| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 8, 2024 | 70G63 | DeWittDistrict 5 | Repair miscellaneous at Canadian National RR, tributary to Salt Creek northeast of Farmer City. | — | Executed | Stark Excavating, Inc. $738,771 · | ||
| Mar 8, 2024 | 70G74 | PiattDistrict 5 | 4.056 miles of Cape Seal Operations from 0.1 mile South of IL 105 to US 36. | — | Executed | Beniach Construction Co., Inc. $596,703 · | ||
| Mar 8, 2024 | 70G82 | ChampaignDistrict 5 | Bridge deck sealing 99 structures in Champaign County; 51 structures in MPO Champaign-Urbana. | — | Executed | M & M Concrete, Inc. $156,931 · | ||
| Mar 8, 2024 | 70G88 | ChampaignDouglasDistrict 5 | 24.620 miles, contract maintenance patching, 0.3 mi north of US 36 to 0.7 mi south of NSRR NW of Champaign. | — | Executed | Beniach Construction Co., Inc. $464,433 · | ||
| Mar 8, 2024 | 70G89 | McLeanDistrict 5 | 0.23 miles Rumble Strip Installation, US Route 24 at Old US Route 66 Intersection. | — | Executed | Kinney Contractors, Inc. $202,904 · | ||
| Mar 8, 2024 | 72159 | SangamonDistrict 6 | Bridge deck overlay on SN 084-0208 and 084-0209 carrying East Lake Shore Drive over ICRR and Lake Springfield Slough, 0.6 and 0.7 miles east of I-55 in Springfield. | — | Executed | Sangamo Construction Company $999,555 · | ||
| Mar 8, 2024 | 72233 | VariousDistrict 6 | Sealing of bridge decks, approach pavements and parapets on multiple structures on various routes in various counties of District 6. | — | Executed | M & M Concrete, Inc. $230,790 · | ||
| Mar 8, 2024 | 72618 | SangamonDistrict 6 | Painting SN 084-0151 carrying Oak Crest Road over I-72, 2.9 miles east of I-55 near Springfield. | — | Executed | Eagle Painting & Maintenance Company, Inc. $208,640 · | ||
| Mar 8, 2024 | 72721 | LoganDistrict 6 | Patching on I-55 from the Sangamon County line to the McLean County line. | — | Executed | Kinney Contractors, Inc. $641,872 · | ||
| Mar 8, 2024 | 72724 | ScottDistrict 6 | Surface removal and standard overlay on Hillview Blacktop from just south of IL 106 to 0.6 miles south of IL 106. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $363,820 · | ||
| Mar 8, 2024 | 72731 | AdamsDistrict 6 | Bridge deck and approach repairs on SN 001-0070 carrying IL 104 eastbound over Mill Creek. | — | Executed | County Contractors, Inc. $408,593 · | ||
| Mar 8, 2024 | 74562 | ClarkDistrict 7 | Replacement of SN 012-0018 carrying US 40 over North Fork Embarras River, 0.6 miles west of Washington Street in Martinsville. | — | Active | Sangamo Construction Company $4,296,237 · | ||
| Mar 8, 2024 | 74903 | ColesDistrict 7 | 9.3 miles of HMA surface removal, binder and surface courses, HMA and aggregate shoulders, longitudinal joint sealant and cured-in-place pipe liner at various locations in Charleston. | — | Executed | Howell Paving, Inc. $4,864,767 · | ||
| Mar 8, 2024 | 74980 | CrawfordDistrict 7 | 0.8 miles of inlay resurfacing on IL 33 from 0.2 miles east of North Glendale Road to Park Forest Drive in Robinson. | — | Executed | Ambraw Asphalt Materials, Inc. $1,227,150 · | ||
| Mar 8, 2024 | 74981 | FayetteDistrict 7 | Patching, milling and resurfacing on I-70 from the Kaskaskia River east of Vandalia to 1 mile west of US 40. | — | Executed | Howell Paving, Inc. $4,499,036 · | ||
