District 6 I-55 BUSIL-29IL-4 Rehabilitation - Pavement Standard Overlay PEORIA RD: W OF NORTHBROOK CT TO N OF TAINTOR RD; VETERANS PKWY: PEORIA RD TO 0.2 MI W OF J DAVID JONES PKWY (ALL IN SPRINGFIELD) $5,100,000 Planned Nov 25 New
— 6-01038-0000 6010380000 District 6 I-55 Rehabilitation - Bridges Bridge New Deck, Bridge Repair AT I-55 BUS (OLD US 66) (OVERHEAD) SW OF LINCOLN $4,000,000 Planned Nov 25 New
— 6-01046-0000 6010460000 District 6 I-55I-72 Reconstruction - Bridges Bridge Replacement AT W LAKE SHORE DR (OVERHEAD) $3,300,000 Planned Nov 25 New
— 6-01048-0000 6010480000 District 6 I-55I-72 Miscellaneous Improvement Bridge Removal/Demolition AT COOK ST (OVERHEAD) IN SPRINGFIELD $1,000,000 Planned Nov 25 New
— 6-01049-0000 6010490000 District 6 I-55 Reconstruction - Bridges Bridge Replacement OVER IC RR 1 MI N OF OLD ROUTE 66 AT GLENARM INTCHG $20,000,000 Planned Nov 25 New
— 6-01067-0000 6010670000 District 6 I-55 Preservation - Bridges Bridge Painting, Bridge Joint Replace/Repair, Bridge Deck Overlay AT LAKE SPRINGFIELD 0.7 MI N OF E LAKE SHORE DR IN SPRINGFIELD $5,600,000 Planned Nov 25 New
— 6-01075-0100 6010750100 District 6 I-55 BUS Rehabilitation - Pavement Standard Overlay 0.2 MI W OF DIRKSEN PKWY TO W OF NORTHBROOK CT IN SPRINGFIELD $2,500,000 Planned Nov 25 New
— 6-01248-0000 6012480000 District 6 I-55 BUSIL-10IL-121 Rehabilitation - Pavement Designed Overlay, Traf Signal Replacement, ADA Improvements NW OF KICKAPOO ST TO S OF PULASKI ST IN LINCOLN $2,900,000 Planned Nov 25 New
— 6-01287-0000 6012870000 District 6 I-55 BUSOld Route 66 Rehabilitation - Pavement Designed Overlay, New Shoulders 0.1 MI SW OF N KICKAPOO ST TO 1.4 MI N OF I-55 $6,100,000 Planned Nov 25 New
— 6-01511-0000 6015110000 District 6 I-55 Rehabilitation - Bridges Bridge New Deck AT STAUNTON RD (OVERHEAD) 1.5 MI N OF MADISON CO LINE $3,500,000 Planned Nov 25 New
— 6-01512-0000 6015120000 District 6 I-55 Rehabilitation - Bridges Bridge New Deck AT ILL 16 (OVERHEAD) W OF LITCHFIELD $7,600,000 Planned Nov 25 New
— 6-02008-0000 6020080000 District 6 9th StI-55 BUS Rehabilitation - Pavement Designed Overlay, ADA Improvements S OF MADISON ST TO S OF S GRAND AVE IN SPRINGFIELD $3,800,000 Planned Nov 25 New
— 6-02008-0100 6020080100 District 6 9th StI-55 BUS Miscellaneous Improvement Traf Signal Replacement, ADA Improvements S OF MADISON ST TO S OF S GRAND AVE IN SPRINGFIELD (TRAFFIC SIGNALS) $3,900,000 Planned Nov 25 New
— 6-02044-0000 6020440000 District 6 I-155I-55 Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-3rd) I-55: 0.6 MI N OF ILL 10 TO 1.5 MI N OF I-55 BUS N OF LINCOLN & I-155: I-55 TO 0.4 MI N $28,000,000 Planned Nov 25 New
— 6-02045-0000 6020450000 District 6 I-55 Reconstruction - Pavement Reconstruction 1.5 MI N OF I-55 BUS N OF LINCOLN TO 1.9 MI N OF KICKAPOO CREEK $51,000,000 Planned Nov 25 New
— 6-02132-0000 6021320000 District 6 I-55 Preservation - Pavements Crack & Joint Sealing 0.8 MI N OF ILL 16 TO 0.6 MI N OF ILL 108 $500,000 Planned Nov 25 New
— 6-60105-0000 6601050000 District 6 I-55 BUSIL-10IL-121 Reconstruction - Pavement Reconstruction, Widening Existing Pavement, Traf Signal Replacement ILL 10/121: 0.1 MI E OF COLLEGE ST TO LOGAN ST; I-55 BUS / ILL 10/121: LOGAN ST TO NW OF KICKAPOO ST (ALL IN LINCOLN) $11,600,000 Planned Nov 25 New
— 6-60105-0003 6601050003 District 6 I-55 BUSIL-10IL-121 Reconstruction - Pavement Utility Adjustment ILL 10/121: 0.1 MI E OF COLLEGE ST TO LOGAN ST; I-55 BUS / ILL 10/121: LOGAN ST TO NW OF KICKAPOO ST (ALL IN LINCOLN) $600,000 Planned Nov 25 New
— 6-72800-0000 6728000000 District 6 I-55 W Fr Rehabilitation - Pavement Designed Overlay 0.1 MI N OF JUDD ST IN GLENARM TO ILL 104 $2,400,000 Planned Nov 25 New
— 8-00254-0000 8002540000 District 8 I-55I-70US-40 Reconstruction - Bridges Bridge Replacement Over Keebler Rd in Collinsville $25,200,000 Planned Nov 25 New
— 8-00478-0000 8004780000 District 8 I-55I-70US-40 Reconstruction - Pavement Bridge Replacement At Black Ln (Overhead) & Fairmont Ave (Overhead) in Collinsville $40,000,000 Planned Nov 25 New
