| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 1-77633-0100 1776330100 | District 1 | I-55 | Reconstruction - Pavement Bridge Replacement At ILL 129 | $54,000,000 | Planned | ||
| — | 1-77633-0101 1776330101 | District 1 | I-55 | Reconstruction - Pavement Utility Adjustment At ILL 129 | $2,000,000 | Planned | ||
| — | 1-77633-0200 1776330200 | District 1 | I-55 | Reconstruction - Pavement Bridge Replacement At Lorenzo Rd | $37,000,000 | Planned | ||
| — | 1-77633-0250 1776330250 | District 1 | I-55 | Reconstruction - Pavement Utility Adjustment At Lorenzo Rd | $2,000,000 | Planned | ||
| — | 1-77633-0300 1776330300 | District 1 | I-55 | Rehabilitation - Pavement Standard Overlay, Widening Existing Pavement, Resurfacing (Int-1st) ILL 129 to Lorenzo Rd | $14,375,000 | Planned | ||
| — | 1-77633-0301 1776330301 | District 1 | I-55 | Rehabilitation - Pavement Utility Adjustment ILL 129 to Lorenzo Rd | $500,000 | Planned | ||
| — | 1-77633-0350 1776330350 | District 1 | I-55 E Fr RdI-55 W Fr Rd | Reconstruction - Pavement Reconstruction Kavanaugh Rd to Lorenzo Rd | $15,000,000 | Planned | ||
| — | 1-77633-0355 1776330355 | District 1 | I-55 E Fr RdI-55 W Fr Rd | Reconstruction - Pavement Utility Adjustment ILL 129 to Lorenzo Rd | $500,000 | Planned | ||
| — | 1-77633-1300 1776331300 | District 1 | I-55 | Initial Construction - Pa Add Auxiliary Lanes ILL 129 to Lorenzo Rd | $14,375,000 | Planned | ||
| — | 1-79214-0000 1792140000 | District 1 | I-55 | Initial Construction - Pa Bridge Replacement At Airport Rd / Lockport Rd | $85,500,000 | Planned | ||
| — | 1-79214-0500 1792140500 | District 1 | I-55 | Initial Construction - Pa Utility Adjustment At Airport Rd / Lockport Rd | $1,000,000 | Planned | ||
| — | 1-79214-1000 1792141000 | District 1 | I-55 | Initial Construction - Pa Bridge Replacement At Ill 126 (Main St) | $85,500,000 | Planned | ||
| — | 1-79214-1500 1792141500 | District 1 | I-55 | Initial Construction - Pa Utility Adjustment At Ill 126 (Main St) | $4,000,000 | Planned | ||
| — | 1-79339-0000 1793390000 | District 1 | I-55Stevenson Expwy | Reconstruction - Bridges Bridge Replacement (Outbound/WB) At Ill 50 (Cicero Ave) & At BRC RR 0.3 Mi E of ILL 50 | $11,000,000 | Planned | ||
| — | 1-79339-0001 1793390001 | District 1 | I-55Stevenson Expwy | Reconstruction - Pavement Reconstruction, Horizontal Realignment, Temporary Lighting (Outbound/WB) At Ill 50 (Cicero Ave) & At BRC RR 0.3 Mi E of ILL 50 | $15,086,000 | Planned | ||
| — | 1-79340-0000 1793400000 | District 1 | I-55Stevenson Expwy | Reconstruction - Bridges Bridge Replacement (Inbound/EB) At Ill 50 (Cicero Ave) & BRC RR 0.3 Mi E of Ill 50 (Cicero Ave) | $12,000,000 | Planned | ||
| — | 1-79340-0001 1793400001 | District 1 | I-55Stevenson Expwy | Reconstruction - Pavement Reconstruction, Horizontal Realignment, Ramp Modifications (Inbound/EB) At Ill 50 (Cicero Ave) & BRC RR 0.3 Mi E of Ill 50 (Cicero Ave) | $14,086,000 | Planned | ||
| — | 1-79340-1000 1793401000 | District 1 | I-55Stevenson Expwy | Reconstruction - Pavement Widening Existing Pavement, Intersection Improvement, Traf Signal Modernization At Ill 50 (Cicero Ave) | $9,000,000 | Planned | ||
| — | 1-79735-0000 1797350000 | District 1 | I-55 | Initial Construction - Pa Add Auxiliary Lanes I-355 to Ill 53 (Bolingbrook Dr) | $24,800,000 | Planned | ||
| — | 1-79735-0400 1797350400 | District 1 | I-55 | Initial Construction - Pa Utility Adjustment I-355 to Ill 53 (Bolingbrook Dr) | $2,000,000 | Planned | ||
