| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 1-71387-0200 1713870200 | District 1 | Algonquin RdIL-62 | Rehabilitation - Pavement Widening Existing Pavement E of Fox River to Sandbloom Rd | $2,075,000 | Planned | ||
| — | 1-76524-1000 1765241000 | District 1 | IL-47 | Rehabilitation - Pavement Standard Overlay Plato Rd to W of Burlington Rd | $1,500,000 | Planned | ||
| — | 1-76773-0900 1767730900 | District 1 | Austin Ave | Rehabilitation - Pavement Standard Overlay Gunnison St to N of ILL 19 (Irving Park Rd) | $1,495,000 | Planned | ||
| — | 1-77633-0300 1776330300 | District 1 | I-55 | Rehabilitation - Pavement Standard Overlay, Widening Existing Pavement, Resurfacing (Int-1st) ILL 129 to Lorenzo Rd | $14,375,000 | Planned | ||
| — | 1-77633-0301 1776330301 | District 1 | I-55 | Rehabilitation - Pavement Utility Adjustment ILL 129 to Lorenzo Rd | $500,000 | Planned | ||
| — | 1-78256-0000 1782560000 | District 1 | Northwest HwyUS-14 | Rehabilitation - Pavement Standard Overlay, ADA Improvements Spring Beach Way to Lake Co Line | $2,275,000 | Planned | ||
| — | 1-78513-2000 1785132000 | District 1 | IL-25River St | Rehabilitation - Pavement Standard Overlay, ADA Improvements Wilson St to N of Sullivan Rd | $6,000,000 | Planned | ||
| — | 1-79311-0000 1793110000 | District 1 | IL-83Kingery Hwy | Rehabilitation - Pavement Standard Overlay S of Oakdale Dr to S of Butterfield Rd | $15,000,000 | Planned | ||
| — | 1-79446-0000 1794460000 | District 1 | Pfingsten Rd | Rehabilitation - Pavement Standard Overlay, ADA Improvements Highland Rd to E Lake Ave | $3,200,000 | Planned | ||
| — | 1-79470-0000 1794700000 | District 1 | Lake StUS-20 | Rehabilitation - Pavement Standard Overlay, ADA Improvements IL 64 (North Ave) to Ill 171 (First Ave) | $2,212,000 | Planned | ||
| — | 1-79486-0000 1794860000 | District 1 | Central Rd | Rehabilitation - Pavement Designed Overlay, ADA Improvements, RR Flagger Wolf Rd to Huber Ln | $7,600,000 | Planned | ||
| — | 1-79496-0000 1794960000 | District 1 | IL-43Oakton StWaukegan Rd | Rehabilitation - Pavement Standard Overlay, ADA Improvements Ill 43 (Waukegan Rd): N of Main St to Oakton St & Oakton St: Harlem Ave to US 14 (Caldwell Ave) | $990,000 | Planned | ||
| — | 1-79546-0000 1795460000 | District 1 | Belvidere StIL-120 | Rehabilitation - Pavement Standard Overlay, ADA Improvements Knight Ave to Ill 137 (Amstutz Expwy) | $2,245,000 | Planned | ||
| — | 1-79569-0000 1795690000 | District 1 | US-20 | Rehabilitation - Pavement Standard Overlay, New Shoulders I-90 to Ill 47 | $1,977,000 | Planned | ||
| — | 1-79570-0000 1795700000 | District 1 | US-30 | Rehabilitation - Pavement Designed Overlay, Milled Rumble Strip Ill 47 to Galena Rd | $1,275,000 | Planned | ||
| — | 1-79618-0000 1796180000 | District 1 | Hyde Park Blvd | Rehabilitation - Pavement Standard Overlay, ADA Improvements Woodlawn Ave to Harper Ave | $269,000 | Planned | ||
| — | 1-79624-0000 1796240000 | District 1 | Lehigh Ave | Rehabilitation - Pavement Standard Overlay, ADA Improvements Touhy Ave to Central Ave | $1,030,000 | Planned | ||
| — | 1-79707-0000 1797070000 | District 1 | IL-38Roosevelt Rd | Rehabilitation - Pavement Designed Overlay, Widening Existing Pavement, Drainage Winfield Rd to County Farm Rd | $12,900,000 | Planned | ||
| — | 1-79707-0010 1797070010 | District 1 | IL-38Roosevelt Rd | Rehabilitation - Pavement Standard Overlay, Drainage Fapp Circle to E of Pierce Ave | $2,500,000 | Planned | ||
