| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jul 31, 2026 | 64T48 | WhitesideDistrict 2 | Bridge repairs and joint replacement on SN 098-0102, carrying Moline Rd over drainage ditch, 1 mile northeast of Lyndon. | — | Executed | Martin & Company Excavating $523,502 · | ||
| Jul 31, 2026 | 64T49 | OgleDistrict 2 | Bridge repairs and joint replacement on SN 071-0015, carrying IL 64 over drainage ditch, 5.7 miles east of junction IL 26. | — | Executed | Martin & Company Excavating $443,472 · | ||
| Jul 31, 2026 | 64V16 | Jo DaviessDistrict 2 | The proposed scope of work is considered an interim repair only and includes installing lagging boards to the existing guardrail posts to prevent water from sheet flowing over the retaining wall and slow down the progression of failure on E. Canyon Road in Jo Daviess County in Section 3, Range 4E and Township 28N. The project is along E. Canyon Road approximately 0.5 miles west of Fiedler Road. | — | Executed | Law Excavating, Inc. $45,940 · | ||
| Jul 31, 2026 | 64V30 | BooneDistrict 2 | Tree removal in advance to CN 64G98 from Shaw Rd east of Winnebago County Line to 0.1 miles northeast of State St in Belvidere. 3.051 miles gross length. | — | Executed | Clean Cut Tree Service, Inc. $615,524 · | ||
| Jul 31, 2026 | 64V41 | Rock IslandDistrict 2 | 2.37 Miles of intermittent resurfacing between US 150 and 38th St. along 27th St. | — | Executed | Valley Construction Co. $755,266 · | ||
| Jul 31, 2026 | 66M85 | LivingstonDistrict 3 | Deck replacement (SN 053-0149) on IL 23 at the BNSF RR and Vermilion River, 0.8 miles south of the LaSalle County Line. | — | Executed | ICC Group Inc. $9,933,000 · | ||
| Jul 31, 2026 | 66N23 | LivingstonDistrict 3 | Removal and replacement of the existing culvert structure (SN 053-2548) carrying IL 116 over_a stream located 5.6 miles west of I-55 in Livingston County. Additional work includes roadway resurfacing, guardrail placement,_and slope and ditch grading. | — | Executed | Riber Construction, Inc. $615,314 · | ||
| Jul 31, 2026 | 66P22 | BureauDistrict 3 | Repairing the Red Covered Bridge (SN 006-0134) on TR 246 (Old Dad Joe_Trail), over Big Bureau Creek, approximately 0.5 mile west of IL-26 in Bureau County. Repairs include roof replacement, truss replacement, floor beam replacement, and other items needed to restore the bridge to its original condition. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,257,661 · | ||
| Jul 31, 2026 | 66T13 | BureauLaSalleDistrict 3 | Milling, resurfacing,_pavement marking, and aggregate construction on a frontage north of I-80 beginning at a dead end (L.M. 0.00) in Bureau County and ending approximately 85 feet west of Plank Rd. in LaSalle County. 1.36 miles gross length. | — | Executed | Advanced Asphalt Company $729,412 · | ||
| Jul 31, 2026 | 66T14 | BureauLaSalleDistrict 3 | Removing and installing new mast arms, foundations, and street signs in three intersections: Wenzel Road and IL 251, Shooting Park Road and IL 251 in LaSalle County and IL 26 and Backbone Rd in Bureau County. | — | Active | |||
| Jul 31, 2026 | 66T15 | LaSalleDistrict 3 | Removing and installing new mast arms, foundations, and street signs in three intersections: I-80 EB Exit Ramp at IL 251, I-80 WB Exit Ramp at IL 251, and May Rd and IL 251 in LaSalle County. | — | Rejected | ROADSAFE TRAFFIC SYSTEMS, INC. $1,096,580 · | ||
| Jul 31, 2026 | 66T21 | FordDistrict 3 | Class D pavement patching of mainline pavement on F.A.S. Route 2482 (IL 165), beginning at IL 47 and 165 (L.M. 0.00) and ending at McLean_County line in Ford County. 4.2 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $690,200 · | ||
| Jul 31, 2026 | 66T22 | FordDistrict 3 | Class D pavement patching of_mainline pavement on F.A.P. Route 693 (IL 9), beginning at IL 9/47 intersection (L.M. 0.00) and ending at Ford/McLean County Line (L.M. 4.30) in Ford County._Approximately 4.3 miles gross length. | — | Executed | G. M. Sipes Construction, Inc. $610,480 · | ||
