| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Feb 27, 2026 | 61M05 | CookDistrict 1 | Resurfacing 173rd Street from Wausau Avenue to South Park Avenue in the Village of South Holland. | — | Executed | K-Five Construction Corporation $293,000 · | ||
| Feb 27, 2026 | 61M16 | CookDistrict 1 | Resurfacing and channelization on Gannon Drive from Golf Road to Higgins Road in the Village of Hoffman Estates. | — | Executed | A Lamp Concrete Contractors, Inc. $838,719 · | ||
| Feb 27, 2026 | 61M18 | CookDistrict 1 | Resurfacing 171st Street from California Avenue to I-80/294 and from Western Avenue to I-80/294 in the Village of Hazel Crest. | — | Executed | Gallagher Asphalt Corporation $399,778 · | ||
| Feb 27, 2026 | 61M19 | McHenryDistrict 1 | Resurfacing Queen Anne Road from IL 120 to Bull Valley Road in the Village of Bull Valley. | — | Executed | Geske and Sons, Inc. $544,925 · | ||
| Feb 27, 2026 | 61M20 | CookDistrict 1 | Lighting improvements on IL 50 from 87th Street to 111th Street in the Village of Oak Lawn. | — | Executed | H & H Electric Co. $318,848 · | ||
| Feb 27, 2026 | 61M21 | CookDistrict 1 | Lighting improvements on US 20 from 69th Avenue to 54th Avenue and from IL 50 to Pulaski Road in the Village of Oak Lawn. | — | Executed | H & H Electric Co. $326,553 · | ||
| Feb 27, 2026 | 61M23 | McHenryDistrict 1 | Resurfacing of Ballard Road from IL 47 to Pauline Avenue in the Village of Lakewood. Additional work includes patching, guardrail, pavement markings and other required work. | — | Executed | Geske and Sons, Inc. $778,992 · | ||
| Feb 27, 2026 | 61M25 | WillDistrict 1 | Rehabilitate of three-span RC channel beam bridge carrying Smith Road over Long Run Creek between W. 138th Street and W. 135th Street in Will County. Work includes replacement of existing channel beams with steel tub girder and concrete deck superstructure, substructure repair, pavement widening, HMA resurfacing and other required work. | — | Executed | D. Construction, Inc. $1,561,361 · | ||
| Feb 27, 2026 | 61M26 | CookDistrict 1 | HMA resurfacing of Braintree Drive from Wise Road to Weathersfield Way in the village of Schaumburg. Work also includes construction of a roundabout intersection at Weathersfield Way, curb and gutter, PCC shared-use path, ADA ramps, lighting and other required work. | — | Executed | A Lamp Concrete Contractors, Inc. $12,659,993 · | ||
| Feb 27, 2026 | 61M27 | CookDistrict 1 | HMA resurfacing of Braintree Road from Weathersfield Way to Schaumburg Road in the village of Schaumburg. Additionally includes pavement patching, curb and gutter, PCC shared-use path, ADA ramps, drainage improvements, lighting relocation and other required work. | — | Executed | A Lamp Concrete Contractors, Inc. $3,554,124 · | ||
| Feb 27, 2026 | 61M28 | CookDistrict 1 | HMA resurfacing of Braintree Drive from Schaumburg Road to Bode Road in the village of Schaumburg. Additionally includes pavement patching, curb and gutter, PCC shared-use path, ADA ramps, drainage improvements, traffic signal modification, lighting relocation and other required work. | — | Executed | A Lamp Concrete Contractors, Inc. $3,964,130 · | ||
| Feb 27, 2026 | 61M31 | CookDistrict 1 | Resurfacing Jones Road from Highland Boulevard to IL 72 in the village of Hoffman Estates. | — | Executed | A Lamp Concrete Contractors, Inc. $631,786 · | ||
| Feb 27, 2026 | 61M32 | CookDistrict 1 | Resurfacing Montrose Avenue from Sayre Avenue to Forest Preserve Drive in the village of Harwood Heights. | — | Executed | A Lamp Concrete Contractors, Inc. $839,740 · | ||
| Feb 27, 2026 | 62P01 | WillDistrict 1 | A single culvert removal and replacement located at Grant Creek on IL Route 53 in Will County, IL The project primarily consists of a single culvert removal and replacement located at Grant Creek on IL Route 53 in Will County, IL. | — | Executed | Austin Tyler Construction, Inc. $4,980,727 · | ||
