| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Sep 17, 2021 | 64N63 | Jo DaviessDistrict 2 | 1.0 mile of safety improvements - Road Diet, patching and resurfacing along US 20 from 6th St. to 0.1 mile W of Camillus Drive in East Dubuque. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,226,553 · | ||
| Sep 17, 2021 | 64R22 | WhitesideDistrict 2 | Safety improvement at Science Ridge Road North of Sterling. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $139,824 · | ||
| Sep 17, 2021 | 64R29 | VariousDistrict 2 | Installation of oversized chevrons along interchange ramp curves at various locations. | — | Executed | T.M.F. Construction Company $569,683 · | ||
| Sep 17, 2021 | 66997 | KankakeeDistrict 3 | The structure replacement carrying Maple St/Waldron Rd over I-57 in Kankakee along with construction of adjace The project consists of the structure replacement carrying Maple St/Waldron Rd over I-57 in Kankakee along with construction of adjacent retaining walls. The project includes the reconstruction of portions of Maple St, Waldron Rd, construction of shared-use path and realigning/reconstructing County RD S89E. | — | Executed | Kankakee Valley Construction Company, Inc. $11,309,823 · | ||
| Sep 17, 2021 | 66D53 | IroquoisDistrict 3 | US 52 - 3P milling and resurfacing, shoulder widening and ADA in Iroquois from East of IL 1 to South of Donovan in Iroquois county. | — | Executed | Iroquois Paving Corporation $5,186,160 · | ||
| Sep 17, 2021 | 66F11 | KankakeeDistrict 3 | Removal and replacement of SN 046-0063 carrying Armour Road over Illinois Central Railroad located 0.3 miles west of IL 50. | — | Executed | D. Construction, Inc. $5,976,820 · | ||
| Sep 17, 2021 | 66K18 | KankakeeDistrict 3 | This project consists of 5.9 miles of shoulder widening and rumble strip installation on IL 17 from 0.10 miles South of IL 1/17 (E Taylor St) to State Line Rd in Kankakee County. | — | Executed | Kankakee Valley Construction Company, Inc. $1,262,477 · | ||
| Sep 17, 2021 | 66L97 | IroquoisDistrict 3 | Removal and replacement of existing 48" and 12" storm sewer, catch basin, manhole, pavement patching and other This project is located at failed 48- diameter pipe culvert at Sta. 391+00 carrying IL 49 over Shavetail Creek approximately 8 miles South of US 24 (Cresent City). This project consists of removal and replacement of existing 48" and 12" storm sewer, catch basin, manhole, pavement patching and other related construction items. | — | Executed | Dirtworks Trucking & Excavating $69,245 · | ||
| Sep 17, 2021 | 66M06 | VariousDistrict 3 | The removal and replacement of all symbol and stop bar pavement markings at various interchanges throughout Di This project consists of the removal and replacement of all symbol and stop bar pavement markings at various interchanges throughout District 3. | — | Executed | A. C. Pavement Striping Co. $978,534 · | ||
| Sep 17, 2021 | 66M07 | VariousDistrict 3 | The installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic con This project consists of the installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems. The work will be completed on a work order basis for repairs and maintenance activities. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $574,990 · | ||
| Sep 17, 2021 | 66M08 | BureauLaSalleDistrict 3 | The installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and th This project consists of the installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and three changeable speed warning signs at the I-80 and I-180 interchange. | — | Executed | T.M.F. Construction Company $71,655 · | ||
| Sep 17, 2021 | 68D17 | WoodfordDistrict 4 | Box culvert replacements on US 150 (S.N. 102-1005; S.N. 102-2503 (new)), 0.9 mile East of Mackinaw River and (S.N. 102-1004; S.N. 102-2030 (new)), 0.16 mile East of CR 1825E. | — | Executed | Phoenix Corporation of the Quad Cities $2,337,434 · | ||
