| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 24, 2026 | 80C49 | CookDistrict 1 | Milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder (2.66-Mile) Designed Overlay, New shoulders, and curb ramps improvements consists of milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder course, replacing aggregate shoulders with (HMA) shoulders, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, thermoplastic pavement markings, joint and crack filling, joint or crack routing in (PCC Pavement), restriping with modified urethane pavem | — | Executed | K-Five Construction Corporation $4,164,775 · | ||
| Apr 24, 2026 | 80C85 | McHenryDistrict 1 | Pavement removal, earth excavation and placement of embankment, box culvert installation, storm sewer installa (15,400-Ft) Roadway Reconstruction Project consists of pavement removal, earth excavation and placement of embankment, box culvert installation, storm sewer installation, new PCC pavement with concrete curb and gutter, sidewalk and shared use path construction, traffic signals and interconnection installations water main relocation, pavement marking, landscaping, erosion and sediment control. Location in the City of McHenry, Village of Prairie Grove, and unincorporated Nunda Township within McHe | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $49,786,194 · | ||
| Apr 24, 2026 | 80D22 | VariousDistrict 1 | Pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic co The work to be performed and completed under this contract consists of pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic control on a work order basis. This work is located within the right-of-way limits of state-maintained routes located in District One. | — | Executed | Homer Tree Service, Inc. $968,950 · | ||
| Apr 24, 2026 | 85792 | StephensonDistrict 2 | Cold-In-Place Recycling on Orangeville Road from McConnell Road to 0.3 miles east of the west corporate limits of Orangeville. | — | Rejected | W K Construction Company, Inc. $582,004 · | ||
| Apr 24, 2026 | 85793 | LeeDistrict 2 | Resurfacing on Brooklyn Road from US 30 to IL 251. | — | Executed | Martin & Company Excavating $1,489,962 · | ||
| Apr 24, 2026 | 85797 | LeeDistrict 2 | Replace the bridge carrying Indian Head Road over Red Oak Ditch. | — | Executed | Martin & Company Excavating $582,765 · | ||
| Apr 24, 2026 | 85798 | WinnebagoDistrict 2 | Rehabilitation of the Rock River Bridge carring Roscoe Road over the Rock River . Includes; concrete bridge deck replacement, steel girder repairs, bearing replacement at eaach abutment, guardrail, HMA approach and shoulders. | — | Executed | ICC Group Inc. $4,934,200 · | ||
| Apr 24, 2026 | 87893 | GrundyDistrict 3 | Construct a three-span PPC deck beam bridge to carry Rice Road over East Fork Mazon River. Includes HMA approach, patching, guardrail and HMA Shoulders. | — | Executed | D. Construction, Inc. $2,879,699 · | ||
| Apr 24, 2026 | 87899 | KendallDistrict 3 | Reconstruction of Ridge Road to an HMA four-lane from Holt Road to Black Road. Includes; curb and gutter, raised median, driveways, drainage improvements, traffic signals, and a shared-use path. | — | Executed | Austin Tyler Construction, Inc. $32,828,299 · | ||
| Apr 24, 2026 | 87900 | LivingstonDistrict 3 | Resurfacing Kangley Road from the LaSalle County line to IL 17. | — | Executed | Kankakee Valley Construction Company, Inc. $805,843 · | ||
| Apr 24, 2026 | 87907 | GrundyDistrict 3 | Sidewalk construction along East North Street, North Jackson Street, and East Washington Street in Gardner. | — | Executed | D. Construction, Inc. $163,783 · | ||
| Apr 24, 2026 | 87909 | LaSalleDistrict 3 | Sidewalk construction and ADA ramps on various routes near Marseilles Elementary School in Marseilles. | — | Executed | Davis Concrete Construction Co. $274,017 · | ||
| Apr 24, 2026 | 89844 | McDonoughDistrict 4 | Replace the bridge carrying Berlin Road over Camp Creek, 0.4 mile north of Bellingham Road. | — | Executed | County Contractors, Inc. $2,420,262 · | ||