| Mar 8, 2024 | 74A64 | CumberlandDistrict 7 | 2.8 miles of patching, resurfacing and shoulders on IL 49 from the Clark County line to the Jasper County line. | — | Executed | Ne-Co Asphalt Co., Inc. $1,801,329 · | ||
| Mar 8, 2024 | 74B82 | EffinghamDistrict 7 | 3.3 miles of patching, milling and resurfacing on IL 32/33 from 0.2 miles west of IL 32 to 0.2 miles west of Ford Avenue in Effingham. | — | Executed | Howell Paving, Inc. $4,287,220 · | ||
| Mar 8, 2024 | 74B88 | ClayDistrict 7 | 6.5 miles of milling and resurfacing on US 45 from Bible Grove Road to 0.1 miles north of Vandalia Road in Louisville. | — | Executed | Howell Paving, Inc. $5,487,005 · | ||
| Mar 8, 2024 | 74C17 | MaconDistrict 7 | 4 miles of patching, resurfacing and aggregate wedge shoulders on IL 121 from 0.2 miles east of Burgener Drive in Mt. Zion to 0.4 miles west of IL 128. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,276,444 · | ||
| Mar 8, 2024 | 74C40 | VariousDistrict 7 | Sealing the bridge decks on 65 structures on various routes in various counties of District 7. | — | Executed | M & M Concrete, Inc. $79,985 · | ||
| Mar 8, 2024 | 74C89 | ColesDistrict 7 | 21.4 miles of weed control on I-57 in various counties of District 7. | — | Executed | The Daltons Inc. $66,177 · | ||
| Mar 8, 2024 | 76H41 | St. ClairDistrict 8 | 2 miles of new construction on IL 158 from IL 161 to IL 177, including new SN 082-0276. | — | Executed | Plocher Construction Company, Inc. $19,990,000 · | ||
| Mar 8, 2024 | 76R84 | MadisonSt. ClairDistrict 8 | Traffic signal modernization at various intersections in District 8. (IL 3 / IL 111 at Godfrey Road; IL 203 at Madison Avenue / High Street; IL 203 at Ohio Avenue) | — | Executed | Electrico, Inc. $546,454 · | ||
| Mar 8, 2024 | 76T13 | VariousDistrict 8 | Pavement patching at various locations in District 8. | — | Executed | Kinney Contractors, Inc. $1,197,526 · | ||
| Mar 8, 2024 | 76T19 | MadisonDistrict 8 | Patching on IL 203 from Eagle Creek Road to the St. Clair County line. | — | Executed | G. M. Sipes Construction, Inc. $214,416 · | ||
| Mar 8, 2024 | 76T21 | BondDistrict 8 | 1.2 miles of chip seal and fog seal on Old IL 127 from 0.2 miles north of OR 15 to IL 127. | — | Executed | DMS Contracting, Inc. $58,640 · | ||
| Mar 8, 2024 | 76T22 | JerseyDistrict 8 | 1.98 miles of patching and resurfacing on Old US 67 from 0.6 miles north of Delhi Road to Hilltop Lane. | — | Executed | Charles E. Mahoney Co. $869,829 · | ||
| Mar 8, 2024 | 76T23 | BondDistrict 8 | 0.9 miles of resurfacing on State Street from O-Fallon Street to US 40 in Pocahontas. | — | Executed | The Kilian Corporation $257,173 · | ||
| Mar 8, 2024 | 76T24 | MadisonDistrict 8 | 2.19 miles of SMART overlay milling and resurfacing, pavement patching, guardrail improvements, and pavement marking on W Frontage Rd from 0.1 miles east of of Park Street in Livingston to the Macoupin County Line. | — | Executed | The Kilian Corporation $1,320,855 · | ||
| Mar 8, 2024 | 76T27 | BondMadisonDistrict 8 | 4.9 miles of fog seal on Schuster Road in Madison County from IL 143 to Bauman Road and on Freys Meadow Avenue in Bond County from Bauman Road to 1 mile west of Pokey Road. | — | Executed | DMS Contracting, Inc. $289,901 · | ||
| Mar 8, 2024 | 76T33 | MadisonDistrict 8 | 0.9 miles of resurfacing on Vadalabene Drive from IL 162 to IL 159 in Maryville. | — | Executed | Charles E. Mahoney Co. $367,895 · | ||
