| Apr 26, 2019 | 87708 | LaSalleDistrict 3 | Replace the bridges carrying TR 469 and TR 382 over Covel Creek, 6 miles east of Grand Ridge. | — | Executed | Riber Construction, Inc. $726,079 · | ||
| Apr 26, 2019 | 87714 | LaSalleDistrict 3 | Resurfacing and intersection improvements on FAS Route 263 (CH 5) at Illinois Route 23. | — | Executed | Advanced Asphalt Company $216,236 · | ||
| Apr 26, 2019 | 89474 | KnoxDistrict 4 | Replace the bridge carrying CH 4 over Walnut Creek, 0.5 mile west of Altona. | — | Executed | County Contractors, Inc. $699,269 · | ||
| Apr 26, 2019 | 93723 | MacoupinDistrict 6 | Remove and replace guardrail and terminals at various locations in Macoupin County. | — | Executed | Clevenger Contractors, Inc. $1,612,957 · | ||
| Apr 26, 2019 | 93725 | AdamsDistrict 6 | Resurfacing CH 4 from North 200th Avenue to North 400th Avenue. | — | Executed | Diamond Construction Company $472,774 · | ||
| Apr 26, 2019 | 95798 | MaconDistrict 7 | Replace the bridge carrying CH 57 over a tributary to Big Creek, 0.2 mile south of Lehman Road. | — | Executed | County Contractors, Inc. $2,990,685 · | ||
| Apr 26, 2019 | 95846 | WabashDistrict 7 | Replace the bridge carrying TR 173 over a drainage ditch, 1.5 miles south of Keensburg. | — | Executed | Lake Contracting, Inc. $244,759 · | ||
| Apr 26, 2019 | 95847 | MoultrieDistrict 7 | Resurface CH 13 from County Road 1500 North to County Road 1400 North. | — | Executed | Ne-Co Asphalt Co., Inc. $254,906 · | ||
| Apr 26, 2019 | 97654 | St. ClairDistrict 8 | Reconstruction of Cargill Elevator Road from the Mississippi River bridge_docks to IL 3 in Cahokia. | — | Executed | Baxmeyer Construction, Inc. $3,245,028 · | ||
| Apr 26, 2019 | 97684 | MadisonDistrict 8 | Resurfacing Clifton Terrace Road from south of IL 3 to Rosenberg Lane in the Village of Godfrey. | — | Executed | Charles E. Mahoney Co. $329,987 · | ||
| Apr 26, 2019 | 97690 | MadisonDistrict 8 | Resurfacing Wanda Road from IL 143 to New Poag Road. | — | Executed | The Kilian Corporation $1,635,887 · | ||
| Apr 26, 2019 | 97694 | St. ClairDistrict 8 | Pavement reconstrcution, curb and gutter, storm sewer, sidewalks, and pavement markings on Simmons Road from Milburn School Road to Porter Road in O'Fallon. | — | Executed | Kamadulski Excavating and Grading Company, Inc. $1,218,315 · | ||
| Apr 26, 2019 | 97695 | MadisonDistrict 8 | Resurfacing Washington Avenue from north of Salu Street to College Avenue in Alton. | — | Executed | Charles E. Mahoney Co. $622,115 · | ||
| Apr 26, 2019 | 97696 | RandolphDistrict 8 | Resurfacing Baldwin Road from Wirth Lane to Ridge Road and from the St. Clair County line to north city limits of Baldwin. | — | Executed | The Kilian Corporation $1,302,949 · | ||
| Apr 26, 2019 | 99575 | SalineDistrict 9 | Replace the bridge carrying DeNeal Road over an unnamed creek, 3 miles east of Mitchellsville. | — | Executed | Dees, Inc. $188,243 · | ||
| Apr 26, 2019 | 99607 | MassacDistrict 9 | Replace the bridge carrying Portland Road over an unnamed stream, 2 miles northwest of Joppa. | — | Executed | Samron Midwest Contracting, Inc. $232,115 · | ||
| Apr 26, 2019 | 99613 | WilliamsonDistrict 9 | Resurfacing CH 18 from Stonefort Road to East Boundary Road north of Creal Springs. | — | Executed | Southern Illinois Asphalt Co., Inc. $605,762 · | ||
| Apr 26, 2019 | 99616 | JacksonDistrict 9 | Resurfacing Ava Road from IL 4 to South of Francis Lane. | — | Executed | E. T. Simonds Construction Company $1,545,387 · | ||
| Apr 26, 2019 | 99618 | JeffersonDistrict 9 | Resurfacing Marlow Road from IL 15 to Opdyke Road | — | Executed | Southern Illinois Asphalt Co., Inc. $382,099 · | ||