| Apr 24, 2026 | 89871 | HendersonDistrict 4 | Construct a three-span PPC deck beam structure to carry CH 15 over Lone Tree Ditch. Includes; HMA approach, and guardrail. | — | Executed | County Contractors, Inc. $1,814,953 · | ||
| Apr 24, 2026 | 89898 | TazewellDistrict 4 | Resurfacing on Broadway Road from Springfield Road to the I-55 Interchange. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $2,149,810 · | ||
| Apr 24, 2026 | 91652 | VermilionDistrict 5 | Replace the bridge carrying TR 13 over Whiskey Creek Branch located 2 miles southeast of Rankin. | — | Executed | Big O Services, LLC $413,282 · | ||
| Apr 24, 2026 | 93783 | MorganDistrict 6 | HMA resurfacing on South Diamond Street from Greenwood Avenue to Michigan Avenue in South Jacksonville. Includes; curb and gutter, sidewalks, and storm sewer. | — | Executed | K. E. Vas Company $1,699,658 · | ||
| Apr 24, 2026 | 93850 | MontgomeryDistrict 6 | Construct PCC sidewalk with ADA ramps along State Street and Taylor Aveue from the Litchfield Public Library to the Litchfield J.D. Colt School in Litchfield. | — | Executed | KRB Excavating, Inc. $282,586 · | ||
| Apr 24, 2026 | 95A04 | RichlandDistrict 7 | Replace existing aggregate shoulder with HMA shoulder with rumble strips on St. Marie Road from the Jasper County Line to IL 150. | — | Executed | Ambraw Asphalt Materials, Inc. $2,499,037 · | ||
| Apr 24, 2026 | 95A07 | LawrenceDistrict 7 | Construct HMA shoulders with rumble strips, and replace the existing pipe culverts on Chauncey Road from Poland Lane to Trinity Lane. | — | Executed | Ambraw Asphalt Materials, Inc. $1,286,849 · | ||
| Apr 24, 2026 | 95A08 | WayneDistrict 7 | HMA resurfacing on CH 13 from CR 600 N to CR 875 N in Wayne County. Includes; aggregate wedge shoulders and pavement markings. | — | Executed | E. T. Simonds Construction Company $914,921 · | ||
| Apr 24, 2026 | 97865 | St. ClairDistrict 8 | Sidewalk construction on various streets in Millstadt. | — | Executed | Baxmeyer Construction, Inc. $833,138 · | ||
| Apr 24, 2026 | 97887 | St. ClairDistrict 8 | Construction of sidewalks and three curb bump-outs along North County Road and W. Madison Street in Mascoutah. Includes; drainage improvements, pavement markings, and seeding. | — | Executed | KRB Excavating, Inc. $191,388 · | ||
| Apr 24, 2026 | 99761 | WilliamsonDistrict 9 | Reconstruction of South Market Street from Boyton Street to 0.1 mile south of Texas Avenue in Marion. | — | Executed | Samron Midwest Contracting, Inc. $979,828 · | ||
| Apr 24, 2026 | 99764 | PulaskiDistrict 9 | HMA overlay and shoulders on Shawnee College Road from Old US 51 to IL 37. | — | Executed | E. T. Simonds Construction Company $3,887,941 · | ||
| Apr 24, 2026 | 99767 | FranklinDistrict 9 | Resurfacing on North Thompsonville Road from Akin Blacktop to IL 34, north of Thompsonville. | — | Executed | E. T. Simonds Construction Company $1,090,460 · | ||
| Apr 24, 2026 | 99768 | PerryDistrict 9 | Hot-In-PLace recycling, HMA surface, and aggregate shoulders on East Park Street Road from the DuQuoin City limits to the Franklin County line. | — | Executed | E. T. Simonds Construction Company $1,139,387 · | ||
| Jun 12, 2026 | 46678 | VariousDistrict 4 | Installation of pavement marking on various routes in various counties throughout District 4. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $3,083,382 · | ||
| Jun 12, 2026 | 46679 | VariousDistrict 4 | Replaecment of raised reflective pavement markers on various routes in various counties throughout District 4. | — | Executed | Precision Pavement Markings Inc. $1,560,696 · | ||
| Jun 12, 2026 | 46918 | MarshallWoodfordDistrict 4 | Reconstruction of SFWA roads with a Bituminous Surface Treatment_with Fog Seal Surface, the excavation and reconstruction at sinkhole locations in the Woodford State Fish and Wildlife Area (SFWA). Placement of a Bituminous Surface Treatment with Fog Seal Surface on the parking lot and camp road are proposed at the Marshall SFWA. Other necessary work at the two locations is included. 0.9 mile gross length. | — | Executed | Phoenix Corporation of the Quad Cities $923,507 · | ||
