Filtered by: Highway: IL-9 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 2-04901-0000 2049010000 | District 2 | IL-92 | Preservation - Bridges Bridge Repair, Bridge Joint Replace/Repair, Bridge Deck Overlay Mississippi River | $3,000,000 | Planned | ||
| — | 2-07660-0100 2076600100 | District 2 | IL-92 | Reconstruction - Pavement Reconstruction, Widening Existing Pavement, Culvert Replacement 0.2 mi N of ILL 192 to 0.4 Mi N of Brights Ct W of Andalusia | $9,645,000 | Planned | ||
| — | 2-07660-0101 2076600101 | District 2 | IL-92 | Reconstruction - Pavement Utility Adjustment 0.2 mi N of ILL 192 to 0.4 Mi N of Brights Ct W of Andalusia | $50,000 | Planned | ||
| — | 2-17500-0100 2175000100 | District 2 | IL-92 | Reconstruction - Bridges Bridge Replacement Fancy Creek 0.5 Mi E of Andalusia | $1,654,000 | Planned | ||
| — | 2-20436-0100 2204360100 | District 2 | IL-92 | Miscellaneous Improvement Culvert Replacement, Designed Overlay, Cold Milling 115th St (W) in Andalusia to 0.4 mi E of ILL 92 (N) | $10,000,000 | Planned | ||
| — | 2-20614-0100 2206140100 | District 2 | IL-92 | Preservation - Bridges Bridge Deck Repairs, Bridge Repair, Bridge Joint Replace/Repair Phenix Ditch 1.3 mi E of ILL 82 | $300,000 | Planned | ||
| — | 2-30118-0100 2301180100 | District 2 | IL-84IL-92 | Reconstruction - Pavement Reconstruction, Traf Signal Replacement, ADA Improvements 0.1 Mi W of ILL 84 (N) to ILL 5 in Silvis | $11,025,000 | Planned | ||
| — | 2-30118-0140 2301180140 | District 2 | IL-84IL-92 | Reconstruction - Pavement Utility Adjustment 0.1 Mi W of ILL 84 (N) to ILL 5 in Silvis | $3,852,000 | Planned | ||
| — | 2-98500-0000 2985000000 | District 2 | IL-92 | Reconstruction - Pavement Reconstruction, Traf Signal Replacement, ADA Improvements ILL 84 (N) in Silvis to 48th St in Moline | $44,100,000 | Planned | ||
| — | 2-98500-0030 2985000030 | District 2 | IL-92 | Reconstruction - Pavement Utility Adjustment ILL 84 (N) in Silvis to 48th St in Moline | $500,000 | Planned | ||
| — | 2-99560-0100 2995600100 | District 2 | IL-92 | Rehabilitation - Pavement Designed Overlay, Patching 238th St in Illinois City to 0.1 Mi W of ILL 192 | $1,686,000 | Planned | ||
| — | 3-09206-0060 3092060060 | District 3 | IL-92 | Rehabilitation - Pavement Designed Overlay Henry Co Line to E of ILL 40 | $6,000,000 | Planned | ||
| — | 3-09206-1001 3092061001 | District 3 | IL-92 | Initial Construction - Br Bridge (New) Drainage Ditch 0.8 Mi W of ILL 172 | $1,000,000 | Planned | ||
| — | 4-00127-0400 4001270400 | District 4 | IL-96 | Rehabilitation - Pavement Designed Overlay W of Benton St in Lomax to Oak St in Dallas City | $6,000,000 | Planned | ||
| — | 4-00132-0200 4001320200 | District 4 | IL-9 | Rehabilitation - Pavement Designed Overlay Prairie Creek to McLean Co Line | $15,000,000 | Planned | ||
| — | 4-00177-0000 4001770000 | District 4 | IL-9 | Reconstruction - Bridges Bridge Replacement Spoon River 1 Mi S of Blyton | $19,800,000 | Planned | ||
| — | 4-00328-0200 4003280200 | District 4 | IL-9 | Reconstruction - Bridges Bridge Replacement Lost Grove Creek 4 mi W of Fiatt | $3,500,000 | Planned | ||