| — | 1-79743-0000 1797430000 | District 1 | Dixie Hwy | Rehabilitation - Pavement Designed Overlay, New Shoulders, Drainage Sycamore Dr to Harwood Ave | $4,500,000 | Planned | ||
| — | 1-79868-0000 1798680000 | District 1 | Western Ave | Rehabilitation - Pavement Standard Overlay, ADA Improvements, RR Flagger McKinley Rd to E Westleigh Rd | $2,800,000 | Planned | ||
| — | 1-79869-0000 1798690000 | District 1 | Northwest HwyUS-14 | Rehabilitation - Pavement Standard Overlay, New Shoulders, Milled Rumble Strip McHenry Co Line to Hart Rd | $1,970,000 | Planned | ||
| — | 1-79876-0000 1798760000 | District 1 | Harlem AveIL-43 | Rehabilitation - Pavement Designed Overlay, Storm Sewer (New), ADA Improvements 47th St to Sanitary & Ship Canal | $4,200,000 | Planned | ||
| — | 1-79880-0000 1798800000 | District 1 | IL-59Sutton Rd | Rehabilitation - Pavement Standard Overlay, ADA Improvements, RR Flagger Cook Co Line to S of Heritage Woods Dr | $7,000,000 | Planned | ||
| — | 1-79925-0000 1799250000 | District 1 | 55th St | Rehabilitation - Pavement Standard Overlay, ADA Improvements East Ave to Joliet Rd | $711,000 | Planned | ||
| — | 1-79944-0000 1799440000 | District 1 | 26th St | Rehabilitation - Pavement Standard Overlay, ADA Improvements Des Plaines Ave to 49th Ave | $6,250,000 | Planned | ||
| — | 1-80085-0000 1800850000 | District 1 | Greenwood Rd | Rehabilitation - Pavement Standard Overlay, ADA Improvements Linneman St to Ill 58 (Golf Rd) | $1,200,000 | Planned | ||
| — | 1-80098-0000 1800980000 | District 1 | Golf RdIL-58 | Rehabilitation - Pavement Standard Overlay, ADA Improvements Ill 59 (Sutton Rd) to Windsong Dr | $2,300,000 | Planned | ||
| — | 1-80145-0000 1801450000 | District 1 | 115th St | Rehabilitation - Pavement Standard Overlay, ADA Improvements Springfield Ave to Western Ave | $3,000,000 | Planned | ||
| — | 1-80146-0000 1801460000 | District 1 | 119th St | Rehabilitation - Pavement Standard Overlay, New Shoulders, Drainage US 45 (LaGrange Rd) to Cal Sag Rd | $2,100,000 | Planned | ||
| — | 1-80183-0000 1801830000 | District 1 | IL-31 | Rehabilitation - Pavement Standard Overlay, ADA Improvements S of Wildrose Spring Rd to S of Third St | $2,500,000 | Planned | ||
| — | 1-80188-0000 1801880000 | District 1 | IL-72Oak Knoll Dr | Rehabilitation - Pavement Designed Overlay, Milled Rumble Strip, New Shoulders DeKalb Co Line to Aurora Dr | $2,500,000 | Planned | ||
| — | 1-80370-0000 1803700000 | District 1 | Front StIL-53 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, New Shoulders Water Street to Grundy Co Line | $5,500,000 | Planned | ||
| — | 1-80439-0000 1804390000 | District 1 | Washington Blvd | Rehabilitation - Pavement Standard Overlay Ill 43 (Harlem Ave) to Austin Blvd | $1,900,000 | Planned | ||
| — | 1-80440-0000 1804400000 | District 1 | Central Ave | Rehabilitation - Pavement Designed Overlay, ADA Improvements 53rd St to 63rd St | $1,012,000 | Planned | ||
| — | 1-80441-0000 1804410000 | District 1 | Dundee Rd | Rehabilitation - Pavement Standard Overlay, ADA Improvements I-94 (Edens Expwy) to Forest Way Dr | $800,000 | Planned | ||
| — | 1-80567-0000 1805670000 | District 1 | Montrose Ave | Rehabilitation - Pavement Standard Overlay Central Ave to Elston Ave | $2,250,000 | Planned | ||
| — | 1-80652-0000 1806520000 | District 1 | E Butterfield Frtg | Rehabilitation - Pavement Designed Overlay DEAD END TO FAIRFIELD AVE | $146,000 | Planned | ||
