| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 13, 2025 | 78A39 | GallatinWhiteDistrict 9 | Intersection reconstruction at the intersection of IL 1 and IL 141 near Omaha. | — | Executed | Samron Midwest Contracting, Inc. $1,697,173 · | ||
| Jun 13, 2025 | 78A72 | JeffersonDistrict 9 | 9.2 miles of patching and resurfacing on IL 15 from the Washington County line to 0.4 miles west of the Mt. Vernon west city limits. | — | Executed | E. T. Simonds Construction Company $2,283,905 · | ||
| Jun 13, 2025 | 78A78 | JacksonUnionDistrict 9 | Joint reconstruction with strip seal and modular seal on SN 039-0048 carrying IL3 over a railroad in Jackson County and joint reconstruction with strip seals on SN 091-0031carrying IL3 over the Big Muddy River in Union County. | — | Executed | E. T. Simonds Construction Company $968,450 · | ||
| Jun 13, 2025 | 78A92 | UnionDistrict 9 | Earth and furnished excavation and placement of stone riprap to repair existing slopes along Old US 51, 0.7 miles northwest of Coben. | — | Executed | Samron Midwest Contracting, Inc. $92,263 · | ||
| Jun 13, 2025 | 78A96 | JohnsonDistrict 9 | Bridge joint repair on SN 044-0033 carrying Eagle Point Road over I-24. | — | Executed | C-Hill Civil Contractors, Inc. $108,746 · | ||
| Jun 13, 2025 | 78A97 | JacksonDistrict 9 | Aggregate shoulders, earth and furnished excavation, stone riprap, pipe underdrains and erosion control blanket to repair existing slopes along IL 149 at SN 039-7036, 0.4 miles west of the Williamson County line west of Hurst. | — | Executed | Sierra Bravo Contractors, LLC $170,723 · | ||
| Jun 13, 2025 | 78B03 | JacksonDistrict 9 | Replacing 615' of pavement and shoulders on westbound IL 13 at Watson Road. | — | Executed | Samron Midwest Contracting, Inc. $1,041,511 · | ||
| Jun 13, 2025 | 78B04 | JacksonDistrict 9 | Patching on US 51 in Carbondale from Willow Street to Grand Avenue and on Mill Street from South Normal Avenue to South Illinois Avenue. | — | Executed | E. T. Simonds Construction Company $543,043 · | ||
| Jun 13, 2025 | 78B05 | JacksonDistrict 9 | Signal grounding at multiple locations on IL 149 and IL 13 in Murphysboro and Carbondale. | — | Executed | Gerstner Electric, Inc. $116,085 · | ||
| Jun 13, 2025 | 78B06 | SalineDistrict 9 | Signal replacement at the intersection of US 45 and Poplar Street in Harrisburg. | — | Executed | Brown Electric, Inc. $493,996 · | ||
| Jun 13, 2025 | 78B13 | WhiteDistrict 9 | 12.3 miles of resurfacing on US 45 from IL 14 to the Wayne County line as well as ADA upgrades in Enfield and Mill Shoals. | — | Executed | Howell Paving, Inc. $7,158,886 · | ||
| Jun 13, 2025 | 78B21 | PulaskiUnionDistrict 9 | 9.3 miles of tree removal on I-57 from the IL 146 interchange to the Perks Road overpass. | — | Executed | Sierra Bravo Contractors, LLC $880,649 · | ||
| Jun 13, 2025 | 78B22 | JacksonDistrict 9 | 0.85 miles of overlay and pavement patching on Airport Road from IL 13 to 1 mile north of IL 13, northwest of Carbondale. | — | Executed | E. T. Simonds Construction Company $297,405 · | ||
| Jun 13, 2025 | 78B31 | WilliamsonDistrict 9 | 1.1miles of pavement patching and resurfacing on IL 37 from 0.1 miles north of 18th Street to south of 4th Street in Johnston City. | — | Executed | E. T. Simonds Construction Company $685,210 · | ||
| Jun 13, 2025 | 78B32 | AlexanderDistrict 9 | 3.25 miles of pavement patching and partial structure removal on US 51 beginning 0.29 miles south of New Cross Street and proceeding south for 3.25 miles. | — | Executed | E. T. Simonds Construction Company $832,728 · | ||
