| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 7, 2025 | 64U11 | VariousDistrict 2 | Bridge washing of 12 structures in various counties. | — | Executed | Pressure Washing Unlimited Inc. $94,625 · | ||
| Mar 7, 2025 | 64U25 | OgleDistrict 2 | 7.931 miles of HMA milling and resurfacing on IL 64 from Chana Rd to Il 251. | — | Executed | Martin & Company Excavating $3,123,589 · | ||
| Mar 7, 2025 | 64U27 | WinnebagoDistrict 2 | 7.54 Miles Hot-Mix Asphalt pavement overlay, 0.2 Mi W of Pecatonica Rd_to 0.2 mile W of Falconer Rd. | — | Executed | Rock Road Companies, Inc. $3,578,388 · | ||
| Mar 7, 2025 | 64U29 | HenryDistrict 2 | Standard overlay on IL 82 from 700N south of Cambridge to IL 17. Approximately 5.87 miles. | — | Executed | Advanced Asphalt Company $2,998,150 · | ||
| Mar 7, 2025 | 64U30 | StephensonDistrict 2 | 4.63 miles of HMA milling and resurfacing on US 20 from Rees Rd to 0.4 mile west of Flansburg Rd. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,614,512 · | ||
| Mar 7, 2025 | 64U33 | WhitesideDistrict 2 | 15.3 miles of milling and resurfacing on Moline Rd. from East St. in Erie to IL 78 and 3rd Ave. in Lyndon to US 30. | — | Executed | Civil Constructors Inc. dba Helm Civil and Valley Construction Co., J.V. $7,840,008 · | ||
| Mar 7, 2025 | 66K70 | BureauDistrict 3 | 350 ft of Bridge Repairs (SN 006-0097) over Green River, 1.4 MI W OF IL 40. | — | Executed | Martin & Company Excavating $650,504 · | ||
| Mar 7, 2025 | 66M57 | DeKalbDistrict 3 | HMA milling and resurfacing (designed overlay), culvert replacement, pavement marking, ditch cleaning and raised reflective markers on IL 72 beginning at IL-23 (N) and ends at Kane County Line; HMA milling and resurfacing (standard overlay), pavement marking, and raised reflective markers on IL 23 beginning at IL 72 and ends at the McHenry County line. 7.183 miles gross length. | — | Executed | Curran Contracting Company $2,734,986 · | ||
| Mar 7, 2025 | 66N41 | PutnamDistrict 3 | Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at Structure No. 078-0047 carrying IL Route 89 over the Illinois River approximately 0.91 mile south of US Route 6. | — | Executed | All States Painting, Inc. $74,028 · | ||
| Mar 7, 2025 | 66N42 | LaSalleDistrict 3 | Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at various structures over the Illinois River in LaSalle County. | — | Executed | Interstate Maintenance, Incorporated $262,302 · | ||
| Mar 7, 2025 | 66P49 | DeKalbDistrict 3 | HMA milling and resurfacing patching, pavement marking and reflective markers on FAP 307 (IL 64), from 0.2 mile east of Airport Rd to Kane County Line in DeKalb County. Approximately 2.946 miles gross length. | — | Executed | Curran Contracting Company $1,541,645 · | ||
| Mar 7, 2025 | 66P51 | GrundyDistrict 3 | Milling and resurfacing 1.15 miles of OR 129 from Main St. to Carbon Hill Rd. in Gardner, along with the replacement of 3 culverts within the Project Bounds. | — | Executed | D. Construction, Inc. $680,856 · | ||
| Mar 7, 2025 | 66P78 | VariousDistrict 3 | Weed spraying to aid in weed control along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. | — | Executed | The Daltons Inc. $168,697 · | ||
| Mar 7, 2025 | 66P83 | LivingstonDistrict 3 | Cleaning and painting all structural steel of SN 053-0160 carrying IL 17 over Prairie Creek, 1.0 mile east of IL 23. | — | Executed | ERA-Valdivia Contractors, Inc. $143,680 · | ||