| — | 1-80890-0010 1808900010 | District 1 | Eisenhower ExpwyI-290US-20 | Rehabilitation - Pavement Standard Overlay, Patching Addison Rd to I-88 | $5,000,000 | Planned | ||
| — | 1-80925-0000 1809250000 | District 1 | 111th St | Rehabilitation - Pavement Designed Overlay Pulaski Rd to Sacramento Ave | $800,000 | Planned | ||
| — | 1-81137-0000 1811370000 | District 1 | Higgins RdIL-72 | Rehabilitation - Pavement Standard Overlay E of Fairview Ave to I-90 Ramp (WB) | $3,105,000 | Planned | ||
| — | 1-81155-0000 1811550000 | District 1 | Forest Preserve Dr | Rehabilitation - Pavement Standard Overlay Belmont Ave to Montrose Ave | $2,957,000 | Planned | ||
| — | 1-81156-0000 1811560000 | District 1 | 5th Ave | Rehabilitation - Pavement Standard Overlay Hemingway Dr to Ill 64 (North Ave) | $688,000 | Planned | ||
| — | 1-81199-0000 1811990000 | District 1 | 143rd StIL-7 | Rehabilitation - Pavement Widening & Resurfacing West Ave to Southwest Hwy | $2,000,000 | Planned | ||
| — | 1-81291-0000 1812910000 | District 1 | Marshfield Ave | Rehabilitation - Pavement Designed Overlay, Drainage 127th St to Vermont Ave | $300,000 | Planned | ||
| — | 1-81326-0000 1813260000 | District 1 | US-12US-20US-45 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Lake St to N of I-290 (Eisenhower Expwy) | $3,500,000 | Planned | ||
| — | 1-81422-0000 1814220000 | District 1 | IL-19Irving Park Rd | Rehabilitation - Pavement Designed Overlay W of Oak Ridge Dr | $20,000 | Planned | ||
| — | 1-81425-0000 1814250000 | District 1 | County Line Rd | Rehabilitation - Pavement Designed Overlay Greenbay Rd to Sheridan Rd | $700,000 | Planned | ||
| — | 1-81430-0000 1814300000 | District 1 | Palatine Rd | Rehabilitation - Pavement Designed Overlay E of Roselle Rd to Smith St | $1,700,000 | Planned | ||
| — | 1-81432-0000 1814320000 | District 1 | IL-126Main St | Rehabilitation - Pavement Standard Overlay Essington Rd to Lockport Rd | $4,900,000 | Planned | ||
| — | 1-81433-0000 1814330000 | District 1 | 96th AveUS-45US-52 | Rehabilitation - Pavement Designed Overlay Wilmington-Peotone Rd to County Line Rd | $1,700,000 | Planned | ||
| — | 1-81434-0000 1814340000 | District 1 | York St | Rehabilitation - Pavement Designed Overlay N of Brush Hill Rd to Ill 38 (Roosevelt Rd) | $300,000 | Planned | ||
| — | 1-81435-0000 1814350000 | District 1 | Galena Blvd | Rehabilitation - Pavement Designed Overlay E of Ill 56 to W of Orchard Rd | $4,300,000 | Planned | ||
| — | 1-81437-0000 1814370000 | District 1 | Main St | Rehabilitation - Pavement Designed Overlay Illinois St to W of Ill 83/171 (Archer Ave) | $3,100,000 | Planned | ||
| — | 1-81438-0000 1814380000 | District 1 | E Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay Renwick Rd to S of Helen Rd | $400,000 | Planned | ||
| — | 1-81439-0000 1814390000 | District 1 | Doris AveUS-52 | Rehabilitation - Pavement Designed Overlay Ill 53 (Chicago St) to S of Pinewood Ln | $3,100,000 | Planned | ||
| — | 1-81440-0000 1814400000 | District 1 | Mcdonough StUS-52US-6 | Rehabilitation - Pavement Designed Overlay E of US 6 (Railroad St) to US 6/Ill 53 (Chicago St) | $600,000 | Planned | ||
| — | 1-81441-0000 1814410000 | District 1 | Pulaski Rd/crawfor | Rehabilitation - Pavement Designed Overlay Vollmer Rd to S of Thornwood Ave | $510,000 | Planned | ||