| Jun 13, 2025 | 78B40 | VariousDistrict 9 | Electrical repair and/or maintenance on various routes throughout District 9. | — | Active | F. W. Electric, Inc. $230,826 · | ||
| Jun 13, 2025 | 87855 | BureauDistrict 3 | HMA resurfacing with aggregate shoulders on CH 24 from US 34 to CH 9. | — | Executed | Advanced Asphalt Company $2,426,250 · | ||
| Jun 13, 2025 | 87858 | IroquoisDistrict 3 | HMA Resurfacing with aggregate shoulders on CH 4 from the west village limits of Clifton to CH 24. | — | Executed | Iroquois Paving Corporation $1,783,862 · | ||
| Jun 13, 2025 | 87860 | KankakeeDistrict 3 | Resurfacing CH 41 from the Will County line to South Street. | — | Executed | Kankakee Valley Construction Company, Inc. $580,188 · | ||
| Jun 13, 2025 | 87863 | DeKalbDistrict 3 | Asphalt resurfacing of Barber Green Road, and four (4) multi-use trails at various locations in DeKalb County. Includes aggregate shoulders and PCC sidewalk. | — | Executed | Curran Contracting Company $868,058 · | ||
| Jun 13, 2025 | 87874 | KankakeeDistrict 3 | Streetscaping improvements at various locations in Grank Park. | — | Executed | M & J Underground Inc. $2,806,802 · | ||
| Jun 13, 2025 | 87882 | LaSalleDistrict 3 | Construction of a single-span PPC deck beam bridge to carry River Road over a drainage ditch, 0.7 miles west of IL 170 in Seneca. | — | Executed | D. Construction, Inc. $535,667 · | ||
| Jun 13, 2025 | 87883 | KankakeeDistrict 3 | Construction of shared-use paths at various location in Bradley. | — | Executed | M & J Underground Inc. $327,924 · | ||
| Jun 13, 2025 | 87884 | LivingstonDistrict 3 | Sidewalk construction at various locations in Dwight. | — | Rejected | D. Construction, Inc. $230,453 · | ||
| Jun 13, 2025 | 87885 | DeKalbDistrict 3 | HMA resurfacing with 3' HMA safety shoulds on Somonauk Road from Chicago Road to US 30. | — | Executed | Curran Contracting Company $881,892 · | ||
| Jun 13, 2025 | 89806 | KnoxDistrict 4 | Cold-in-place recycling and HMA surfacing on CH 25 and CH 26 from the south corporate limits of Galesburg to CH 26. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,710,475 · | ||
| Jun 13, 2025 | 89859 | TazewellDistrict 4 | Pavement reconstruction, sidewalk replacement, curb and gutter replacement, storm sewer, traffic signals and lighting on Court Street from 8th Street to 10th Street in Pekin. | — | Executed | William Charles Construction Company, LLC $4,930,196 · | ||
| Jun 13, 2025 | 89866 | KnoxDistrict 4 | Construction of PCC Sidewalk with ADA Ramps along East Fifer Street from Willard Street to Morton Avenue in Galesburg. | — | Executed | Illinois Civil Contractors, Inc. $302,246 · | ||
| Jun 13, 2025 | 89869 | PeoriaDistrict 4 | Resurfacing on Cloverdale Road from west of White Clover Drive to IL 29 in Chillicothe. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $405,578 · | ||
| Jun 13, 2025 | 91631 | EdgarDistrict 5 | Construction of a three-span steel beam structure with concrete deck to carry CH 16 over Flemington Tributary in Edgar County. Includes HMA approach pavement and traffic barrier terminals. | — | Executed | Big O Services, LLC $1,648,370 · | ||
| Jun 13, 2025 | 91657 | DeWittDistrict 5 | Guardrail improvements at various locations in DeWitt County | — | Executed | Lovewell Fencing, Inc. $1,235,769 · | ||
| Jun 13, 2025 | 91756 | McLeanDistrict 5 | Roadway reconstruction and new multi-use path on West College Avenue from West of the Norfolk Southern Railroad to White Oak Street in Normal. | — | Executed | Rowe Construction, a div of UCM, Inc. $1,506,116 · | ||