| Mar 7, 2025 | 66P84 | KankakeeDistrict 3 | Cleaning and painting all steel components of structure 046-0114 carrying I-57 over Minnie Creek, 4.3 miles north of the Chebanse interchange. | — | Executed | ERA-Valdivia Contractors, Inc. $127,908 · | ||
| Mar 7, 2025 | 66P95 | LaSalleDistrict 3 | HMA milling and resurfacing on the frontage road, parallel to IL 23 on the north side of Streator, and is approximately 0.22 mile long. | — | Executed | Kankakee Valley Construction Company, Inc. $180,130 · | ||
| Mar 7, 2025 | 66R00 | VariousDistrict 3 | Litter removal from the interstate highways at interchanges and rest areas throughout District 3. | — | Active | The Final Connection, Inc. $327,337 · | ||
| Mar 7, 2025 | 66R05 | LaSalleDistrict 3 | Replacing the 6" centerline pavement marking with 9" contrast pavement marking tape and replacing the 8" lane lines at interchange ramps on I-39 from north of Oglesby Interchange at M.M. 54 to M.M. 76.4. | — | Executed | A. C. Pavement Striping Co. $936,906 · | ||
| Mar 7, 2025 | 66R06 | LaSalleLivingstonDistrict 3 | Contrast pavement marking of the 8" lane lines on IL 23 at Richards Rd in LaSalle County and ending at Adams St in Livingston County and also on IL 18 beginning at Second Ave and ending at Wasson St in LaSalle County. | — | Executed | Varsity Striping & Construction Co. $268,247 · | ||
| Mar 7, 2025 | 66R07 | VariousDistrict 3 | Removal and replacement of damaged or deteriorated sand module impact attenuators on various interstate routes in various counties in District 3. | — | Executed | |||
| Mar 7, 2025 | 66R09 | LivingstonDistrict 3 | Excavating and grading existing shoulders and placing aggregate shoulders on OR 66 from IL Route 116 to E. 1600 Road. | — | Executed | H. J. Eppel & Co. $88,186 · | ||
| Mar 7, 2025 | 66R29 | BureauDistrict 3 | 2.3 miles HMA milling and resurfacing, patching, pavement marking, and reflective markers on SBI 7C (2775E RD), from US 6 to IL 29 in Bureau County. | — | Executed | Advanced Asphalt Company $1,461,525 · | ||
| Mar 7, 2025 | 66R30 | BureauDistrict 3 | HMA milling and resurfacing, patching, pavement marking and reflective markers on SBI 88 (NEW BEDFORD RD), from Main St in New Bedford to IL 40 in Bureau County. 1.74 mile gross length. | — | Executed | Advanced Asphalt Company $985,903 · | ||
| Mar 7, 2025 | 66R34 | IroquoisDistrict 3 | HMA milling and resurfacing 2" (SMART) of the mainline, shoulder work, pavement marking, and raised reflectors on FAI 57 from 0.5 mile north of IL 116 to 1.6 miles north of CH4. 4.88 miles gross. | — | Executed | Iroquois Paving Corporation $9,823,667 · | ||
| Mar 7, 2025 | 68E50 | KnoxDistrict 4 | Widening and resurfacing, culvert replacements, culvert repairs, drainage improvements, and guardrail upgrades on IL 180 from IL 167 to US 150 in Knox County. Approximately 10.48 miles. | — | Executed | Gunther Construction, a div of UCM, Inc. $29,190,217 · | ||
| Mar 7, 2025 | 68F90 | PutnamDistrict 4 | 5.91 miles of resurfacing (PPP) project extends from 1.4 miles east of the I-180/IL 26 interchange to IL 89. | — | Executed | Advanced Asphalt Company $5,166,321 · | ||
| Mar 7, 2025 | 68H31 | TazewellDistrict 4 | Bridge deck sealing at various locations in Tazewell County. | — | Executed | All States Painting, Inc. $348,300 · | ||
