Filtered by: Highway: IL-4 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 1-75983-1000 1759831000 | District 1 | Harlem AveIL-43 | Maintenance - Pavements Pump Station At US 12/20 (95th St) 0.6 Mi N of I-294 (Tri-State Tollway) - Pumpstation | $15,000,000 | Planned | ||
| — | 1-76524-1000 1765241000 | District 1 | IL-47 | Rehabilitation - Pavement Standard Overlay Plato Rd to W of Burlington Rd | $1,500,000 | Planned | ||
| — | 1-78770-0500 1787700500 | District 1 | Harlem AveIL-43 | Initial Construction - Br Utility Adjustment At BRC RR (65th St) | $4,000,000 | Planned | ||
| — | 1-78770-2000 1787702000 | District 1 | Harlem AveIL-43 | Initial Construction - Br RR Grade Separation At BRC RR (65th St) | $75,000,000 | Planned | ||
| — | 1-78770-3000 1787703000 | District 1 | Archer AveHarlem AveIL-43 | Miscellaneous Improvement Traf Signal Replacement, Water Main, Drainage Archer Ave: Ill 171 to Ill 43 (Harlem Ave) & Ill 43 (Harlem Ave): Archer Ave to 63rd St | $35,000,000 | Planned | ||
| — | 1-79402-0000 1794020000 | District 1 | Harlem AveIL-43 | Rehabilitation - Bridges Bridge Repair, Bridge Superstructure Rehab At Sanitary & Ship Canal | $14,935,000 | Planned | ||
| — | 1-79496-0000 1794960000 | District 1 | IL-43Oakton StWaukegan Rd | Rehabilitation - Pavement Standard Overlay, ADA Improvements Ill 43 (Waukegan Rd): N of Main St to Oakton St & Oakton St: Harlem Ave to US 14 (Caldwell Ave) | $990,000 | Planned | ||
| — | 1-79876-0000 1798760000 | District 1 | Harlem AveIL-43 | Rehabilitation - Pavement Designed Overlay, Storm Sewer (New), ADA Improvements 47th St to Sanitary & Ship Canal | $4,200,000 | Planned | ||
| — | 1-79899-0010 1798990010 | District 1 | Harlem AveIL-43 | Preservation - Bridges Bridge Repair, Bridge Widening, Bridge Deck Overlay At CN RR S of I-55 Ramps (EB) | $24,493,000 | Planned | ||
| — | 1-80327-0000 1803270000 | District 1 | Harlem AveIL-43 | Reconstruction - Pavement Bridge Repair 46th/47th St to 53rd St | $8,000,000 | Planned | ||
| — | 1-80847-0000 1808470000 | District 1 | IL-47Main St | Preservation - Pavements Ultra-Thin Bnd Wr Course Ware Rd to Ill 173 | $2,500,000 | Planned | ||
| — | 1-80956-0000 1809560000 | District 1 | IL-47 | Reconstruction - Bridges Culvert Replacement Over Pingree Creek (3.6 Mi S of US 20/ILL 72) | $300,000 | Planned | ||
| — | 1-81207-0000 1812070000 | District 1 | IL-43IL-58US-14 | Preservation - Pavements Smart Overlay Emerson St to US 14 (Caldwell Ave) | $2,430,000 | Planned | ||
| — | 1-81233-0000 1812330000 | District 1 | Harlem AveIL-43 | Preservation - Pavements Smart Overlay W 26th St to 46th St/47th St | $3,300,000 | Planned | ||
| — | 1-81251-0000 1812510000 | District 1 | Harlem AveIL-43 | Preservation - Pavements Crack & Joint Sealing 111th St to 170th St | $590,000 | Planned | ||
| — | 1-81255-0000 1812550000 | District 1 | IL-43Waukegan Rd | Preservation - Pavements Crack & Joint Sealing US 41 (Skokie Hwy) to Pulaski Dr/McGaw Rd | $50,000 | Planned | ||