| Jun 12, 2026 | 46952 | CookDistrict 1 | Resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs (2.69-Mile) Project consists of resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs. The work includes hot- mix asphalt resurfacing of roadway and parking areas, striping of park roadways and parking lots, bridge construction, pipe culvert replacements, sign replacements, multi-use path improvements, sidewalk and ADA improvements, and other miscellaneous improvement items. Project is in William Powers State Park, located in the City of Chicago in | — | Executed | K-Five Construction Corporation $3,153,771 · | ||
| Jun 12, 2026 | 61L30 | KaneDistrict 1 | Full-depth reclamation and HMA surfacing of Brown Road, Campton Hills Road, Denker Road and Town Hall Road in the village of Campton Hills. | — | Executed | Builders Paving, LLC $2,893,888 · | ||
| Jun 12, 2026 | 61M10 | KaneDistrict 1 | Traffic signal modernization along Indian Trail Road between Ohio Street and Pennsbury Lane in the city of Aurora. | — | Rejected | K-Five Construction Corporation $5,028,975 · | ||
| Jun 12, 2026 | 61M42 | KaneDistrict 1 | Resurfacing Wheeler Road from Esker Drive to IL 47 in the village of Sugar Grove. | — | Executed | D. Construction, Inc. $654,874 · | ||
| Jun 12, 2026 | 61M43 | KaneDistrict 1 | Resurfacing Dugan Road from North Wheeler Road to south of Fays Lane in the village of Sugar Grove. | — | Executed | D. Construction, Inc. $692,262 · | ||
| Jun 12, 2026 | 61M44 | KaneDistrict 1 | Resurfacing 1st Street from IL 72 to Dunning Avenue in the village of West Dundee. | — | Executed | Geske and Sons, Inc. $754,807 · | ||
| Jun 12, 2026 | 61M46 | CookDistrict 1 | HMA resurfacing of Skokie Boulevard from the southern city limits to Lake-Cook Road in the village of Northbrook. | — | Executed | Builders Paving, LLC $2,247,439 · | ||
| Jun 12, 2026 | 61M49 | CookDistrict 1 | Installation of pedestrian lighting along the illinois Prairie Path in the village of Maywood. | — | Executed | Sjostrom & Sons, Inc. $1,709,017 · | ||
| Jun 12, 2026 | 61M51 | CookDistrict 1 | Reconstruction of HMA trail from 109th Street and Lavergne Avenue to Harold L. Richards High School in the village of Oak Lawn. | — | Executed | Martam Construction Incorporated $3,179,237 · | ||
| Jun 12, 2026 | 61M53 | CookDistrict 1 | Resurfacing Lexington Drive from Lake Cook Road to McHenry Road in the village of Wheeling. | — | Executed | Builders Paving, LLC $478,613 · | ||
| Jun 12, 2026 | 62L30 | CookDistrict 1 | (2.95-Mile) Roadway Reconstruction and widening with hot-mix asphalt pavement, resurfacing, multi-cell box culverts, pipe culverts, storm sewer systems, ditch grading, curb and gutter, pavement markings, landscaping, guardrail. Located on Main Street is a two-lane roadway located in the Village of Lemont and unincorporated Cook County. | — | Executed | D. Construction, Inc. $13,940,412 · | ||
| Jun 12, 2026 | 62M71 | KaneKendallDistrict 1 | Earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pave (3.59-Mile) Roadway Reconstruction project on a new shifted alignment consists of earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pavement, hot-mix asphalt binder and surface courses, pavement removal, PCC shoulder, hot-mix asphalt shoulder, combination concrete curb and gutter, concrete median, PCC sidewalk, drainage improvements, sheet pile retaining wall, cast in place box culverts, traffic signal installation, water main relocation, l | — | Executed | D. Construction, Inc. $52,733,996 · | ||