| — | 4-01024-0100 4010240100 | District 4 | IL-94Old Us 34 | Reconstruction - Bridges Bridge Replacement Old US 34: at Old Tom Creek 0.6 Mi E of Church St; ILL 94: at Honey Creek 1.3 Mi N of CR 400N & at Henderson Overflow 0.3 Mi S of TR 29 | $5,280,000 | Planned | ||
| — | 4-02922-0200 4029220200 | District 4 | IL-9 | Rehabilitation - Pavement Designed Overlay, Widening Existing Pavement Ave F to Ave A in Canton | $9,000,000 | Planned | ||
| — | 4-02924-0000 4029240000 | District 4 | IL-78IL-9 | Rehabilitation - Pavement Designed Overlay E of 1st Ave to 5th Ave in Canton | $800,000 | Planned | ||
| — | 4-03024-2540 4030242540 | District 4 | IL-91 | Preservation - Bridges Bridge Repair, Bridge Deck Overlay At North Creek, Prince Run Trib, Mud Run Creek & Camp Run Creek | $1,900,000 | Planned | ||
| — | 4-03024-2560 4030242560 | District 4 | IL-29IL-98 | Preservation - Bridges Bridge Repair, Bridge Deck Overlay ILL 98 at Lick Creek & Lick Creek Trib; ILL 29 at Little Lick Creek | $1,900,000 | Planned | ||
| — | 4-03050-0100 4030500100 | District 4 | IL-41IL-9 | Rehabilitation - Pavement Designed Overlay, Curb And Gutter, Storm Sewer (New) NCL to SCL of Bushnell | $5,200,000 | Planned | ||
| — | 4-03622-0000 4036220000 | District 4 | IL-94 | Rehabilitation - Pavement Designed Overlay Henderson Creek Overflow to Old US 34 in Biggsville | $15,000,000 | Planned | ||
| — | 4-03622-0600 4036220600 | District 4 | IL-94 | Rehabilitation - Pavement Designed Overlay 1500E to Hancock Co Line | $8,000,000 | Planned | ||
| — | 4-03622-0800 4036220800 | District 4 | IL-94 | Rehabilitation - Pavement Designed Overlay JCT ILL 135 (S) to Henderson Creek Overflow | $10,400,000 | Planned | ||
| — | 4-04510-0100 4045100100 | District 4 | IL-9US-24 | Initial Construction - Pa Additional Lanes Banner to E of Romine Rd | $49,000,000 | Planned | ||
| — | 4-04510-0102 4045100102 | District 4 | IL-9US-24 | Initial Construction - Pa Utility Adjustment Banner to E of Romine Rd | $700,000 | Planned | ||
| — | 4-04510-0150 4045100150 | District 4 | IL-9US-24 | Miscellaneous Improvement Bridge Replacement Banner to E of Romine Rd (Various Structures) | $5,600,000 | Planned | ||
| — | 4-04510-0203 4045100203 | District 4 | IL-9US-24 | Initial Construction - Pa Utility Adjustment E of Romine Rd to Kingston Mines | $700,000 | Planned | ||
| — | 4-04510-0400 4045100400 | District 4 | IL-9US-24 | Initial Construction - Pa Additional Lanes E of Romine Rd to Kingston Mines | $62,000,000 | Planned | ||
| — | 4-04510-0403 4045100403 | District 4 | IL-9US-24 | Initial Construction - Pa Utility Adjustment E of Romine Rd to Kingston Mines | $600,000 | Planned | ||
| — | 4-04510-0450 4045100450 | District 4 | IL-9US-24 | Reconstruction - Bridges Bridge Replacement 0.4 Mi E of Trivoli Rd & 0.1 Mi E of Glasford Rd | $2,150,000 | Planned | ||
| — | 4-04819-0600 4048190600 | District 4 | IL-97 | Rehabilitation - Pavement Designed Overlay S of Littlers Creek to ILL 116 | $12,600,000 | Planned | ||
| — | 4-04819-0650 4048190650 | District 4 | IL-97 | Rehabilitation - Pavement Utility Adjustment S of Littlers Creek to ILL 116 | $500,000 | Planned | ||