| Feb 27, 2026 | 62R19 | VariousDistrict 1 | Replacement and upgrading of the existing Intelligent Transportation Systems (ITS) from east of Ridge Rd to just west of Wheeler Rd and from Gardner St to I-355 for a net length of approximately 87,518 feet (16.58 miles). The improvement is located in the Villages of Shorewood, Minooka, Rockdale, and New Lenox and in the City of Joliet within Grundy, Kendall, and Will Counties. | — | Executed | Meade Inc. $12,989,531 · | ||
| Feb 27, 2026 | 62R23 | WillDistrict 1 | (2,215.87-Ft) Replacement of the Des Plaines River Bridge including the realignment and reconstruction of the mainline pavement, cross-road reconstruction, enclosed storm sewer system with drainage structures, detention ponds, earth excavation and embankment grading, retaining and noise abatement walls, barrier and moment slab construction, bridge replacement, roadway lighting, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, navigation lighting, tra | — | Executed | D. Construction, Inc. & Kraemer North America, LLC JV $164,963,136 · | ||
| Feb 27, 2026 | 62T82 | LakeDistrict 1 | A single culvert removal and replacement includes shoulder widening at the culvert, guardrail removal and repl Project consists of a single culvert removal and replacement includes shoulder widening at the culvert, guardrail removal and replacement and ditch regrading. Project is located on Illinois Route 173 over an unnamed Ditch, 0.5 miles east of Illinois Route 131 in the city of Zion, IL. | — | Executed | Martam Construction Incorporated $1,524,058 · | ||
| Feb 27, 2026 | 62V09 | CookDistrict 1 | (1621-Ft) Intersection Improvements and Traffic Modernization will involve right-turn lane Pavement Reconstruction, Pavement widening, Intersection Resurfacing, Traffic Signal Modification, and ADA improvements. Located at IL 72 (Higgins Road) and Huntington Boulevard in the Village of Hoffman Estates in Cook County. | — | Executed | Plote Construction, Inc. $2,129,000 · | ||
| Feb 27, 2026 | 62V43 | KaneDistrict 1 | Pavement patching, HMA overlay of p (1.54-Mile) Project consists of pavement patching, HMA overlay of p.c.c pavement, resurfacing with polymerized hot-mix asphalt surface course, binder course and curb and gutter replacement, thermoplastic pavement marking located in the Village of Huntley and Rutland Township in Kane County. | — | Executed | Builders Paving, LLC $2,670,318 · | ||
| Feb 27, 2026 | 62W78 | LakeDistrict 1 | Project includes Lighting Improvement including removal of light towers and replace it with poles, LED luminaires, metal foundations, lighting controller, conduit and cables lighting improvements at US 41 at Park Ave and US 41 at Clavey Rd. in Highland Park. | — | Executed | Hecker and Company, Inc. $1,798,186 · | ||
| Feb 27, 2026 | 62W92 | VariousDistrict 1 | Replace old controllers, install new network switches, PTZ, integration to ATMS install new fiber at 20 signals. These locations are in the following municipalities, Carpentersville, Algonquin, Barrington Hills, East Dundee, Park City, and Gages Lake. Project located mainly in Lake and Kane counties with one location in Cook and two locations in McHenry counties. | — | Executed | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $1,883,890 · | ||
| Feb 27, 2026 | 62X53 | CookDistrict 1 | (185-ft) Proposed Culvert Repairs improvements is located at the intersection of IL 59 and IL 68 (Dundee Road) SN 016-2212, Village of Barrington Hills in Cook County. | — | Executed | MYS, Incorporated $899,287 · | ||
| Feb 27, 2026 | 62X88 | CookDistrict 1 | (6,935-Ft) Designed and Standard Overlays, ADA sidewalk ramp Improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, placement of pavement markings, installation of sidewalk ramp improvements, located on IL Route 43 (Waukegan Rd.) from Henley Street to Emerson Street in the Villages of Glenview and Morton Grove in Cook County. | — | Executed | Peter Baker & Son Co. $2,806,275 · | ||