| Sep 17, 2021 | 68G62 | FultonDistrict 4 | Intersection improvement with flashing lights and lighting upgrades in Fulton County. | — | Executed | Illinois Civil Contractors, Inc. $723,553 · | ||
| Sep 17, 2021 | 68G63 | WoodfordDistrict 4 | New shoulders along US 150 from County Road 1250E, West of Goodfield to the McLean County Line. | — | Executed | Rowe Construction, a div of UCM, Inc. $3,018,142 · | ||
| Sep 17, 2021 | 70F64 | ChampaignDouglasMcLeanDistrict 5 | 43.69 miles of pavement marking on I-55 from Sugar Creek to 1.0 miles E of the Veterans Parkway interchange, and on I-57 from the Coles County line S of Arcola to the Ford County line. | — | Executed | Varsity Striping & Construction Co. $1,676,308 · | ||
| Sep 17, 2021 | 72D40 | ScottDistrict 6 | Removing existing box culvert and replacing with 8' x 4' box culvert on Old US 36, 1.7 miles northeast of I-72, west of Riggston. | — | Executed | Kinney Contractors, Inc. $339,921 · | ||
| Sep 17, 2021 | 72K08 | SchuylerDistrict 6 | Bridge replacement (SN 085-0002) carrying US 67 over Bluff Ditch, 1.8 miles northwest of IL 100. | — | Executed | County Contractors, Inc. $1,553,674 · | ||
| Sep 17, 2021 | 72N00 | MorganDistrict 6 | Lot improvements at the Jacksonville Maintenance Yard. | — | Executed | K. E. Vas Company $129,762 · | ||
| Sep 17, 2021 | 72N01 | SchuylerDistrict 6 | Lot improvements at the Rushville Maintenance Yard. | — | Executed | Lee Hood d/b/a Hood Demolition & Excavation $129,336 · | ||
| Sep 17, 2021 | 72N15 | LoganDistrict 6 | Pipe culvert removal and replacement on I-55 around Lincoln. | — | Executed | Kinney Contractors, Inc. $122,464 · | ||
| Sep 17, 2021 | 72N16 | PikeDistrict 6 | Cured-in-place pipe liners on IL 96 in Atlas. | — | Executed | Phoenix Corporation of the Quad Cities $163,615 · | ||
| Sep 17, 2021 | 74752 | EffinghamDistrict 7 | Shoulder work, base course widening, curb and gutter, ADA sidewalk improvements and box culvert replacement on US 40 from the Fayette County line to Division Street in Altamont and on IL 128 from US 40 in Altamont to 0.1 miles north of I-70. | — | Executed | Howell Paving, Inc. $4,548,184 · | ||
| Sep 17, 2021 | 74899 | LawrenceDistrict 7 | Tree removal along IL 33 from County Road 1300 to Westport. | — | Executed | Endrizzi Contracting, Inc $241,553 · | ||
| Sep 17, 2021 | 74A72 | VariousDistrict 7 | Chain link fence replacement at 4 locations: D7 headquarters in Effingham, Shelbyville Yard, Charleston Yard and Lawrenceville Yard. | — | Rejected | COLLINS & HERMANN, INC. $307,866 · | ||
| Sep 17, 2021 | 76P29 | VariousDistrict 8 | Repair and maintenance of electrical equipment at various pump stations in District 8. | — | Executed | Electrico, Inc. $58,258 · | ||
| Sep 17, 2021 | 76P30 | CalhounDistrict 8 | Repair and maintenance of electrical equipment at the Joe Page Bridge in Hardin (SN 031-0001). | — | Executed | Wissehr Electric, Inc. $52,601 · | ||
| Sep 17, 2021 | 76P31 | St. ClairDistrict 8 | Well treatment at various locations in East St. Louis and Venice. | — | Executed | Davinroy Mechanical Contractor, Inc. $714,100 · | ||
| Sep 17, 2021 | 76P38 | ClintonDistrict 8 | 2.6 miles of resurfacing on Old US 50 from 0.2 miles west of Carter Street to 0.6 miles east of Pipeline Road. | — | Executed | The Kilian Corporation $518,909 · | ||
| Sep 17, 2021 | 76P68 | MadisonDistrict 8 | Bridge painting on I-255 over I-55/70 (SN 060-0206 and 060-0207). | — | Executed | Venus Painting Co. $779,600 · | ||
| Sep 17, 2021 | 76P69 | St. ClairDistrict 8 | Bridge painting on IL 13 (SN 082-0115 and 082-0116). | — | Executed | Civil Coatings and Construction Inc. $492,648 · | ||
| Sep 17, 2021 | 76P74 | VariousDistrict 8 | Pavement marking at various locations in Bond, Clinton, Marion and Washington Counties. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,148,148 · | ||