| Mar 7, 2025 | 68J17 | McDonoughDistrict 4 | 12 miles of Cape Seal on IL 9 from the Hancock County Line to US 67 in Good Hope in McDonough County. | — | Executed | A. C. Pavement Striping Co. $1,625,964 · | ||
| Mar 7, 2025 | 68J19 | MarshallPeoriaWoodfordDistrict 4 | Crack and joint sealing at various locations in Peoria, Marshall, and Woodford Counties. | — | Executed | Denler, Inc. $858,085 · | ||
| Mar 7, 2025 | 68J27 | VariousDistrict 4 | Installation of ITS and traffic signal equipment at various locations in District 4. | — | Rejected | Oberlander Electric Co. $382,690 · | ||
| Mar 7, 2025 | 68J33 | VariousDistrict 4 | Districtwide weed spraying. | — | Executed | The Daltons Inc. $157,527 · | ||
| Mar 7, 2025 | 68J40 | HendersonDistrict 4 | Bridge repair to SN 036-0040 including replacing expansion joints, epoxy crack injection, and patching. | — | Executed | Brandt Construction Co. $625,000 · | ||
| Mar 7, 2025 | 68J86 | VariousDistrict 4 | Electrical maintenance contract (maintenance and repair D4 traffic signals, overhead lighting, and ITS facilities). | — | Executed | Laser Electric, Inc. $651,955 · | ||
| Mar 7, 2025 | 70D55 | McLeanDistrict 5 | 10.76 miles of pavement rehab - Designed Overlay Resurfacing (INT-3rd), underdrains, patching, paving and low speed weigh in motion scale from 0.3 mile west of TR 90 (725 E Rd) south of Carlock to I-55 north of Normal (including ramps and Carlock weigh stations). | — | Executed | Rowe Construction, a div of UCM, Inc. $36,874,418 · | ||
| Mar 7, 2025 | 70F98 | EdgarDistrict 5 | HMA surface removal and resurfacing at various locations along US 150 mainline and shoulder pavement from 125' west of Lower Terre Haute Rd in Paris ,IL to a point approximately 0.3 mile west of CNRL Railroad including the Sulphur Springs Rd and Court St intersection. 2.531 miles gross length. | — | Executed | Evergreen Roadworks, LLC $6,670,718 · | ||
| Mar 7, 2025 | 70G42 | DeWittPiattVermilionDistrict 5 | Constructing push walls and slabs at the IDOT Maintenance Facilities of Clinton, Monticello, and Fithian within Dewitt, Vermilion, and Piatt Counties. | — | Executed | Big O Services, LLC $289,172 · | ||
| Mar 7, 2025 | 70G76 | VariousDistrict 5 | Bridge deck sealing of 109 structures in DeWitt, Piatt, and McLean Counties. | — | Executed | All States Painting, Inc. $188,013 · | ||
| Mar 7, 2025 | 70H32 | VermilionDistrict 5 | 1.14 miles of SMART overlay on US 136 from 0.1 mile west of Lynch Spur in Danville to Indiana State Line. | — | Executed | Cross Construction, Inc. $717,409 · | ||
| Mar 7, 2025 | 70H33 | ChampaignDistrict 5 | 6.15 miles of microsurfacing 2 pass, 0.8 mile south of Washington St in Urbana to Madison St in Philo. | — | Executed | A. C. Pavement Striping Co. $997,903 · | ||
| Mar 7, 2025 | 70H45 | McLeanDistrict 5 | Bridge deck repairs to SN's 057-0127, 057-0132, and 057-0161 in McLean County. | — | Executed | Stark Excavating, Inc. $958,366 · | ||
| Mar 7, 2025 | 70H52 | PiattDistrict 5 | 2.756 miles of Crack and Joint Sealing from Dewitt/Piatt Co Line to 1 mile E of 900E Rd W of Mansfield. | — | Executed | Complete Asphalt Service Co. $32,351 · | ||
| Mar 7, 2025 | 70H53 | DeWittDistrict 5 | 3.069 miles of Smart Resurfacing on US 51 from Tributary Long Point Creek to south of Main Street north of Clinton and north of Heritage Rd to north of Texas Church Rd south of Clinton. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,171,692 · | ||