| Mar 8, 2024 | 76T36 | St. ClairDistrict 8 | 0.8 miles of chip seal and fog seal on California Drive from 79th Street to IL 157. | — | Executed | DMS Contracting, Inc. $60,997 · | ||
| Mar 8, 2024 | 76T37 | MonroeDistrict 8 | 1.2 miles of chip seal and fog seal along Ghent Road (Old Route 3) from the Monroe County line to 0.3 miles north of Columbia Lakes Drive. | — | Executed | DMS Contracting, Inc. $85,644 · | ||
| Mar 8, 2024 | 78948 | JohnsonDistrict 9 | Removal and replacement of SN 044-7057 carrying IL 146 over an unnamed ditch, 0.6 miles east of IL 147. | — | Executed | Sierra Bravo Contractors, LLC $544,736 · | ||
| Mar 8, 2024 | 78997 | FranklinDistrict 9 | Adding a 5- concrete wearing surface on 2 structures carrying IL 34 over a creek, approximately 2.5 miles east of Benton. (SN 028-0044 and 028-0045) | — | Executed | Samron Midwest Contracting, Inc. $731,731 · | ||
| Mar 8, 2024 | 78A07 | WhiteDistrict 9 | Bridge deck overlay and HMA transitions on dual bridges carrying I-64 over French Creek, 1.25 miles west of IL 1. (SN 097-0051 and 097-0052) | — | Executed | E. T. Simonds Construction Company $617,963 · | ||
| Mar 8, 2024 | 78A20 | GallatinDistrict 9 | 8.5 miles of milling and resurfacing on IL 1 from 0.1 miles south of Grater Road to the Hardin County line. | — | Executed | E. T. Simonds Construction Company $3,393,720 · | ||
| Mar 8, 2024 | 78A31 | JeffersonDistrict 9 | 0.85 miles of seal coating on Game Farm Road from IL 37 to the Game Farm entrance gate. | — | Executed | Illini Asphalt Corporation $63,398 · | ||
| Mar 8, 2024 | 78A34 | JeffersonDistrict 9 | 1.5 miles of patching, HMA surface removal, binder and surface courses on Old IL 37 from IL 37 on the north to IL 37 on the south. | — | Executed | E. T. Simonds Construction Company $763,684 · | ||
| Mar 8, 2024 | 78A37 | SalineDistrict 9 | 7 miles of patching, HMA surface removal and resurfacing on IL 142 from the Hamilton County line to just north of US 45 in Eldorado. | — | Executed | E. T. Simonds Construction Company $2,986,792 · | ||
| Mar 8, 2024 | 78A45 | FranklinDistrict 9 | 5.7 miles of HMA surface removal, binder and surface course, HMA shoulders, aggregate shoulders and patching on IL 14 from IL 148 in Christopher to North Court Street in West City. | — | Executed | E. T. Simonds Construction Company $2,185,980 · | ||
| Mar 8, 2024 | 78A46 | JeffersonDistrict 9 | 17.3 miles of patching, HMA surface removal and HMA resurfacing on IL 148 from the Franklin County line to 0.4 miles west of IL 37 in Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $5,064,070 · | ||
| Mar 8, 2024 | 78A47 | FranklinPerryDistrict 9 | 10.9 miles of patching, milling and resurfacing on IL 154 from US 51 north of DuQuoin to IL 148 south of Sesser. | — | Executed | E. T. Simonds Construction Company $5,053,409 · | ||
| Mar 8, 2024 | 85752 | StephensonDistrict 2 | Install signing, raised reflective pavement markers and pavement markings on various routes in Stephenson County. | — | Executed | Countryman, Inc. $158,342 · | ||
| Mar 8, 2024 | 85753 | HenryDistrict 2 | Replace the bridge carrying CH 19 over Hillery Creek, 3 miles south of Cambridge. | — | Executed | Curnyn Construction Co. $718,769 · | ||
| Mar 8, 2024 | 85754 | BooneDistrict 2 | Resurface Newburg Road from the Kishwaukee River Bridge to Irene Road in Belvidere. | — | Executed | Rock Road Companies, Inc. $636,212 · | ||