| Jun 12, 2026 | 62R61 | CookDistrict 1 | (710.53-Ft) Bridge Replacement and widening project (SN 016-2015) include pavement resurfacing/reconstruction, curb and gutter replacement, sidewalk replacement (including ADA improvements), various drainage improvements, watermain (including jacking beneath I-290), signing, pavement markings, bridge and underpass lighting, traffic signal modernization, replacement storm manhole The project is in the City of Chicago, Cook County on Laramie Ave. over I-290. | — | Executed | OHLA Central, Inc. $43,537,120 · | ||
| Jun 12, 2026 | 62T46 | CookDistrict 1 | Bridge Joint Replace, bearing and Substructure Repairs (350.89-Ft) Bridge Deck Overlay consists of Bridge Joint Replace, bearing and Substructure Repairs. This improvement is located along 131st Street over Metra Railroad (SN 016-2611) located in Cook County, Illinois. | — | Executed | D. Construction, Inc. $602,552 · | ||
| Jun 12, 2026 | 62U72 | McHenryDistrict 1 | Pavement removal, earth excavation and placement of embankment, precast box culvert installation, bridge repla (8,360-Ft) Roadway add lanes and reconstruction project consists of pavement removal, earth excavation and placement of embankment, precast box culvert installation, bridge replacement, storm sewer installation, construction of new PCC pavement with combination concrete curb and gutter, sidewalk and shared use path construction, traffic signals and interconnection installations, highway lighting replacement, water main and sanitary sewer relocation, placement of pavement marking, landscaping, er | — | Executed | Martam Construction Incorporated $52,825,490 · | ||
| Jun 12, 2026 | 62V08 | CookDuPageKaneDistrict 1 | Ditch regrading, culvert replacement, and various other drainage improvements The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County. | — | Executed | D. Construction, Inc. $1,863,322 · | ||
| Jun 12, 2026 | 62V63 | McHenryDistrict 1 | Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement (0.895-Mile) Project consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. Location is in the City of Algonquin, McHenry County. | — | Executed | SKC Construction, Inc. $184,544 · | ||
| Jun 12, 2026 | 62V77 | LakeDistrict 1 | Routing, cleaning, and sealing of longitudinal cracks in existing HMA (Hot-Mix Asphalt) pavement and between t (9,669-Ft) Crack and Joint Sealing project consists of routing, cleaning, and sealing of longitudinal cracks in existing HMA (Hot-Mix Asphalt) pavement and between the existing HMA pavement and curb and gutter, restriping with Modified Urethane pavement marking lines. The project is located within the Village of Lake Villa and unincorporated Lake Villa Township in Lake County. | — | Executed | Mosley Construction 1, LLC $579,146 · | ||
| Jun 12, 2026 | 62V78 | DuPageKaneDistrict 1 | (1.31-Mile) This is a crack and joint sealant improvement consisting of routing cleaning, and sealing of longitudinal cracks and joints within concrete pavement, concrete patching, grading and shaping shoulders, some guardrail replacement, modified urethane pavement marking. This improvement is located within the City of Geneva and West Chicago in Kane and DuPage Counties. | — | Executed | Mosley Construction 1, LLC $850,529 · | ||
| Jun 12, 2026 | 62W82 | VariousDistrict 1 | This project proposes converting the entire closed loop system into a centralized traffic management system with remote connection capabilities. This project will install new single mode fiber optic cable, network switches, PTZ cameras and ATC controllers among other equipment to allow for remote access and monitoring capabilities at these locations. There are eighty-two (82) signalized intersections proposed on this project located in Cook and DuPage Counties within the Cities of Rolling Meadow | — | Executed | H & H Electric Co. $6,878,841 · | ||
| Jun 12, 2026 | 62W83 | CookDistrict 1 | This project adds 35 traffic signals into the Central Traffic Management System and 2 traffic signals to an existing closed loop system including installing fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and monitoring capabilities at these locations. The Project is in three different areas of Cook County. | — | Executed | H & H Electric Co. $2,052,267 · | ||