| — | 1-81442-0000 1814420000 | District 1 | Touhy Ave | Rehabilitation - Pavement Designed Overlay E of Capital Dr to Kedzie Ave | $870,000 | Planned | ||
| — | 1-81445-0000 1814450000 | District 1 | IL-72South Frontage Rd | Rehabilitation - Pavement Designed Overlay W of Ill 25 (Dundee Ave) | $120,000 | Planned | ||
| — | 1-81446-0000 1814460000 | District 1 | New Willow Rd | Rehabilitation - Pavement Designed Overlay W of Ill 43 (Waukegan Rd) to I-94 (Edens Expwy) | $4,500,000 | Planned | ||
| — | 1-81448-0000 1814480000 | District 1 | South Frontage RdUS-14 | Rehabilitation - Pavement Designed Overlay W of Lake Shore Dr | $300,000 | Planned | ||
| — | 1-81450-0000 1814500000 | District 1 | Troy RdUS-52 | Rehabilitation - Pavement Designed Overlay County Line Rd to Wynstone Dr | $1,100,000 | Planned | ||
| — | 1-81453-0000 1814530000 | District 1 | First AveIL-171 | Rehabilitation - Pavement Designed Overlay 43rd St to S of 44th St | $500,000 | Planned | ||
| — | 1-81456-0000 1814560000 | District 1 | Claire Blvd/rexfor | Rehabilitation - Pavement Designed Overlay Pulaski Rd to I-294 (Tri-State Tollway) | $320,000 | Planned | ||
| — | 1-81457-0000 1814570000 | District 1 | Barrington Rd | Rehabilitation - Pavement Designed Overlay Ill 59 to Ill 68 (Dundee Rd) | $1,500,000 | Planned | ||
| — | 1-81458-0000 1814580000 | District 1 | Chicago Heights-gl | Rehabilitation - Pavement Designed Overlay S of Holbrook Rd to Vollmer Rd | $1,400,000 | Planned | ||
| — | 1-81459-0000 1814590000 | District 1 | Lawrence Ave | Rehabilitation - Pavement Designed Overlay Ill 171 (Cumberland Rd) to Ill 43 (Harlem Ave) | $3,500,000 | Planned | ||
| — | 1-81460-0000 1814600000 | District 1 | 175th St | Rehabilitation - Pavement Designed Overlay W of Western Ave to I-294 (Tri-State Tollway) | $2,400,000 | Planned | ||
| — | 1-81462-0000 1814620000 | District 1 | 47th St | Rehabilitation - Pavement Designed Overlay East Ave to W of Plainfield Rd | $1,500,000 | Planned | ||
| — | 1-81463-0000 1814630000 | District 1 | Burnham Ave | Rehabilitation - Pavement Designed Overlay N of 161st St to 172nd St | $1,700,000 | Planned | ||
| — | 1-81464-0000 1814640000 | District 1 | Burnham Ave | Rehabilitation - Pavement Designed Overlay N of 176th St to S of 197th St | $5,200,000 | Planned | ||
| — | 1-81466-0000 1814660000 | District 1 | IL-64North Ave | Rehabilitation - Pavement Designed Overlay County Line Rd to W of Ill 47 | $5,500,000 | Planned | ||
| — | 1-81468-0000 1814680000 | District 1 | East Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay Bluff Rd to Front St | $600,000 | Planned | ||
| — | 1-81471-0000 1814710000 | District 1 | IL-83Lake St | Rehabilitation - Pavement Designed Overlay S of US 45 to N of Buffalo Grove Rd | $13,000,000 | Planned | ||
| — | 1-81472-0000 1814720000 | District 1 | IL-43Waukegan Rd | Rehabilitation - Pavement Designed Overlay Hampton Blvd to S of Talbot Ave | $1,100,000 | Planned | ||
| — | 1-81475-0000 1814750000 | District 1 | 31st St | Rehabilitation - Pavement Designed Overlay Ill 50 (Cicero Ave) to Kostner Ave | $1,010,000 | Planned | ||
| — | 1-81476-0000 1814760000 | District 1 | Archer AveIL-171 | Rehabilitation - Pavement Standard Overlay Roberts Rd to 79th St | $4,700,000 | Planned | ||
| — | 1-81477-0000 1814770000 | District 1 | 22nd St | Rehabilitation - Pavement Designed Overlay W of Enterprise Dr to I-294 (Tri-State Tollway) | $3,760,000 | Planned | ||