| Feb 27, 2026 | 62Y17 | CookDistrict 1 | Joint replacement, substructure repairs and cleaning and painting of bearings of the bridge located on Cermak (460-Ft) Bridge Deck Overlay (SN 016-0634) consist of joint replacement, substructure repairs and cleaning and painting of bearings of the bridge located on Cermak Road at Des Plaines River in the Village of North Riverside Cook County. | — | Executed | MYS, Incorporated $1,272,505 · | ||
| Feb 27, 2026 | 62Y26 | WillDistrict 1 | (4,658.13-Ft) Bridge Repairs (S.N. 099-0298) includes bridge deck scarification latex concrete overlay, joint reconstruction, patching, and substructure repair butt joints, HMA overlay of the approach pavement, drainage structure adjustments, and pavement marking replacement located along IL Route 50 (Governors Highway) over the CN railroad from Watson Road to Egyptian Trail, in the Village of Monee in Will County, Illinois. | — | Executed | Iroquois Paving Corporation $1,191,152 · | ||
| Feb 27, 2026 | 62Y35 | VariousDistrict 1 | Mowing the roadsides of Expressways in District One This work consists of mowing the roadsides of Expressways in District One. | — | Active | |||
| Feb 27, 2026 | 62Y37 | VariousDistrict 1 | This project is to provide prompt installation of new fence and repair of damaged fence located on various State maintained arterial and expressway routes within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. | — | Executed | Industrial Fence, Inc. $833,967 · | ||
| Feb 27, 2026 | 64J38 | WhitesideDistrict 2 | 1.2 miles of cold milling, standard overlay, patching, ADA improvements and traffic signal modernization on WB IL2 E 4th St from East 3rd St to IL40 in Sterling. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,673,307 · | ||
| Feb 27, 2026 | 64R72 | WinnebagoDistrict 2 | 0.725 miles; Reconstruction; Harrison Ave: Mill Rd to 0.3 miles east of Kishwaukee River and I 39: 0.2 mi N of Harrison Ave to I-90. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $21,418,706 · | ||
| Feb 27, 2026 | 64S71 | CarrollDistrict 2 | 10.3 miles of milling, HMA overlay, shoulders, and patching on IL 84 from 0.2 mile north of Doty Rd south of Savanna to the Whiteside County Line. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $7,058,363 · | ||
| Feb 27, 2026 | 64T23 | OgleDistrict 2 | 1,200 feet gross pavement patching on I-39 under Twombly Rd overpass. 2 Miles NE of Rochelle. | — | Executed | Martin & Company Excavating $138,615 · | ||
| Feb 27, 2026 | 64U03 | LaSalleLeeDistrict 2 | 19.3 miles, ultra-thin bonded wearing course, microsurfacing joint repairs, pavement patching, and rest_area improvements from LaSalle County Line_to Ogle County Line. | — | Executed | Rock Road Companies, Inc. $14,540,979 · | ||
| Feb 27, 2026 | 64U56 | Jo DaviessDistrict 2 | House demolition at 492 Wall St. and 380 Wisconsin Ave. in East Dubuque. | — | Executed | Louie's Trenching Service, Inc. $58,728 · | ||
| Feb 27, 2026 | 64U96 | Rock IslandDistrict 2 | Full cleaning and painting of SN's 081-0122/0123 and SN's 081-0128/0129. | — | Executed | Eagle Painting & Maintenance Company, Inc. $364,310 · | ||
| Feb 27, 2026 | 64U97 | Rock IslandWhitesideDistrict 2 | Full cleaning and painting of SN's 081-0134/0135 and SN's 098-0063/0064. | — | Executed | Venus Painting Co. $584,153 · | ||
| Feb 27, 2026 | 64V11 | Rock IslandDistrict 2 | Bridge washing of 11 structures along I-74 in Rock Island County. | — | Executed | Pressure Washing Unlimited Inc. $70,874 · | ||
| Feb 27, 2026 | 64V12 | WinnebagoDistrict 2 | Bridge washing of SN 101-0133 and 101-0134 over the Kishwaukee River in Winnebago County. | — | Executed | All States Painting, Inc. $18,890 · | ||