| — | 4-06622-0000 4066220000 | District 4 | IL-17IL-94 | Rehabilitation - Pavement Standard Overlay 11th Ave to E of ILL 94 (N) in Aledo | $3,500,000 | Planned | ||
| — | 4-07219-0700 4072190700 | District 4 | IL-9US-24 | Reconstruction - Bridges Bridge New Deck KJRY RR 1 Mi E of Mapleton | $15,000,000 | Planned | ||
| — | 4-07225-0200 4072250200 | District 4 | IL-91 | Rehabilitation - Pavement Designed Overlay 0.1 Mi S of Legion Hall Rd to Grange Hall Rd | $4,000,000 | Planned | ||
| — | 4-08510-0150 4085100150 | District 4 | IL-9 | Reconstruction - Bridges Bridge Replacement Drowning Fork Creek 2 mi w of ILL 41 | $5,000,000 | Planned | ||
| — | 4-08825-0300 4088250300 | District 4 | IL-17IL-91 | Rehabilitation - Pavement Designed Overlay Toulon ECL to Spoon River | $17,000,000 | Planned | ||
| — | 4-09017-0000 4090170000 | District 4 | IL-29IL-9 | Rehabilitation - Pavement Designed Overlay N of Thornton St to Mackinaw River | $10,000,000 | Planned | ||
| — | 4-09022-0400 4090220400 | District 4 | IL-98 | Rehabilitation - Pavement Culvert Replacement 0.2 mi E of Parkway Dr in North Pekin to 0.2 mi W of Flint St in Morton | $25,000,000 | Planned | ||
| — | 4-09495-0000 4094950000 | District 4 | IL-9 | Reconstruction - Bridges Bridge Replacement At Dillon Creek 1 Mi W of Tremont | $2,500,000 | Planned | ||
| — | 5-50090-0000 5500900000 | District 5 | IL-9 | Preservation - Bridges Bridge Deck Overlay 2 mi E of Rankin; 3.5 mi E of Rankin; 0.5 mi E of East Lynn | $1,500,000 | Planned | ||
| — | 5-53153-0000 5531530000 | District 5 | IL-9 | Rehabilitation - Pavement Standard Overlay ILL 1 at Hoopeston to Indiana State Line | $8,000,000 | Planned | ||
| — | 5-53153-0200 5531530200 | District 5 | IL-9 | Preservation - Bridges Bridge Deck Overlay At N Fork Vermilion River 0.3 mi W of 1700 Rd E of Hoopeston | $850,000 | Planned | ||
| — | 5-53384-0000 5533840000 | District 5 | IL-9US-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, Curb And Gutter N Main St to E Empire St in Bloomington | $11,519,000 | Planned | ||
| — | 5-53384-0200 5533840200 | District 5 | IL-9US-150 | Rehabilitation - Pavement Utility Adjustment N Main St to E Empire St in Bloomington | $50,000 | Planned | ||
| — | 5-53514-0000 5535140000 | District 5 | IL-9 | Reconstruction - Bridges Bridge Replacement Money Creek 3.8 Mi E of ILL 165 | $2,000,000 | Planned | ||
| — | 5-53938-0000 5539380000 | District 5 | IL-9 | Rehabilitation - Pavement Designed Overlay, Safety Improvements Arrowsmith Rd to Ford Co Line | $9,200,000 | Planned | ||
| — | 6-00364-0000 6003640000 | District 6 | IL-94US-136 | Rehabilitation - Pavement Designed Overlay, ADA Improvements US 136: W OF FAYETTE ST TO MADISON ST; US 136 / ILL 94: MADISON ST TO W OF 1500 N; ILL 94: N OF US 136 (ALL IN CARTHAGE) | $2,500,000 | Planned | ||
| — | 6-00413-0000 6004130000 | District 6 | IL-78IL-97US-136 | Reconstruction - Pavement Reconstruction, ADA Improvements, Vertical Realignment US 136: ILLINOIS RIVER BRIDGE TO S OF RANDOLPH ST; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO S OF ILLINOIS ST (ALL IN HAVANA) | $8,100,000 | Planned | ||
| — | 6-00413-0002 6004130002 | District 6 | IL-78IL-97US-136 | Reconstruction - Pavement Utility Adjustment US 136: ILLINOIS RIVER BRIDGE TO E OF CHARLOTTE AVE; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO N OF IM RR (ALL IN HAVANA) | $250,000 | Planned | ||