| — | 1-81481-0000 1814810000 | District 1 | Tower Rd | Rehabilitation - Pavement Designed Overlay W of Forestway Dr | $150,000 | Planned | ||
| — | 1-81483-0000 1814830000 | District 1 | New Ave | Rehabilitation - Pavement Designed Overlay W of I-355 to Lockport St | $1,200,000 | Planned | ||
| — | 1-81485-0000 1814850000 | District 1 | Hicks Rd | Rehabilitation - Pavement Designed Overlay US 14 (Northwest Hwy) to Euclid Ave | $2,300,000 | Planned | ||
| — | 1-81486-0000 1814860000 | District 1 | Justamere Rd | Rehabilitation - Pavement Designed Overlay 143rd St to N of Conway Ct | $500,000 | Planned | ||
| — | 1-81487-0000 1814870000 | District 1 | Wolf Rd | Rehabilitation - Pavement Designed Overlay S of Camp McDonald Rd to Euclid Rd | $275,000 | Planned | ||
| — | 1-81489-0000 1814890000 | District 1 | Ridge Rd | Rehabilitation - Pavement Designed Overlay Dixie Hwy to Ill 1 (Halsted St) | $3,000,000 | Planned | ||
| — | 1-81490-0000 1814900000 | District 1 | 26th St | Rehabilitation - Pavement Designed Overlay Western Ave to End Ave | $3,800,000 | Planned | ||
| — | 1-81491-0000 1814910000 | District 1 | West Side | Rehabilitation - Pavement Designed Overlay (I-94 West Side) Gross Point Rd to Long Ave | $500,000 | Planned | ||
| — | 1-81492-0000 1814920000 | District 1 | E Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay 143rd St to Lockport/Airport Rd | $925,000 | Planned | ||
| — | 1-81493-0000 1814930000 | District 1 | Governors HwyIL-50 | Rehabilitation - Pavement Designed Overlay Margaret St to S of Egyptian Trail | $750,000 | Planned | ||
| — | 1-81494-0000 1814940000 | District 1 | Washington St | Rehabilitation - Pavement Designed Overlay Kankakee St to S of Ill 113/ Ill 129 (Division St) | $1,000,000 | Planned | ||
| — | 1-81495-0000 1814950000 | District 1 | East Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay Ill 53 to Joliet Rd | $1,400,000 | Planned | ||
| — | 1-81496-0000 1814960000 | District 1 | Central Ave | Rehabilitation - Pavement Designed Overlay (I-94 Frontage Rd) Oakton St to Howard St | $410,000 | Planned | ||
| — | 1-81500-0000 1815000000 | District 1 | West Side | Rehabilitation - Pavement Designed Overlay (I-94 West Side) Long Ave to Fargo Ave | $200,000 | Planned | ||
| — | 1-81501-0000 1815010000 | District 1 | Channahon RdUS-6 | Rehabilitation - Pavement Designed Overlay Ill 7 (McDonough St) to Larkin Ave | $5,300,000 | Planned | ||
| — | 1-81502-0000 1815020000 | District 1 | Vermont St | Rehabilitation - Pavement Designed Overlay Irving Ave to 127th St | $3,400,000 | Planned | ||
| — | 1-81503-0000 1815030000 | District 1 | Ashland Ave | Rehabilitation - Pavement Designed Overlay Linden Rd to Joe Orr Rd | $4,700,000 | Planned | ||
| — | 1-81504-0000 1815040000 | District 1 | Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay Cass Ave to Clarendon Hills Rd | $1,750,000 | Planned | ||
| — | 1-81509-0000 1815090000 | District 1 | 95th St | Rehabilitation - Pavement Designed Overlay Ill 171 (Archer Ave) to US 12/45 (96th Ave) | $5,200,000 | Planned | ||
| — | 1-81510-0000 1815100000 | District 1 | 131st St | Rehabilitation - Pavement Designed Overlay Ill 7 (Southwest Hwy) to Ill 43 (Harlem Ave) | $3,300,000 | Planned | ||
| — | 1-81511-0000 1815110000 | District 1 | Dixie Hwy | Rehabilitation - Pavement Designed Overlay Harwood Ave to N of 183rd St | $900,000 | Planned |
1–100 of 834Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.