| Jun 13, 2025 | 93828 | MacoupinDistrict 6 | Replace the bridge carrying CH 34 over Solomon Creet, 0.3 mile east of Bethal Road | — | Executed | C-Hill Civil Contractors, Inc. $1,520,000 · | ||
| Jun 13, 2025 | 93831 | ChristianDistrict 6 | Sidewalk replacement at various locations in Taylorville. Includes HMA resurfacing, driveway replacement, drainage improvements, ADA improvements, and Seeding. | — | Executed | Earth Worx Solutions LLC $700,361 · | ||
| Jun 13, 2025 | 93832 | SangamonDistrict 6 | Sidewalk replacement at various locations in Auburn. | — | Executed | Otto Baum Company, Inc. $223,575 · | ||
| Jun 13, 2025 | 93836 | HancockDistrict 6 | Construct a single-span PPC IL36N-Beam Bridge to carry CH 3 over Deer Creek, 0.6 mile north of Burnside. | — | Executed | County Contractors, Inc. $1,156,235 · | ||
| Jun 13, 2025 | 93837 | ChristianDistrict 6 | Resurfacing East 6 Street from Spruce Street to Minnesota Street in Pana. | — | Executed | P. H. Broughton & Sons, Inc. $235,358 · | ||
| Jun 13, 2025 | 97771 | St. ClairDistrict 8 | Patching of failed concrete pavement joints along Old Collinsville Road from Lebanon Avenue to Ashland Avenue in St. Clair County. Includes raised reflective pavement markers. | — | Executed | Kinney Contractors, Inc. $691,627 · | ||
| Jun 13, 2025 | 97834 | St. ClairDistrict 8 | Resurfacing on West Washington Street from Centreville Avenue to South Illinois Street in Belleville. | — | Executed | Stutz Excavating, Inc. $531,515 · | ||
| Jun 13, 2025 | 97848 | St. ClairDistrict 8 | Pavement widening on Maple Street from Main Street to Shiloh Heights Drive, and the construction of a right-turn lane from Maple Street onto northbound Main Street in Shiloh. | — | Executed | Stutz Excavating, Inc. $1,468,668 · | ||
| Jun 13, 2025 | 97859 | St. ClairDistrict 8 | Resurfacing Martin Luther King Drive from Collinsville Avenue to 8th Street in East St. Louis. | — | Executed | Keeley & Sons, Inc. $1,352,831 · | ||
| Jun 13, 2025 | 97860 | St. ClairDistrict 8 | Reconstruct the northwest corner of IL 3 at Monsanto Avenue, and resurface Monsanto Avenue from IL 3 east for 0.04 miles in Sauget. | — | Active | Hank's Excavating & Landscaping, Inc. $607,366 · | ||
| Jun 13, 2025 | 97864 | MonroeDistrict 8 | HMA resurfacing on CH 12 from Meyer Avenue in Valmeyer to Bluff Road North. | — | Executed | Christ Bros. Asphalt, Inc. $823,576 · | ||
| Jun 13, 2025 | 97870 | MadisonDistrict 8 | Construction of an HMA multi-use path on a lime-modified subgrade adjacent to US 40 from South Main Street to Creekside Drive in Troy. | — | Executed | Stutz Excavating, Inc. $683,304 · | ||
| Jun 13, 2025 | 99747 | FranklinDistrict 9 | Construction of stamped Concrete Sidewalk, street lighting system, Curb and gutter on IL 149 in West Frankfort. | — | Rejected | |||
| Jun 13, 2025 | 99750 | SalineDistrict 9 | Construction of a Roundabout at Small Street and Veterans Drive in Harrisburg. Includes PCC pavement, sidewalks, drainage, signing and lighting. | — | Executed | E. T. Simonds Construction Company $1,463,163 · | ||
| Jun 13, 2025 | 99751 | AlexanderDistrict 9 | Resurfacing on Ullin Road from IL 127 to the Pulaski County line. | — | Executed | E. T. Simonds Construction Company $742,951 · | ||
| Jun 13, 2025 | 99752 | PerryDistrict 9 | Replace the bridge carrying White Walnut Road over White Walnut Creek, 1.7 miles north of IL 154. | — | Executed | C-Hill Civil Contractors, Inc. $455,888 · | ||
| Jun 13, 2025 | 99753 | GallatinDistrict 9 | Resurfacing on Pounds Hallow Road from IL 1 to the Hardin County Line. | — | Executed | Samron Midwest Contracting, Inc. $741,652 · | ||