| Mar 8, 2024 | 85755 | Rock IslandDistrict 2 | HMA resurfacing, patching ADA improvements, Utility adjustments, and drainage structure adjustments on 19th Avenue from east corporate limits of Rock Island to 7th Street in Moline. | — | Executed | Langman Construction, Inc. $1,044,013 · | ||
| Mar 8, 2024 | 85756 | OgleDistrict 2 | HMA overlay with HMA shoulders on Mantague Road from IL 26 to Baileyville Road and on Baileyville Road from Montague Road to IL 26. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,059,060 · | ||
| Mar 8, 2024 | 87811 | BureauDistrict 3 | HMA resurfacing, curb and gutter, and traffic signals on South Main Street in Princeton. | — | Executed | Advanced Asphalt Company $845,557 · | ||
| Mar 8, 2024 | 87821 | LivingstonDistrict 3 | Replace the bridge carrying CH 16 over Prairie Creek, 1.5 miles south of IL 17. | — | Executed | Tobey's Construction & Cartage, Inc. $511,620 · | ||
| Mar 8, 2024 | 87830 | LaSalleDistrict 3 | HMA resurfacing with aggregate wedge shoulders and other miscellaneous work on County Highway 41 from the DeKalb County Line to Brown Street in Earlville. | — | Executed | Advanced Asphalt Company $567,219 · | ||
| Mar 8, 2024 | 87833 | DeKalbDistrict 3 | Resurface Somonauk Street from High Street to Conlin Avenue in Sycamore. | — | Executed | Curran Contracting Company $1,136,943 · | ||
| Mar 8, 2024 | 87842 | BureauDistrict 3 | Sidewalk construction along various streets in Ladd. | — | Executed | Gensini Excavating, Inc. $282,441 · | ||
| Mar 8, 2024 | 87844 | GrundyDistrict 3 | Sidewalk and driveway replacement, and landscaping along IL 13 from 5th Avenue to Curtis Street in Diamond. | — | Executed | P. T. Ferro Construction Co. $507,801 · | ||
| Mar 8, 2024 | 87845 | LaSalleDistrict 3 | Sidewalk construction on 11th Street from Rutland Street to Carrie Lane, and on Rutland street from 11th Street to Fillebrowne Street in Marseilles. | — | Executed | Gensini Excavating, Inc. $544,677 · | ||
| Mar 8, 2024 | 89798 | FultonDistrict 4 | Reconstruction of CH 15 from the McDonough County Line to IL 9. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,628,388 · | ||
| Mar 8, 2024 | 89814 | PeoriaDistrict 4 | HMA resurfacing with pavement markings on Adams Street from US 24 to Franklin Avenue in Bartonville. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $694,399 · | ||
| Mar 8, 2024 | 89836 | PeoriaDistrict 4 | Replace PPC deck beams, HMA overlay of approach, shoulder and guardrail replacement on Duncan Road over a tributary to the Spoon River, 2.5 miles north of IL 90 | — | Executed | Stark Excavating, Inc. $1,002,171 · | ||
| Mar 8, 2024 | 89850 | TazewellDistrict 4 | Construction of PCC Sidewalk, combination curb and gutter, pavement markings, signing and fencing along Stadiam Drive from Court Street North to the existing Pekin park District Trail in Pekin. | — | Executed | Illinois Civil Contractors, Inc. $573,961 · | ||
| Mar 8, 2024 | 91618 | VermilionDistrict 5 | Replace the bridge carrying TR 243 over Stony Creek, 1.5 miles northwest of Muncie. | — | Executed | Stark Excavating, Inc. $1,162,872 · | ||
| Mar 8, 2024 | 91620 | McLeanDistrict 5 | Construct a 10 foot wide HMA shared-Use path, PCC sidewalk, curb and gutter, and landscaping along Gregory Street from Parkside Road to Adelaide Street in Normal. | — | Executed | Rowe Construction, a div of UCM, Inc. $1,023,294 · | ||
