Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2025 93827 MenardDistrict 6 Construction of a multi-use trail with trail head parking area between Irwin Bridge Road an Ethell Road. Work includes aggregate base course, shoulders, HMA surface course, pipe culverts, pavment markings, signage, erosion control, bicycle railing and so much more. — Executed Nov 25 New Laverdiere Construction, Inc. $1,454,080 ·
Jan 17, 2025 95968 EdwardsDistrict 7 Replace the bridge carrying West Terminal Street over Butter Creek, east of Red Hill Road in Albion. — Executed Nov 25 New Samron Midwest Contracting, Inc. $425,523 ·
Jan 17, 2025 95970 LawrenceDistrict 7 Replace the bridge carrying Birds Lane over Mad Creek, 1 mile east of Chauncey. — Executed Nov 25 New Samron Midwest Contracting, Inc. $837,511 ·
Jan 17, 2025 97789 MadisonDistrict 8 Sidewalk construction along Pearl Street and a new pedestrian crossing at the Union Pacific and Kansas City Southern Railroads in Godfrey. — Executed Nov 25 New Stutz Excavating, Inc. $116,495 ·
Jan 17, 2025 97843 MadisonDistrict 8 HMA resurfacing on Cougar Drive from Junction Drive tot Illini Drive, and HMA resurfacing and reconstruction on Junction Drive from Cougar to Troy Road in Glen Carbon. — Executed Nov 25 New Keller Construction, Inc. $949,494 ·
Jan 17, 2025 97847 MadisonDistrict 8 Resurfacing Erwin Plegge Boulevard from Bethalto Road to Prairie Steet in Bethalto — Executed Nov 25 New Charles E. Mahoney Co. $670,202 ·
Jan 17, 2025 97849 MadisonDistrict 8 Construct a single span 54" plate girder structure with concrete deck to carry Lee Road over Sugar Creek. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $1,092,439 ·
Jan 17, 2025 97850 MonroeDistrict 8 Construct a two-span 36" plate girder structure with concrete deck to carry Bluff Road over Carr Creek. — Executed Nov 25 New Keeley & Sons, Inc. $2,792,091 ·
Jan 17, 2025 97853 MadisonDistrict 8 Construct a shared-use path along IL 157 from West Schwarz Street to Enclave Boulevard in Edwardsville. — Executed Nov 25 New Keller Construction, Inc. $531,755 ·
Jan 17, 2025 99687 WilliamsonDistrict 9 Construction of a Roundabout at Skyline Drive and Crenshaw Road. Work includes PCC Pavement, curb and gutter, storm sewers, pipe culverts, signage, and lighting . — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,026,739 ·
Jan 17, 2025 99712 JeffersonDistrict 9 Resurfacing Old Fairfield Road from Stinson Drive to 0.2 mile west of Campground Lane in Mt. Vernon. — Executed Nov 25 New E. T. Simonds Construction Company $387,947 ·
Mar 7, 2025 46942 JeffersonDistrict 9 Oil and chip, drainage and other improvements to the roads and parking lots near and within Rend Lake State Fish and Wildlife Area. — Executed Nov 25 New Illini Asphalt Corporation $1,020,559 ·
Mar 7, 2025 46946 SalineDistrict 9 Oil and chip, drainage and other improvements to the roads, Carrier Mills Township Road and parking lots near and within Sahara Woods State Fish and Wildlife Area. — Executed Nov 25 New Illini Asphalt Corporation $883,314 ·
Mar 7, 2025 61J84 KaneDistrict 1 Reconstruct IL 38 from Fox River Bridge to Kirk Road in Geneva. — Executed Nov 25 New R. W. Dunteman Company $30,162,688 ·
Mar 7, 2025 61K89 CookDistrict 1 Roadway Reconstruction at the intersection of John Humphrey Drive and 143rd Street in Orland Park. Includes drainage improvements, installation of a pile supported embankment system, replacement of the wearing surface on the existing dry land bridge, traffic signal modernization and interconnection, and lighting improvements. — Executed Nov 25 New D. Construction, Inc. $9,722,683 ·
Mar 7, 2025 61L01 CookDistrict 1 Resurfacing 171st Street from Dixie Highway to Wood Street in Hazel Crest. — Executed Nov 25 New D. Construction, Inc. $341,757 ·