| — | 1-79899-0000 1798990000 | District 1 | I-55Stevenson Expwy | Reconstruction - Bridges Retaining Wall At Ill 43 (Harlem Ave) (Overhead) | $24,493,000 | Planned | ||
| — | 1-80894-0000 1808940000 | District 1 | I-55 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Caton Farm Rd (Overhead) 3 Mi N of US 52 | $1,000,000 | Planned | ||
| — | 1-80959-0000 1809590000 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Deck Overlay Over Western Ave Viaduct (EB) | $15,800,000 | Planned | ||
| — | 1-80959-1000 1809591000 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Deck Overlay Over Western Ave Viaduct (WB) | $15,800,000 | Planned | ||
| — | 1-81129-0000 1811290000 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (WB) | $50,000,000 | Planned | ||
| — | 1-81129-0010 1811290010 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (WB) | $4,250,000 | Planned | ||
| — | 1-81129-1000 1811291000 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Wolf Rd to Ill 50 (Cicero Ave) & DCM | $50,000,000 | Planned | ||
| — | 1-81129-2000 1811292000 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (EB) | $50,000,000 | Planned | ||
| — | 1-81129-2010 1811292010 | District 1 | I-55Stevenson Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Ill 50 (Cicero Ave) to Chinatown Feeder Ramps (EB) | $2,000,000 | Planned | ||
| — | 1-81219-0000 1812190000 | District 1 | I-55 | Preservation - Pavements Smart Overlay N of Kennedy Dr to I-55 NB Ramp to Ill 129/Frontage Rd | $7,000,000 | Planned | ||
| — | 1-81374-0000 1813740000 | District 1 | I-55IL-171 Intchg | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Des Plaines River | $5,500,000 | Planned | ||
| — | 1-81438-0000 1814380000 | District 1 | E Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay Renwick Rd to S of Helen Rd | $400,000 | Planned | ||
| — | 1-81468-0000 1814680000 | District 1 | East Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay Bluff Rd to Front St | $600,000 | Planned | ||
| — | 1-81492-0000 1814920000 | District 1 | E Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay 143rd St to Lockport/Airport Rd | $925,000 | Planned | ||
| — | 1-81495-0000 1814950000 | District 1 | East Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay Ill 53 to Joliet Rd | $1,400,000 | Planned | ||
| — | 1-81504-0000 1815040000 | District 1 | Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay Cass Ave to Clarendon Hills Rd | $1,750,000 | Planned | ||
| — | 1-81646-0000 1816460000 | District 1 | East Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay S of McDonough St to County Farm Rd | $205,000 | Planned | ||
| — | 1-81768-0000 1817680000 | District 1 | I-55Stevenson Expwy | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-2nd) County Line Rd to Kedzie Ave (WB) | $30,000,000 | Planned | ||
| — | 1-81768-1000 1817681000 | District 1 | I-55Stevenson Expwy | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-2nd) County Line Rd to Kedzie Ave (EB) | $30,000,000 | Planned | ||
| — | 3-05553-0170 3055530170 | District 3 | I-55 | Preservation - Pavements Smart Overlay McLean Co Line to 1.7 Mi S of ILL 116 | $11,317,000 | Planned | ||
| — | 3-05553-0210 3055530210 | District 3 | I-55 | Preservation - Pavements Smart Overlay 1.7 Mi S of ILL 116 to 0.8 Mi N of Wolf Creek | $17,000,000 | Planned | ||
| — | 5-53315-1000 5533151000 | District 5 | I-55 | Preservation - Bridges Bridge Deck Overlay At Timber Creek 1 mi N of Funks Grove | $2,500,000 | Planned | ||
| — | 5-53364-0000 5533640000 | District 5 | I-55 | Reconstruction - Bridges Bridge Replacement AT TOWANDA AVE (Overhead) 1.7 MI E OF US 51 | $6,500,000 | Planned | ||