| Sep 17, 2021 | 76P75 | GreeneJerseyDistrict 8 | 39.4 miles of pavement marking removal and replacement on IL 108 from the Calhoun County line to IL 267 and on IL 100/16 from 0.3 miles east of Eldred Eldred Road to 0.1 miles west of Grafton Hills Drive. | — | Executed | STF, LLC d/b/a Traffic Control Company $898,383 · | ||
| Sep 17, 2021 | 76P76 | MadisonDistrict 8 | Pavement marking in various locations of Madison County. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $666,667 · | ||
| Sep 17, 2021 | 76P77 | RandolphSt. ClairDistrict 8 | Water blasting removal of existing pavement marking and replacement with thermoplastic or modified urethane pavement marking at various locations in St. Clair and Randolph Counties. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,234,568 · | ||
| Sep 17, 2021 | 76P81 | RandolphDistrict 8 | 5.6 miles of patching on IL 3 from IL 150 to 1 mile south of Pleasant Hill Road and IL 150 from IL 3 to Murphysboro Road. | — | Executed | E. T. Simonds Construction Company $682,813 · | ||
| Sep 17, 2021 | 76P82 | RandolphDistrict 8 | 6.2 miles of patching on IL 150 from IL 4, west of Steeleville, to the Perry County line. | — | Executed | G. M. Sipes Construction, Inc. $475,119 · | ||
| Sep 17, 2021 | 78503 | FranklinDistrict 9 | Conversion of the wye intersection of IL 149 and IL 184 to a roundabout intersection. | — | Executed | E. T. Simonds Construction Company $1,777,808 · | ||
| Sep 17, 2021 | 78602 | SalineDistrict 9 | 5.9 miles of patching, HMA surface removal, HMA surface, HMA shoulders and aggregate shoulders on IL 34 / 145 from the signalized intersection of US 45 and IL 34 / 145 to the intersection of IL 34 and IL 145. | — | Executed | E. T. Simonds Construction Company $2,188,313 · | ||
| Sep 17, 2021 | 78848 | FranklinUnionWilliamsonDistrict 9 | Bridge deck repairs on SN 100-0069 carrying IL 148 over Crab Orchard Lake, 2.8 miles south of IL 13; SN 091-0064 carrying IL 127 over Lingle Creek, 0.3 miles north of Mill Creek; SN 091-0067 carrying IL 127 over Mill Creek, 0.5 miles 0.5 miles north of Mill Creek; SN 028-0037 carrying IL 149 over Big Muddy River, 1.6 miles east of Ziegler. | — | Executed | E. T. Simonds Construction Company $1,177,173 · | ||
| Sep 17, 2021 | 78862 | VariousDistrict 9 | Surface preparation and application of bridge deck sealer on bridges in Alexander, Johnson, Massac, Pulaski and Union Counties. | — | Executed | All States Painting, Inc. $238,300 · | ||
| Sep 17, 2021 | 78864 | JacksonDistrict 9 | 19.3 miles of patching, HMA surface removal, HMA resurfacing and HMA safety shoulders on IL 3 and IL 149. | — | Executed | Samron Midwest Contracting, Inc. $4,252,377 · | ||
| Sep 17, 2021 | 78873 | UnionDistrict 9 | 7.4 miles of HMA surface removal and resurfacing on US 51 from IL 146 to I-57. | — | Executed | E. T. Simonds Construction Company $2,275,872 · | ||
| Sep 17, 2021 | 78875 | AlexanderDistrict 9 | 1.8 miles of pavement patching, HMA surface removal and HMA surfacing on IL 3 in Olive Branch from 0.1 miles west of Pigeon Roost Road to Brownsville Road. | — | Rejected | Southern Illinois Asphalt Co., Inc. $811,280 · | ||
| Sep 17, 2021 | 78881 | VariousDistrict 9 | Bridge painting in various counties; 2 in Jefferson, 1 in Hamilton, 1 in White, 1 in Johnson and 4 in Pulaski Counties. | — | Executed | ERA-Valdivia Contractors, Inc. $1,887,170 · | ||
| Sep 17, 2021 | 78889 | JohnsonDistrict 9 | 500 feet of grade adjustment by milling and filling with HMA binder and HMA surface coarse on US 45 approximately 2.5 miles north of the I-24 Intersection, near Roosevelt Loop. | — | Executed | E. T. Simonds Construction Company $72,246 · | ||