Mar 7, 2025 61L02 WillDistrict 1 Construct an HMA Multi-Use Path in Home Glen, from Coachman Lane to Heatherwood Drive. Includes HMA Pavement removal, sidewalks, ADA ramps, and signage. — Executed Nov 25 New D. Construction, Inc. $398,891 ·
Mar 7, 2025 61L05 LakeDistrict 1 Resurfacing, PCC base course, decorative PCC sidewalk, granite cobble curb, brick paver banding, and crosswalks, decorative lighting, and landscaping on Deerpath Road from Oakwood Avenue to Western Avenue in Lake Forest. — Executed Nov 25 New D'Land Construction, LLC $2,990,057 ·
Mar 7, 2025 61L09 CookDistrict 1 Traffic signal modernization at the intersection of Wolf Road and Palmer Avenue in Northlake. — Executed Nov 25 New Home Towne Electric, Inc. $674,695 ·
Mar 7, 2025 61L10 DuPageDistrict 1 PCC Sidewalk with segmental concrete block retaining wall from Freeport Drive to DuJardin Elementary Shcool. Additional work includes curb and gutter, pavement patching, storm sewer, steel railing, and fencing. — Executed Nov 25 New D'Land Construction, LLC $225,598 ·
Mar 7, 2025 61L12 CookDistrict 1 Resurface Main Street from US 30 to 216th Street in Matteson. — Executed Nov 25 New Gallagher Asphalt Corporation $824,771 ·
Mar 7, 2025 61L13 WillDistrict 1 HMA resurfacing on Highpoint Drive from Discovery Park to Weber Road in Romeoville. Additional work includes Class D patches, PCC driveways, sidewalks, drainage and utility structures, and pavement markings. — Executed Nov 25 New P. T. Ferro Construction Co. $392,397 ·
Mar 7, 2025 61L14 CookDistrict 1 HMA resurfacing on Center Street from 175th Street to 171st Street in East Hazel Crest. Additional work includes Patching, HMA shoulders, Driveways, Sidewalks, an HMA Multi-use Path, Lighting, Drainage Structures, and Pavement Markings. — Executed Nov 25 New D. Construction, Inc. $927,996 ·
Mar 7, 2025 61L15 CookDistrict 1 Resurface 207th Street from IL 50 to Crawford Avenue in Matteson. — Executed Nov 25 New P. T. Ferro Construction Co. $899,917 ·
Mar 7, 2025 61L16 LakeDistrict 1 Sidewalk improvements at various intersections in Lake Forest. — Executed Nov 25 New D'Land Construction, LLC $246,136 ·
Mar 7, 2025 61L17 LakeDistrict 1 Resurfacing Hart Road from West of the Village limits to Round Lake Road in Round Lake — Executed Nov 25 New Peter Baker & Son Co. $388,288 ·
Mar 7, 2025 61L20 CookDistrict 1 Resurfacing Taft Drive from east of Union Avneu to Canal Street in South Holland. — Executed Nov 25 New D. Construction, Inc. $413,449 ·
Mar 7, 2025 61L23 CookDistrict 1 HMA Resurfacing on Hassell Road from Fairway Cout to Rosedale Lane in Hoffman Estates. Additional work includes patching, ADA Ramp, Sidewalks, Driveways, Pavement Markings, and Signage. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $1,163,964 ·
Mar 7, 2025 61L25 CookDistrict 1 Roadway, pedestrian, and street improvements on Sterling Avenue from Central Drive to Flossmoor Road in Flossmoor. — Executed Nov 25 New D. Construction, Inc. $1,920,303 ·
Mar 7, 2025 61L26 KaneDistrict 1 Resurfacing on Prairie Street from Randall Road to South 13th Street in St. Charles. — Rejected Nov 25 New
Mar 7, 2025 61L27 CookDistrict 1 HMA resurfacing of Stroy Avenue from 186th Street to Thornton-Lansing Road in Lansing. Includes patching, driveways, curb and gutter, sidewalks, drainage improvements, pavement markings, and signage. — Executed Nov 25 New Gallagher Asphalt Corporation $592,913 ·
Mar 7, 2025 62G55 WillDistrict 1 Pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course The Standard Overlay consists of pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course, drainage structures adjustment and cleaning, grading and shaping ditches, placement of pavement markings. Located on Illinois Route 171 (Archer Ave.) begins at Boula Ave. and extends in a northeasterly direction for 4,542.2 feet (0.86 mile ) to approximately 0.1 miles southwest of I-355. The improvement is in the City of Lockport, in Will County. — Executed Nov 25 New Gallagher Asphalt Corporation $1,427,655 ·