| Mar 8, 2024 | 91627 | ChampaignDistrict 5 | Sidewalk replacement and construction at various locations in Rantoul. | — | Executed | A & R Mechanical Service, Inc. $176,950 · | ||
| Mar 8, 2024 | 91637 | McLeanDistrict 5 | HMA resurfacing with HMA base course widening, concrete curb and gutter, and shoulder rumble strips on CH 15 from IL 1654 to IL 9. | — | Executed | Rowe Construction, a div of UCM, Inc. $2,971,504 · | ||
| Mar 8, 2024 | 91638 | PiattDistrict 5 | Cold-In-Place Recylcing, HMA surface and shoulders, aggregate shoulders, rumble strips, signage, and drainage improvements on CH 2, from the south corporate limits of Mansfield for 1.77 miles. | — | Executed | Open Road Paving Company LLC $2,541,678 · | ||
| Mar 8, 2024 | 93814 | LoganDistrict 6 | Resurfacing CH 15 from IL 10 to 5th Street in Middletown. | — | Executed | Truman L. Flatt & Sons Co., Inc. $1,703,168 · | ||
| Mar 8, 2024 | 93815 | PikeDistrict 6 | Replace existing structure with a three-span PPC deck beam structure, with aggregate approach pavement, shoulder widening and traffic barrier terminals on Union Street over Spring Creek in Nebo. | — | Executed | County Contractors, Inc. $943,320 · | ||
| Mar 8, 2024 | 93816 | AdamsDistrict 6 | Cold-In-Place Recycling and HMA Overlay on North 1200th Avenue from S.N. 001-3025 to east of TR 414 | — | Executed | Diamond Construction Company $1,027,503 · | ||
| Mar 8, 2024 | 95946 | ColesDistrict 7 | PCC sidewalks, ADA Ramps, and Curb and Gutter on Western Avenue from 43rd Street to Noyes Court in Mattoon. | — | Executed | Shores Builders, Inc. $163,684 · | ||
| Mar 8, 2024 | 95948 | CrawfordDistrict 7 | Resurface Trimble Road/Robinson Road from IL 1 to E 1150 Avenue. | — | Executed | Ambraw Asphalt Materials, Inc. $1,387,981 · | ||
| Mar 8, 2024 | 95950 | ShelbyDistrict 7 | Construction of a single-span PPC deck beam bridge with aggregate approach, channel excavation and seeding on 375 North Road on Matney Branch, 1.2 miles southeast of Oconee. | — | Executed | C-Hill Civil Contractors, Inc. $498,888 · | ||
| Mar 8, 2024 | 97809 | MonroeDistrict 8 | Replace the bridge carrying Carl Street over Wilson Creek, south of IL 3 in Columbia | — | Executed | Baxmeyer Construction, Inc. $648,598 · | ||
| Mar 8, 2024 | 97825 | BondDistrict 8 | Replace the bridge carrying TR 164 over Little Beaver Creek, 1/5 miles south of Dudleyville Road. | — | Executed | C-Hill Civil Contractors, Inc. $498,888 · | ||
| Mar 8, 2024 | 97830 | MadisonDistrict 8 | PCC Pavement, sidewalks, driveways, storm sewers, and pavement markings on Sixth Street from Pine Street to Poplar Street in Highland. | — | Executed | RCS Construction, Inc. $1,549,285 · | ||
| Mar 8, 2024 | 99726 | WilliamsonDistrict 9 | Construct a Bi-Directional Left Turn lane to include base course widening, resurfacing, and extension of a box culvert on IL 166, 4 miles south of IL 13. | — | Active | |||
| Apr 26, 2024 | 46639 | VariousDistrict 2 | Removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order. | — | Executed | O'Brien Civil Works, Inc. $152,258 · | ||
| Apr 26, 2024 | 46641 | VariousDistrict 6 | Removing and replacing damaged raised reflective pavement markers or lenses throughout District 6. | — | Executed | P & P Construction Co. $2,796,520 · | ||
| Apr 26, 2024 | 46642 | VariousDistrict 2 | Placing various widths of preformed plastic and modified urethane pavement marking lines, letters and symbols within the limits specified on each individual work order. | — | Executed | Precision Pavement Markings Inc. $4,661,960 · | ||