| Mar 7, 2025 | 70H55 | ChampaignDistrict 5 | 0.063 mile PCC pavement patching under ICRR in Rantoul. | — | Executed | G. M. Sipes Construction, Inc. $344,184 · | ||
| Mar 7, 2025 | 72255 | SangamonDistrict 6 | 6 miles of resurfacing with drainage improvements on IL 123 from 0.4 miles east of IL 29, east of Athens, to West Outer Road, 0.3 miles west of I-55. | — | Executed | P. H. Broughton & Sons, Inc. $2,490,973 · | ||
| Mar 7, 2025 | 72321 | SangamonDistrict 6 | 3 miles of resurfacing on IL 4 (Veterans Parkway) from 0.2 miles north of Greenbriar Drive to 0.1 miles south of Prairie Crossing Drive in Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $8,892,709 · | ||
| Mar 7, 2025 | 72322 | VariousDistrict 6 | Bridge deck sealing on various routes in District 6. | — | Executed | All States Painting, Inc. $279,580 · | ||
| Mar 7, 2025 | 72590 | VariousDistrict 6 | Maintenance and repair of surveillance cameras, vehicle detectors, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet networks, and all peripheral equipment throughout District 6. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $141,700 · | ||
| Mar 7, 2025 | 72602 | VariousDistrict 6 | Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $535,685 · | ||
| Mar 7, 2025 | 72603 | VariousDistrict 6 | Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6. | — | Executed | Bodine Electric of Decatur $292,133 · | ||
| Mar 7, 2025 | 72608 | ScottDistrict 6 | Bridge deck patching, joint repairs, and approach repairs on SN 086-0016 and SN 086-0019 carrying Hillview Road over Sandy Creek and Little Sandy Creek in southern Scott County. | — | Executed | Freesen, a div of UCM, Inc. $383,898 · | ||
| Mar 7, 2025 | 72651 | SangamonDistrict 6 | Bridge painting on SN 084-0145 carrying Farmingdale Road over I-72, 2.6 miles west of Wabash Avenue, west of Springfield. | — | Executed | Three Star Painting, Inc. $210,000 · | ||
| Mar 7, 2025 | 72652 | AdamsDistrict 6 | Bridge painting on SN 001-0069 carrying OR 79 over I-172, 2.2 miles south of IL 57. | — | Executed | Three Star Painting, Inc. $240,000 · | ||
| Mar 7, 2025 | 72736 | PikeDistrict 6 | Installation of a virtual weigh-in-motion system on eastbound I-72 from 0.6 miles west of CH 3 and proceeding for 300- to the east. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,392,377 · | ||
| Mar 7, 2025 | 72748 | LoganDistrict 6 | Bridge deck patching on SN 054-0031 carrying IL-54 over Lake Fork Creek in southern Logan County. | — | Executed | Otto Baum Company, Inc. $215,000 · | ||
| Mar 7, 2025 | 72749 | ChristianDistrict 6 | Bridge deck patching on four bridges carrying IL 104 over Lake Sangchris west of Kinkaid. (SN 011-0019, 011-0020, 011-0021, and 011-0022) | — | Executed | Freesen, a div of UCM, Inc. $425,495 · | ||
| Mar 7, 2025 | 72759 | SangamonDistrict 6 | 0.3 miles of pavement reconstruction, ADA improvements and traffic signal upgrades on 5th Street (Business I-55) from Spruce Street to Ash Street in Springfield. | — | Executed | Kinney Contractors, Inc. $5,348,364 · | ||
| Mar 7, 2025 | 72831 | MacoupinDistrict 6 | Resurfacing on IL 16 from east of Rose Lane in Shipman to 0.3 miles west of IL 159. | — | Executed | Charles E. Mahoney Co. $1,368,306 · | ||