| Jun 12, 2026 | 62W91 | CookDistrict 1 | Installing fiber optic cable, network switches, PTZ Cameras and traffic controllers among other equipment to a This project proposes adding 10 traffic signals into the Central Traffic Management System and connecting two existing closed-loop systems together consists of installing fiber optic cable, network switches, PTZ Cameras and traffic controllers among other equipment to allow for remote access and monitoring capabilities. The project is in the Village of Olympia Fields, Village of Franklin Park, City of Northlake and City of Berwyn in Cook County. | — | Rejected | H & H Electric Co. $1,753,960 · | ||
| Jun 12, 2026 | 62W99 | CookDistrict 1 | Furnishing all labor, materials, equipment, and other incidentals necessary for the completion of HMA pavement The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of HMA pavement patching, storm sewer cleaning, bridge deck repairs, superstructure repairs, substructure repairs, lighting. Located in the Elk Grove Township and City of Schaumburg, Cook County, on IL 53/I-290 from south I-90 interchange to IL 72 (Higgins Rd). | — | Executed | K-Five Construction Corporation $25,555,133 · | ||
| Jun 12, 2026 | 62X28 | WillDistrict 1 | Concrete removal, concrete structures, structural repair of concrete, steel reinforcement bars, performed join (1,079.50-Ft) Bridge Joint replace/repair culvert repair, and wing wall and abutment repair project consist of concrete removal, concrete structures, structural repair of concrete, steel reinforcement bars, performed joint seal, and polymer concrete, guardrail removal and replacement, traffic control, erosion control, furnishing and placing topsoil. This project is in the Village of Channahon in Will County, Illinois. | — | Executed | D. Construction, Inc. $248,599 · | ||
| Jun 12, 2026 | 62X37 | WillDistrict 1 | (4.25-Mile) Furnishing and installing landscaping along I-80 corridor from Gardner Street to Gouger Road in the City of Joliet, Joliet Township and the Village of New Lenox within Will County. | — | Executed | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $3,580,280 · | ||
| Jun 12, 2026 | 62X52 | DuPageDistrict 1 | A full depth patching of the top slab over the culvert at the unnamed stream, concrete repair of the north hea The project consists of a full depth patching of the top slab over the culvert at the unnamed stream, concrete repair of the north headwall. Located at culvert (SN# 022-0567) in the City of Darien in DuPage County. | — | Executed | D. Construction, Inc. $266,169 · | ||
| Jun 12, 2026 | 64L94 | HenryDistrict 2 | 0.91 miles of reconstruction on IL 81 from 0.2 miles west of Union St to 0.3 miles west of IL 78 in Kewanee. This includes ADA improvements. | — | Executed | Valley Construction Co. $14,149,820 · | ||
| Jun 12, 2026 | 64N73 | StephensonDistrict 2 | 1.33 miles of pavement patching, cold milling, and HMA resurfacing along with ADA improvements and traffic signal modifications on US Bus 20 from Park Blvd to Clark St in Freeport. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $7,439,990 · | ||
| Jun 12, 2026 | 64S70 | StephensonDistrict 2 | 5.0 miles of pavement patching, cold milling, and HMA resurfacing on IL 26 from the Wisconsin State Line to Brush Creek near Orangeville. | — | Executed | Rock Road Companies, Inc. $3,817,934 · | ||
| Jun 12, 2026 | 64T07 | OgleDistrict 2 | Bridge repairs and joint replacement on SN 071-0036, carrying IL 72 over drainage, 4.1 miles east of IL 26 and SN 071-0037, carrying IL 72 over drainage, 7.9 miles east of IL 26. | — | Executed | Martin & Company Excavating $747,738 · | ||
| Jun 12, 2026 | 64T46 | WhitesideDistrict 2 | Bridge repairs, deck overlay and joint replacement on SN 098-0103, carrying IL 78 over Coon Creek, 1.8 miles south of Prophetstown. | — | Executed | Martin & Company Excavating $353,100 · | ||