| Apr 26, 2024 | 46645 | VariousDistrict 2 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on each individual work order. | — | Executed | Precision Pavement Markings Inc. $998,000 · | ||
| Apr 26, 2024 | 60P75 | DuPageDistrict 1 | (1.62-Mile) Proposed improvement includes widening and reconstruction of IL Route 56 (Butterfield Road) from West of I-355 to Arboretum Drive including Bridge repairs, multi-use path, traffic signals and lighting. | — | Executed | R. W. Dunteman Company $38,948,948 · | ||
| Apr 26, 2024 | 61D34 | WillDistrict 1 | Pavement widening and reconstrtution;includes resurfacing, traffic signals and lightings at the intersection of Bell Road and 143rd Street in Homer Glen. | — | Executed | D. Construction, Inc. $24,310,460 · | ||
| Apr 26, 2024 | 61H34 | WillDistrict 1 | New roadway construction to extend 143rd Street from IL 59 to IL 126. Includes; construction of a new bridge over the DuPage River, culvert exetensions, retaining walls, traffic signals and lighting in Plainfield. | — | Executed | D. Construction, Inc. $53,042,202 · | ||
| Apr 26, 2024 | 61J08 | WillDistrict 1 | Construct a single-lane eliptical roundabout at the intersection of Cedar Road and Haven Avenue in New Lenox. Includes full-depth HMA Pavement, curb and gutter, sidewalk, lighting, and landscaping. | — | Executed | Austin Tyler Construction, Inc. $2,355,249 · | ||
| Apr 26, 2024 | 61J14 | DuPageDistrict 1 | Replace existing structure with a single-span PPC bulb t-beam superstructure with concrete deck, HMA pavement, retaining wall, HMA multi-use path, storm sewers, sidewalks, ADA improvements, Guardrail, curb and gutter, and signage on Warrenville Road over the East Branch of the DuPage River in Lisle. | — | Executed | Dunnet Bay Construction Company $8,419,194 · | ||
| Apr 26, 2024 | 61K00 | DuPageDistrict 1 | Resurfacing Lombard Road from Army Trial Boulevard to Fullerton Avenue in the Village of Addison. | — | Executed | R. W. Dunteman Company $1,427,498 · | ||
| Apr 26, 2024 | 61K13 | DuPageDistrict 1 | Sidewalk construction along Armitage Avenue from Ardmore Avenue to Ellsworth Avenue in Addison. | — | Executed | R. W. Dunteman Company $544,000 · | ||
| Apr 26, 2024 | 61K15 | KaneDistrict 1 | Construct an HMA Shared-Use path with a prefabricated steel truss pedestrian bridge over Blackberry Creek. Includes drainage improvements and landscaping. Project is located between Bell Vue Lane and the Virgil Gilman Nature Trail in Sugar Grove. | — | Executed | D. Construction, Inc. $571,413 · | ||
| Apr 26, 2024 | 61K29 | CookDistrict 1 | HMA Resurfacing, curb and gutter, driveways, sidewalks, pavement patching, pavement markings, restoring Parkways on 25th Avenue from Lawrence Avenue to Waveland Avenue in Schiller Park | — | Executed | Builders Paving, LLC $1,542,137 · | ||
| Apr 26, 2024 | 61K30 | CookDistrict 1 | Extend a multi-use path from 84th Avenue to 179th Street in Tinley Park. | — | Executed | D. Construction, Inc. $264,969 · | ||
| Apr 26, 2024 | 61K31 | CookDistrict 1 | Sidewalk construction on various routes within Alsip. | — | Executed | Davis Concrete Construction Co. $268,435 · | ||