| Apr 26, 2019 | 99619 | WhiteDistrict 9 | Resurfacing CH 7 from 650 North Road to IL 141. | — | Executed | E. T. Simonds Construction Company $1,527,191 · | ||
| Jun 14, 2019 | 46497 | VariousDistrict 6 | PAVEMENT MARKING ON VARIOUS ROUTES THROUGHOUT DISTRICT 6 | — | Executed | STF, LLC d/b/a Traffic Control Company $1,337,766 · | ||
| Jun 14, 2019 | 46505 | DuPageMcHenryDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Dupage and McHenry counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $422,500 · | ||
| Jun 14, 2019 | 46506 | CookDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Cook County. | — | Executed | STF, LLC d/b/a Traffic Control Company $820,000 · | ||
| Jun 14, 2019 | 46507 | LakeWillDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Lake and Will counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $593,000 · | ||
| Jun 14, 2019 | 46508 | VariousDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, 8, 12 and 24 inches in width throughout District One. | — | Executed | STF, LLC d/b/a Traffic Control Company $699,050 · | ||
| Jun 14, 2019 | 46509 | CookDistrict 1 | Remove and replace reflectors and pavement marker castings within limits shown. | — | Executed | STF, LLC d/b/a Traffic Control Company $246,018 · | ||
| Jun 14, 2019 | 46511 | VariousDistrict 3 | REPLACING REFLECTORIZED GUARDRAIL MARKERS, TERMINAL MARKERS, AND PLACING LINEAR DELINEATOR PANELS WITHIN THE LIMITS OF THE CONTRACT. | — | Executed | Northern Contracting, Inc. $202,126 · | ||
| Jun 14, 2019 | 46512 | VariousDistrict 3 | REMOVING REFLECTORS, PLACING NEW REFLECTORS, REMOVING DAMAGED RAISED RFLECTIVE PAVEMENT MARKER CASTINGS AND REPLACING WITH NEW WITHIN THE LIMITS SHOWN. | — | Executed | P & P Construction Co. $125,347 · | ||
| Jun 14, 2019 | 46513 | VariousDistrict 3 | REMOVING AND REPLACING REFLCTORS, AND RAISED REFLECTIVE PAVEMENT MARKER CASTINGS WITHIN THE LIMITS SHOWN. | — | Executed | STF, LLC d/b/a Traffic Control Company $202,445 · | ||
| Jun 14, 2019 | 46514 | VariousDistrict 3 | Remove and replace reflectors, remove and replace damaged raised reflective pavement marker castings within limits shown. | — | Executed | P & P Construction Co. $153,496 · | ||
| Jun 14, 2019 | 46515 | VermilionDistrict 5 | 38.57 MILES OF GROOVING AND PAVEMENT STRIPING. | — | Executed | Varsity Striping & Construction Co. $524,436 · | ||
| Jun 14, 2019 | 46516 | VariousDistrict 4 | Remove and replace raised reflective pavement markers within limits shown. | — | Executed | P & P Construction Co. $571,845 · | ||
| Jun 14, 2019 | 46517 | VariousDistrict 4 | REMOVAL OF EXISTING PAVEMENT MARKINGS AND REPLACING WITH EPOXY AND MODIFIED URETHANE PAVEMENT MARKING LINES WITHIN THE LIMITS SPECIFIED ON EACH WORK ORDER. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,098,686 · | ||
| Jun 14, 2019 | 46518 | VariousDistrict 6 | REPAIRING OR REPLACING DAMAGED SIGN COMPONENTS, FURNISHING AND INSTALLING NEW SIGN SUPPORTS, REPAIRING OR REPLACING DAMAGED SIGN COMPONENTS, FURNISHING NEW OVERHEAD SIGN STRUCTURES AND REAPIRS TO OVERHEAD SIGN STRUCTURES AT VARIOUS LOCATIONS THROUGHOUT THE STATE. | — | Executed | Kujo, Inc. $2,556,621 · | ||
| Jun 14, 2019 | 46519 | VariousDistrict 2 | REMOVING EXISTING GUARDRAIL DELINEATORS AND INSTALLING NEW GUARDRAIL DELINEATORS WITHIN THE LIMITS SPECIFIED ON EACH INDIVIDUAL WORK ORDER. | — | Executed | Endrizzi Contracting, Inc $279,807 · | ||