| — | 6-00413-0300 6004130300 | District 6 | IL-97US-136 | Miscellaneous Improvement Traf Signal Replacement, ADA Improvements AT WATER ST, SCHRADER ST & PROMENADE ST IN HAVANA | $1,300,000 | Planned | ||
| — | 6-00568-0000 6005680000 | District 6 | Great River RdIL-96 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, Parking Improvement W OF WINCHESTER ST IN NAUVOO TO SHERIDAN CREEK 0.9 MI S OF NAUVOO | $5,000,000 | Planned | ||
| — | 6-00753-0000 6007530000 | District 6 | IL-96 | Reconstruction - Pavement Reconstruction, ADA Improvements VERMONT ST TO S OF ALDO BLVD IN QUINCY | $4,100,000 | Planned | ||
| — | 6-00753-0200 6007530200 | District 6 | IL-96 | Rehabilitation - Pavement Designed Overlay, ADA Improvements LOCUST ST TO N OF VERMONT ST IN QUINCY | $2,800,000 | Planned | ||
| — | 6-00753-0300 6007530300 | District 6 | IL-96 | Rehabilitation - Pavement Standard Overlay, ADA Improvements 0.1 MI N OF KOCHS LN TO LOCUST ST IN QUINCY | $2,100,000 | Planned | ||
| — | 6-00776-0000 6007760000 | District 6 | IL-9 | Rehabilitation - Pavement Designed Overlay, ADA Improvements LA HARPE ECL TO W OF PARK LN / G ST IN LA HARPE | $2,000,000 | Planned | ||
| — | 6-00779-0000 6007790000 | District 6 | IL-125IL-97 | Reconstruction - Pavement Bridge Replacement 0.5 MI W OF ILL 97/125 JCT TO OLD COVERED BRIDGE LN | $23,500,000 | Planned | ||
| — | 6-00779-0100 6007790100 | District 6 | IL-125IL-97 | Initial Construction - Pa Bridge (New) 0.5 MI W OF ILL 97/125 JCT TO OLD COVERED BRIDGE LN | $16,500,000 | Planned | ||
| — | 6-00836-0000 6008360000 | District 6 | IL-96 | Preservation - Bridges Bridge Deck Overlay AMBROSIA CREEK 1 MI N OF US 54 | $600,000 | Planned | ||
| — | 6-00848-0000 6008480000 | District 6 | IL-97Jefferson St | Rehabilitation - Bridges Bridge New Deck AT SPRING CREEK 0.1 MI E OF ILL 4 IN SPRINGFIELD | $4,500,000 | Planned | ||
| — | 6-01150-0000 6011500000 | District 6 | IL-96US-136 | Rehabilitation - Pavement Designed Overlay, ADA Improvements US 136: 0.1 MI E OF MAIN ST IN HAMILTON TO 0.1 MI E OF HAMILTON ECL & ILL 96: US 136 TO S OF US 136 IN HAMILTON | $2,700,000 | Planned | ||
| — | 6-01276-0000 6012760000 | District 6 | IL-9IL-94 | Rehabilitation - Pavement Designed Overlay W OF KEOKUK JUNCTION RAILWAY TO W OF TR 244 (2400 E ST) W OF LA HARPE | $2,800,000 | Planned | ||
| — | 6-01285-0000 6012850000 | District 6 | IL-96 | Rehabilitation - Pavement Designed Overlay, Bi-Direct Left Turn Lane, ADA Improvements S OF ALDO BLVD TO 0.1 MI S OF STATE ST IN QUINCY | $4,600,000 | Planned | ||
| — | 6-01285-0100 6012850100 | District 6 | IL-96 | Miscellaneous Improvement Traf Signal Replacement, ADA Improvements AT 24TH & STATE ST, AT 30TH ST & AT STATE & 36TH ST IN QUINCY | $1,400,000 | Planned | ||
| — | 6-01467-0000 6014670000 | District 6 | Great River RdIL-96 | Rehabilitation - Pavement Designed Overlay 0.1 MI N OF CH 24 (CONNABLE RD) 3 MI E OF NAUVOO ECL TO W OF WINCHESTER ST IN NAUVOO | $3,000,000 | Planned | ||