| Feb 27, 2026 | 64V13 | BooneWinnebagoDistrict 2 | Bridge washing of 9 structures in Boone and Winnebago Counties. | — | Executed | M & M Concrete, Inc. $50,950 · | ||
| Feb 27, 2026 | 64V14 | VariousDistrict 2 | Bridge washing of 17 structures in various counties. | — | Executed | All States Painting, Inc. $84,725 · | ||
| Feb 27, 2026 | 64V15 | VariousDistrict 2 | Bridge washing of 12 structures in various counties. | — | Executed | Interstate Maintenance, Incorporated $93,400 · | ||
| Feb 27, 2026 | 66N22 | KendallDistrict 3 | Plug and abandon existing culvert (SN 047-2514) carrying IL 71 over a stream located 0.1 miles SW of Fennel Rd in Newark, IL and replace nearby side road culvert, culvert lining, and ditch re-grading. | — | Executed | D. Construction, Inc. $199,416 · | ||
| Feb 27, 2026 | 66P67 | LaSalleDistrict 3 | Milling and resurfacing 3 3/4" (designed overlay)_on FAP 587 (US 34) beginning 0.6 mile east of I-39 and ending at E 12th Road in Earlville. Additional work includes micro-surface with high friction aggregate and sinusoidal rumble strips in the curves, ditch cleaning, culvert cleaning, and end section replacements, pavement marking, and raised reflective pavement markers. 7.07 miles gross length. | — | Executed | Advanced Asphalt Company $3,606,240 · | ||
| Feb 27, 2026 | 66R39 | KankakeeDistrict 3 | Routing and filling primarily longitudinal but includes transverse as needed from the intersection of IL 17 and IL 1 continuing south on IL 1 to the north city limits of St. Anne, IL. 6.76 gross miles. | — | Executed | Freehill Asphalt, Inc. $39,585 · | ||
| Feb 27, 2026 | 66R41 | FordDistrict 3 | Crack sealing on ILL 47 in Gibson City to 900E Rd, and IL 115 to Baltimore Dr in Paxton. 7.97 gross miles. | — | Executed | Freehill Asphalt, Inc. $57,066 · | ||
| Feb 27, 2026 | 66R92 | BureauDistrict 3 | Cleaning and painting structural steel, pavement striping, and traffic control at SN's 006-0055, 006-0057, and 006-0058 on I-180 in Bureau County. | — | Executed | Venus Painting Co. $1,595,710 · | ||
| Feb 27, 2026 | 66R93 | LivingstonDistrict 3 | Cleaning and painting all structural steel and_non- structural steel components of Structure No. 053-0164 carrying IL Route 170 over Mud Creek approximately 0.95 mi north of IL Route 23 in Livingston County. | — | Executed | ERA-Valdivia Contractors, Inc. $114,382 · | ||
| Feb 27, 2026 | 66R94 | GrundyDistrict 3 | Cleaning and painting all structural steel and non-structure_steel components on Structure No. 032-0092 carrying Carbon Hill Rd. over I-55 approximately 4.8 miles south of Reed Rd in Grundy County. | — | Rejected | Civil Coatings and Construction Inc. $356,186 · | ||
| Feb 27, 2026 | 66R95 | BureauDistrict 3 | cleaning and painting all structural steel and non-structural steel components of Structure No. 006-0135 carrying US-34 over Burlington Northern Railroad approximately 1.1 mi. northeast of ILL 26 in Bureau County. | — | Executed | ERA-Valdivia Contractors, Inc. $389,686 · | ||
| Feb 27, 2026 | 66T02 | IroquoisDistrict 3 | Cleaning and painting all structural steel and_non-structural steel components of Structure No. 038-0198 carrying IL Route 49 over Little Mud Creek approximately 2.6 mi. north of Cissna Park in Iroquois County. | — | Executed | ERA-Valdivia Contractors, Inc. $133,444 · | ||
| Feb 27, 2026 | 66T06 | BureauDistrict 3 | Cleaning and painting all structural steel and non-structural steel of SN's: 006-0156 carrying IL 40 over Hickory Creek, 3.5 mi. north of I-80, and 006-0157 carrying IL 40 over a drainage ditch, 3.0 mi. north of I-80. | — | Executed | ERA-Valdivia Contractors, Inc. $181,661 · | ||
| Feb 27, 2026 | 68474 | PeoriaDistrict 4 | Resurfacing IL 6 from 0.7 mile north of Hoerr's Pond to south of I-74 in Peoria County. 4.2 miles gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $25,863,073 · | ||