| Jul 31, 2026 | 66T30 | LaSalleDistrict 3 | Installation of flashing beacons at the intersection of IL18 and E 15th Rd. | — | Executed | CSD Environmental Services, Inc. $404,001 · | ||
| Jul 31, 2026 | 66T35 | KankakeeDistrict 3 | Removing and replacing high-mast tower, underpass and roadway lighting luminares at the I-57 and IL 50 Interchange and at the south IL 1/17 intersection. | — | Executed | Laser Electric, Inc. $447,135 · | ||
| Jul 31, 2026 | 66T37 | LaSalleDistrict 3 | Furnishing and installing video detection systems at_the intersections of IL 351/5th St. Intersection, IL 351/ 11th Street Intersection, and IL 351 and Civic Rd. Intersections. | — | Executed | Ficek Electric & Communication Systems, Inc. $241,801 · | ||
| Jul 31, 2026 | 66T53 | DeKalbDistrict 3 | Milling and resurfacing 2 1/4" (standard overlay) and additional work including shoulder and centerline rumble strips, pavement marking, and raised reflective pavement markers on FAP 17 (IL 64) beginning from Ogle County Line to Clare Rd. in DeKalb County. Approximately 6.108 miles gross length. | — | Executed | Curran Contracting Company $2,389,089 · | ||
| Jul 31, 2026 | 68K27 | TazewellWoodfordDistrict 4 | Milling and resurfacing IL 26 from Spring Bay to NCL to IL Rte 116 in Tazewell and Woodford Counties. Approximately 6.87 miles gross length. | — | Executed | Advanced Asphalt Company $1,822,642 · | ||
| Jul 31, 2026 | 68L01 | PeoriaDistrict 4 | HMA patching and resurfacing of the intersection at_ IL91/Alta Rd in Peoria. Approximately 0.303 miles gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $892,489 · | ||
| Jul 31, 2026 | 68L02 | PeoriaDistrict 4 | HMA patching on IL 8/IL 78 from Il 8 to Main St in Elmwood. Approximately 0.53 miles gross length. | — | Executed | Advanced Asphalt Company $253,825 · | ||
| Jul 31, 2026 | 68L03 | FultonKnoxDistrict 4 | HMA patching on IL 97 from Littlers Creek to IL 116. Approximately 2.92 miles gross length. | — | Executed | Brandt Construction Co. $630,038 · | ||
| Jul 31, 2026 | 70G29 | ChampaignDistrict 5 | 0.72 mile of sanitary sewer at Illini Prairie Rest Areas. | — | Executed | Stark Excavating, Inc. $3,219,237 · | ||
| Jul 31, 2026 | 70J06 | VariousDistrict 5 | District wide on-call guardrail and fence repairs. | — | Executed | COLLINS & HERMANN, INC. $1,317,046 · | ||
| Jul 31, 2026 | 70J08 | ChampaignDouglasDistrict 5 | Tree removal at various locations along I 74 and I 57 | — | Executed | Thor General Contracting LLC $87,478 · | ||
| Jul 31, 2026 | 72372 | LoganMontgomeryDistrict 6 | 14.85 miles of crack and joint sealing on I-155 from 2 miles south of US 136 to the Tazwell County Line; on I-55 from 0.8 miles north of IL 16 to 0.6 miles north of IL 108; on IL 108 at the I-55 interchange. | — | Executed | Freehill Asphalt, Inc. $143,774 · | ||
| Jul 31, 2026 | 72E81 | HancockPikeDistrict 6 | ITS expansion in Hancock and Pike Counties. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $279,735 · | ||
| Jul 31, 2026 | 72E85 | ScottDistrict 6 | Resurfacing on US 67 at the median crossover 0.2 miles north of the Greene County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $105,717 · | ||
| Jul 31, 2026 | 72E86 | SangamonDistrict 6 | Resurfacing on Stevenson Drive from east of Adloff Lane to east of I-55 northbound ramps in Springfield. | — | Executed | Truman L. Flatt & Sons Co., Inc. $286,492 · | ||
| Jul 31, 2026 | 72J00 | MacoupinSangamonDistrict 6 | 9.32 Miles of crack and joint Sealing on IL 4 from 0.3 miles south of IL 104 in Auburn to north of George Street in Virden and on IL 4 from 0.3 miles southwest of IL 29 (J David Jones Pkwy) to 0.2 miles north of Washington Street. | — | Executed | Freehill Asphalt, Inc. $92,224 · | ||