| — | 6-01468-0000 6014680000 | District 6 | Great River RdIL-96 | Rehabilitation - Pavement Designed Overlay SHERIDAN CREEK 0.9 MI S OF NAUVOO TO WAGGONER CREEK 3.7 MI N OF HAMILTON | $5,300,000 | Planned | ||
| — | 6-01516-0000 6015160000 | District 6 | IL-106IL-99 | Reconstruction - Bridges Bridge Replacement ILL 99: DITCH 2 MI & 3.3 MI SW OF VERSAILLES SCL; ILL 106: DITCH 6.2 MI SE OF BARRY ECL | $6,000,000 | Planned | ||
| — | 6-01528-0000 6015280000 | District 6 | IL-99US-24 | Rehabilitation - Pavement Designed Overlay, New Shoulders, ADA Improvements US 24: 0.3 MI W OF BUCKHORN / DAMON RD TO ILL 99 N (CROSS ST) & ILL 99 S (PITTSFIELD RD) TO 0.5 MI E; US 24 / ILL 99: CROSS ST TO PITTSFIELD RD (ALL IN MOUNT STERLING) | $2,700,000 | Planned | ||
| — | 6-01528-0100 6015280100 | District 6 | IL-99 | Rehabilitation - Pavement Standard Overlay, Bi-Direct Left Turn Lane, Curb And Gutter US 24 IN MOUNT STERLING TO 1.6 MI S OF ILL 107 | $4,400,000 | Planned | ||
| — | 6-01528-0400 6015280400 | District 6 | IL-99US-24 | Miscellaneous Improvement Traf Signal Replacement, ADA Improvements AT CROSS ST & PITTSFIELD RD IN MOUNT STERLING | $800,000 | Planned | ||
| — | 6-02017-0000 6020170000 | District 6 | IL-99 | Preservation - Pavements Cape Seal, Fog Seal 1.6 MI S OF ILL 107 TO S OF VERSAILLES NCL | $1,100,000 | Planned | ||
| — | 6-02027-0000 6020270000 | District 6 | IL-96 | Reconstruction - Bridges Culvert Replacement AT LEVEE 0.3 MI SE OF US 54 | $1,300,000 | Planned | ||
| — | 6-02056-0000 6020560000 | District 6 | IL-110IL-336IL-94 | Preservation - Pavements Microsurfacing 1 Pass, Fog Seal 3.1 MI S OF US 136 IN CARTHAGE TO 0.8 MI N OF ILL 94 S JCT | $1,800,000 | Planned | ||
| — | 6-02058-0000 6020580000 | District 6 | IL-96 | Preservation - Pavements Cape Seal, Fog Seal HANCOCK CO LINE TO BEAR CREEK | $900,000 | Planned | ||
| — | 6-02060-0000 6020600000 | District 6 | IL-104IL-99 | Preservation - Pavements Cape Seal, Fog Seal ILL 99: MCGEE DRAINAGE DITCH TO ILL 104; ILL 104: E OF MCKEE CREEK IN CHAMBERSBURG TO 0.6 MI E OF ILL 99 & E OF WASHINGTON ST IN MEREDOSIA TO US 67 | $1,500,000 | Planned | ||
| — | 6-02099-0000 6020990000 | District 6 | IL-94 | Preservation - Pavements Crack & Joint Sealing POWELLTON RD TO 1.1 MI N OF CH 29 (FERRIS RD) N OF CARTHAGE | $100,000 | Planned | ||
| — | 6-60116-0000 6601160000 | District 6 | IL-96 | Rehabilitation - Pavement Designed Overlay 0.1 MI SW OF MEADOW ST IN NIOTA TO 0.1 MI N OF CH 24 (CONNABLE RD) 3 MI E OF NAUVOO ECL | $4,100,000 | Planned | ||
| — | 6-60126-0000 6601260000 | District 6 | IL-96 | Rehabilitation - Pavement Culvert Extension US 24 TO 0.1 MI N OF KOCHS LN IN QUINCY | $7,800,000 | Planned | ||
| — | 6-60129-0000 6601290000 | District 6 | IL-96 | Rehabilitation - Pavement Bridge New Deck, Bridge Widening 0.1 MI S OF STATE ST IN QUINCY TO 0.2 MI E OF 36TH ST S OF QUINCY | $11,000,000 | Planned | ||
| — | 6-60129-0002 6601290002 | District 6 | IL-96 | Rehabilitation - Pavement Utility Adjustment 0.1 MI S OF STATE ST IN QUINCY TO 0.2 MI E OF 36TH ST S OF QUINCY | $400,000 | Planned | ||
| — | 6-60129-1000 6601291000 | District 6 | IL-96 | Rehabilitation - Pavement Culvert Replacement 0.2 MI E OF 36TH ST TO MILL CREEK 0.3 MI S OF I-172 S OF QUINCY | $5,700,000 | Planned | ||