Mar 7, 2025 62L58 CookDistrict 1 Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps (1.426-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers. Located in the Villages of Lincolnwood and City of Chicago in Cook County. — Rejected Nov 25 New Builders Paving, LLC $4,247,496 ·
Mar 7, 2025 62N33 DuPageDistrict 1 (16.7-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 64 (North Avenue) from Smith / Kautz Rd to York St in the Cities of St. Charles West Chicago, and Elmhurst, and in the Villages of Carol Stream, Glendale Heights, Lombard, Addison, and Villa Park in DuPage County. — Rejected Nov 25 New John Burns Construction Company $25,464,000 ·
Mar 7, 2025 62N91 CookDistrict 1 (3.86-Mile) Bridge Rehabilitation and Roadway Improvement along Il 53 in Cook County. — Executed Nov 25 New Dunnet Bay Construction Company & K-Five Construction Corporation $105,964,527 ·
Mar 7, 2025 62P43 CookDistrict 1 (533-Ft), Bridge Superstructure replacement, bridge abutment replacement, approach slab replacement, pier repairs, lighting, ADA improvements and traffic signal Modernization. This project is located on Leavitt Street over Interstate 290 (I-290) between the intersections of Congress Parkway and Van Buren Street. — Executed Nov 25 New Lorig Construction Company $13,975,161 ·
Mar 7, 2025 62R58 CookDuPageDistrict 1 This project is located along IL 19 (Irving Park Road) from East of Wise Road to Roselle Road. The scope of work includes designed overlay, new shoulders, and ADA improvements. The gross and net length is 14,175 feet (2 .68 miles). It is located in the Villages of Roselle and Schaumburg, and unincorporated Bloomingdale and Schaumburg Townships in Cook and DuPage Counties. — Executed Nov 25 New R. W. Dunteman Company $4,792,444 ·
Mar 7, 2025 62R73 CookDistrict 1 Culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement The proposed improvement consists of culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement and resurfacing located on IL 68 (Dundee Road) over E. Branch of Salt Creek in the Village of Palatine, Cook County. Gross and Net length: 2430 Ft (0.46 Mile) — Executed Nov 25 New Martam Construction Incorporated $2,946,729 ·
Mar 7, 2025 62R96 McHenryDistrict 1 Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (3.16 miles) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, on IL 173 from Northeast of Riegheimer Road to 0.2 miles south of Oak Grove Road. This project is in the City of Harvard and Alden Township. — Executed Nov 25 New Peter Baker & Son Co. $1,270,720 ·
Mar 7, 2025 62T31 DuPageDistrict 1 Gross and Net Length = 3,713 feet (0.703 miles) and 341 feet (0.065 miles). Bridge Preservation Project: Deck Overlay, Joint Replacement / Repair at IL 53 over Ginko Way (Morton Arboretum) and over East Branch DuPage River. This project is located in Unincorporated DuPage County. — Executed Nov 25 New D. Construction, Inc. $1,159,146 ·
Mar 7, 2025 62T48 CookDistrict 1 (1,119-Ft) Bridge preservation project: deck overlay, joints replacement/ repair. Improvement includes hydro scarification, latex modified concrete overlay, deck slab repair, structural repair of concrete, sawcut grooving, join replacement, approach slab repair, concrete sealer, HMA approach butt joints, median replacement and curb and gutter replacement. Location of Work: Western venue at Thorn Creek (approx. 0.2-miles South of Sauk Trail) in the Village of Park Forest. — Executed Nov 25 New D. Construction, Inc. $589,859 ·