| Sep 17, 2021 | 78898 | FranklinDistrict 9 | 5.4 miles of patching, HMA surface removal and resurfacing, safety shoulders and guardrail removal and replacement on IL 154 from near the rail crossing in Sesser to near Fitzgerrell Park Drive. | — | Executed | E. T. Simonds Construction Company $4,066,957 · | ||
| Sep 17, 2021 | 89795 | FultonDistrict 4 | Replace the bridge carrying CH 2 over Coal Creek, 4.25 miles south of London Mills. | — | Executed | Stark Excavating, Inc. $1,359,595 · | ||
| Sep 17, 2021 | 93772 | CassDistrict 6 | Resurfacing CH 8 from IL 125 to south of Pine Street. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $580,391 · | ||
| Sep 17, 2021 | 97758 | MadisonDistrict 8 | Replace the bridge carrying Albers Lane over Rocky Branch Creek in Bethalto. | — | Executed | Stutz Excavating, Inc. $1,316,433 · | ||
| Sep 17, 2021 | 97760 | MadisonDistrict 8 | Pavement reconstruction, new sidewalks and drainage improvements on North Prairie Street from Corbin Street to Dorothy Street in Bethalto. | — | Executed | Baxmeyer Construction, Inc. $1,375,777 · | ||
| Sep 17, 2021 | 97762 | MadisonDistrict 8 | Construction of a shared-use path along IL 157 from Lewis Road to the Goshen Trail Pedestrian Tunnel under IL 157 in Edwardsville. | — | Executed | Baxmeyer Construction, Inc. $837,008 · | ||
| Sep 17, 2021 | 97764 | MadisonDistrict 8 | Resurfcing Johnson Road from Terrace Lane to Wabsh Avenue in Granite City. | — | Executed | RCS Construction, Inc. $769,306 · | ||
| Nov 5, 2021 | 46583 | VariousDistrict 3 | Repairing various widths of pavement markings including lines, letters, numbers and symbols This project is located on various highways throughout District 3. This project consists of repairing various widths of pavement markings including lines, letters, numbers and symbols. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,854,677 · | ||
| Nov 5, 2021 | 46924 | LaSalleDistrict 3 | Reconstructing a new retaining wall with associated appurtenances, HMA pavement, aggregate base course, type B The project consists of reconstructing a new retaining wall with associated appurtenances, HMA pavement, aggregate base course, type B gutter, guardrail, pavement markings and other improvements along the Entrance Road to the Buffalo Rock State Park, gross and net length 0.05 mi. | — | Executed | D. Construction, Inc. $637,507 · | ||
| Nov 5, 2021 | 46930 | WinnebagoDistrict 2 | Road reconstruction, bridge repairs, culvert replacements to park roads and parking areas, and all other neces These proposed improvements consist of road reconstruction, bridge repairs, culvert replacements to park roads and parking areas, and all other necessary work to complete the project within the Rock Cut State Park in Winnebago County, gross/net length 3.00 mi. | — | Executed | William Charles Construction Company, LLC $1,855,251 · | ||
| Nov 5, 2021 | 61G85 | LakeDistrict 1 | Pavement reconstruction, resurfacing, curb and gutter replacement, sidewalk replacement, storm sewer, traffic signal improvements and pavement markings on Clavey Road, from 0.4 miles east of US 41 to Green Bay Road in Highland. | — | Rejected | Lake County Grading Company, LLC $9,399,399 · | ||
| Nov 5, 2021 | 61H15 | CookDistrict 1 | Reconstruction and widening of roadway, sidewalk replacement, construct multi-use path, roadway lighting and traffic signal upgrade on IL 19 from Winchester DRive to east of Bartlett Road and on Bartlett Road from East Oltendorf Road to south of IL 19 in Streamwood | — | Executed | Plote Construction, Inc. $5,898,529 · | ||
| Nov 5, 2021 | 61H22 | DuPageDistrict 1 | Traffic signal improvements at various locations in DuPage County | — | Executed | Home Towne Electric, Inc. $5,849,810 · | ||