| Jun 13, 2025 | 99754 | PopeDistrict 9 | HMA overlay with aggregate shoulds on Bay City Road from west of Climer Road to Jones Orchard Road. | — | Executed | E. T. Simonds Construction Company $966,973 · | ||
| Jun 13, 2025 | 99756 | WilliamsonDistrict 9 | HMA Overlay with Aggregate Wedge Shoulders on Power Plant Road from County Club Road to McKinny Chapel Road. | — | Executed | E. T. Simonds Construction Company $660,852 · | ||
| Aug 1, 2025 | 61K77 | DuPageDistrict 1 | Construct a shared-use path along Elizabeth Drive from Forest Preserve Drive to Wood Dale Road, and Wood Dale from Murray Drive to Elizabeth Drive in Wood Dale. | — | Executed | R. W. Dunteman Company $553,433 · | ||
| Aug 1, 2025 | 61L37 | CookDistrict 1 | Reconstruction of McConnor Parkway from Meacham Road to Roosevelet Boulevard in Schaumburg. Includes HMA Roadway, Curb and Gutter, Sidewalks, Multi-Use Path, ADA Improvements, Drainage Improvements, Traffice Signal Modernization, and Lighting. | — | Executed | Plote Construction, Inc. $5,761,086 · | ||
| Aug 1, 2025 | 61L38 | CookDistrict 1 | Reconstruction of McConnor Parkway from Roosevelet Boulevard to Gold Road in Schaumburg. Includes HMA Roadway, Curb and Gutter, Sidewalks, Multi-Use Path, ADA Improvements, Drainage Improvements, Traffice Signal Modernization, and Lighting. | — | Executed | Plote Construction, Inc. $6,017,267 · | ||
| Aug 1, 2025 | 61L45 | DuPageDistrict 1 | Scarification of existing PCC pavement, and HMA resurfacing on Western Frontage Road from IL 83 to Oakleaf Drive in Addison Township. | — | Executed | R. W. Dunteman Company $495,500 · | ||
| Aug 1, 2025 | 61L46 | DuPageDistrict 1 | Construct Multi-Use Paths along various routes in Hanover Park. Includes; PCC Sidewalk, and steel plate beam guardrail. | — | Executed | A Lamp Concrete Contractors, Inc. $1,424,943 · | ||
| Aug 1, 2025 | 61L47 | DuPageDistrict 1 | HMA resurfacing and widening of Town Road from West Roosevelt Road (IL 38) to West Washington Street in West Chicago. Includes; curb and gutter, sidewalks, ADA ramps, driveways, and storm sewer. | — | Executed | Everlast Blacktop Inc. $1,807,185 · | ||
| Aug 1, 2025 | 61L58 | KaneDistrict 1 | Reconstruction and resurfacing of L.W. Besinger Drive from Lake Marian Road to IL 25 in Carpentersville. | — | Executed | Plote Construction, Inc. $5,096,305 · | ||
| Aug 1, 2025 | 61L61 | KaneDistrict 1 | Resurfacing on Merrill Road from the Village limits to Bliss Road in Sugar Grove. | — | Executed | Builders Paving, LLC $448,788 · | ||
| Aug 1, 2025 | 61L67 | KaneDistrict 1 | Reconstruction of Wheeler Road from Dugan Road to Esker Drive in Sugar Grove. | — | Executed | D. Construction, Inc. $472,933 · | ||
| Aug 1, 2025 | 62N97 | CookDistrict 1 | Earth excavation, construction of storm sewers and drainage structures, combination curb and gutter, HMA base (2,965-Ft) Intersection improvement project consists of earth excavation, construction of storm sewers and drainage structures, combination curb and gutter, HMA base course widening, resurfacing with binder and surface courses, modernization of traffic signals, channelization with thermoplastic pavement markings. Location: IL 58 (Golf Rd) at Barrington Road and at Hoffman Estates Drive, located within the Village of Hoffman Estates. | — | Executed | Everlast Blacktop Inc. $6,691,406 · | ||