| — | 5-53400-0000 5534000000 | District 5 | I-55 | Preservation - Bridges Bridge Deck Overlay At CH 8 (Overhead) 1 mi W of Lexington | $3,000,000 | Planned | ||
| — | 5-53492-0000 5534920000 | District 5 | I-55 BUSVeterans Pkwy | Preservation - Bridges Bridge Deck Overlay At US 51 & NS RR S of Bloomington | $6,500,000 | Planned | ||
| — | 5-53511-0000 5535110000 | District 5 | I-55 BUSVeterans Pkwy | Preservation - Bridges Bridge Deck Overlay At UP RR & Old Route 66 2.8 mi N of ILL 9 | $8,600,000 | Planned | ||
| — | 5-53523-0000 5535230000 | District 5 | I-55 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-3rd) 0.9 mi N of Pipeline Rd NE of Normal to 0.4 mi S of CH 8 S of Lexington | $26,000,000 | Planned | ||
| — | 6-00200-0000 6002000000 | District 6 | I-55 | Initial Construction - Pa Additional Lanes 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE | $15,000,000 | Planned | ||
| — | 6-00200-0050 6002000050 | District 6 | I-55 | Reconstruction - Pavement Reconstruction, Ramp Repair 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE | $110,000,000 | Planned | ||
| — | 6-00200-0400 6002000400 | District 6 | I-55 | Reconstruction - Bridges Bridge Replacement OVER I-55 BUS & UP RR AT SHERMAN INTCHG | $18,000,000 | Planned | ||
| — | 6-00200-0440 6002000440 | District 6 | I-55 | Reconstruction - Bridges Bridge Replacement AT TR 33 (SUDDUTH RD) (OVERHEAD) 0.6 MI N OF I-55 BUS AT SHERMAN INTCHG | $3,000,000 | Planned | ||
| — | 6-00200-0500 6002000500 | District 6 | I-55 | Rehabilitation - Bridges Bridge New Deck, Bridge Widening AT FANCY CREEK 1.1 MI N OF I-55 BUS AT SHERMAN INTCHG | $4,400,000 | Planned | ||
| — | 6-00291-0000 6002910000 | District 6 | 6th StI-55 BUSI-55 BUSA | Reconstruction - Pavement Reconstruction, Intersection Reconstn, Turning Lanes 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD | $14,000,000 | Planned | ||
| — | 6-00291-0100 6002910100 | District 6 | 6th StI-55 BUSI-55 BUSA | Miscellaneous Improvement Turning Lanes, Sidewalks, Bikeway 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD | $8,000,000 | Planned | ||
| — | 6-00770-0000 6007700000 | District 6 | I-55 BUSIL-29IL-4 | Rehabilitation - Pavement Standard Overlay PEORIA RD: W OF NORTHBROOK CT TO N OF TAINTOR RD; VETERANS PKWY: PEORIA RD TO 0.2 MI W OF J DAVID JONES PKWY (ALL IN SPRINGFIELD) | $5,100,000 | Planned | ||
| — | 6-01038-0000 6010380000 | District 6 | I-55 | Rehabilitation - Bridges Bridge New Deck, Bridge Repair AT I-55 BUS (OLD US 66) (OVERHEAD) SW OF LINCOLN | $4,000,000 | Planned | ||
| — | 6-01046-0000 6010460000 | District 6 | I-55I-72 | Reconstruction - Bridges Bridge Replacement AT W LAKE SHORE DR (OVERHEAD) | $3,300,000 | Planned | ||
| — | 6-01048-0000 6010480000 | District 6 | I-55I-72 | Miscellaneous Improvement Bridge Removal/Demolition AT COOK ST (OVERHEAD) IN SPRINGFIELD | $1,000,000 | Planned | ||
| — | 6-01049-0000 6010490000 | District 6 | I-55 | Reconstruction - Bridges Bridge Replacement OVER IC RR 1 MI N OF OLD ROUTE 66 AT GLENARM INTCHG | $20,000,000 | Planned | ||
| — | 6-01067-0000 6010670000 | District 6 | I-55 | Preservation - Bridges Bridge Painting, Bridge Joint Replace/Repair, Bridge Deck Overlay AT LAKE SPRINGFIELD 0.7 MI N OF E LAKE SHORE DR IN SPRINGFIELD | $5,600,000 | Planned | ||
| — | 6-01075-0100 6010750100 | District 6 | I-55 BUS | Rehabilitation - Pavement Standard Overlay 0.2 MI W OF DIRKSEN PKWY TO W OF NORTHBROOK CT IN SPRINGFIELD | $2,500,000 | Planned | ||