| Jul 31, 2026 | 72J44 | BrownPikeDistrict 6 | 6.4 miles of milling and resurfacing, storm sewer replacement, bridge repairs and guardrail upgrades on IL 99 from south of Versailles northern city limits to Mckee Drainage Ditch, 0.1 miles north of IL 104. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $8,178,851 · | ||
| Jul 31, 2026 | 74829 | MoultrieDistrict 7 | 1.5 miles of resurfacing with curb and gutter upgrades on IL 32 in Sullivan. | — | Executed | Howell Paving, Inc. $3,050,707 · | ||
| Jul 31, 2026 | 74E43 | ColesDistrict 7 | Bridge deck overlay on SN 015-0032 carrying Old State Road over I-57 east of Mattoon. | — | Executed | Howell Paving, Inc. $61,319 · | ||
| Jul 31, 2026 | 74E44 | VariousDistrict 7 | Repairs of known guardrail damage and repairs of future damage on an on-call basis. | — | Executed | COLLINS & HERMANN, INC. $825,162 · | ||
| Jul 31, 2026 | 76V11 | MadisonDistrict 8 | 13 miles of pavement patching on IL 140 from Hamel to Alhambra and on IL 4 from IL 143 to south of US 40. | — | Executed | Kinney Contractors, Inc. $951,953 · | ||
| Jul 31, 2026 | 76V21 | BondDistrict 8 | 7.8 miles of chip seal with fog seal on IL 140 from Linder Boulevard in Greenville to the Fayette County line. | — | Executed | Evergreen Roadworks, LLC $622,539 · | ||
| Jul 31, 2026 | 76V22 | MadisonSt. ClairDistrict 8 | 2 miles of chip seal on IL 111 / Collinsville Road from 0.1 miles west of Roselake Drive to a joint east of Jondro Avenue in Fairmont City. | — | Executed | DMS Contracting, Inc. $899,907 · | ||
| Jul 31, 2026 | 78520 | JeffersonDistrict 9 | 4.4 miles of milling, resurfacing, crown and superelevation corrections, safety shoulders, earthwork and drainage improvements on IL 37 from south of SN 041-0032, carrying IL 37 over the Casey Fork, to Campground Road north of Bonnie. | — | Executed | E. T. Simonds Construction Company $9,952,613 · | ||
| Jul 31, 2026 | 78935 | JeffersonDistrict 9 | Removal and replacement of SN 041-0043 carrying IL 142 over an unnamed creek 1.8 miles south of Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $1,269,718 · | ||
| Jul 31, 2026 | 78B60 | UnionDistrict 9 | 5.2 miles of patching, milling and resurfacing on IL 146 from IL 3 in Ware to IL 127 west of Jonesboro. | — | Executed | E. T. Simonds Construction Company $4,132,778 · | ||
| Jul 31, 2026 | 78B80 | FranklinDistrict 9 | 10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County line. | — | Executed | Mosley Construction 1, LLC $717,325 · | ||
| Jul 31, 2026 | 78C18 | JacksonWilliamsonDistrict 9 | 9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and the Wolf Creek Interchange. | — | Executed | CSD Environmental Services, Inc. $241,350 · | ||
| Jul 31, 2026 | 78C21 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barriers and fence on a workorder basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,458,402 · | ||
| Jul 31, 2026 | 80B42 | VariousDistrict 1 | Repairing damaged concrete barrier wall, sound wall, bridge parapet, bridge fence railing, retaining wall, med This project consists of repairing damaged concrete barrier wall, sound wall, bridge parapet, bridge fence railing, retaining wall, median barrier gate system. Location is on various State maintained routes located in Various Counties throughout District 1. | — | Executed | D. Construction, Inc. $1,380,593 · | ||
| Jul 31, 2026 | 80B44 | CookDistrict 1 | Bridge deck scarification and latex concrete overlay, transverse joint repair at the north and south abutments (2,800-Ft) Bridge Overlay includes HMA resurfacing and patching consists of bridge deck scarification and latex concrete overlay, transverse joint repair at the north and south abutments, concrete pier repair, cleaning and adjusting deck drains, road surface removal, HMA overlay and paving, pavement patching, removal and replacement of combination curb and gutter, removal and replacement of guardrail, pavement markings. Located in the Village of Alsip, Cook County. | — | Executed | D. Construction, Inc. $2,052,202 · | ||