— 8-00485-0000 8004850000 District 8 I-55I-64US-40 Reconstruction - Pavement Pavement Replacement Mississippi River to I-64 (Tri-Level) Intchg in East St Louis $31,500,000 Planned Nov 25 New
— 8-00485-1000 8004851000 District 8 I-55I-64US-40 Rehabilitation - Bridges Bridge New Deck Mississippi River to I-64 (Tri-Level) Intchg in East St Louis $39,300,000 Planned Nov 25 New
— 8-00585-0000 8005850000 District 8 I-55I-70US-40 Reconstruction - Bridges Bridge Replacement At Pleasant Ridge Rd (Overhead) 0.7 mi W of ILL 159 in Maryville $10,000,000 Planned Nov 25 New
— 8-00603-0000 8006030000 District 8 I-55I-64US-40 Preservation - Bridges Bridge Deck Overlay Mississippi River to I-64 (Tri-Level) Intchg in East St Louis (Various Structures) $45,600,000 Planned Nov 25 New
— 8-00603-1000 8006031000 District 8 I-55I-64US-40 Preservation - Bridges Bridge Repair Over Abandoned Southern RR in East St. Louis $600,000 Planned Nov 25 New
— 8-00840-0000 8008400000 District 8 I-55I-64IL-3 Reconstruction - Bridges Bridge Replacement Poplar St Complex - ILL 3 Ramps in East St Louis $73,900,000 Planned Nov 25 New
— 8-00840-1000 8008401000 District 8 I-55I-64IL-3 Reconstruction - Bridges Bridge Replacement Poplar St Complex - ILL 3 Ramps in East St Louis $32,700,000 Planned Nov 25 New
— 8-00841-0000 8008410000 District 8 I-55I-64IL-3 Reconstruction - Bridges Bridge Replacement Poplar St Complex - ILL 3 Ramps in East St Louis $82,500,000 Planned Nov 25 New
— 8-00841-1000 8008411000 District 8 I-55I-64IL-3 Reconstruction - Bridges Bridge Replacement Poplar St Complex - ILL 3 Ramps in East St Louis $51,000,000 Planned Nov 25 New
— 8-00998-0000 8009980000 District 8 I-55I-64US-40 Preservation - Bridges Bridge Deck Sealing Poplar Street Bridge $389,000 Planned Nov 25 New
— 8-00999-1000 8009991000 District 8 I-55I-70US-40 Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Over ILL 157 in Collinsville $4,500,000 Planned Nov 25 New
FY 2025 1-80428-0000 1804280000 District 1 I-55 W Fr Rd NbW Frontage Rd Nb Rehabilitation - Pavement Standard Overlay Front Rd to Bluff Rd $660,000 Planned Nov 25 New
FY 2025 1-81126-0000 1811260000 District 1 I-55 Maintenance - Bridges Bridge Repair At Cass Ave (Overhead) $2,000,000 Planned Nov 25 New
FY 2025 5-53401-0000 5534010000 District 5 I-55 Preservation - Bridges Bridge Deck Overlay At CH 29 (Overhead) 0.5 mi N of Towanda & At Money Creek 1.5 mi NE of Towanda $5,500,000 Planned Nov 25 New
FY 2025 5-53415-0000 5534150000 District 5 I-55 Rehabilitation - Bridges Bridge New Deck At US 136 E of McLean $6,600,000 Planned Nov 25 New
FY 2025 5-53457-0000 5534570000 District 5 I-55 Preservation - Bridges Bridge Deck Overlay At Mackinaw River 2 mi SW of Lexington & At Turkey Creek 1.5 mi SW of Lexington $7,000,000 Planned Nov 25 New
FY 2025 5-53949-0000 5539490000 District 5 I-55I-74US-51 Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-4th) 1.8 mi S of Shirley to I-55/74 Intchg SW of Bloomington $17,200,000 Planned Nov 25 New
FY 2025 6-00291-0102 6002910102 District 6 6th StI-55 BUSI-55 BUSA Reconstruction - Pavement Utility Adjustment 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD $500,000 Planned Nov 25 New
FY 2025 6-01047-0000 6010470000 District 6 I-55 Reconstruction - Bridges Bridge Replacement AT BISSELL RD (OVERHEAD) 1 MI N OF SANGAMON AVE / ILL 54 $4,100,000 Planned Nov 25 New
FY 2025 6-01047-0200 6010470200 District 6 I-55 Reconstruction - Bridges Bridge Replacement AT CH 1 (E ANDREW RD) (Overhead) 0.5 MI S OF SHERMAN INTCHG $4,100,000 Planned Nov 25 New
FY 2025 6-01227-0000 6012270000 District 6 I-55 E Fr Rehabilitation - Pavement Designed Overlay 0.3 MI N OF N 16TH AVE N OF LITCHFIELD TO S OF N 19TH AVE E OF I-55 / ILL 108 INTCHG $2,300,000 Planned Nov 25 New
FY 2025 6-01472-0000 6014720000 District 6 I-55 Rehabilitation - Pavement Standard Overlay, Resurfacing (Int-3rd), Ramp Repair 2.8 MI S OF ILL 123 IN WILLIAMSVILLE TO LOGAN CO LINE $26,000,000 Planned Nov 25 New
FY 2025 6-01495-0000 6014950000 District 6 I-55 Preservation - Pavements Crack & Joint Sealing N OF GLENARM INTCHG TO 0.2 MI N OF SOUTHWIND RD $540,000 Planned Nov 25 New
1–98 of 98

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.