| — | 1-81387-0000 1813870000 | District 1 | Harlem AveIL-43 | Maintenance - Bridges Bridge Repair, Pier Repair At Cal Sag Channel | $15,000,000 | Planned | ||
| — | 1-81472-0000 1814720000 | District 1 | IL-43Waukegan Rd | Rehabilitation - Pavement Designed Overlay Hampton Blvd to S of Talbot Ave | $1,100,000 | Planned | ||
| — | 1-81568-0000 1815680000 | District 1 | IL-43Waukegan Rd | Rehabilitation - Pavement Standard Overlay S of Ammer Rd to Woodlawn Ave | $1,000,000 | Planned | ||
| — | 1-81612-0000 1816120000 | District 1 | Harlem AveIL-43 | Rehabilitation - Pavement Designed Overlay Hanover St to S of 63rd St | $3,650,000 | Planned | ||
| — | 2-11750-0170 2117500170 | District 2 | IL-40 | Preservation - Pavements Crack & Joint Sealing 0.4 Mi N of I-88 to ILL 92 | $525,000 | Planned | ||
| — | 2-20095-0100 2200950100 | District 2 | IL-40 | Reconstruction - Bridges Culvert Replacement Skunk Creek 3.5 mi E of Coleta | $500,000 | Planned | ||
| — | 2-23610-0004 2236100004 | District 2 | IL-40IL-40 BLocust St | Reconstruction - Pavement Utility Adjustment Le Fevre Rd to 2nd St & 2nd St to ILL 40 (Locust St) in Sterling | $100,000 | Planned | ||
| — | 2-23625-0000 2236250000 | District 2 | IL-2IL-40Locust St | Rehabilitation - Pavement Designed Overlay, ADA Improvements E 14th St to W 6th St in Sterling | $1,890,000 | Planned | ||
| — | 2-23940-0100 2239400100 | District 2 | IL-40 | Preservation - Pavements Crack & Joint Sealing, ADA Improvements, Culvert Replacement ILL 78 to Marion Ave in Chadwick | $5,000,000 | Planned | ||
| — | 2-53505-0000 2535050000 | District 2 | IL-40 | Safety ADA Improvements Stover Ave to Old Mill St in Milledgeville | $441,000 | Planned | ||
| — | 2-53518-0000 2535180000 | District 2 | IL-40US-30 | Safety ADA Improvements US 30: 12th Ave to ILL 40 & ILL 40: 0.1 Mi N of W 2nd St to US 30 in Rock Falls | $2,500,000 | Planned | ||
| — | 3-04747-0010 3047470010 | District 3 | IL-47 | Initial Construction - Pa Additional Lanes ILL 71 to Caton Farm Rd | $20,000,000 | Planned | ||
| — | 3-04747-0030 3047470030 | District 3 | IL-47 | Reconstruction - Pavement Culvert Replacement ILL 71 to Caton Farm Rd | $18,000,000 | Planned | ||
| — | 3-04747-0040 3047470040 | District 3 | IL-47 | Maintenance - Pavements Patching At US 34 in Yorkville | $500,000 | Planned | ||
| — | 3-04938-0010 3049380010 | District 3 | IL-49 | Rehabilitation - Pavement Standard Overlay US 24 in Crescent City to Vermilion Co Line | $4,180,000 | Planned | ||
| — | 3-38093-0000 3380930000 | District 3 | IL-49 | Reconstruction - Bridges Bridge Replacement Shavetail Creek 4.8 Mi S of US 24 | $1,300,000 | Planned | ||
| — | 3-38190-0000 3381900000 | District 3 | IL-49 | Reconstruction - Bridges Bridge Replacement Branch Pigeon Creek 2.4 Mi N of ILL 9 | $1,500,000 | Planned | ||
| — | 4-00551-0500 4005510500 | District 4 | IL-41 | Rehabilitation - Pavement Designed Overlay ILL 116 to Avon SCL | $23,000,000 | Planned | ||