| Jul 31, 2026 | 80C87 | CookDistrict 1 | (HMA) overlay on PCC pavement with (HMA) binder and surface course, patching, resurfacing with (HMA) surface c (1,538-Ft) Standard Overlay consists of (HMA) overlay on PCC pavement with (HMA) binder and surface course, patching, resurfacing with (HMA) surface course and (HMA) binder course, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, raised reflective pavement markers. This project is located in the Village of Calumet Park, within Cook County. | — | Executed | Gallagher Asphalt Corporation $288,498 · | ||
| Jul 31, 2026 | 80D50 | CookDistrict 1 | Removing graffiti from the surfaces on State DOT right of way or other locations as directed by the Engineer GRAFFITI REMOVAL shall consist of removing graffiti from the surfaces on State DOT right of way or other locations as directed by the Engineer. Located on the Eisenhower (I-290) from Wells St to Mannheim Rd (US 45) in Cook County. | — | Executed | ERA-Valdivia Contractors, Inc. $2,425,000 · | ||
| Jul 31, 2026 | 85781 | Rock IslandDistrict 2 | PCC full-depth roadway construction extending Bend Blvd. from 3rd St. to 7th St. in the city of East Moline. | — | Executed | Miller Trucking & Excavating Company $6,393,210 · | ||
| Jul 31, 2026 | 91669 | EdgarDistrict 5 | HMA resurfacing of CH 4 from southeast of the city of Paris to E. 575th Rd. in Edgar County. | — | Executed | Evergreen Roadworks, LLC $2,189,996 · | ||
| Jul 31, 2026 | 92621 | SangamonDistrict 6 | 3.1 miles of additional lanes, noise wall, bridge demolition and pedestrian overpass on IL 97 / Jefferson Street from east of Lincoln Trail / North Old Covered Bridge Lane to 0.2 miles west of IL 4 (Veterans Parkway) in Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $36,568,681 · | ||
| Jul 31, 2026 | 93856 | MacoupinDistrict 6 | Construction of a three-span PPC deck beam bridge carrying CH 33 over Joe's Creek in Macoupin County. | — | Executed | C-Hill Civil Contractors, Inc. $1,021,148 · | ||
| Jul 31, 2026 | 93860 | MasonDistrict 6 | Cape seal resurfacing with an A-1 Bituminous Surface Treatment on CH 4 and CH 13 from Mason St. to the north city limit of Forest City. | — | Executed | A. C. Pavement Striping Co. $586,823 · | ||
| Jul 31, 2026 | 97866 | MonroeDistrict 8 | HMA roadway reconstruction of Ghent Rd. from Main St. to Christina Ct. in the city of Columbia. | — | Executed | Mayer Landscaping, Inc. $1,072,824 · | ||
| Jul 31, 2026 | 97878 | St. ClairDistrict 8 | Construction of a shared-use path along IL 4 from Onyx Dr. to Harnett St. in the city of Mascoutah. | — | Active | |||
| Jul 31, 2026 | 97902 | MarionDistrict 8 | HMA resurfacing from Westgate Ave. from US 50 to Whitaker St., Whitaker St. from Westgate Ave. to Delmar Ave. and Westgate Ave. from Whitaker St. to Mitchell St. in the city of Salem. | — | Executed | Howell Paving, Inc. $436,089 · | ||
| Jul 31, 2026 | 99774 | PerryDistrict 9 | Pipe culvert replacement and patching the roadway on Kathleen Rd. 1.1 miles south of IL 152. | — | Rejected | |||
| Jul 31, 2026 | 99775 | WilliamsonDistrict 9 | Resurfacing Bandyville Rd. from Stotlar Rd. to Crenshaw Rd. and Crenshaw Rd. from 0.3 mile west of Bandyville Rd. to Bandyville Rd. in the city of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $693,605 · | ||
| Sep 18, 2026 | 46676 | VariousDistrict 0 | Repairing or replacing damaged sign components, furnishing and installing new signs and supports, repairing or replacing damaged sign components, furnishing new overhead sign structure components, end supports and structures, and other sign repair at locations as described in work orders throughout the state. | — | Rejected | |||
| Sep 18, 2026 | 46691 | VariousDistrict 7 | Pavement markings at various locations throughout District 7. | — | Executed | Varsity Striping & Construction Co. $820,973 · | ||