| Apr 26, 2024 | 61K32 | DuPageDistrict 1 | Pavement reconstruction with an HMA multi-use path, curb and gutter, HMA shoulders, sidewalks, ADA ramps, traffic signals, culvert extension, and storm sewer on Gary Avenue from Jewell Road to Harrison Avenue in Wheaton. | — | Executed | Plote Construction, Inc. $4,291,788 · | ||
| Apr 26, 2024 | 61K33 | DuPageDistrict 1 | HMA Resurfacing, sidewalks, traffic signal modifications, and pavement markings on Main Street from Sherman Road to Franklin Street in Downers Grove. | — | Executed | K-Five Construction Corporation $2,384,159 · | ||
| Apr 26, 2024 | 61K34 | LakeDistrict 1 | Pavement reconstruction on FAU 160 (Sprucewood Ln.) from Rolling Ridge Lane to Lake Shore Drive, continuing on Lake Shore from Sprucewood Lane to Beck Road in Lindenhurst. | — | Executed | Lenny Hoffman Excavating, Inc. $5,300,754 · | ||
| Apr 26, 2024 | 61K35 | McHenryDistrict 1 | Roadway widening, reconstruction, resurfacing and triffic signals at the intersectionof Three Oaks Road and Lutter Drive/Sands Road in Crystal Lake. | — | Executed | Curran Contracting Company $2,591,532 · | ||
| Apr 26, 2024 | 61K39 | KaneDistrict 1 | Resurface Baseline Road from US 30 to IL 31 in Montgomery. | — | Executed | Geneva Construction Company $431,447 · | ||
| Apr 26, 2024 | 61K41 | CookDistrict 1 | Construct a concrete paver parking lot, retention basin, drainage improvements, and other work on the Cal-Sag Trial at the Lake Katherine Nature Center in Palos Heights. | — | Executed | D. Construction, Inc. $870,603 · | ||
| Apr 26, 2024 | 61K42 | McHenryDistrict 1 | Traffic signal replacement on Virginia Road from Teckler Boulevard to James R. Rekow Road, and at the intersection of Pyott Road and James R. Rekow Road in Crystal Lake and Lake of the Hills. | — | Executed | H & H Electric Co. $1,455,916 · | ||
| Apr 26, 2024 | 62380 | WillDistrict 1 | Location 1: FAU 354 (Richards Street) at Hickory Creek North of I-80 (SN 099- 0123) 1,835 Feet (0.35 Mile) project which includes reconstruction and widening of the bridge bridge superstructure, pavement reconstruction, noise barriers, drainage, signing, lighting, and traffic signals in the City of Joliet and Joliet Township in Will County. Location feet 2: FAI 80 (I-80) over Des Plaine River (099-0056 EB and 099-0057 WB) 782 feet (0.15 Mile) project which includes structural steel repairs in th | — | Executed | D. Construction, Inc. $19,992,722 · | ||
| Apr 26, 2024 | 62L16 | McHenryDistrict 1 | 7.3 miles of Standard Overlay, Milled Rumble Strips and drainage improvements on IL 173 in the Villages of Hebron and Alden. | — | Executed | Peter Baker & Son Co. $5,133,133 · | ||
| Apr 26, 2024 | 62L31 | CookDistrict 1 | (1,560-Ft) Bridge structural repairs, bridge deck overlay removal and replacement, joint replacement, and bridge drainage repairs, for the Ohio St. Bascule Bridge over the North Branch Chicago River, and the west and east approach bridges, in the City of Chicago, Cook County, IL. | — | Executed | Lorig Construction Company $15,385,971 · | ||
| Apr 26, 2024 | 62M25 | LakeMcHenryDistrict 1 | (8.47-Mile) Standard Overlay, Milled Rumble Strips, Drainage Improvements on IL 173 (Kenosha St) from Greenwood Rd to Madison Ave. This project is in the Villages of Richmond, Spring Grove and in Unincorporated Hebron, Richmond and Burton Townships in McHenry and Lake Counties. | — | Executed | Payne & Dolan, Inc. $7,564,874 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.