| — | 4-01024-0200 4010240200 | District 4 | IL-17IL-29IL-40 | Reconstruction - Bridges Bridge Replacement ILL 29: at Trib Illinois River 0.6 Mi S of Hopewell Dr; ILL 40: at Camp Creek 0.1 Mi N of ILL 17(E); TR 101A: at W Branch Panther Creek W of ILL 116/117 | $2,220,000 | Planned | ||
| — | 4-03050-0100 4030500100 | District 4 | IL-41IL-9 | Rehabilitation - Pavement Designed Overlay, Curb And Gutter, Storm Sewer (New) NCL to SCL of Bushnell | $5,200,000 | Planned | ||
| — | 4-04817-1500 4048171500 | District 4 | IL-41 | Rehabilitation - Bridges Bridge New Deck, Bridge Superstructure Rehab Over BSNF RR 0.5 mi N of St. Augustine | $3,300,000 | Planned | ||
| — | 4-05517-0600 4055170600 | District 4 | IL-41US-136 | Rehabilitation - Pavement Designed Overlay Bushnell SCL to N of TR 199 | $9,000,000 | Planned | ||
| — | 4-06217-0500 4062170500 | District 4 | IL-17IL-40 | Rehabilitation - Bridges Bridge New Deck, Bridge Painting, Bridge Repair Over UP RR at Camp Grove | $3,200,000 | Planned | ||
| — | 4-07222-1200 4072221200 | District 4 | IL-40 | Rehabilitation - Pavement Designed Overlay, ADA Improvements N of Pioneer Pkwy to S of Prospect Rd in Peoria | $8,000,000 | Planned | ||
| — | 4-07222-1400 4072221400 | District 4 | IL-40 | Rehabilitation - Pavement Standard Overlay N of Timber Ln to N of Pioneer Pkwy in Peoria | $4,000,000 | Planned | ||
| — | 4-09750-0100 4097500100 | District 4 | IL-40Knoxville Ave | Reconstruction - Pavement Reconstruction, ADA Improvements, Storm Sewer (New) I-74 to US 150 (War Memorial Dr) in Peoria | $28,000,000 | Planned | ||
| — | 4-09750-0150 4097500150 | District 4 | IL-40Knoxville Ave | Reconstruction - Pavement Utility Adjustment I-74 to US 150 (War Memorial Dr) in Peoria | $500,000 | Planned | ||
| — | 5-53007-0000 5530070000 | District 5 | Division StIL-47US-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Eastwood Dr in Mahomet to ILL 10 | $4,500,000 | Planned | ||
| — | 5-53007-0100 5530070100 | District 5 | Division StIL-47 | Reconstruction - Bridges Culvert Replacement At Camp Creek 1.1 mi N of I-72 | $750,000 | Planned | ||
| — | 5-53007-0400 5530070400 | District 5 | Division StIL-47US-150 | Rehabilitation - Pavement Utility Adjustment Eastwood Dr in Mahomet to ILL 10 | $50,000 | Planned | ||
| — | 5-53010-0000 5530100000 | District 5 | IL-48 | Reconstruction - Bridges Bridge Replacement AT CREEK 2.8 Mi S of ILL 10 & 2.6 Mi N of I-72 | $2,000,000 | Planned | ||
| — | 5-53154-0000 5531540000 | District 5 | IL-49 | Rehabilitation - Pavement Standard Overlay Iroquois Co Line to US 136 (W) | $4,900,000 | Planned | ||
| — | 5-53177-0000 5531770000 | District 5 | IL-49 | Reconstruction - Bridges Bridge Replacement Over UP RR 1.8 mi N of US 136 | $8,000,000 | Planned | ||
| — | 5-53197-0000 5531970000 | District 5 | IL-49US-150Warren St | Rehabilitation - Pavement Designed Overlay Main St in St Joseph to ILL 49 (N) W of Fithian | $8,200,000 | Planned | ||
| — | 5-53332-0000 5533320000 | District 5 | IL-48 | Rehabilitation - Pavement Standard Overlay ILL 10 at Weldon to ILL 32 at Cisco | $4,300,000 | Planned | ||