| Sep 18, 2026 | 61K62 | LakeDistrict 1 | Reconstruction of Deerfield Rd. from Milwaukee Ave. to Saunders Rd. in the villages of Buffalo Grove, Riverwoods and Deerfield. Work includes full-depth HMA pavement, curb and gutter, drainage improvements, precast box culverts, bridge deck replacement, sidewalk, multi-use path, traffic signal modernization and other required work. | — | Active | |||
| Sep 18, 2026 | 61K82 | CookDistrict 1 | HMA resurfacing and widening at the intersection of Waukegan Rd. and East Lake Avenue in the village of Glenview. Additional work includes storm sewers, curb and gutter, traffic signal modernization, lighting, pavement marking and other required work. | — | Executed | |||
| Sep 18, 2026 | 61L85 | McHenryDistrict 1 | Construction of a two-span IL-Beam bridge with concrete deck to carry Johnson Road over Nippersink Creek. Includes raising roadway profile, HMA roadway construction and guardrail. | — | Executed | ICC Group Inc. $4,751,000 · | ||
| Sep 18, 2026 | 61M29 | CookDistrict 1 | Full depth pavement reconstruction of Willow Rd. from Forestway Dr. to Provident Ave. in the village of Winnetka. Work includes PCC pavement, curb and gutter, sidewalk, drainage improvements, traffic signals, lighting and other required work. | — | Awarded | |||
| Sep 18, 2026 | 61M58 | CookDistrict 1 | Construction of a shared-use path from Strieby Drive to Fullerton Avenue in the River Grove Forest Protection District. Includes aggregate and HMA, precast concrete boardwalk, sidewalk, and traffic signal modernization. | — | Active | |||
| Sep 18, 2026 | 61M59 | McHenryDistrict 1 | Full-Depth reclamation, HMA binder and surface, aggregate shoulder, and the construction of a shared-use path from Airport Road to IL 23 in Harvard. | — | Executed | |||
| Sep 18, 2026 | 61M61 | WillDistrict 1 | Replace the bridge carrying Royce Road over the DuPage River, west of IL 53 in Bolingbrook. | — | Active | |||
| Sep 18, 2026 | 61M63 | CookDistrict 1 | HMA resurfacing on George Street from North Avenue (IL 64 to the north village limit of Melrose Park. Includes curb and gutter, sidewalk, water main installation and pavement markings. | — | Active | |||
| Sep 18, 2026 | 61M64 | CookDistrict 1 | HMA resurfacing on Gilbert Avenue from 47th Street to Ogden Avenue in Western Springs. Includes patching, curb and gutter, sidewalks with ADA ramps, drainage improvements and flashing beacons. | — | Active | |||
| Sep 18, 2026 | 61M66 | CookDistrict 1 | Pedestrian signing and pavement markings to upgrade existing shared-use paths and bicycle routes at various locations in Glenview. | — | Active | |||
| Sep 18, 2026 | 61M67 | KaneDistrict 1 | HMA resurfacing on various routes in Aurora. Includes recessed pavement markings, sidewalk, curb and gutter. | — | Awarded | |||
| Sep 18, 2026 | 61M68 | KaneDistrict 1 | HMA resurfacing n Douglas Avenue/Douglas Road from US 30 to Ashland Avenue in Montgomery. Includes curb and gutter, sidewalk, drainage improvements, and detector loop replacement. | — | Executed | D. Construction, Inc. $1,466,728 · | ||
| Sep 18, 2026 | 62V55 | CookDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course Smart Overlay, ADA and APS improvements consist of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, installation of raised reflective pavement markers, placement of thermoplastic pavement marking. The project is located within the City of Harvey in Cook County. | — | Executed | Gallagher Asphalt Corporation $3,712,308 · | ||
| Sep 18, 2026 | 62X09 | CookDistrict 1 | (1.33-Mile) Drainage Improvements of the Frontage Road Storm Sewers (FRS) in Harrison Street that include Open Cut Trenching and Jacking Sewer Installation for storm sewer size 66-, jacking and receiving chambers, pavement removal, backfilling, roadway reconstruction and patching, resurfacing, relocation of water main and combined sewers along Harrison Street, and jacking water main and combined sewers under I-290. Location is on Harrison Street and Bataan Dr. from West of 21st Ave. to East of 1 | — | Active | |||