| Aug 1, 2025 | 62V12 | CookDistrict 1 | Standard Overlay and ADA Improvements resurfacing the existing asphalt pavement with HMA surface and binder co This project consists of Standard Overlay and ADA Improvements resurfacing the existing asphalt pavement with HMA surface and binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. Located: Southwest Hwy US 6 (FAU 297) located along US 6 and begins at Will Cook Road and proceeds approximately 5,439 feet (1.03 miles) in a north-easterly direction to south of Wolf Road in the Village of Orland Park in Cook County. | — | Executed | Austin Tyler Construction, Inc. $664,171 · | ||
| Aug 1, 2025 | 62V91 | CookDistrict 1 | HMA (overlay) with HMA binder and surface course, full depth PCC pavement removal and replacement, cold millin (1,830-Ft) Standard Overlay, Pavement Replacement, Designed Overlay and ADA improvements consists of HMA (overlay) with HMA binder and surface course, full depth PCC pavement removal and replacement, cold milling of existing asphalt surface, sidewalk removal and replacement, curb ramps for sidewalks (ADA) improvements, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings and raised reflective pavement markers. Located on Paul | — | Executed | D. Construction, Inc. $992,687 · | ||
| Aug 1, 2025 | 62W21 | DuPageDistrict 1 | Joint replacement, substructure repairs and steel repairs of the bridge, located on I-55 at Cass Avenue (Overh (500-Ft) Bridge Deck Overlay on SN 022-0072 consists of joint replacement, substructure repairs and steel repairs of the bridge, located on I-55 at Cass Avenue (Overhead) in the Village of Darien, DuPage County, Illinois. | — | Executed | Martam Construction Incorporated $1,781,767 · | ||
| Aug 1, 2025 | 62W57 | CookDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals at various locations in District 1. | — | Executed | Hecker and Company, Inc. $2,599,373 · | ||
| Aug 1, 2025 | 62W58 | CookDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, controller, installation of accessible pedestrian signals, handholes, conduit, foundations at various locations in District 1. | — | Executed | |||
| Aug 1, 2025 | 62X45 | CookKaneKendallDistrict 1 | Bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the This improvement consists of bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs, and inside and outside of dividing walls along walkways of the structure placement of modified urethane pavement markings. Located throughout Cook, Kane and Kendall Counties. | — | Executed | Mosley Construction 1, LLC $1,455,444 · | ||
| Aug 1, 2025 | 62X50 | WillDistrict 1 | Milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk remova (2,067-Ft) Designed Overlay, Curb Ramps improvements (ADA), Sidewalk Replacement consists of milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk removal and replacement, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, curb ramps for sidewalks, raised reflective pavement markers, Location: IL 53 (Baltimore Street), from Kankakee Street to West of Forked Creek within the | — | Executed | Gallagher Asphalt Corporation $975,357 · | ||
| Aug 1, 2025 | 62X86 | WillDistrict 1 | Asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and sur (3,435-Ft) Design and Standard Overlay consists of asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and surface course, thermoplastic pavement markings. Located on Illinois Route FAU 388, I-55 Frontage Road NB in the Village of Channahon in Will County. | — | Executed | D. Construction, Inc. $250,346 · | ||