| — | 6-01248-0000 6012480000 | District 6 | I-55 BUSIL-10IL-121 | Rehabilitation - Pavement Designed Overlay, Traf Signal Replacement, ADA Improvements NW OF KICKAPOO ST TO S OF PULASKI ST IN LINCOLN | $2,900,000 | Planned | ||
| — | 6-01287-0000 6012870000 | District 6 | I-55 BUSOld Route 66 | Rehabilitation - Pavement Designed Overlay, New Shoulders 0.1 MI SW OF N KICKAPOO ST TO 1.4 MI N OF I-55 | $6,100,000 | Planned | ||
| — | 6-01511-0000 6015110000 | District 6 | I-55 | Rehabilitation - Bridges Bridge New Deck AT STAUNTON RD (OVERHEAD) 1.5 MI N OF MADISON CO LINE | $3,500,000 | Planned | ||
| — | 6-01512-0000 6015120000 | District 6 | I-55 | Rehabilitation - Bridges Bridge New Deck AT ILL 16 (OVERHEAD) W OF LITCHFIELD | $7,600,000 | Planned | ||
| — | 6-02008-0000 6020080000 | District 6 | 9th StI-55 BUS | Rehabilitation - Pavement Designed Overlay, ADA Improvements S OF MADISON ST TO S OF S GRAND AVE IN SPRINGFIELD | $3,800,000 | Planned | ||
| — | 6-02008-0100 6020080100 | District 6 | 9th StI-55 BUS | Miscellaneous Improvement Traf Signal Replacement, ADA Improvements S OF MADISON ST TO S OF S GRAND AVE IN SPRINGFIELD (TRAFFIC SIGNALS) | $3,900,000 | Planned | ||
| — | 6-02044-0000 6020440000 | District 6 | I-155I-55 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-3rd) I-55: 0.6 MI N OF ILL 10 TO 1.5 MI N OF I-55 BUS N OF LINCOLN & I-155: I-55 TO 0.4 MI N | $28,000,000 | Planned | ||
| — | 6-02045-0000 6020450000 | District 6 | I-55 | Reconstruction - Pavement Reconstruction 1.5 MI N OF I-55 BUS N OF LINCOLN TO 1.9 MI N OF KICKAPOO CREEK | $51,000,000 | Planned | ||
| — | 6-02132-0000 6021320000 | District 6 | I-55 | Preservation - Pavements Crack & Joint Sealing 0.8 MI N OF ILL 16 TO 0.6 MI N OF ILL 108 | $500,000 | Planned | ||
| — | 6-60105-0000 6601050000 | District 6 | I-55 BUSIL-10IL-121 | Reconstruction - Pavement Reconstruction, Widening Existing Pavement, Traf Signal Replacement ILL 10/121: 0.1 MI E OF COLLEGE ST TO LOGAN ST; I-55 BUS / ILL 10/121: LOGAN ST TO NW OF KICKAPOO ST (ALL IN LINCOLN) | $11,600,000 | Planned | ||
| — | 6-60105-0003 6601050003 | District 6 | I-55 BUSIL-10IL-121 | Reconstruction - Pavement Utility Adjustment ILL 10/121: 0.1 MI E OF COLLEGE ST TO LOGAN ST; I-55 BUS / ILL 10/121: LOGAN ST TO NW OF KICKAPOO ST (ALL IN LINCOLN) | $600,000 | Planned | ||
| — | 6-72800-0000 6728000000 | District 6 | I-55 W Fr | Rehabilitation - Pavement Designed Overlay 0.1 MI N OF JUDD ST IN GLENARM TO ILL 104 | $2,400,000 | Planned | ||
| — | 8-00254-0000 8002540000 | District 8 | I-55I-70US-40 | Reconstruction - Bridges Bridge Replacement Over Keebler Rd in Collinsville | $25,200,000 | Planned | ||
| — | 8-00478-0000 8004780000 | District 8 | I-55I-70US-40 | Reconstruction - Pavement Bridge Replacement At Black Ln (Overhead) & Fairmont Ave (Overhead) in Collinsville | $40,000,000 | Planned | ||
| — | 8-00485-0000 8004850000 | District 8 | I-55I-64US-40 | Reconstruction - Pavement Pavement Replacement Mississippi River to I-64 (Tri-Level) Intchg in East St Louis | $31,500,000 | Planned | ||
| — | 8-00485-1000 8004851000 | District 8 | I-55I-64US-40 | Rehabilitation - Bridges Bridge New Deck Mississippi River to I-64 (Tri-Level) Intchg in East St Louis | $39,300,000 | Planned | ||
| — | 8-00585-0000 8005850000 | District 8 | I-55I-70US-40 | Reconstruction - Bridges Bridge Replacement At Pleasant Ridge Rd (Overhead) 0.7 mi W of ILL 159 in Maryville | $10,000,000 | Planned | ||
| — | 8-00603-0000 8006030000 | District 8 | I-55I-64US-40 | Preservation - Bridges Bridge Deck Overlay Mississippi River to I-64 (Tri-Level) Intchg in East St Louis (Various Structures) | $45,600,000 | Planned | ||
