(CX-B)B
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Sangamo Construction Company Low bidder | $4,296,237 | ||
| 2 | Samron Midwest Contracting, Inc. | $5,213,231 | +21.3% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Sangamo Constru… | #2 Samron Midwest … |
|---|---|---|---|---|---|---|---|
| 1 | X5030250 | BR DECK GROOVING LONG | 941 | SQ YD | $13.44 | $13.00 | |
| 2 | X5040101 | FD PREC BRIDGE APP SLAB | 1,804 | SQ FT | $176.28 | $144.00 | |
| 3 | X7011800 | TRAF CONT-PROT BLR 21 | 1 | L SUM | $4,649.57 | $5,200.00 | |
| 4 | Z0001495 | BR APPROACH SHLD REM | 33.1 | SQ YD | $59.00 | $17.00 | |
| 5 | Z0004552 | APPROACH SLAB REM | 137 | SQ YD | $49.64 | $56.00 | |
| 6 | Z0005010 | HMA F PATCH (C M) | 10 | TON | $660.60 | $244.00 | |
| 7 | Z0016702 | DETOUR SIGNING | 1 | L SUM | $27,929.54 | $28,000.26 | |
| 8 | Z0018002 | DRAINAGE SCUPPR DS-11 | 8 | EACH | $2,125.59 | $2,102.00 | |
| 9 | Z0029090 | DIAMOND GRIND BR SEC | 1,239 | SQ YD | $17.29 | $13.00 | |
| 10 | Z0070150 | REM RELOC EX MONUMENT | 1 | EACH | $306.15 | $1,100.00 | |
| 11 | 20300100 | CHANNEL EXCAVATION | 6,782 | CU YD | $41.96 | $34.00 | |
| 12 | 28100109 | STONE RIPRAP CL A5 | 2,032 | SQ YD | $81.12 | $125.00 | |
| 13 | 28200200 | FILTER FABRIC | 2,032 | SQ YD | $5.18 | $4.00 | |
| 14 | 40600290 | BIT MATLS TACK CT | 4,062 | POUND | $1.87 | $2.50 | |
| 15 | 40600990 | TEMPORARY RAMP | 27 | SQ YD | $47.28 | $40.00 | |
| 16 | 40603085 | HMA BC IL-19.0 N70 | 169 | TON | $156.92 | $205.00 | |
| 17 | 40604052 | HMA SC IL-9.5 C N70 | 676 | TON | $172.47 | $216.00 | |
| 18 | 42000060 | WELDED WIRE REINF | 123 | SQ YD | $17.40 | $17.00 | |
| 19 | 42000080 | PVT CON PCC BR APP SL | 168 | SQ YD | $205.12 | $222.00 | |
| 20 | 42001300 | PROTECTIVE COAT | 1,554 | SQ YD | $3.17 | $1.65 | |
| 21 | 44000100 | PAVEMENT REM | 574 | SQ YD | $41.59 | $20.00 | |
| 22 | 44000155 | HMA SURF REM 1 1/2 | 7,968 | SQ YD | $5.49 | $7.00 | |
| 23 | 48100100 | AGGREGATE SHLDS A | 540 | TON | $55.00 | $47.00 | |
| 24 | 50100100 | REM EXIST STRUCT | 1 | EACH | $120,580.58 | $106,000.00 | |
| 25 | 50104650 | SLOPE WALL REMOV | 1,240 | SQ YD | $11.06 | $4.00 | |
| 26 | 50200100 | STRUCTURE EXCAVATION | 287 | CU YD | $50.16 | $38.00 | |
| 27 | 50300100 | FLOOR DRAINS | 26 | EACH | $682.94 | $679.00 | |
| 28 | 50300225 | CONC STRUCT | 154.8 | CU YD | $1,058.41 | $1,500.00 | |
| 29 | 50300255 | CONC SUP-STR | 401.4 | CU YD | $1,441.78 | $1,625.00 | |
| 30 | 50300300 | PROTECTIVE COAT | 1,554 | SQ YD | $2.15 | $2.00 | |
| 31 | 50500105 | F & E STRUCT STEEL | 1 | L SUM | $1,453,450.75 | $1,856,810.51 | |
| 32 | 50500505 | STUD SHEAR CONNECTORS | 4,536 | EACH | $4.49 | $4.50 | |
| 33 | 50800205 | REINF BARS, EPOXY CTD | 116,470 | POUND | $1.74 | $3.50 | |
| 34 | 51200963 | FUR M S PILE 16X0.375 | 1,369 | FOOT | $90.21 | $200.00 | |
| 35 | 51202305 | DRIVING PILES | 1,369 | FOOT | $0.0200 | $0.0100 | |
| 36 | 51203200 | TEST PILE MET SHELLS | 2 | EACH | $6,024.01 | $3,600.00 | |
| 37 | 51204650 | PILE SHOES | 32 | EACH | $617.97 | $261.00 | |
| 38 | 51500100 | NAME PLATES | 1 | EACH | $698.14 | $646.00 | |
| 39 | 52000110 | PREF JT STRIP SEAL | 73 | FOOT | $240.67 | $274.00 | |
| 40 | 52100520 | ANCHOR BOLTS 1 | 48 | EACH | $169.08 | $136.00 | |
| 41 | 58600101 | GRANULAR BACKFILL STR | 148 | CU YD | $86.05 | $63.00 | |
| 42 | 60100060 | CONC HDWL FOR P DRAIN | 4 | EACH | $309.58 | $736.00 | |
| 43 | 60146304 | P UNDR FOR STRUCT 4 | 157 | FOOT | $23.93 | $23.00 | |
| 44 | 60500060 | REMOV INLETS | 4 | EACH | $362.96 | $488.00 | |
| 45 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $6,714.78 | $4,600.00 | |
| 46 | 63200310 | GUARDRAIL REMOV | 328 | FOOT | $8.10 | $7.00 | |
| 47 | 63301210 | REM RE-E SPBGR TY A | 819 | FOOT | $13.20 | $21.00 | |
| 48 | 63301990 | REM RE-E T B TERM T1 | 2 | EACH | $2,560.79 | $2,000.00 | |
| 49 | 66700205 | PERM SURV MKRS T1 | 1 | EACH | $841.84 | $2,300.00 | |
| 50 | 67000400 | ENGR FIELD OFFICE A | 10 | CAL MO | $2,305.29 | $2,200.00 | |
| 51 | 67100100 | MOBILIZATION | 1 | L SUM | $253,477.98 | $310,000.00 | |
| 52 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $5,895.90 | $8,300.00 | |
| 53 | 70107025 | CHANGEABLE MESSAGE SN | 14 | CAL DA | $288.02 | $236.00 | |
| 54 | 70300100 | SHORT TERM PAVT MKING | 236 | FOOT | $6.20 | $5.00 | |
| 55 | 70300150 | SHRT TRM PAVT MK REM | 79 | SQ FT | $2.30 | $12.00 | |
| 56 | 78001110 | PAINT PVT MK LINE 4 | 7,855 | FOOT | $0.5100 | $1.00 |