| Aug 1, 2025 | 62Y25 | CookDistrict 1 | The demolition of (7) seven single family residences and detached garages, adjacent surface parking lot This is a building demolition contract and site clean-up contract consists of the demolition of (7) seven single family residences and detached garages, adjacent surface parking lot. The project is located west of 64th Place to 65th Street. Old Harlem Road is under the jurisdiction of Chicago in Cook County. | — | Executed | C & D Recycling Services, Inc. $340,540 · | ||
| Aug 1, 2025 | 64C24 | WinnebagoDistrict 2 | 2.09 miles of reconstruction of I-39/US 20 from 0.3 mile east of Mulford Rd to 0.2 mile north of Harrison Ave. | — | Executed | OHLA Central, Inc. $125,917,852 · | ||
| Aug 1, 2025 | 64P28 | WinnebagoDistrict 2 | 0.78 mile of patching, resurfacing, ADA and signals on IL 70 from Safford Rd to Glenwood Ave in Rockford. | — | Executed | Martin & Company Excavating $1,406,302 · | ||
| Aug 1, 2025 | 64U53 | WhitesideDistrict 2 | 0.5 miles of partial depth patching from Base St to 350' east of Milnes Dr in Morrison. | — | Executed | Martin & Company Excavating $303,113 · | ||
| Aug 1, 2025 | 64U79 | StephensonDistrict 2 | Earthwork and embankment for temporary runaround at the intersection of US 20 and IL 73. US 20: from 0.4 mile west of IL 73 to 1 mile east of IL 73 (Reese Road). IL 73: from 0.4 mile north to 0.2 mile south of US 20. | — | Executed | Fischer Excavating, Inc. $652,317 · | ||
| Aug 1, 2025 | 66R72 | VariousDistrict 3 | Vegetation management control along various routes in DeKalb, Grundy, Iroquois, Kendall, LaSalle, Livingston, and Ford Counties. | — | Executed | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $328,314 · | ||
| Aug 1, 2025 | 66R73 | VariousDistrict 3 | Tree removal at various locations throughout the District. | — | Executed | Clean Cut Tree Service, Inc. $530,912 · | ||
| Aug 1, 2025 | 68898 | PeoriaDistrict 4 | Bridge replacement of structure carrying IL 116 (Harmon Highway) over BNSF and UPRR/Kickapoo Creek. | — | Executed | ICC Group Inc. $23,160,000 · | ||
| Aug 1, 2025 | 68B70 | PeoriaDistrict 4 | 0.19 mile ramp widening for an additional left turn lane, traffic signal installation to replace temporary traffic signals, mill and overlay, drainage improvements at IL 40 (Knoxville Ave) and IL 6, Ramp D in Peoria. | — | Executed | Otto Baum Company, Inc. $1,750,000 · | ||
| Aug 1, 2025 | 68J12 | HendersonDistrict 4 | Bridge deck overlay, joint replacements and bridge repairs on IL 94 to SN's 036-0043 over Henderson Creek, 036-0041 over Jinks Hollow Creek, and 036-0047 over BNRR and Henderson Creek in Henderson County. | — | Executed | Laverdiere Construction, Inc. $2,803,521 · | ||
| Aug 1, 2025 | 68J13 | FultonDistrict 4 | Bridge deck overlay, joint replacements and bridge repairs to SN 029-0007 carrying US Route 24 over BNSF RR 1 mile east of the Schuyler County Line in Fulton County. | — | Executed | Freesen, a div of UCM, Inc. $496,456 · | ||
| Aug 1, 2025 | 68J14 | FultonDistrict 4 | Bridge deck overlays on SN's 029-0057 over Coal Creek, 029-0061 over Turkey Creek, 029-0062 over Lost Grove Creek, and 029-0065 over Putt Creek in Fulton County. | — | Executed | Freesen, a div of UCM, Inc. $2,366,430 · | ||
| Aug 1, 2025 | 68K35 | VariousDistrict 4 | Placing, grading and compacting an aggregate shoulder wedge level with adjacent HMA pavement or shoulder on various routes in various counties throughout the eastern section of District 4. | — | Executed | J.C. Dillon, Inc. $627,990 · | ||
| Aug 1, 2025 | 70024 | PiattDistrict 5 | Remove and construct superstructures on SN 074-0069 (EB) and SN 074-0070 (WB) carrying FAI 72 over the Norfolk Southern Railway to rehabilitate the structures and replace approach pavements. | — | Executed | Stark Excavating, Inc. $8,849,135 · | ||