| Jun 12, 2026 | 64T47 | OgleDistrict 2 | Bridge repairs, deck overlay and joint replacement on SN 071-0078, carrying IL 64 over Pine Creek, 4.1 miles east of IL 26. | — | Executed | Martin & Company Excavating $618,490 · | ||
| Jun 12, 2026 | 64T58 | StephensonDistrict 2 | Bridge repairs and joint replacement on SN 089-0038, carrying IL 75 over Pecatonica River in Freeport. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $784,183 · | ||
| Jun 12, 2026 | 64U86 | WinnebagoDistrict 2 | 1.5 miles of pavement patching along Alpine Rd. between Riverside Blvd and Spring Creek Rd. | — | Executed | Alliance Contractors, Inc. $727,514 · | ||
| Jun 12, 2026 | 64V25 | WinnebagoDistrict 2 | Resurfacing US 20 ramp intersection returns at Montague Rd. and Meridian Rd. | — | Executed | Martin & Company Excavating $241,756 · | ||
| Jun 12, 2026 | 64V31 | VariousDistrict 2 | Intersection safety improvements at US 52/IL 64 and IL 78 in Carroll County, US 52 and Freeport Rd. and IL 72 and River Rd. in Ogle County, IL 70 and Meridian Rd. and IL 75 and Meridian Rd. in Winnebago County, and IL 251 and Chicago/Shaw Rd. in Lee County. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $349,356 · | ||
| Jun 12, 2026 | 64V39 | StephensonDistrict 2 | 1.41 miles of patching and standard overlay on South St from Locust Ave to Galena Ave in Freeport. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,734,393 · | ||
| Jun 12, 2026 | 64V40 | Rock IslandDistrict 2 | Shoulder resurfacing and reconstruction, drainage, erosion control, ditch grading, interim lighting and ITS work at the IL 5/I-74 interchange. Work along I-74 begins approximately 0.6 miles north of IL 5 and ends approximately 0.4 miles south of IL 5. The work along IL 5 begins at 16th St and ends approximately 0.3 miles east of I-74. the gross length of the project is 10,559 ft. | — | Executed | Valley Construction Co. $8,996,139 · | ||
| Jun 12, 2026 | 64V42 | WhitesideDistrict 2 | 0.76 miles of patching, cold milling, and standard overlay on WB IL 2 East 4th St to IL 40 in Sterling. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,381,280 · | ||
| Jun 12, 2026 | 66A91 | LaSalleDistrict 3 | Pavement resurfacing on the I-80 and I-39 interchange entrance/exit ramps with minor rehabilitation and repair work at select structures, improvements to existing pipe and box culverts, slope and ditch grading, upgrading guardrails, impact attenuators, high tension cable barriers, and superelevation on FAI 80(I-80) from 0.1 miles east of IL-351 to 0.3 miles west of IL-178. Approximately 4.13 miles gross length. | — | Executed | Advanced Asphalt Company $19,753,741 · | ||
| Jun 12, 2026 | 66C06 | GrundyDistrict 3 | Milling and resurfacing 3 3/4 inches (designed overlay), class D patching, pipe culvert end section_replacements and cleaning, detector loop replacement, pavement marking, and raised reflective pavement markers on US 6 beginning at IL 47 in Morris, and ends 0.7 miles west of Nigas Road._Approximately 6.81 miles gross length. | — | Executed | D. Construction, Inc. $4,185,244 · | ||
| Jun 12, 2026 | 66K39 | FordDistrict 3 | Improvements to a dual structure (SN 027-0052 and 027-0053) which carries Interstate 57 (I-57) over Big Four Ditch about 2.4 miles south of IL 9 in Ford County. | — | Executed | Stark Excavating, Inc. $19,725,609 · | ||
| Jun 12, 2026 | 66M84 | LaSalleDistrict 3 | Removal of the existing box culvert (SN 050-2546) and replacement with 2-42" EQRS 42" culverts on US 34 over Mendota Creek Tributary, approximately 4.1 miles west of I-39 in Mendota in LaSalle County. Approximately 259 feet gross length. | — | Executed | D. Construction, Inc. $443,941 · | ||
| Jun 12, 2026 | 66M92 | LivingstonDistrict 3 | Culvert replacements (SN 053-2588 and -2589) over an Indian Creek Tributary 1 miles north of Ford County Line and 0.2 mile north of N200N Rd in Strawn. | — | Executed | Iroquois Paving Corporation $705,367 · | ||