| Nov 5, 2021 | 61H27 | McHenryDistrict 1 | Pavement widening and construction, curb and gutter, sidewalks, lighting, traffic signals, storm sewer and water main improvements on Main Street from IL 176 to the UP Railroad tracks, and on IL 176 from 2nd Street to Illinois Street in Crystal Lake. | — | Executed | Pir Tano Construction Company, Inc. $4,564,372 · | ||
| Nov 5, 2021 | 61H28 | LakeDistrict 1 | Replace the bridge carrying Central Avenue over an unamed ravine, 0.1 mile west of Lake Michigan in Highland Park. | — | Executed | Dunnet Bay Construction Company $3,315,548 · | ||
| Nov 5, 2021 | 62C25 | CookDistrict 1 | (1.86-Mile) Channelization improvements at the intersections of East Ave. at Joliet Rd. and 55th St., traffic signal modernization, drainage improvements, retaining walls, culvert rehabilitation, and modifications to lighting in McCook, Hodgkins, and Countryside. | — | Executed | K-Five Construction Corporation $16,873,742 · | ||
| Nov 5, 2021 | 62F87 | CookWillDistrict 1 | (1,215 Ft.) Channelization project on Illinois Route 50 (Cicero Avenue) and Steger Road that includes standard overlay, traffic signal installation, and lighting installation. Located in the Villages of University Park and Richton Park. | — | Executed | P. T. Ferro Construction Co. $1,073,908 · | ||
| Nov 5, 2021 | 62H97 | DuPageDistrict 1 | (1.826-Mile) Designed overlay and ADA improvements on I-55 N. Frontage Rd. from IL 83 to Elm St., located in the Villages of Willowbrook and Burr Ridge. | — | Executed | K-Five Construction Corporation $1,359,555 · | ||
| Nov 5, 2021 | 62J26 | LakeDistrict 1 | (2300-Ft) Rehabilitation of culverts located on US 41 over Unnamed Creeks (N of IL 173 to S of Westleigh Rd) in the Villages of Wardsworth, Gurnee and Lake Forest. (SN 049-0228, SN 049-2015, SN 049-2016, SN 049-0575) | — | Executed | Lorig Construction Company $2,777,744 · | ||
| Nov 5, 2021 | 62L12 | CookDistrict 1 | (1.34-Mile) Designed Overlay, Pedestrian Ramps. Location: Torrence Avenue, from Calumet River to 86 feet N. of 114th Street in the City of Chicago. | — | Executed | K-Five Construction Corporation $1,443,742 · | ||
| Nov 5, 2021 | 62L84 | CookDistrict 1 | (2.87-Mile) Standard Overlay, ADA Improvements; Location: FAP 353: US 30 Lincoln Highway from Lowe Ave to East of IL 394 in the City of Chicago Heights and Village of Ford Heights in Cook County. | — | Executed | Iroquois Paving Corporation $2,371,635 · | ||
| Nov 5, 2021 | 62M19 | CookDistrict 1 | (5.18-Mile) SMART Overlay, ADA improvements, patching, crack and joint sealing, pavement markings project on US 12-20-41 from I-94 (Dan Ryan Expy) to I-90 (Chicago Skyway). Located in the City of Chicago in Cook County. | — | Executed | MAT Construction Leasing, Inc. $3,699,988 · | ||
| Nov 5, 2021 | 62M28 | CookDistrict 1 | (364-ft) Bridge Preservation Project including bridge deck patching and overlay expansion joints replacement, bearings, piers and beams repairs. Location: Bridge carrying Glenwood-Lansing Road over IL 394, in the Village of Glenwood. | — | Executed | Lorig Construction Company $990,562 · | ||
| Nov 5, 2021 | 62M30 | CookDistrict 1 | (675-ft) Bridge repair, joint replacement and bridge deck overlay, located on Interstate 57 (I-57) over the Wisconsin Central Limited (WCL) Railroad in the Villages of Matteson and Richton Park. | — | Executed | Lorig Construction Company $2,179,021 · | ||
| Nov 5, 2021 | 62M34 | DuPageDistrict 1 | (1555-Ft) Bridge deck overlay, expansion joint replacement and drainage scuppers repair located on a bridge carrying II 56 over 1-355 in the Village of Downers Grove. | — | Executed | Martam Construction Incorporated $1,989,293 · | ||
| Nov 5, 2021 | 62M35 | DuPageDistrict 1 | (1556-Ft) Bridge deck overlay and expansion joint replacement located on a bridge carrying 1164 over 1-355 in the Village of Lombard in DuPage County, IL. | — | Executed | Martam Construction Incorporated $2,304,407 · | ||
