FAU 1593 22 BJ
- Let date
- Friday, June 12, 2026
- Contract
- 62T46 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- (350.89-Ft) Bridge Deck Overlay consists of Bridge Joint Replace, bearing and Substructure Repairs. This improvement is located along 131st Street over Metra Railroad (SN 016-2611) located in Cook County, Illinois.
- Classification
- Bridge Joint Replace, bearing and Substructure Repairs ·
- Project number
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $602,552 | ||
| 2 | Martam Construction Incorporated | $639,954 | +6.2% | |
| 3 | Lorig Construction Company | $659,524 | +9.5% | |
| 4 | MYS, Incorporated | $672,946 | +11.7% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 Martam Construc… | #3 Lorig Construct… | #4 MYS, Incorporat… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0325748 | ACRYLIC COATING | 15 | SQ YD | $330.00 | $360.00 | $350.00 | $111.02 | |
| 2 | X0325749 | FIBER WRAP | 111 | SQ FT | $165.00 | $165.00 | $200.00 | $277.55 | |
| 3 | X0326766 | CLEAN RESEAL RLF JNT | 102 | FOOT | $45.00 | $54.00 | $1.00 | $83.27 | |
| 4 | X2010516 | SELECTIVE CLEARING | 7 | UNIT | $984.50 | $1,100.00 | $900.00 | $993.64 | |
| 5 | X5030250 | BR DECK GROOVING LONG | 462 | SQ YD | $20.85 | $9.00 | $10.00 | $20.26 | |
| 6 | X5030539 | FLOOR DRAINS CLEANED | 8 | EACH | $500.00 | $400.00 | $450.00 | $166.53 | |
| 7 | X5060700 | CLEAN/PAINT BEARINGS | 12 | EACH | $3,633.30 | $3,000.00 | $3,000.00 | $3,667.01 | |
| 8 | X6700407 | ENGRS FLD OFC TY A D1 | 3 | CAL MO | $5,000.00 | $3,600.00 | $5,000.00 | $3,223.98 | |
| 9 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $37,425.00 | $53,800.00 | $115,000.00 | $8,326.55 | |
| 10 | X7200061 | TEMP INFO SIGNING | 51.4 | SQ FT | $30.00 | $28.00 | $22.00 | $27.76 | |
| 11 | X8900104 | TEMP TR SIGNAL TIMING | 9 | EACH | $440.00 | $500.00 | $400.00 | $444.08 | |
| 12 | Z0001800 | APPR SLAB REPAIR (PD) | 1 | SQ YD | $2,500.00 | $2,800.00 | $2,500.00 | $4,217.84 | |
| 13 | Z0029090 | DIAMOND GRIND BR SEC | 715 | SQ YD | $15.05 | $9.00 | $9.50 | $15.54 | |
| 14 | Z0043800 | P P CONC I-BM REPAIR | 10 | SQ FT | $1,000.00 | $500.00 | $500.00 | $333.06 | |
| 15 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $6,396.50 | $6,000.00 | $5,000.00 | $6,661.24 | |
| 16 | 28000400 | PERIMETER EROS BAR | 225 | FOOT | $9.90 | $12.00 | $10.00 | $9.99 | |
| 17 | 28000500 | INLET & PIPE PROTECT | 8 | EACH | $350.00 | $150.00 | $350.00 | $166.53 | |
| 18 | 40600290 | BIT MATLS TACK CT | 348 | POUND | $0.0100 | $0.1000 | $0.1000 | $5.27 | |
| 19 | 40600370 | LONG JOINT SEALANT | 335 | FOOT | $32.29 | $35.00 | $35.00 | $26.36 | |
| 20 | 40600982 | HMA SURF REM BUTT JT | 237 | SQ YD | $0.0100 | $1.00 | $1.00 | $29.98 | |
| 21 | 40604062 | HMA SC IL-9.5 D N70 | 75 | TON | $150.00 | $550.00 | $500.00 | $405.23 | |
| 22 | 45000110 | RELIEF JOINT 2 | 102 | FOOT | $100.00 | $122.00 | $62.00 | $94.37 | |
| 23 | 48102100 | AGG WEDGE SHLD TYPE B | 1 | TON | $1,000.00 | $325.00 | $400.00 | $1,235.23 | |
| 24 | 50102400 | CONC REM | 10.1 | CU YD | $2,500.00 | $2,800.00 | $3,700.00 | $2,825.46 | |
| 25 | 50157300 | PROTECTIVE SHIELD | 327 | SQ YD | $100.00 | $30.00 | $2.00 | $139.48 | |
| 26 | 50300255 | CONC SUP-STR | 11.1 | CU YD | $3,000.00 | $3,200.00 | $3,700.00 | $4,308.98 | |
| 27 | 50300300 | PROTECTIVE COAT | 932 | SQ YD | $1.00 | $1.00 | $3.00 | $2.74 | |
| 28 | 50800205 | REINF BARS, EPOXY CTD | 1,660 | POUND | $4.00 | $5.00 | $5.00 | $6.88 | |
| 29 | 52000110 | PREF JT STRIP SEAL | 106 | FOOT | $275.00 | $315.00 | $330.00 | $272.01 | |
| 30 | 53016002 | DECK SLAB REP (FD-T2) | 24 | SQ YD | $1,500.00 | $3,200.00 | $550.00 | $749.39 | |
| 31 | 53101002 | BR DECK SCAR 3/4 | 770 | SQ YD | $65.00 | $44.00 | $60.00 | $60.70 | |
| 32 | 53101410 | BR DK LTX C OLY 2 3/4 | 770 | SQ YD | $135.00 | $118.00 | $140.00 | $177.33 | |
| 33 | 53212754 | STR REP CON DP = < 5 | 15 | SQ FT | $300.00 | $500.00 | $650.00 | $721.63 | |
| 34 | 58700300 | CONCRETE SEALER | 1,036 | SQ FT | $3.00 | $4.00 | $3.50 | $2.99 | |
| 35 | 59000200 | EPOXY CRACK INJECTION | 156 | FOOT | $70.00 | $70.00 | $72.00 | $138.78 | |
| 36 | 67100100 | MOBILIZATION | 1 | L SUM | $35,500.00 | $38,000.00 | $35,000.00 | $36,815.03 | |
| 37 | 70102621 | TR CONT & PROT 701501 | 2 | EACH | $0.0100 | $4,000.00 | $1,250.00 | $3,691.44 | |
| 38 | 78009004 | MOD URETH PM LINE 4 | 1,376 | FOOT | $4.62 | $4.60 | $4.50 | $4.66 | |
| 39 | 78009012 | MOD URETH PM LINE 12 | 20 | FOOT | $24.20 | $25.00 | $30.00 | $24.42 | |
| 40 | 78100100 | RAISED REFL PAVT MKR | 6 | EACH | $715.00 | $700.00 | $625.00 | $721.63 | |
| 41 | 78300200 | RAISED REF PVT MK REM | 6 | EACH | $20.00 | $30.00 | $30.00 | $55.51 | |
| 42 | 78300201 | PVT MKG REM GRINDING | 479 | SQ FT | $3.00 | $3.00 | $2.00 | $3.33 |