| — | 5-53435-0000 5534350000 | District 5 | IL-49 | Rehabilitation - Pavement Standard Overlay I-74 to US 150 at Ogden | $2,000,000 | Planned | ||
| — | 6-00176-0000 6001760000 | District 6 | IL-16IL-4 | Rehabilitation - Pavement Designed Overlay, Standard Overlay, Storm Sewer (New) ILL 4: NCL OF EAST GILLESPIE TO ILL 16 & ILL 16: W OF CLAY ST IN GILLESPIE TO 0.1 MI E OF ILL 4 | $3,500,000 | Planned | ||
| — | 6-00176-0100 6001760100 | District 6 | IL-4 | Miscellaneous Improvement Traf Signal Replacement AT ILL 16 IN EAST GILLESPIE | $500,000 | Planned | ||
| — | 6-00438-0000 6004380000 | District 6 | IL-4 | Rehabilitation - Pavement Designed Overlay, New Shoulders, Culvert Replacement CARLINVILLE SCL TO LITCHFIELD RD | $7,000,000 | Planned | ||
| — | 6-00742-0000 6007420000 | District 6 | IL-4Veterans Pkwy | Safety Intersection Reconstn, Left Turn Lanes, Traf Signal Replacement AT LINDBERGH BLVD IN SPRINGFIELD | $5,000,000 | Planned | ||
| — | 6-00770-0000 6007700000 | District 6 | I-55 BUSIL-29IL-4 | Rehabilitation - Pavement Standard Overlay PEORIA RD: W OF NORTHBROOK CT TO N OF TAINTOR RD; VETERANS PKWY: PEORIA RD TO 0.2 MI W OF J DAVID JONES PKWY (ALL IN SPRINGFIELD) | $5,100,000 | Planned | ||
| — | 6-01000-0000 6010000000 | District 6 | IL-4 | Rehabilitation - Pavement Designed Overlay 0.1 MI W OF DONALDSON RD TO 0.1 MI N OF ALLEN RD (N OF CARLINVILLE) | $2,200,000 | Planned | ||
| — | 6-01034-0000 6010340000 | District 6 | IL-4 | Rehabilitation - Pavement Designed Overlay N OF GEORGE ST IN VIRDEN TO S OF MOUND ST IN GIRARD | $3,900,000 | Planned | ||
| — | 6-01059-0100 6010590100 | District 6 | IL-4 | Rehabilitation - Pavement Designed Overlay, Curb And Gutter, Patching N OF HAIG RD N OF CARLINVILLE TO N OF N BROAD ST IN CARLINVILLE | $1,700,000 | Planned | ||
| — | 6-01059-0200 6010590200 | District 6 | IL-4 | Reconstruction - Pavement Reconstruction, Curb And Gutter, Traf Signal Replacement N OF N BROAD ST IN CARLINVILLE TO N OF CARLINVILLE SQUARE IN CARLINVILLE | $5,100,000 | Planned | ||
| — | 6-01146-0000 6011460000 | District 6 | IL-4 | Rehabilitation - Pavement Standard Overlay, ADA Improvements 0.2 MI N OF MANSION RD IN SPRINGFIELD TO N OF TEAL DR IN CHATHAM | $5,700,000 | Planned | ||
| — | 6-01519-0000 6015190000 | District 6 | IL-4 | Rehabilitation - Pavement Designed Overlay LITCHFIELD RD TO EAST GILLESPIE NCL | $5,200,000 | Planned | ||
| — | 6-01561-0000 6015610000 | District 6 | IL-4Veterans Pkwy | Rehabilitation - Pavement Designed Overlay 0.4 MI S OF I-72 TO 0.2 MI N OF MANSION RD IN SPRINGFIELD | $6,500,000 | Planned | ||
| — | 6-02064-0000 6020640000 | District 6 | IL-4Veterans Pkwy | Miscellaneous Improvement Bridge Removal/Demolition OVER OLD IC RR 0.3 MI N OF I-72 IN SPRINGFIELD | $3,800,000 | Planned | ||
| — | 6-02149-0000 6021490000 | District 6 | IL-4 | Preservation - Pavements Crack & Joint Sealing 0.3 MI S OF ILL 104 IN AUBURN TO N OF GEORGE ST IN VIRDEN | $200,000 | Planned | ||
| — | 7-51034-0000 7510340000 | District 7 | IL-105IL-48 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, Traf Signal Modernization ILL 105: 0.2 Mi E of Old US 51 BUS in Decatur to ILL 48 & ILL 48: ILL 105 to 0.5 Mi NE of US 51 | $8,640,000 | Planned | ||