| Nov 5, 2021 | 62M93 | CookDistrict 1 | (0.17-Mile) Roadway lighting improvement, located in the Village of South Holland, IL. on US6 (162ND St.) east of 1-94 (Bishop Ford Expressway). Light tower and foundation removal. Install new light poles, metal foundations, LED luminaires, conduits and cables, excavations and site restoration. | — | Executed | H & H Electric Co. $220,484 · | ||
| Nov 5, 2021 | 62N46 | McHenryDistrict 1 | (1.11-mile) ultra-thin bonded wearing course along US 14 from Crowley Road to Oak Grove Road. Located in the City of Harvard and unincorporated McHenry Co. | — | Executed | Peter Baker & Son Co. $322,358 · | ||
| Nov 5, 2021 | 62N52 | CookKaneDistrict 1 | (2.63-Mile) Standard overlay and ADA improvement project on IL 19 (Irving Park Road) from IL 25 to IL 59 in Cook and Kane Counties. | — | Executed | Arrow Road Construction Co. $2,384,740 · | ||
| Nov 5, 2021 | 62N55 | KaneDistrict 1 | (1.64-mile) Standard Overlay, Milled Rumble Strip and ADA improvements project, consisting of HMA removal, pavement patching, HMA resurfacing, curb ramps (ADA) improvements, pavement markings install. Located on IL 25 from Hazel Avenue to the Kendall County Line in the City of Aurora and the Village of Montgomery. | — | Executed | Geneva Construction Company $1,031,471 · | ||
| Nov 5, 2021 | 62N63 | CookDistrict 1 | Standard overlay resurfacing of IL 58 (Summit St) begins 240 ft west of Hawatha Dr, proceed easterly (3.578 miles) to 300 ft east of IL 59 (Sutton Rd) in the Villages of Elgin and Hoffman Estates, Hanover Township. | — | Executed | J. A. Johnson Paving Company $3,313,313 · | ||
| Nov 5, 2021 | 62P24 | CookDistrict 1 | (1,054-ft) Bridge Painting on (SNs 016-0343, 016-0344) carrying US Route 45 over the Cal Sag Channel in unincorporated Cook County. | — | Executed | Capital Industrial Services $1,583,300 · | ||
| Nov 5, 2021 | 62P46 | CookDistrict 1 | Cleaning and painting of steel bridge structures at 3 locations. 1)Lake-Cook Road over US 41 (SN-016-0811) in Village of Highland Park. 2) Dundee Road (IL-68) over 1-94 (SN-016-0939) in the Village of Northbrook and Glencoe. 3) US-14 over IL-58 (Golf Road) (SN-016-0236) in the City of Des Plaines. | — | Executed | Capital Industrial Services $1,230,733 · | ||
| Nov 5, 2021 | 62P48 | CookDistrict 1 | Bridge repairs and substructure repair at the bridge spanning 1-290 over Des Plaines River (SN 016-0090) in th This improvement consists of bridge repairs and substructure repair at the bridge spanning 1-290 over Des Plaines River (SN 016-0090) in the Village of Park, Proviso Township, Cook County. | — | Rejected | Martam Construction Incorporated $508,935 · | ||
| Nov 5, 2021 | 62P49 | CookDistrict 1 | Bridge deck sealing and bridge joint repair. Location: 1-90/94 at various locations in the City of Chicago in Cook County. (SN-016-0189, SN-016-0398, SN-016-1007, SN-016-1152, SN-016-1153). | — | Executed | Herlihy Mid-Continent Company $210,646 · | ||
| Nov 5, 2021 | 62P61 | CookDistrict 1 | (631-Mile) Litter/ Debris Removal project from edge of pavement to the Pedestrian Barrier on 1-90/94 (Dan Ryan Expwy) expressway from Congress Pkwy to 1-57/ 1-94 (Bishop Ford Expwy). | — | Executed | Peeples Landscaping and Snow Removal Ltd. $693,406 · | ||
| Nov 5, 2021 | 62P62 | CookDistrict 1 | (528-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1) FAI 94: 1-94 from 1-90/94 (Dan Ryan Expwy) to 1-80; 2) FAP 341: Stony Island from 1-94 to US 12 (95th) 3) FAU 1574: 103rd St from Cottage Groove to Stony Island. | — | Executed | Peeples Landscaping and Snow Removal Ltd. $580,267 · | ||
| Nov 5, 2021 | 62P63 | CookDistrict 1 | (167.4-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 - Stevenson expressway from Lake Shore Dr. to IL 43 (Harlem Ave.). | — | Executed | Peeples Landscaping and Snow Removal Ltd. $183,971 · | ||