Mar 7, 2025 62T50 CookDistrict 1 Bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County (292-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County. — Executed Nov 25 New D. Construction, Inc. $1,094,671 ·
Mar 7, 2025 62T83 McHenryDistrict 1 Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (1.49-Mile) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers; Location: IL 173, from Harvard Hills Rd to SW of Righeimer Rd within the City of Harvard. — Executed Nov 25 New Peter Baker & Son Co. $622,485 ·
Mar 7, 2025 62U89 WillDistrict 1 The building demolition at various locations The proposed scope of work consists of the building demolition at various locations. Each building removal will include removal any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalk and_driveways, utilities and trees within the parcels limits. The project is in Will County. — Executed Nov 25 New Scanlon Excavating & Concrete, Inc. $498,400 ·
Mar 7, 2025 62U91 LakeDistrict 1 (1.61-Mile) Standard Overlay, New Shoulders improvement consisting of hot-mix asphalt surface removal, pavement patching, nominal curb and gutter replacement hot-mix asphalt resurfacing, installation of hot-mix asphalt shoulders, grading and shaping of existing aggregate shoulders, and thermoplastic pavement marking Old Skokie Road from US 41 (Skokie Highway) to the Wisconsin State Line within the Village of Wadsworth, in Lake County. — Executed Nov 25 New Payne & Dolan, Inc. $2,424,972 ·
Mar 7, 2025 62W55 VariousDistrict 1 Various Expressway Routes (Daytime Sweeping) This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, Lake and Will. — Executed Nov 25 New Central Sweeping of Illinois, LLC $11,515,816 ·
Mar 7, 2025 62W60 CookDuPageDistrict 1 This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals with ADA compliant ramps at various locations in District 1. — Executed Nov 25 New H & H Electric Co. $1,375,723 ·
Mar 7, 2025 62W61 VariousDistrict 1 This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals. installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals, ADA ramp improvements, connection to KDOT and LCDOT centralized traffic signal systems at various locations in District 1. — Executed Nov 25 New H & H Electric Co. $2,125,601 ·
Mar 7, 2025 62W63 CookDistrict 1 This is a parking lot resurfacing improvement includes pavement removal, drainage structure adjustment, placement of subbase material, HMA binder course HMA surface course, Portland cement concrete, thermoplastic pavement markings. Located in the IDOT Hillside Maintenance Yard at, 4160 May St., Hillside, IL. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $794,968 ·
Mar 7, 2025 62W73 CookDistrict 1 Standard and Design Overlay and ADA Improvements and all incidental and collateral work (2.89-Mile) Standard and Designed Overlay with ADA improvements on Green Bay Road from Scott Avenue to Kenilworth Avenue located in the Villages of Kenilworth, Winnetka and Glencoe within Cook County. — Rejected Nov 25 New Peter Baker & Son Co. $4,682,472 ·
Mar 7, 2025 62W87 CookDistrict 1 (9.76-Mile) Standard Overlay, Bridge Deck Overlay, Bridge Repair, Bridge Superstructure Replacement, Sign Structures, Lighting, and ITS. Location of Work: I-94 (Bishop Ford Freeway) from West of Martin Luther King Dr to US 6 (159th St) within the Cities of Chicago and Calumet and the Villages of Burnham Riverdale, South Holland and Dolton. — Active Nov 25 New Lorig Construction Company $81,370,819 ·
Mar 7, 2025 62X21 CookLakeDistrict 1 Cleaning and painting designated steel surfaces This is a bridge painting project consists of cleaning and painting designated steel surfaces. Location #1: IL-58 (Dempster St) over I-94 (Edens Expwy) Village of Skokie in Cook County SN: 016-0943. Location #2: Clavey Rd over US-41 (Edens) City of Highland Park in Lake County SN: 049-0165. Location #3: Tower Rd over I-94/US-41 (Edens) Village of Northfield in Cook County SN: 016-0815. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $1,181,744 ·