| Mar 7, 2025 | 72832 | MenardDistrict 6 | 4.7 miles of resurfacing on IL 97 from 0.2 miles northwest of Waring Street to the CandIM Railroad, partial width resurfacing on IL 97 from the CandIM Railroad to north of Jefferson Street and partial width resurfacing on IL 97 from the IL 97 / IL 123 Junction to 0.1 miles east of the junction. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,260,205 · | ||
| Mar 7, 2025 | 72D99 | SangamonDistrict 6 | 4.9 miles of resurfacing on Old US 36 from 0.2 miles west of Loami Bates Road to 0.7 miles south of I-72. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,068,376 · | ||
| Mar 7, 2025 | 72G18 | AdamsDistrict 6 | Bridge replacement of SN 001-0016 carrying IL 57 over Harkness Creek at Bluff Hall. | — | Executed | County Contractors, Inc. $874,583 · | ||
| Mar 7, 2025 | 74327 | FayetteDistrict 7 | Replacement of SN 026-0068 carrying IL 185 over Lone Grove Branch just east of County Road 2300E, approximately 1 mile east of St. Peter. | — | Executed | Samron Midwest Contracting, Inc. $1,228,617 · | ||
| Mar 7, 2025 | 74A28 | LawrenceDistrict 7 | Bridge superstructure replacement on SN 051-0033 carrying US 50 frontage road over Allison Ditch, 2 miles east of the Airport Road interchange. | — | Executed | C-Hill Civil Contractors, Inc. $430,600 · | ||
| Mar 7, 2025 | 74C45 | LawrenceDistrict 7 | 10.2 miles of resurfacing on US 50 from 0.2 miles east of IL 250 to the Embarras River and on US 50 BUS from US 50 to IL 250/US 50 BUS in Lawrenceville. | — | Executed | Ambraw Asphalt Materials, Inc. $4,591,977 · | ||
| Mar 7, 2025 | 74C96 | EffinghamDistrict 7 | Patching, bridge deck overlay, bridge joint repair/replacement, bridge deck repairs on SN 026-2004 on US 45 (Banker Street) at CSXT Railroad (overhead), 0.2 miles south of US 40. | — | Executed | Sangamo Construction Company $1,553,456 · | ||
| Mar 7, 2025 | 74D01 | FayetteDistrict 7 | Bridge painting at 4 locations in Fayette County. , Cleaning and painting 4 structures in Fayette County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $789,601 · | ||
| Mar 7, 2025 | 74D03 | MaconDistrict 7 | Painting of 2 bridge structures: SN 058-0087 carrying Kirby Road over I-72 northeast of Decatur and SN 058-0127 carrying US 36 over IL 48 in Decatur. | — | Executed | Eagle Painting & Maintenance Company, Inc. $387,334 · | ||
| Mar 7, 2025 | 74D05 | VariousDistrict 7 | Bridge deck sealing of 93 bridge decks on various routes in Macon, Moultrie and Shelby Counties. | — | Executed | All States Painting, Inc. $179,337 · | ||
| Mar 7, 2025 | 74D33 | FayetteDistrict 7 | Stiffener connection repairs on SN 026-0102 and SN 026-0103 carrying I-70 over IL 140 and the CSXT Railroad, 0.8 miles east of the Bond County line. | — | Executed | William Charles Construction Company, LLC $1,412,000 · | ||
| Mar 7, 2025 | 74D38 | WabashDistrict 7 | Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. | — | Executed | M & M Concrete, Inc. $54,800 · | ||
| Mar 7, 2025 | 76K02 | St. ClairDistrict 8 | Bridge repair, approach roadway and painting on SN 082-0017 carrying I-55/70 over the CSX, KCS, NS, and TRRA Railroads and two private access roads, just east of the I-55/64/70 Tri-Level Interchange near the City of East St. Louis. | — | Executed | Keeley & Sons, Inc. $35,988,571 · | ||