| Jun 14, 2019 | 46520 | VariousDistrict 2 | PLACING VARIOUS WIDTHS OF MODIFIED URETHANE AND THERMOPLASTIC PAVEMENT MARKING LINES, LETTERS, AND SYMBOLS WITHIN THE LIMITS SPECIFIED ON EACH WORK ORDER. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,587,475 · | ||
| Jun 14, 2019 | 46521 | VariousDistrict 9 | REMOVING REFLECTORS, PLACING NEW REFLECTORS, REMOVING DAMAGED RAISED REFLECTIVE PAVEMENT MARKER CASTINGS AND INSTALLING NEW CASTINGS ON VARIOUS ROUTES THROUGH- OUT DISTRICT 9. | — | Executed | STF, LLC d/b/a Traffic Control Company $227,183 · | ||
| Jun 14, 2019 | 46526 | MadisonDistrict 8 | Pump station improvements at 2 locations: 1) I-255 at Grey's Farm/Sparks Lane in Collinsville; 2) I-270/Fun and Sun at West Chain of Rocks in Mitchell. | — | Rejected | Electrico, Inc. $60,485 · | ||
| Jun 14, 2019 | 46528 | LoganDistrict 6 | INSTALLATION OF NEW AUTOMATIC TRANSFER SWITCH AT THE STORM WATER PUMP STATION ON IL 121. | — | Rejected | Kovilic Construction Company, Inc. $147,850 · | ||
| Jun 14, 2019 | 46529 | EffinghamLawrenceMaconDistrict 7 | New automatic transfer switch and miscellaneous improvements to 3 pump stations: 1) Westport Pump House along IL 33 in Lawrence County; 2) Effingham Pump House at US 40 and US 45 in Effingham County; 3) Decatur Pump House on Garfield Avenue east of IL 121 in Macon County. | — | Executed | Bodine Electric of Decatur $230,811 · | ||
| Jun 14, 2019 | 46916 | ClintonDistrict 8 | RESURFACING OF PARK ROADS AND PARKING LOT. ADA SIDEWALK AND RAMP UPGRADES AND REPLACEMENT OF CULVERTS AT ELDON HAZLET STATE PARK. | — | Executed | Howell Paving, Inc. $1,323,717 · | ||
| Jun 14, 2019 | 46917 | BureauDistrict 3 | 2 miles of resurfacing park roads and parking lots with A-2 Oil and Chip at Mautino State Fish and Wildlife Area. Project includes some roadway widening, culvert replacement and drainage improvements. | — | Executed | Phoenix Corporation of the Quad Cities $476,639 · | ||
| Jun 14, 2019 | 60R80 | CookDistrict 1 | Bridge deck and approach overlay, repairs and reconstruction of deck joints on structures carrying Sheridan Road over ravines in the Village of Glencoe and City of Highland Park. (SN 016-0616, 0617, 0618, 0619) | — | Executed | Copenhaver Construction, Inc. $1,624,894 · | ||
| Jun 14, 2019 | 61E01 | KaneDistrict 1 | Construction of a pedestrian tunnel under the UP Railroad to reconnect the Fox River Trail on the west side of the tracks to the Prairie Path on the east side of the tracks, in the Raymond Street Forest Preserve. | — | Executed | Martam Construction Incorporated $3,439,622 · | ||
| Jun 14, 2019 | 61F06 | CookDistrict 1 | PCC multi-use path construction with ADA ramp improvements on Shermer Road from West Lake Avenue to willow Road in the Village of Glenview. | — | Executed | M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $999,270 · | ||
| Jun 14, 2019 | 61F37 | CookDistrict 1 | Roadway reconstruction, traffic signals, interconnection with railroad signals, curb and gutter, sidewalk and street lighting at the intersection of 95th Street and Museum Avenue in Oak Lawn. | — | Executed | Alliance Contractors, Inc. $1,728,958 · | ||
| Jun 14, 2019 | 61F76 | WillDistrict 1 | Construction of a multi-use path adjacent to University Parkway from Steger- Monee Road to Western Avenue in the Village of University Park. | — | Executed | Iroquois Paving Corporation $525,868 · | ||
| Jun 14, 2019 | 61F78 | McHenryDistrict 1 | Sidewalk and lighting improvements on Pearl Street from Illinois Route 31 to Riverside Drive in the City of McHenry. | — | Executed | Sumit Construction Co., Inc. $530,035 · | ||