| Nov 5, 2021 | 62P64 | CookDistrict 1 | (417.6-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-290/ IL 11 O expressway from Austin Blvd to Wells St. | — | Executed | Peeples Landscaping and Snow Removal Ltd. $458,938 · | ||
| Nov 5, 2021 | 62P65 | CookDistrict 1 | (292.2-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-190; 1-90/94 expressways from W. of US 12/45 Mannheim Rd to Congress Parkway. | — | Executed | Peeples Landscaping and Snow Removal Ltd. $321,125 · | ||
| Nov 5, 2021 | 62P66 | VariousDistrict 1 | Temporary traffic control setup on various State maintained expressway and arterial routes District-wide on a The improvement consists of temporary traffic control setup on various State maintained expressway and arterial routes District-wide on a work order basis. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,589,000 · | ||
| Nov 5, 2021 | 64H58 | Jo DaviessDistrict 2 | Removal and replacement of the SN 043-0040 carrying IL 78 over the Plum River located 6.3 miles South of US 20. | — | Executed | Sjostrom & Sons, Inc. $2,878,168 · | ||
| Nov 5, 2021 | 64L12 | HenryRock IslandDistrict 2 | Sidewalk Ramps for the disabled along various routes in the villages of Alpha, Andover, Osco, Woodhull, Andalusia, Coal Valley, and Edgington. | — | Executed | Phoenix Corporation of the Quad Cities $1,206,546 · | ||
| Nov 5, 2021 | 64M41 | LeeDistrict 2 | 0.37 mile, Removal and replacement of concrete box culverts carrying IL 251 over drainage from 0.5 mile South of US 30 to 0.3 mile North of Tower Road. (SN's 052-1064, 1066, C003, 1076, 1077) | — | Executed | Fischer Excavating, Inc. $1,566,058 · | ||
| Nov 5, 2021 | 64P97 | Rock IslandDistrict 2 | Washing the bridge (SN 081-0011) carrying I-80 over the Mississippi River. | — | Executed | All States Painting, Inc. $164,500 · | ||
| Nov 5, 2021 | 64P98 | VariousDistrict 2 | Washing three bridges over the Mississippi River, Carroll County (SN 008-0052) carrying US 52/IL 64, Rock Island County (SN 081-9905) carrying US 67, Whiteside County (SN 098-6003) carrying US 30. | — | Executed | All States Painting, Inc. $127,000 · | ||
| Nov 5, 2021 | 64P99 | VariousDistrict 2 | Washing six bridges over the Rock River, in Henry, Rock Island and Whiteside Counties. | — | Executed | All States Painting, Inc. $87,000 · | ||
| Nov 5, 2021 | 64R00 | HenryRock IslandDistrict 2 | Washing five bridges over the Rock River, in Henry and Rock Island Counties. | — | Executed | All States Painting, Inc. $62,000 · | ||
| Nov 5, 2021 | 64R01 | VariousDistrict 2 | Washing eight bridges at various locations in Henry, Lee, Ogle, Stephenson and Whiteside Counties. | — | Executed | All States Painting, Inc. $75,500 · | ||
| Nov 5, 2021 | 64R05 | VariousDistrict 2 | Washing twelve bridges at various locations in Henry, Lee, Rock Island, and Whiteside Counties. | — | Executed | All States Painting, Inc. $121,000 · | ||
| Nov 5, 2021 | 64R06 | BooneWinnebagoDistrict 2 | Washing eleven bridges at various locations in Boone and Winnebago Counties. | — | Executed | Interstate Maintenance, Incorporated $109,749 · | ||
| Nov 5, 2021 | 64R07 | VariousDistrict 2 | Washing seventeen bridges at various locations in Carroll, Ogle, Stephenson, and Whiteside Counties. | — | Executed | All States Painting, Inc. $140,200 · | ||
| Nov 5, 2021 | 64R25 | OgleDistrict 2 | Repair slope failure of Northbound embankment 0.6 mile South of IL 38. | — | Executed | Law Excavating, Inc. $122,553 · | ||
| Nov 5, 2021 | 64R27 | WhitesideDistrict 2 | Pavement patching on IL 2 from Lynn Blvd in Sterling to Prairieville Road. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $595,141 · | ||
| Nov 5, 2021 | 64R28 | Rock IslandDistrict 2 | Pavement patching from Kennedy Dr in East Moline to Hospital RD in Silvis. | — | Executed | G. M. Sipes Construction, Inc. $637,757 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.