| — | 8-00603-1000 8006031000 | District 8 | I-55I-64US-40 | Preservation - Bridges Bridge Repair Over Abandoned Southern RR in East St. Louis | $600,000 | Planned | ||
| — | 8-00840-0000 8008400000 | District 8 | I-55I-64IL-3 | Reconstruction - Bridges Bridge Replacement Poplar St Complex - ILL 3 Ramps in East St Louis | $73,900,000 | Planned | ||
| — | 8-00840-1000 8008401000 | District 8 | I-55I-64IL-3 | Reconstruction - Bridges Bridge Replacement Poplar St Complex - ILL 3 Ramps in East St Louis | $32,700,000 | Planned | ||
| — | 8-00841-0000 8008410000 | District 8 | I-55I-64IL-3 | Reconstruction - Bridges Bridge Replacement Poplar St Complex - ILL 3 Ramps in East St Louis | $82,500,000 | Planned | ||
| — | 8-00841-1000 8008411000 | District 8 | I-55I-64IL-3 | Reconstruction - Bridges Bridge Replacement Poplar St Complex - ILL 3 Ramps in East St Louis | $51,000,000 | Planned | ||
| — | 8-00998-0000 8009980000 | District 8 | I-55I-64US-40 | Preservation - Bridges Bridge Deck Sealing Poplar Street Bridge | $389,000 | Planned | ||
| — | 8-00999-1000 8009991000 | District 8 | I-55I-70US-40 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Over ILL 157 in Collinsville | $4,500,000 | Planned | ||
| FY 2025 | 1-80428-0000 1804280000 | District 1 | I-55 W Fr Rd NbW Frontage Rd Nb | Rehabilitation - Pavement Standard Overlay Front Rd to Bluff Rd | $660,000 | Planned | ||
| FY 2025 | 1-81126-0000 1811260000 | District 1 | I-55 | Maintenance - Bridges Bridge Repair At Cass Ave (Overhead) | $2,000,000 | Planned | ||
| FY 2025 | 5-53401-0000 5534010000 | District 5 | I-55 | Preservation - Bridges Bridge Deck Overlay At CH 29 (Overhead) 0.5 mi N of Towanda & At Money Creek 1.5 mi NE of Towanda | $5,500,000 | Planned | ||
| FY 2025 | 5-53415-0000 5534150000 | District 5 | I-55 | Rehabilitation - Bridges Bridge New Deck At US 136 E of McLean | $6,600,000 | Planned | ||
| FY 2025 | 5-53457-0000 5534570000 | District 5 | I-55 | Preservation - Bridges Bridge Deck Overlay At Mackinaw River 2 mi SW of Lexington & At Turkey Creek 1.5 mi SW of Lexington | $7,000,000 | Planned | ||
| FY 2025 | 5-53949-0000 5539490000 | District 5 | I-55I-74US-51 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-4th) 1.8 mi S of Shirley to I-55/74 Intchg SW of Bloomington | $17,200,000 | Planned | ||
| FY 2025 | 6-00291-0102 6002910102 | District 6 | 6th StI-55 BUSI-55 BUSA | Reconstruction - Pavement Utility Adjustment 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD | $500,000 | Planned | ||
| FY 2025 | 6-01047-0000 6010470000 | District 6 | I-55 | Reconstruction - Bridges Bridge Replacement AT BISSELL RD (OVERHEAD) 1 MI N OF SANGAMON AVE / ILL 54 | $4,100,000 | Planned | ||
| FY 2025 | 6-01047-0200 6010470200 | District 6 | I-55 | Reconstruction - Bridges Bridge Replacement AT CH 1 (E ANDREW RD) (Overhead) 0.5 MI S OF SHERMAN INTCHG | $4,100,000 | Planned | ||
| FY 2025 | 6-01227-0000 6012270000 | District 6 | I-55 E Fr | Rehabilitation - Pavement Designed Overlay 0.3 MI N OF N 16TH AVE N OF LITCHFIELD TO S OF N 19TH AVE E OF I-55 / ILL 108 INTCHG | $2,300,000 | Planned | ||
| FY 2025 | 6-01472-0000 6014720000 | District 6 | I-55 | Rehabilitation - Pavement Standard Overlay, Resurfacing (Int-3rd), Ramp Repair 2.8 MI S OF ILL 123 IN WILLIAMSVILLE TO LOGAN CO LINE | $26,000,000 | Planned | ||
| FY 2025 | 6-01495-0000 6014950000 | District 6 | I-55 | Preservation - Pavements Crack & Joint Sealing N OF GLENARM INTCHG TO 0.2 MI N OF SOUTHWIND RD | $540,000 | Planned |
1–98 of 98
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.