| Mar 7, 2025 | 76L49 | St. ClairDistrict 8 | 0.6 miles of chip seal / fog seal on Summerfield Road / Main Street from Old US 50 to Casad Street in Summerfield. | — | Rejected | DMS Contracting, Inc. $104,126 · | ||
| Mar 7, 2025 | 76R99 | St. ClairDistrict 8 | 7 miles of resurfacing with bridge and ramp repairs on I-64 from 0.2 miles west of IL 157 to 0.3 miles west of Greenmount Road. | — | Executed | The Kilian Corporation and Christ Brothers Asphalt $76,871,166 · | ||
| Mar 7, 2025 | 76T06 | St. ClairDistrict 8 | Bridge painting on SN 082-0192 and 082-0193 carrying I-64 over IL 161 in New Baden. | — | Executed | Eagle Painting & Maintenance Company, Inc. $258,280 · | ||
| Mar 7, 2025 | 76T83 | MonroeDistrict 8 | 3.51 miles of Slurry Seal on IL 3 from just north of Market Street to just north of Vandebrook Drive in Waterloo. | — | Executed | A. C. Pavement Striping Co. $879,340 · | ||
| Mar 7, 2025 | 76T84 | RandolphDistrict 8 | 4 miles of microsurfacing on IL 4 from 0.2 miles south of IL 13 to 0.1 miles north of VFW Drive in Sparta. | — | Executed | A. C. Pavement Striping Co. $416,962 · | ||
| Mar 7, 2025 | 76T85 | St. ClairDistrict 8 | 5 miles of longitudinal partial depth patching on I-64 from 0.1 miles west of 15th Street to 0.2 miles west of IL 157. | — | Executed | Christ Bros. Asphalt, Inc. $3,895,613 · | ||
| Mar 7, 2025 | 76T97 | VariousDistrict 8 | Pavement patching at various locations throughout District 8. | — | Executed | Kinney Contractors, Inc. $1,950,920 · | ||
| Mar 7, 2025 | 76U15 | MadisonDistrict 8 | 0.8 miles of patching and resurfacing on IL 162 from 0.4 miles west of I-255 to 0.4 miles east of I-255. | — | Executed | The Kilian Corporation $564,097 · | ||
| Mar 7, 2025 | 76U17 | St. ClairDistrict 8 | Bridge deck repairs on 5 structures carrying I-64 over various routes and railroads. | — | Executed | Keeley & Sons, Inc. $1,087,066 · | ||
| Mar 7, 2025 | 76U20 | MadisonDistrict 8 | 0.7 miles of chip seal on West Delmar Avenue from State Street in Alton to IL 3 in Godfrey. | — | Rejected | DMS Contracting, Inc. $107,062 · | ||
| Mar 7, 2025 | 76U28 | St. ClairDistrict 8 | Resurfacing on CH 42 (Foley Drive) from IL 157 in Cahokia Heights to 0.1 miles west of Gerold Lane in Belleville. | — | Executed | Christ Bros. Asphalt, Inc. $1,985,692 · | ||
| Mar 7, 2025 | 76U29 | WashingtonDistrict 8 | 8 miles of patching on I-64 from 0.9 miles west of CH 11 to the Jefferson County line. | — | Executed | E. T. Simonds Construction Company $2,422,705 · | ||
| Mar 7, 2025 | 78844 | HardinDistrict 9 | Box culvert replacement on IL 34 over Tributary of Pinhook Creek, about 0.7 miles south of the Pope County line and on IL 34 over a Ditch located 1.5 miles north of IL 146 and approximately 0.5 miles south of Eichorn. | — | Executed | Sierra Bravo Contractors, LLC $897,358 · | ||
| Mar 7, 2025 | 78A38 | WhiteDistrict 9 | Reconstruction of IL 1 and US 45 intersection in Norris City with improved turning radii and island crosswalks. | — | Executed | Samron Midwest Contracting, Inc. $1,668,898 · | ||
| Mar 7, 2025 | 78A90 | JohnsonDistrict 9 | 9.7 miles of resurfacing on IL 146 from Old Metropolis Road to the Pope County line. | — | Executed | Samron Midwest Contracting, Inc. $3,367,965 · | ||
| Mar 7, 2025 | 78A91 | UnionDistrict 9 | Installing PCC shoulders, curb and gutter, earth and furnished excavation, and riprap for slope repairs on US 51 near SN 091-2001, 3.8 miles north of Anna. | — | Executed | Sierra Bravo Contractors, LLC $359,872 · | ||