| — | 6-60129-1002 6601291002 | District 6 | IL-96 | Rehabilitation - Pavement Utility Adjustment 0.2 MI E OF 36TH ST TO MILL CREEK 0.3 MI S OF I-172 S OF QUINCY | $300,000 | Planned | ||
| — | 6-73430-0000 6734300000 | District 6 | IL-61IL-94 | Reconstruction - Bridges Bridge Replacement BIG NECK CREEK 0.5 MI N OF ILL 94 | $2,200,000 | Planned | ||
| FY 2025 | 2-12925-0000 2129250000 | District 2 | IL-78IL-92 | Rehabilitation - Pavement Standard Overlay, Cold In-Place Recycling, Cold Milling ILL 78: 0.2 mi N of ILL 92 to N of W 8th St in Prophetstown & ILL 92: ILL 78 to Bureau Co Line | $8,000,000 | Planned | ||
| FY 2025 | 3-00927-0080 3009270080 | District 3 | IL-47IL-54IL-9 | Preservation - Pavements Crack & Joint Sealing ILL 47 in Gibson City to 900E Rd; ILL 115 to Baltimore Dr in Paxton | $200,000 | Planned | ||
| FY 2025 | 4-00015-0100 4000150100 | District 4 | IL-78IL-97US-136 | Preservation - Bridges Bridge Painting, Bridge Repair Illinois River at Havana | $15,000,000 | Planned | ||
| FY 2025 | 4-00025-0500 4000250500 | District 4 | IL-90IL-91 | Rehabilitation - Pavement Designed Overlay ILL 91 (N) in Princeville to ILL 91 (S) N of Dunlap | $5,200,000 | Planned | ||
| FY 2025 | 4-02024-2410 4020242410 | District 4 | IL-78IL-97US-24 | Preservation - Pavements Crack & Joint Sealing US 24: Maple St in Lewistown to Little America; ILL 78/97: US 24 to S of Clark Rd | $250,000 | Planned | ||
| FY 2025 | 4-03617-0000 4036170000 | District 4 | IL-94 | Rehabilitation - Pavement Designed Overlay ILL 116 to 300N | $7,000,000 | Planned | ||
| FY 2025 | 4-07010-0203 4070100203 | District 4 | IL-97US-150 | Rehabilitation - Pavement Designed Overlay US 150: 0.2 mi E of I-74 W ramp to 0.1 mi W of JCT ILL 97 (S); ILL 97: JCT US 150 (W) to S of CH 17 | $2,000,000 | Planned | ||
| FY 2025 | 4-07225-0000 4072250000 | District 4 | IL-90 | Rehabilitation - Pavement Standard Overlay ILL 90/91 JCT (E) to ILL 40 | $2,750,000 | Planned | ||
| FY 2025 | 4-09022-0300 4090220300 | District 4 | IL-98 | Rehabilitation - Pavement Designed Overlay ILL 29 to 0.2 mi E of Parkway Dr | $2,400,000 | Planned | ||
| FY 2025 | 5-52980-0000 5529800000 | District 5 | IL-9 | Reconstruction - Bridges Bridge Replacement At stream 0.4 mi W of 3200 East Rd NW of Arrowsmith | $1,500,000 | Planned | ||
| FY 2025 | 5-53151-0000 5531510000 | District 5 | IL-9 | Rehabilitation - Pavement Designed Overlay Tazewell Co Line to ILL 122 | $7,000,000 | Planned | ||
| FY 2025 | 5-53385-0000 5533850000 | District 5 | IL-9IL-9 BUS-150 | Rehabilitation - Pavement Designed Overlay, ADA Improvements, Curb And Gutter ILL 9: W Mulberry St to Center St; US 150: N Center St to W Locust St in Bloomington | $14,810,000 | Planned | ||
| FY 2025 | 5-53386-0000 5533860000 | District 5 | IL-9 BUS-150 F | Reconstruction - Pavement Reconstruction, ADA Improvements, Curb And Gutter W of Towanda Ave to N Main St in Bloomington | $19,747,000 | Planned | ||
| FY 2025 | 6-02053-0000 6020530000 | District 6 | IL-96 | Preservation - Pavements Crack & Joint Sealing HANCOCK CO LINE TO BEAR CREEK | $90,000 | Planned |
1–100 of 103Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.