Mar 7, 2025 62X36 McHenryDistrict 1 This is a milled rumble strip project. This project begins at the south of the intersection of IL Route 31 (Richmond Road) and Pioneer Drive and proceeds in a northernly direction for 5.204 miles to south of the intersection of IL 31 Tryon Grove Road and U.S. Route 12. The project is located within the Villages of Ringwood and Richmond and the Townships of Richmond and McHenry in McHenry County. — Executed Nov 25 New Payne & Dolan, Inc. $348,412 ·
Mar 7, 2025 62X76 CookDuPageWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties. — Executed Nov 25 New Thor General Contracting LLC $305,910 ·
Mar 7, 2025 62X77 CookWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. — Executed Nov 25 New Thor General Contracting LLC $477,405 ·
Mar 7, 2025 62X79 CookLakeDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy) in Cook and Lake Counties. — Executed Nov 25 New The Final Connection, Inc. $164,400 ·
Mar 7, 2025 62X90 LakeDistrict 1 The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish located on various State maintained arterial routes located within the county of Lake. — Executed Nov 25 New Central Sweeping of Illinois, LLC $2,728,800 ·
Mar 7, 2025 62X91 VariousDistrict 1 The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish. Location is on various State maintained arterial routes located within Kane and McHenry Counties. — Executed Nov 25 New Central Sweeping of Illinois, LLC $1,982,600 ·
Mar 7, 2025 62X95 VariousDistrict 1 Weed Spraying within various areas in District 1 and IDOT District 1 maintenance yards: Alsip, Oakbrook, Gurnee, and Northbrook. — Executed Nov 25 New ALLEN CHASE ENTERPRISES INC. $338,044 ·
Mar 7, 2025 64N01 WhitesideDistrict 2 8.25 miles of patching, milling and resurfacing on I-88 from Elkhorn Creek to US 30. Expansion joint replacement, deck patching, concrete overlay, and miscellaneous other bridge repairs to SN's: 098-0073, 098-0074, 098-0075, 098-0076, 098-0087, and 098-0088. Demolition and removal of SN's 098-0089 and 098-0090. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $26,883,771 ·
Mar 7, 2025 64R02 LeeDistrict 2 Reconstruction of sidewalk ramps for those with disabilities at ramps deemed uncompliant, patching, milling, and resurfacing along various state routes in Dixon, Illinois. Gross Length 4,163 ft. — Executed Nov 25 New Martin & Company Excavating $4,036,696 ·
Mar 7, 2025 64S33 StephensonDistrict 2 Bridge repairs and joint replacement on SN 089-0030, carrying IL 73 over Indian Creek in Winslow. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $447,987 ·
Mar 7, 2025 64S87 Rock IslandDistrict 2 Traffic signals upgrade at Barstow Rd 0.6 mile northeast of IL 92 interchange in Carbon Cliff. — Executed Nov 25 New Davenport Electric Contract Company $321,496 ·
Mar 7, 2025 64T20 HenryDistrict 2 Bridge repairs and approach and deck overlay on SN 037-0143, carrying US 6 over Mosquito Creek, 0.3 miles west of I-280. — Executed Nov 25 New Martin & Company Excavating $263,536 ·
Mar 7, 2025 64T81 WhitesideDistrict 2 0.5 miles of resurfacing on US 30 from IL 78 to Garden Plain Rd in Morrison — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $218,027 ·
Mar 7, 2025 64T82 Rock IslandDistrict 2 Standard overlay on Airport Rd from 0.56 mile to 0.86 mile east of Rock Island - Milan Parkway. 0.6 mile gross length. — Executed Nov 25 New Brandt Construction Co. $266,278 ·
Mar 7, 2025 64T91 WhitesideDistrict 2 Full bridge cleaning and painting at SN 098-0033 carrying US 30 over Elkhorn Creek 0.6 mile west of Como Rd. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $289,059 ·