| Sep 18, 2026 | 62X38 | VariousDistrict 1 | Furnishing and installing landscaping including all incidental and ancillary work necessary to complete the pr (2.93-mile) This project consists of furnishing and installing landscaping including all incidental and ancillary work necessary to complete the project. Traffic will be maintained on I-80 using shoulder closures during the allowable off-peak hours. The improvement is in the Villages of Shorewood, and Minooka, within Grundy, Kendall and Will Counties. | — | Executed | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $1,999,952 · | ||
| Sep 18, 2026 | 62Y03 | LakeDistrict 1 | The placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of This Improvement consists of the placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs and inside and outside of dividing walls along walkways of the structure, both faces of parapet where parapet separates roadway from sidewalk. These improvements are located on various routes/ structures within the Lake County limits. | — | Executed | M & M Concrete, Inc. $262,641 · | ||
| Sep 18, 2026 | 64T43 | HenryDistrict 2 | Bridge repairs and joint replacement of 10 bridges in Henry County. | — | Executed | D. Construction, Inc. $8,698,583 · | ||
| Sep 18, 2026 | 64U88 | WhitesideDistrict 2 | 0.87 miles of intermittent resurfacing from 5th St to US 30 in Whiteside County. | — | Executed | |||
| Sep 18, 2026 | 64V24 | OgleDistrict 2 | 0.57 miles of pavmement patching and 770' of Standard overlay on IL 251 from 0.3 miles south of IL 38 to 5th Ave in Ogle County. | — | Executed | |||
| Sep 18, 2026 | 64V52 | WinnebagoDistrict 2 | The reconstruction of the Cemetery Loop Rd 0.31 miles of reconstruction of Mill Road from US 20 to 0.2 miles north of US 20 and construction of Service Rd 0.3 miles west of Mill Road. The project also consists of the reconstruction of the Cemetery Loop Rd. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,930,601 · | ||
| Sep 18, 2026 | 64V85 | VariousDistrict 2 | On-call maintenance of electrical facilities along state maintained routes in the eastern half of District 2. | — | Executed | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $514,056 · | ||
| Sep 18, 2026 | 64V86 | VariousDistrict 2 | On-call maintenance of electrical facilities along State Maintained Routes in the western half of District 2. | — | Executed | Davenport Electric Contract Company $457,266 · | ||
| Sep 18, 2026 | 64W06 | WinnebagoDistrict 2 | 0.32 miles of pavement patching along IL 2 at the Bauer Pkwy intersection. | — | Executed | |||
| Sep 18, 2026 | 64W42 | Rock IslandDistrict 2 | Beam fabrication for proposed SN 081-0174 carrying IL 5 over 27th St in Moline. | — | Executed | DeLong's Inc. of Missouri $2,611,633 · | ||
| Sep 18, 2026 | 66863 | KankakeeDistrict 3 | Reconstructing the interchange to provide a single point urban diamond interchange This project is located on FAI 57 (I-57) at IL-17 interchange in Kankakee. Work consists of reconstructing the interchange to provide a single point urban diamond interchange. The proposed interchange will accommodate a future six lane section on I-57. Bridges SN 046-0006 (NB) and SN 046-0007 (SB) will be replaced with SN 046-0154, and SN 046-0005 carrying the KBandS RR over I-57 with SN 046-9904. The work consists of reconstruction of 1.6 miles of I-57, and 0.73 miles of IL 17. Work includes pa | — | Executed | |||
| Sep 18, 2026 | 66926 | LaSalleDistrict 3 | IL 23 deck replacement (SN 050-0047) at Covel Creek 3.4 miles south of IL 71 and bridge replacement (SN 050-0048) at Covel Creek 5.0 miles south of IL 71. | — | Executed | D. Construction, Inc. $4,253,399 · | ||
| Sep 18, 2026 | 66B81 | IroquoisDistrict 3 | Culvert replacement (SN 038-2517) at stream under IL 1, located 0.3 miles south of US 24. | — | Active | |||