| Aug 1, 2025 | 72949 | AdamsDistrict 6 | Expansion joint removal and deck/approach patching on SN 001-0074 carrying IL 96 over White Oak Creek, 1.6 miles south of Lima. | — | Executed | County Contractors, Inc. $414,675 · | ||
| Aug 1, 2025 | 72958 | SangamonDistrict 6 | Expansion joint seal replacement on SN 084-0152 and SN 084-0153 carrying I-72 over the Sangamon River, 3.5 miles east of I-55. | — | Executed | Otto Baum Company, Inc. $68,200 · | ||
| Aug 1, 2025 | 72965 | LoganDistrict 6 | Substructure repairs on SN 054-0103 carrying Old IL 121 over Branch of Kickapoo Creek, 0.5 miles north of Lincoln. | — | Executed | Otto Baum Company, Inc. $94,400 · | ||
| Aug 1, 2025 | 72975 | SangamonDistrict 6 | Chip sealing on various routes in Sangamon County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $325,622 · | ||
| Aug 1, 2025 | 72K42 | AdamsDistrict 6 | 2 miles of resurfacing, ADA improvements, traffic signal improvements and patching on IL 104 (Broadway Street) from west of 12th Street to west of 38th Street in Quincy. | — | Executed | Diamond Construction Company $14,948,037 · | ||
| Aug 1, 2025 | 76M52 | St. ClairDistrict 8 | 0.9 miles of resurfacing and ADA improvements on IL 159 from Washington Street to 0.2 miles south of IL 13/158 in Belleville. | — | Executed | The Kilian Corporation $2,621,744 · | ||
| Aug 1, 2025 | 76M55 | St. ClairDistrict 8 | 1.4 miles of resurfacing with ADA improvements on IL 203 from Collinsville Road to the Madison County line. | — | Executed | Keeley & Sons, Inc. $5,476,581 · | ||
| Aug 1, 2025 | 76T74 | VariousDistrict 8 | Lighting upgrades on I-255 at I-55/70, on I-255 at Collinsville Road and on I-55/70 at Black Lane in Collinsville. | — | Executed | Electrico, Inc. $1,999,091 · | ||
| Aug 1, 2025 | 76U44 | VariousDistrict 8 | Bridge structural repairs at various locations in various counties of District 8. | — | Executed | Keeley & Sons, Inc. $1,822,815 · | ||
| Aug 1, 2025 | 76U45 | VariousDistrict 8 | Bridge deck patching on various interstate bridges in Madison and St. Clair Counties. | — | Executed | Keeley & Sons, Inc. $1,894,424 · | ||
| Aug 1, 2025 | 76U60 | RandolphDistrict 8 | 6.5 miles of pavement patching on IL 4 / IL 150 from 0.3 miles west of IL 4 (West Junction) to IL 4 (East Junction). | — | Rejected | |||
| Aug 1, 2025 | 76U62 | VariousDistrict 8 | Weed spraying for broadleaf weeds along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. | — | Executed | The Daltons Inc. $192,882 · | ||
| Aug 1, 2025 | 76U63 | VariousDistrict 8 | Weed spraying for Johnson Grass along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. | — | Executed | The Daltons Inc. $199,866 · | ||
| Aug 1, 2025 | 76U65 | MadisonDistrict 8 | 1.4 miles of slurry seal on IL 159 from Clay Street to Kinloch Avenue in Collinsville. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $537,958 · | ||
| Aug 1, 2025 | 78916 | WilliamsonDistrict 9 | Signal modifications, railroad interconnects and fiber optic installation on IL 37 from IL 13 to Boyton Street in Marion. | — | Executed | Gerstner Electric, Inc. $1,302,315 · | ||
| Aug 1, 2025 | 78A74 | JohnsonWilliamsonDistrict 9 | 9.5 miles of resurfacing on IL 166 from 0.1 miles south of Tune Road to US 45. Also includes ADA improvements in Creal Springs. | — | Executed | E. T. Simonds Construction Company $3,949,325 · | ||
| Aug 1, 2025 | 78B39 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,540,098 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.