| Feb 27, 2026 | 68C43 | McDonoughDistrict 4 | Tree mitigation and prairie restoration at various locations adjacent to the NW quadrant of the Macomb Bypass. | — | Executed | JIMAX Landscape LLC $314,609 · | ||
| Feb 27, 2026 | 68E33 | MarshallDistrict 4 | Bridge replacement of SN 062-0008 with SN 062-0074 carrying IL 29 over Barrville Creek, two miles south of Sparland in Marshall County. | — | Executed | Gillan Construction LLC $1,706,806 · | ||
| Feb 27, 2026 | 68F91 | FultonMcDonoughDistrict 4 | 6.24 miles of resurfacing from SCL of Avon to IL 9 in Fulton and McDonough Counties. | — | Executed | Gunther Construction, a div of UCM, Inc. $11,748,219 · | ||
| Feb 27, 2026 | 68J46 | PeoriaDistrict 4 | 0.24 mile intersection improvement, Extended EP US 150 left-turn lane, widening for addition of SB right-turn lane, and change left-turn signal phasing from protected/permissive to protected only at the US 150 and West Willow Knolls Dr. intersection in Peoria County. | — | Executed | Otto Baum Company, Inc. $749,500 · | ||
| Feb 27, 2026 | 68J51 | PeoriaDistrict 4 | 316' bridge preservation project at SN 072-0169 carrying IL 8 (Southport Rd) over UPRR, 0.2 miles east of Reservoir Blvd in Peoria County. | — | Executed | Stark Excavating, Inc. $878,313 · | ||
| Feb 27, 2026 | 68J57 | PeoriaDistrict 4 | 7.53 miles of resurfacing on IL 90/IL 91 from IL 91(N) in Princeville to IL 91(S), north of Dunlap; and on IL 90 from the IL Rte 90/IL Rte 91 Junction (E) to IL Rte 40; and on SN 072-0035 carrying IL 90 over Kickapoo Creek Tributary. | — | Executed | Advanced Asphalt Company $5,129,210 · | ||
| Feb 27, 2026 | 68J68 | FultonDistrict 4 | Resurfacing and cold-in-place recycling on Il 78 from Fort St in Farmington to 0.2 mile north of Alder St in Canton; and resurfacing on Old Il 78 from IL 78 from IL 78(N) to IL 78(S) in Norris. Approximately 7.63 miles gross. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $7,447,606 · | ||
| Feb 27, 2026 | 68J96 | MarshallDistrict 4 | 8.765 miles of resurfacing and cold-in-place recycling on IL 17 from IL 89 to west of I-39 in Marshall County. | — | Executed | Advanced Asphalt Company $7,833,037 · | ||
| Feb 27, 2026 | 68K06 | VariousDistrict 4 | Electrical maintenance contract (maintenance and repair D4 traffic signals, overhead lighting and ITS facilities). | — | Executed | Laser Electric, Inc. $764,783 · | ||
| Feb 27, 2026 | 68K11 | VariousDistrict 4 | Washing of seven bridges in Disrict 4. | — | Executed | All States Painting, Inc. $1,394,676 · | ||
| Feb 27, 2026 | 68K15 | PeoriaDistrict 4 | 6.47 miles of resurfacing on IL 78 from west of US 150 to south of IL 8 in Peoria County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,624,569 · | ||
| Feb 27, 2026 | 68K16 | PeoriaDistrict 4 | 3.53 miles of milling and resurfacing and all related collateral work along US Route 150 and IL Route 78 from 0.1 mile north of North Junction Illinois Route 78/US Route 150 to 0.1 mile north of Interstate 74 in Peoria County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,332,964 · | ||
| Feb 27, 2026 | 68K56 | TazewellDistrict 4 | Bridge deck and approach pavement resurfacing, replacement of existing expansion joints, and all related collateral work necessary to complete the project located along IL Rte 9 over Prairie Creek in Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $239,981 · | ||
| Feb 27, 2026 | 68K57 | MarshallDistrict 4 | Clearing and disposing the existing silt in and around Structure No. 062-2001, installing stone dumped riprap at both ends of the box culvert, grading to drain at both ends, and all related collateral work necessary to complete the project on Illinois Route 40 (FAP 646) over Mud Run, 1.38 miles south of Illinois Route 17 in Marshall County. | — | Executed | Gillan Construction LLC $21,865 · | ||
| Feb 27, 2026 | 68K58 | HendersonDistrict 4 | Replace expansion joints, patch parapets, fill slopewall voids on SN 036-0009 on Illinois Route 96 over Dugout Creek east of Lomax, Illinois in Henderson County. | — | Executed | Laverdiere Construction, Inc. $393,005 · | ||