| Sep 18, 2026 | 66M67 | LaSalleDistrict 3 | Removing and replacing SN 050-0124 carrying IL 71 over Cedar Creek, located approximately 3 miles west of I-39 in LaSalle County. | — | Executed | D. Construction, Inc. $868,946 · | ||
| Sep 18, 2026 | 68E86 | PeoriaDistrict 4 | Bridge replacement to SN 072-0123 at Closen Rd over I-474 in Bellevue. | — | Executed | Stark Excavating, Inc. $4,389,144 · | ||
| Sep 18, 2026 | 68H60 | TazewellDistrict 4 | Converting the existing two-way stop controlled condition to all-way stop control with red-flashing beacons, stop ahead signs with dual flashing beacons, lighting upgrades, widening the radii at the intersection, construction of 4-foot wide Hot-Mix Asphalt shoulder along the curve radii with 2-foot aggregate wedge shoulders, new pavement marking, removing and replacing an 18-inch pipe culvert and related collateral work necessary to complete the project. This project is located at the intersecti | — | Executed | Otto Baum Company, Inc. $649,800 · | ||
| Sep 18, 2026 | 68K53 | VariousDistrict 4 | 128.7 miles of placing, grading and compacting an aggregate shoulder wedge level with adjacent hot-mix asphalt (HMA) pavement or shoulder on various route routes in various counties throughout the western section of District 4. | — | Executed | |||
| Sep 18, 2026 | 68L11 | VariousDistrict 4 | 100 miles of placing, grading, and compacting an aggregate shoulder wedge level with adjacent hot-mix asphalt (HMA) pavement or shoulder consistent with the locations and details in the plans; on various routes in various counties in the eastern section of District 4. | — | Executed | J.C. Dillon, Inc. $563,520 · | ||
| Sep 18, 2026 | 70J35 | VariousDistrict 5 | Districtwide installation, maintenance, and removal of Smart Work Zone technology throughout District 5. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $350,000 · | ||
| Sep 18, 2026 | 70J42 | VariousDistrict 5 | Removal and disposal of trees on state maintained routes within District 5. | — | Awarded | |||
| Sep 18, 2026 | 72222 | SangamonDistrict 6 | Bridge deck overlay, bridge repairs, and bridge painting on SN 084-0207 carrying IL 29 over the Sangamon River, 2.7 miles north of IL 4 in Springfield. | — | Executed | |||
| Sep 18, 2026 | 72406 | AdamsDistrict 6 | Bridge deck overlay, bridge electrical work, bridge joint replacement, bridge repair and navigation lighting repairs on the Quincy Bayview Bridge over the Mississippi River. | — | Executed | Freesen, a div of UCM, Inc. $6,962,525 · | ||
| Sep 18, 2026 | 72C80 | MacoupinDistrict 6 | Culvert replacement on IL 4 over a ditch north of West North Street in Girard. (SN 059-7007) | — | Executed | |||
| Sep 18, 2026 | 72E59 | LoganDistrict 6 | Bridge deck overlay, bridge repairs, and bridge painting on SN 054-0075 carrying TR 33 over I-155 at the Hartsburg Interchange. | — | Executed | Otto Baum Company, Inc. $1,485,400 · | ||
| Sep 18, 2026 | 72E83 | AdamsDistrict 6 | Bridge deck overlay and miscellaneous bridge repairs on SN 001-0008 carrying IL 96 over Rock Creek, 2 miles south of IL 61 in Ursa. | — | Executed | County Contractors, Inc. $719,190 · | ||
| Sep 18, 2026 | 72E88 | SchuylerDistrict 6 | Pipe culvert removal and replacement on IL 99, 0.8 miles south of CH 5 (Camden Road / La Prairie Road), south of Camden. | — | Executed | Rees Construction Company of Quincy $81,487 · | ||
| Sep 18, 2026 | 74636 | MaconDistrict 7 | 2.09 miles of patching, milling, resurfacing and detector loops on Old US 51 Business from IL 48 / IL 121 to US 36. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $6,043,453 · | ||
| Sep 18, 2026 | 74650 | ColesDistrict 7 | Superstructure replacement and bridge widening of 2 structures on I-57 over IC Railroad and TR 86 at Jones Switch. (SN 015-0003 and 015-0004) | — | Executed | Sangamo Construction Company $11,526,296 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.