| Jun 12, 2026 | 66N45 | BureauDistrict 3 | Superstructure replacement (SN 006-0112) at CH 8 (Overhead), 2 miles north of US 6 on I-80. | — | Executed | D. Construction, Inc. $2,414,143 · | ||
| Jun 12, 2026 | 66T09 | IroquoisDistrict 3 | Various sizes of Class B pavement patching pavement striping and aggregate wedge shoulders at the Sheldon Weight Station approximately 1.9 miles east of US Route 52 (N) in Sheldon, Iroquois County. | — | Executed | Iroquois Paving Corporation $388,737 · | ||
| Jun 12, 2026 | 66T10 | LaSalleDistrict 3 | Removal and replacement of the fabric reinforced elastomeric troughs and associated hardware at Structure No. 050-0219 carrying F.A.S. Route 268A (CH 15) over the Illinois River approximately 0.4 mile south of US 6 (Marseilles) in LaSalle County. | — | Executed | Riber Construction, Inc. $236,720 · | ||
| Jun 12, 2026 | 66T11 | LaSalleDistrict 3 | Washing all components of Structure No. 050-0079 carrying F.A.P. Route 46 (IL 251) over the Illinois River and CSX Railroad approximately 0.1 mile south of US 6 (Peru) in LaSalle County. This includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and elastomeric troughs. | — | Executed | All States Painting, Inc. $58,232 · | ||
| Jun 12, 2026 | 66T12 | GrundyDistrict 3 | Washing all components of the structure which includes all structural steel (beams, girders, diaphragms, beari Project is located at Structure No. 032-0099 carrying F.A.P. Route 326 (IL 47) over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 (Morris) in Grundy County. This work consists of washing all components of the structure which includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and el | — | Executed | All States Painting, Inc. $57,414 · | ||
| Jun 12, 2026 | 66T29 | FordDistrict 3 | Class B pavement patching of mainline pavement This project is located on F.A.P. Route 681 (IL 116), Section (115, 116)PP, beginning at Iroquois County Line to Livingston County Line. This project consists of Class B pavement patching of mainline pavement. 6.0 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $372,960 · | ||
| Jun 12, 2026 | 66T32 | LivingstonDistrict 3 | Herbicide, seeding, landscaping, and maintenance for this pollinator project located along FAI 55 (I-55) at the Limestone Rest Area sites south of Pontiac, IL. | — | Executed | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $764,070 · | ||
| Jun 12, 2026 | 66T36 | VariousDistrict 3 | One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. Funded by MCHD funds, Contract Maintenance funds, and Maintenance of HTC Median Barrier funds. | — | Executed | Kujo, Inc. $2,101,221 · | ||
| Jun 12, 2026 | 66T39 | LaSalleDistrict 3 | Pavement patching and joint repair along I-39 at the following interchanges in LaSalle County: Tonica (SB only), IL 71, IL 251, Oglesby, I-80, and US 34. 3.06 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $2,815,825 · | ||
| Jun 12, 2026 | 66T40 | VariousDistrict 3 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated within the right-of-way of the Interstate Routes, including, but not limited to, medians; inside and outside areas adjacent to exit and entrance ramps at various interchanges; interchange gore areas between mainline and ramps; and inside and outside of on/off ramps at rest areas within District 3 on interstates I-180, I-39, | — | Executed | The Final Connection, Inc. $153,733 · | ||
| Jun 12, 2026 | 66T41 | GrundyLivingstonDistrict 3 | Litter picking on interstate I-55, throughout Livingston and Grundy Counties in District 3. | — | Executed | The Final Connection, Inc. $49,729 · | ||
| Jun 12, 2026 | 66T42 | FordIroquoisKankakeeDistrict 3 | Litter picking_on interstate I-57, throughout Ford, Iroquois, and Kankakee Counties. | — | Executed | The Final Connection, Inc. $75,170 · | ||