| — | 7-52757-0000 7527570000 | District 7 | IL-121IL-48 | Rehabilitation - Pavement Designed Overlay At Pershing Rd & 22nd St Int in Decatur | $1,910,000 | Planned | ||
| — | 7-52762-0000 7527620000 | District 7 | IL-48 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, Traf Signal Modernization S of Marietta St to Southside Dr in Decatur | $7,350,000 | Planned | ||
| — | 7-52763-0000 7527630000 | District 7 | IL-48 | Rehabilitation - Pavement Standard Overlay, ADA Improvements ILL 32 to I-72 | $10,150,000 | Planned | ||
| — | 7-52913-0000 7529130000 | District 7 | IL-48 | Rehabilitation - Pavement Designed Overlay I-72 to 0.1 Mi N of Pershing Rd in Decatur | $6,100,000 | Planned | ||
| — | 7-52922-0000 7529220000 | District 7 | IL-49 | Initial Construction - Br Culvert (New) At Panther Creek 0.2 Mi W of Clark Co Line | $500,000 | Planned | ||
| — | 7-52958-0000 7529580000 | District 7 | IL-49 | Preservation - Pavements Microsurfacing 1 Pass Cumberland Co Line to Main St in Willow Hill | $1,310,000 | Planned | ||
| — | 8-00375-0000 8003750000 | District 8 | IL-4 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Mascoutah Plaza Dr in Mascoutah to S of Cornmill Rd & NCL to ILL 15 in Fayetteville | $2,800,000 | Planned | ||
| — | 8-00460-0000 8004600000 | District 8 | IL-4 | Rehabilitation - Pavement Designed Overlay, New Shoulders, Drainage 0.3 mi S of ILL 140 to 0.3 mi S of ILL 143 | $33,000,000 | Planned | ||
| — | 8-00460-0400 8004600400 | District 8 | IL-4 | Rehabilitation - Pavement Utility Adjustment 0.3 mi S of I-55 to 0.3 mi S of ILL 140 | $3,000,000 | Planned | ||
| — | 8-00460-1000 8004601000 | District 8 | IL-4 | Rehabilitation - Pavement Culvert Replacement 0.3 mi S of I-55 to 0.3 mi S of ILL 140 | $16,500,000 | Planned | ||
| — | 8-00460-5400 8004605400 | District 8 | IL-4 | Rehabilitation - Pavement Utility Adjustment 0.3 mi S of ILL 140 to 0.3 mi S of ILL 143 | $7,000,000 | Planned | ||
| — | 8-00591-0000 8005910000 | District 8 | IL-15IL-4 | Reconstruction - Bridges Bridge Replacement Kaskaskia River 0.2 mi E of Jct ILL 4 in Fayetteville; Kaskaskia Overflow 0.4 mi & 0.6 mi E of Jct ILL 4 | $66,000,000 | Planned | ||
| — | 8-00607-1000 8006071000 | District 8 | IL-4 | Reconstruction - Pavement Bridge Deck Repairs, Bridge Deck Sealing Southern Dr in Lebanon to 0.3 Mi S of I-64 in Mascoutah | $21,000,000 | Planned | ||
| — | 8-00623-0000 8006230000 | District 8 | IL-150IL-4 | Reconstruction - Pavement Pavement Replacement, ADA Improvements ILL 4 to Green St in Steeleville | $21,000,000 | Planned | ||
| — | 8-00623-0400 8006230400 | District 8 | IL-150IL-4 | Reconstruction - Pavement Utility Adjustment ILL 4 to Green St in Steeleville | $200,000 | Planned | ||
| — | 8-00623-2000 8006232000 | District 8 | IL-150IL-4 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay, Drains (Replace/Repair) At Mary's River W of Steeleville | $1,400,000 | Planned | ||