Mar 7, 2025 64U07 Rock IslandDistrict 2 Bridge washing of 11 structures along I-74 in Rock Island County. — Executed Nov 25 New Pressure Washing Unlimited Inc. $68,100 ·
Mar 7, 2025 64U08 WinnebagoDistrict 2 Bridge washing of SN 101-0133 and 101-0134 over the Kishwaukee River in Winnebago County. — Executed Nov 25 New Pressure Washing Unlimited Inc. $20,900 ·
Mar 7, 2025 64U09 BooneWinnebagoDistrict 2 Bridge washing of 9 structures in Boone and Winnebago Counties. — Executed Nov 25 New Pressure Washing Unlimited Inc. $58,850 ·
Mar 7, 2025 64U10 VariousDistrict 2 Bridge washing of 9 structures in Boone and Winnebago Counties. — Executed Nov 25 New Pressure Washing Unlimited Inc. $92,050 ·
Mar 7, 2025 64U11 VariousDistrict 2 Bridge washing of 12 structures in various counties. — Executed Nov 25 New Pressure Washing Unlimited Inc. $94,625 ·
Mar 7, 2025 64U25 OgleDistrict 2 7.931 miles of HMA milling and resurfacing on IL 64 from Chana Rd to Il 251. — Executed Nov 25 New Martin & Company Excavating $3,123,589 ·
Mar 7, 2025 64U27 WinnebagoDistrict 2 7.54 Miles Hot-Mix Asphalt pavement overlay, 0.2 Mi W of Pecatonica Rd_to 0.2 mile W of Falconer Rd. — Executed Nov 25 New Rock Road Companies, Inc. $3,578,388 ·
Mar 7, 2025 64U29 HenryDistrict 2 Standard overlay on IL 82 from 700N south of Cambridge to IL 17. Approximately 5.87 miles. — Executed Nov 25 New Advanced Asphalt Company $2,998,150 ·
Mar 7, 2025 64U30 StephensonDistrict 2 4.63 miles of HMA milling and resurfacing on US 20 from Rees Rd to 0.4 mile west of Flansburg Rd. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,614,512 ·
Mar 7, 2025 64U33 WhitesideDistrict 2 15.3 miles of milling and resurfacing on Moline Rd. from East St. in Erie to IL 78 and 3rd Ave. in Lyndon to US 30. — Executed Nov 25 New Civil Constructors Inc. dba Helm Civil and Valley Construction Co., J.V. $7,840,008 ·
Mar 7, 2025 66K70 BureauDistrict 3 350 ft of Bridge Repairs (SN 006-0097) over Green River, 1.4 MI W OF IL 40. — Executed Nov 25 New Martin & Company Excavating $650,504 ·
Mar 7, 2025 66M57 DeKalbDistrict 3 HMA milling and resurfacing (designed overlay), culvert replacement, pavement marking, ditch cleaning and raised reflective markers on IL 72 beginning at IL-23 (N) and ends at Kane County Line; HMA milling and resurfacing (standard overlay), pavement marking, and raised reflective markers on IL 23 beginning at IL 72 and ends at the McHenry County line. 7.183 miles gross length. — Executed Nov 25 New Curran Contracting Company $2,734,986 ·
Mar 7, 2025 66N41 PutnamDistrict 3 Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at Structure No. 078-0047 carrying IL Route 89 over the Illinois River approximately 0.91 mile south of US Route 6. — Executed Nov 25 New All States Painting, Inc. $74,028 ·
Mar 7, 2025 66N42 LaSalleDistrict 3 Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at various structures over the Illinois River in LaSalle County. — Executed Nov 25 New Interstate Maintenance, Incorporated $262,302 ·
Mar 7, 2025 66P49 DeKalbDistrict 3 HMA milling and resurfacing patching, pavement marking and reflective markers on FAP 307 (IL 64), from 0.2 mile east of Airport Rd to Kane County Line in DeKalb County. Approximately 2.946 miles gross length. — Executed Nov 25 New Curran Contracting Company $1,541,645 ·
Mar 7, 2025 66P51 GrundyDistrict 3 Milling and resurfacing 1.15 miles of OR 129 from Main St. to Carbon Hill Rd. in Gardner, along with the replacement of 3 culverts within the Project Bounds. — Executed Nov 25 New D. Construction, Inc. $680,856 ·
Mar 7, 2025 66P78 VariousDistrict 3 Weed spraying to aid in weed control along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. — Executed Nov 25 New The Daltons Inc. $168,697 ·