| Jun 12, 2026 | 66T45 | LaSalleDistrict 3 | Class B patching at the concrete section of FAP 603 (US 52) over I-39, beginning 0.47 miles west of I-39 (Station 191+44) and ending 0.35 miles east of I-39 (Station 234+23), and also includes the entrance and exit ramps at the interchange in LaSalle County. 4,500 feet gross length. | — | Executed | G. M. Sipes Construction, Inc. $639,792 · | ||
| Jun 12, 2026 | 66T60 | VariousDistrict 3 | Removal and proper disposal of medium (6-15 inch diameter) and large (greater than 15 inch diameter) trees, tree trimming, clearing of undesirable bushes, and the maintenance of old growth oak trees along state-maintained routes of Bureau, La Salle, Livingston, and Grundy counties. Work will be limited to occur between October 1, 2026 and March 31st, 2027 due to Threatened and Endangered Species (TandE). | — | Executed | Homer Tree Service, Inc. $769,735 · | ||
| Jun 12, 2026 | 68C93 | PeoriaDistrict 4 | Resurfacing IL 6 from north of IL 29 to IL 40 (Knoxville Ave) in Peoria in Peoria County. 2.94 miles gross length. | — | Executed | Advanced Asphalt Company $10,996,119 · | ||
| Jun 12, 2026 | 68J15 | TazewellDistrict 4 | Bridge deck overlay, joint replacement/repairs and bridge approach roadway improvements at S.N. 090-0124 carrying WB BUS 24 over US 24 near_Washington and resurface BUS 24 from US 24 to IL 8 in Tazewell County. 1.430 miles gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,373,982 · | ||
| Jun 12, 2026 | 68J31 | TazewellDistrict 4 | Resurface IL 98 from IL 29 to 0.2 mile East of Parkway Drive in Tazewell County. 1.3551 miles gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,191,255 · | ||
| Jun 12, 2026 | 68J50 | WarrenDistrict 4 | Resurfacing 20th St from US 34 to North St in Kirkwood and on North St from 20th St to US 34 in Kirkwood in Warren County. 1.823 gross miles. | — | Executed | Brandt Construction Co. $1,613,831 · | ||
| Jun 12, 2026 | 68J56 | PeoriaDistrict 4 | Resurface IL 116 (W. Harmon Highway, W. Lincoln Ave.) from Kickapoo Creek to Griswold St. in Peoria. 1.00 mile gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $2,771,058 · | ||
| Jun 12, 2026 | 68J59 | TazewellDistrict 4 | Resurfacing McMullen Rd and IL 122 from west of I-155 to 2.1 miles east of Hopedale, including cold-in-place recycling in Tazewell County. 5.086 miles gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $9,263,926 · | ||
| Jun 12, 2026 | 68J61 | KnoxDistrict 4 | 6.17 miles patching and resurfacing of I-74 from 0.3 miles west of E Main Street in Galesburg to east of the IL 97 interchange; 0.40 miles of patching and resurfacing of E Main Street from 0.2 miles east of Michigan Avenue to_0.1 mile east of Soangetaha Road; and 1.19 miles of patching and resurfacing of US 150/IL 97 from 0.2 miles_east of I-74 westbound ramps to 0.1 miles west of Junction IL 97 south on IL 97. | — | Rejected | |||
| Jun 12, 2026 | 68J70 | WoodfordDistrict 4 | 9 miles of patching, CIR, resurfacing, guardrail replacedment, and ADA ramps on IL 117 from south of Raymond St to the US 150 intersection and on US 150 from west of the IL 117 intersection to the McLean County Line. | — | Executed | Advanced Asphalt Company $8,498,702 · | ||
| Jun 12, 2026 | 68J72 | MarshallDistrict 4 | Resurfacing IL 89 from the Putnam County line to IL 17, South of Varna in Marshall County. 5.527 miles gross length. | — | Executed | Advanced Asphalt Company $5,423,600 · | ||
| Jun 12, 2026 | 68K14 | HendersonDistrict 4 | Resurfacing IL 94 from IL 116 to 300N in Henderson County. 5.737 miles gross length. | — | Rejected | |||
| Jun 12, 2026 | 68K18 | TazewellDistrict 4 | Resurfacing US 24/IL 29 (Main St) from north of Wesley Rd to south of Poplar St in Creve Coeur in Tazewell County. 1.31 miles gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,147,460 · | ||
| Jun 12, 2026 | 68K19 | McDonoughDistrict 4 | Resurfacing US 136 from 0.1 miles westof TR 226 to 0.1 miles west of CH 18, west of Macomb in McDonough County. 1.276 gross miles. | — | Executed | Gunther Construction, a div of UCM, Inc. $4,415,604 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.