| Feb 27, 2026 | 68K59 | McDonoughDistrict 4 | Re-applying bituminous material binder to the existing aggregate slopewalls at Structure Nos. 055-0052 and 055-0053, Illinois Rte 336 over the BNSF Railroad. | — | Executed | Brandt Construction Co. $128,795 · | ||
| Feb 27, 2026 | 68K62 | VariousDistrict 4 | Cleaning and painting structural steel of eleven existing bridges throughout District 4. | — | Executed | Venus Painting Co. $1,975,015 · | ||
| Feb 27, 2026 | 68K91 | VariousDistrict 4 | Districtwide repairs to guardrail and cable guardrail caused by motorists (MCHD). | — | Executed | Northern Contracting, Inc. $800,027 · | ||
| Feb 27, 2026 | 70D72 | McLeanDistrict 5 | Culvert replacement at ditch 0.4 mile south of US 136 in Heyworth. | — | Executed | Stark Excavating, Inc. $684,610 · | ||
| Feb 27, 2026 | 70F37 | McLeanDistrict 5 | Bridge deck overlay and other repairs to SN 057-0163, SN 057-0164 over Money Creek, and 057-0162 over I-55. 487.42 gross feet. | — | Executed | Stark Excavating, Inc. $7,331,185 · | ||
| Feb 27, 2026 | 70F77 | McLeanDistrict 5 | Remove and construct bridge decks on two structures SN 057-0154 (SB) and 057-0155 (NB) carrying FAI 55 over US 136 in McLean County. | — | Executed | Stark Excavating, Inc. $6,845,494 · | ||
| Feb 27, 2026 | 70H61 | ChampaignDistrict 5 | Bridge beam replacement and pier repair to S.N. 010-0220 at Salt Fork River 1 milew north of St. Joseph. | — | Executed | Stark Excavating, Inc. $414,045 · | ||
| Feb 27, 2026 | 70H62 | DouglasEdgarDistrict 5 | Bridge deck repairs to S.N. 021-0049 and S.N. 023-0026 carrying FAP 820 (IL-130) and FAP 836 IL-49 in Douglas and Edgar Counties. | — | Executed | Sangamo Construction Company $926,892 · | ||
| Feb 27, 2026 | 70H66 | McLeanDistrict 5 | Bridge deck sealing of 63 structures in McLean County. | — | Executed | M & M Concrete, Inc. $149,515 · | ||
| Feb 27, 2026 | 70H81 | ChampaignDistrict 5 | 2.11 miles of median cable improvements on I-74 from 0.3 miles west of County Rd 2500E to Market St in Ogden. | — | Executed | COLLINS & HERMANN, INC. $501,796 · | ||
| Feb 27, 2026 | 72295 | AdamsDistrict 6 | 2.1 miles of resurfacing, patching, ADA improvements, traffic signal improvements and structure improvements on IL 104 (Broadway Street) from west of 38th Street to east of 63rd Street in Quincy. | — | Executed | Diamond Construction Company $18,201,126 · | ||
| Feb 27, 2026 | 72440 | MacoupinDistrict 6 | 2.6 miles of milling and resurfacing on Old US 66 from Old US 66 to south of West 8th Street and from 0.1 miles south of Werner Road to Old US 66 in Mt. Olive. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,683,856 · | ||
| Feb 27, 2026 | 72469 | ChristianDistrict 6 | 8.4 miles of microsurfacing on Mt. Auburn Road from south of Arch Street in Mt. Auburn to south of CH 21 (2100N Road) in Taylorville. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $739,077 · | ||
| Feb 27, 2026 | 72540 | VariousDistrict 6 | On-call repair of guardrail, cable guardrail and impact attenuators at various locations throughout District 6 as needed. | — | Executed | COLLINS & HERMANN, INC. $2,066,290 · | ||
| Feb 27, 2026 | 72542 | MenardDistrict 6 | Resurfacing on IL 97, 123 from IC and IM Railroad to Antle Street and from south of Lincoln Avenue to 0.1 miles north of North Shore Drive, south of Petersburg. | — | Executed | Truman L. Flatt & Sons Co., Inc. $324,366 · | ||
| Feb 27, 2026 | 72546 | SangamonDistrict 6 | Installation of cure-in-place pipe liners at 12 locations on I-72 in Sangamon County. | — | Executed | J.C. Dillon, Inc. $555,264 · | ||
| Feb 27, 2026 | 72762 | SchuylerDistrict 6 | 11.7 miles of standard overlay, concrete gutter repairs, riprap and culvert rehabilitation (SN 085-2013) on IL 101 from the Hancock County line to 0.2 miles west of Freeman Mine Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,590,001 · | ||