| Mar 7, 2025 | 78B01 | WhiteDistrict 9 | 667' of pavement removal, installation of 10- PCC pavement and ADA ramp reconstruction on IL 1 from South Street to Mill Street in Grayville. | — | Executed | Samron Midwest Contracting, Inc. $659,683 · | ||
| Mar 7, 2025 | 85765 | Rock IslandDistrict 2 | Construction of a PCC shared-use path with curb and gutter, earth shoulders, drainage structures, storm sewer, and more along 10th Street from Avenue of the Cities to Crosstown Avenue in Silvis. | — | Executed | Phoenix Corporation of the Quad Cities $1,156,075 · | ||
| Mar 7, 2025 | 85768 | OgleDistrict 2 | HMA Overlay with HMA Shoulders on Tower Road from Water Road to Montague Road north of Byron. | — | Executed | Martin & Company Excavating $534,977 · | ||
| Mar 7, 2025 | 85775 | LeeDistrict 2 | Surface Profile Milling, Cold-in-Place Recycling, and HMA Resurfacing on Perry Road from IL 251 to the BNSF Railroad in Steward. | — | Executed | Martin & Company Excavating $640,103 · | ||
| Mar 7, 2025 | 87738 | BureauDistrict 3 | Construct a single span PPC deck beam bridge to carrying 600 Avenue North over Silver Creek. | — | Executed | Curnyn Construction Co. $429,897 · | ||
| Mar 7, 2025 | 87850 | IroquoisDistrict 3 | Removal of the existing sub-structure, and construction of a new concrete stub abutments, bearing and joint replacement, and reconstruction of the approaches to the bridge carrying CH 31 over the Iroquois River, one mile north of Watseka. | — | Executed | Iroquois Paving Corporation $1,179,351 · | ||
| Mar 7, 2025 | 87853 | LaSalleDistrict 3 | Replace the bridge carrying Kelly Street over Prairie Creek, north of Bluff Street. | — | Executed | D. Construction, Inc. $852,364 · | ||
| Mar 7, 2025 | 87861 | LaSalleDistrict 3 | HMA resurfacing wiht HMA and Aggregate shoulders on County Highway 51 from Old Chicago Road to the City of Marseilles. | — | Executed | Advanced Asphalt Company $1,516,752 · | ||
| Mar 7, 2025 | 87866 | DeKalbDistrict 3 | Reconstrut the intersection of Glidden Road and Baseline Road. | — | Executed | Martin & Company Excavating $442,950 · | ||
| Mar 7, 2025 | 87875 | DeKalbDistrict 3 | Reconstruction of Main Street between BNSF Railroad and Knights Road in Sandwich. Work includes fulldepth pavement reclamation, PCC and HMA Pavement, sidewalks, curb and gutter, and storm sewers. | — | Executed | Fischer Excavating, Inc. $4,466,099 · | ||
| Mar 7, 2025 | 87876 | LaSalleDistrict 3 | Construct a PCC Shared-use path with a pedestrian bridge over Il 125. This project is located south of Wenzel Road in the City of Peru. | — | Executed | D. Construction, Inc. $4,565,811 · | ||
| Mar 7, 2025 | 87877 | LaSalleDistrict 3 | Resurfacing and Shoulder Widening on CH 4 from CH 15 to the Grundy County Line. | — | Executed | D. Construction, Inc. $1,868,000 · | ||
| Mar 7, 2025 | 87878 | LaSalleDistrict 3 | Resurfacing and shoulder widening on CH 4 from IL 71 to CH 15. | — | Executed | Advanced Asphalt Company $1,448,524 · | ||
| Mar 7, 2025 | 87879 | LaSalleDistrict 3 | HMA resurfacing of Iowa Avenue, Proter Street, and Bronson Street from Main Street to Johnson Street in Streator. Inlcudes Curb and Gutter, sidewalks, and storm sewers. | — | Executed | Advanced Asphalt Company $1,674,922 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.