Mar 7, 2025 66P83 LivingstonDistrict 3 Cleaning and painting all structural steel of SN 053-0160 carrying IL 17 over Prairie Creek, 1.0 mile east of IL 23. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $143,680 ·
Mar 7, 2025 66P84 KankakeeDistrict 3 Cleaning and painting all steel components of structure 046-0114 carrying I-57 over Minnie Creek, 4.3 miles north of the Chebanse interchange. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $127,908 ·
Mar 7, 2025 66P95 LaSalleDistrict 3 HMA milling and resurfacing on the frontage road, parallel to IL 23 on the north side of Streator, and is approximately 0.22 mile long. — Executed Nov 25 New Kankakee Valley Construction Company, Inc. $180,130 ·
Mar 7, 2025 66R00 VariousDistrict 3 Litter removal from the interstate highways at interchanges and rest areas throughout District 3. — Active Nov 25 New The Final Connection, Inc. $327,337 ·
Mar 7, 2025 66R05 LaSalleDistrict 3 Replacing the 6" centerline pavement marking with 9" contrast pavement marking tape and replacing the 8" lane lines at interchange ramps on I-39 from north of Oglesby Interchange at M.M. 54 to M.M. 76.4. — Executed Nov 25 New A. C. Pavement Striping Co. $936,906 ·
Mar 7, 2025 66R06 LaSalleLivingstonDistrict 3 Contrast pavement marking of the 8" lane lines on IL 23 at Richards Rd in LaSalle County and ending at Adams St in Livingston County and also on IL 18 beginning at Second Ave and ending at Wasson St in LaSalle County. — Executed Nov 25 New Varsity Striping & Construction Co. $268,247 ·
Mar 7, 2025 66R07 VariousDistrict 3 Removal and replacement of damaged or deteriorated sand module impact attenuators on various interstate routes in various counties in District 3. — Executed Nov 25 New
Mar 7, 2025 66R09 LivingstonDistrict 3 Excavating and grading existing shoulders and placing aggregate shoulders on OR 66 from IL Route 116 to E. 1600 Road. — Executed Nov 25 New H. J. Eppel & Co. $88,186 ·
Mar 7, 2025 66R29 BureauDistrict 3 2.3 miles HMA milling and resurfacing, patching, pavement marking, and reflective markers on SBI 7C (2775E RD), from US 6 to IL 29 in Bureau County. — Executed Nov 25 New Advanced Asphalt Company $1,461,525 ·
Mar 7, 2025 66R30 BureauDistrict 3 HMA milling and resurfacing, patching, pavement marking and reflective markers on SBI 88 (NEW BEDFORD RD), from Main St in New Bedford to IL 40 in Bureau County. 1.74 mile gross length. — Executed Nov 25 New Advanced Asphalt Company $985,903 ·
Mar 7, 2025 66R34 IroquoisDistrict 3 HMA milling and resurfacing 2" (SMART) of the mainline, shoulder work, pavement marking, and raised reflectors on FAI 57 from 0.5 mile north of IL 116 to 1.6 miles north of CH4. 4.88 miles gross. — Executed Nov 25 New Iroquois Paving Corporation $9,823,667 ·
Mar 7, 2025 68E50 KnoxDistrict 4 Widening and resurfacing, culvert replacements, culvert repairs, drainage improvements, and guardrail upgrades on IL 180 from IL 167 to US 150 in Knox County. Approximately 10.48 miles. — Executed Nov 25 New Gunther Construction, a div of UCM, Inc. $29,190,217 ·
Mar 7, 2025 68F90 PutnamDistrict 4 5.91 miles of resurfacing (PPP) project extends from 1.4 miles east of the I-180/IL 26 interchange to IL 89. — Executed Nov 25 New Advanced Asphalt Company $5,166,321 ·
Mar 7, 2025 68H31 TazewellDistrict 4 Bridge deck sealing at various locations in Tazewell County. — Executed Nov 25 New All States Painting, Inc. $348,300 ·
Mar 7, 2025 68J17 McDonoughDistrict 4 12 miles of Cape Seal on IL 9 from the Hancock County Line to US 67 in Good Hope in McDonough County. — Executed Nov 25 New A. C. Pavement Striping Co. $1,625,964 ·
Mar 7, 2025 68J19 MarshallPeoriaWoodfordDistrict 4 Crack and joint sealing at various locations in Peoria, Marshall, and Woodford Counties. — Executed Nov 25 New Denler, Inc. $858,085 ·
6,601–6,700 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.