| — | 8-00624-0000 8006240000 | District 8 | IL-150IL-4 | Reconstruction - Pavement Pavement Replacement, ADA Improvements Clyde Steele St to Howard Ave in Percy | $11,400,000 | Planned | ||
| — | 8-00624-0400 8006240400 | District 8 | IL-150IL-4 | Reconstruction - Pavement Utility Adjustment Clyde Steele St to Howard Ave in Percy | $200,000 | Planned | ||
| — | 8-00625-0000 8006250000 | District 8 | IL-150IL-4 | Reconstruction - Pavement Pavement Replacement Green St in Steeleville to Clyde Steele St in Percy | $8,700,000 | Planned | ||
| — | 8-00625-2000 8006252000 | District 8 | IL-150IL-4 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Cox Creek E of Steeleville ECL | $900,000 | Planned | ||
| — | 8-00626-0000 8006260000 | District 8 | IL-150IL-4 | Reconstruction - Pavement Pavement Replacement Howard Ave in Percy to Perry Co Line | $5,500,000 | Planned | ||
| FY 2025 | 1-77727-0000 1777270000 | District 1 | IL-47US-30 | Initial Construction - Pa Additional Lanes, ADA Improvements Cross St to Jericho Rd | $24,771,000 | Planned | ||
| FY 2025 | 1-77727-0005 1777270005 | District 1 | IL-47US-30 | Reconstruction - Pavement Utility Adjustment Cross St to 0.4 Mi s of Galena Rd | $1,000,000 | Planned | ||
| FY 2025 | 1-77727-0006 1777270006 | District 1 | IL-47US-30 | Reconstruction - Pavement RR Relocation, RR Flagger Cross St to 0.4 Mi S of Galena Rd | $7,500,000 | Planned | ||
| FY 2025 | 1-77727-1000 1777271000 | District 1 | IL-47US-30 | Reconstruction - Pavement Bridge Replacement Cross St to Jericho Rd | $39,500,000 | Planned | ||
| FY 2025 | 1-77727-1005 1777271005 | District 1 | IL-47US-30 | Reconstruction - Pavement Utility Adjustment Cross St to 0.4 Mi s of Galena Rd | $1,600,000 | Planned | ||
| FY 2025 | 1-77727-2000 1777272000 | District 1 | IL-47US-30 | Initial Construction - Pa Additional Lanes Jericho Rd to 0.4 Mi S of Galena Rd | $24,600,000 | Planned | ||
| FY 2025 | 1-77727-2010 1777272010 | District 1 | IL-47US-30 | Reconstruction - Pavement Culvert Replacement Jericho Rd to 0.4 Mi S of Galena Rd | $16,400,000 | Planned | ||
| FY 2025 | 1-77727-2400 1777272400 | District 1 | IL-47US-30 | Initial Construction - Pa Utility Adjustment Jericho Rd to 0.4 Mi S of Galena Rd | $2,500,000 | Planned | ||
| FY 2025 | 1-80227-0000 1802270000 | District 1 | IL-47 | Rehabilitation - Pavement Standard Overlay, ADA Improvements Kreutzer Rd to N of Jim Dhamer Dr | $3,230,000 | Planned | ||
| FY 2025 | 1-81541-0000 1815410000 | District 1 | IL-43Waukegan Rd | Rehabilitation - Pavement Standard Overlay Woodlawn Ave to Ill 58 (Golf Rd) | $5,900,000 | Planned | ||
| FY 2025 | 1-81645-0000 1816450000 | District 1 | IL-43IL-58Waukegan Rd | Rehabilitation - Pavement Designed Overlay Ill 58 (Golf Rd) to Emerson St | $800,000 | Planned | ||
| FY 2025 | 1-90013-1151 1900131151 | District 1 | IL-47Seminary St | Initial Construction - Pa Utility Adjustment 0.1 Mi N of ILL 120 (McHenry Ave) to US 14 | $1,400,000 | Planned |
1–100 of 114Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.