| Feb 27, 2026 | 72989 | SangamonDistrict 6 | 1.9 miles of resurfacing on Dirksen Parkway from Stevenson Drive to south of Wide Track Drive. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,597,405 · | ||
| Feb 27, 2026 | 72A82 | VariousDistrict 6 | 18.3 miles of crack and joint sealing on various routes in Adams, Morgan and Pike Counties. | — | Executed | SKC Construction, Inc. $153,087 · | ||
| Feb 27, 2026 | 72C96 | SangamonDistrict 6 | Patching and resurfacing on I-55 from 2.8 miles south of IL 123 in Williamsville to the Logan County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $25,964,194 · | ||
| Feb 27, 2026 | 72J75 | MontgomeryDistrict 6 | 2.9 miles of resurfacing on the I-55 East Frontage Road from 0.3 miles north of North 16th Avenue, north of Litchfield, to south of North 19th Avenue, east of IL 108. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,699,801 · | ||
| Feb 27, 2026 | 74368 | MaconDistrict 7 | Bridge replacement on IL 48 over Mosquito Creek, 1.5 miles northeast of Blue Mound. (SN 058-0029) | — | Executed | Sangamo Construction Company $2,735,104 · | ||
| Feb 27, 2026 | 74653 | ColesDistrict 7 | Replacement of SN 015-0034 carrying CH 31 over the Little Wabash River, 0.8 miles south of Paradise Road. | — | Executed | Sangamo Construction Company $3,082,674 · | ||
| Feb 27, 2026 | 74C49 | ClarkDistrict 7 | Bridge joint replacement, abutment and pier repair, new approaches, bridge deck scarification with overlay and slopewall repairs on I-70 at North Cleone Road (Martinsville interchange). (SN 012-0029) | — | Executed | Sangamo Construction Company $1,826,162 · | ||
| Feb 27, 2026 | 74D47 | EffinghamFayetteDistrict 7 | Bridge deck sealing on 98 bridge decks throughout Effingham and Fayette Counties. | — | Executed | All States Painting, Inc. $154,439 · | ||
| Feb 27, 2026 | 74D53 | LawrenceDistrict 7 | 5.5 miles of patching, milling and resurfacing on Old US 50 from US 50 Business to IL 33. | — | Executed | Ambraw Asphalt Materials, Inc. $3,649,451 · | ||
| Feb 27, 2026 | 74D64 | EffinghamFayetteDistrict 7 | 64.5 miles of weed spray control on I-57 and I-70 in Effingham and Fayette Counties. | — | Executed | The Daltons Inc. $84,942 · | ||
| Feb 27, 2026 | 74E30 | VariousDistrict 7 | Guardrail repairs of existing damage from motorists at locations shown on the plans and damage yet to be realized on an on-call basis throughout District 7. | — | Executed | COLLINS & HERMANN, INC. $811,102 · | ||
| Feb 27, 2026 | 76A37 | MarionDistrict 8 | Bridge replacement on Old US 51 over Crooked Creek, 0.3 miles north of Central City. (SN 061-0007) | — | Executed | Samron Midwest Contracting, Inc. $4,343,470 · | ||
| Feb 27, 2026 | 76B42 | MarionWashingtonDistrict 8 | Bridge replacement on US 51 over Louse Run Tributary, 2 miles south of Patoka, and the replacement of 3 bridge with culverts on DuBois Blacktop Road over a creek, 3 miles west of DuBois. | — | Executed | C-Hill Civil Contractors, Inc. $3,575,562 · | ||
| Feb 27, 2026 | 76U40 | MarionDistrict 8 | 4 miles of resurfacing on US 51 from Texas Avenue in Sandoval to north of Central City. | — | Executed | Howell Paving, Inc. $4,980,603 · | ||
| Feb 27, 2026 | 76U42 | MadisonDistrict 8 | 7 miles of microsurfacing on I-255 from the St. Clair County line to I-270. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $6,640,925 · | ||
| Feb 27, 2026 | 76U43 | MadisonDistrict 8 | 3.9 miles of resurfacing on IL 255 from 0.1 miles north of Seminary Road to US 67 in Godfrey. | — | Executed | Charles E. Mahoney Co. $7,764,431 · | ||
| Feb 27, 2026 | 76U52 | VariousDistrict 8 | Various pavement patching call-out locations throughout District 8. | — | Executed | Kinney Contractors, Inc. $1,982,334 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.