| Jun 14, 2019 | 61F80 | McHenryDistrict 1 | Resurfacing Curran Road from Illinois Route 120 to Ojibwa Lane in the City of McHenry. | — | Executed | Curran Contracting Company $525,561 · | ||
| Jun 14, 2019 | 61F83 | DuPageDistrict 1 | Bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carryi Work consists of bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carrying 83rd Street over I-355 between Wharf Dr. and Woodward Avenue in the village of Woodridge. | — | Executed | D. Construction, Inc. $288,756 · | ||
| Jun 14, 2019 | 61F84 | CookDistrict 1 | Construction of a pedestrian path adjacent to Roselle Road from Algonquin Road to Shire Circle in the Village of Palatine. | — | Executed | A Lamp Concrete Contractors, Inc. $379,874 · | ||
| Jun 14, 2019 | 62B75 | LakeDistrict 1 | Intersection reconstruction at IL 131 and Kenosha Road in the Village of Beach Park. | — | Executed | Campanella and Sons, Inc. $3,348,311 · | ||
| Jun 14, 2019 | 62C06 | McHenryDistrict 1 | Intersection improvement, roadway realignment and traffic signal installation where IL 176 intersects with Mt. Thabor Road and Haligus Road in Crystal Lake. | — | Executed | Plote Construction, Inc. $3,852,700 · | ||
| Jun 14, 2019 | 62C08 | CookDistrict 1 | Intersection widening, traffic signal modernization and resurfacing at Kedzie Avenue and 119th Street in Merrionette. | — | Executed | D. Construction, Inc. $920,917 · | ||
| Jun 14, 2019 | 62D39 | McHenryDistrict 1 | Replace culvert, roadway reconstruction and resurfacing on IL 120 in Greenwood Township. | — | Executed | Alliance Contractors, Inc. $243,993 · | ||
| Jun 14, 2019 | 62F19 | DuPageDistrict 1 | Channelization and traffic sigal modernization at IL 59 and Army Trail Road. | — | Executed | Benchmark Construction Co., Inc. $3,488,015 · | ||
| Jun 14, 2019 | 62G30 | LakeDistrict 1 | 3.1 miles of resurfacing on IL 22 from N. Quentin Road to IL 83 in the Villages of Kildeer and Long Grove. | — | Executed | Builders Paving, LLC $1,698,888 · | ||
| Jun 14, 2019 | 62G83 | LakeDistrict 1 | 1.9 miles of resurfacing, shoulders, milled rumble strips, ADA ramps and pedestrian traffic signals at 2 locations in Gurnee, Livertyville, Waukegan and Park City: 1) IL 120 from east of I-94 to IL 43; 2)IL 21 at Red Top Drive. | — | Executed | Peter Baker & Son Co. $2,893,697 · | ||
| Jun 14, 2019 | 62H09 | CookDuPageKaneDistrict 1 | Guardrail end section replacement at various locations in Cook, DuPage and Kane Counties. | — | Executed | Midwest Fence Corporation $433,668 · | ||
| Jun 14, 2019 | 62H10 | LakeMcHenryDistrict 1 | Guardrail improvements at varous locations in McHenry and Lake Counties. | — | Executed | Kujo, Inc. $655,072 · | ||
| Jun 14, 2019 | 62H11 | CookWillDistrict 1 | Guardrail end section replacement at various locations in Cook and Will Counties. | — | Executed | Midwest Fence Corporation $559,277 · | ||
| Jun 14, 2019 | 62H18 | LakeDistrict 1 | Culvert wing wall replacement on IL 120 just west of IL 83 in Grayslake. | — | Executed | Meru Corporation $147,965 · | ||
| Jun 14, 2019 | 62H33 | VariousDistrict 1 | DRAINAGE IMPROVEMENTS ON VARIOUS STATE MAINTAINED ROUTES IN COOK, DUPAGE, AND LAKE COUNTIES. | — | Executed | Copenhaver Construction, Inc. $872,848 · | ||
| Jun 14, 2019 | 62H37 | DuPageDistrict 1 | Wing Wall and culvert repairs at the structure carrying IL 59 in Warrenville. Includes grading and shaping of the ditch on the south side of US 20, E of Garden Avenue in Roselle. | — | Executed | Lakes & Rivers Contracting, Inc. $290,571 · | ||
| Jun 14, 2019 | 62H46 | VariousDistrict 1 | Trombone mast arm replacement at various locations in District 1. | — | Executed | Home Towne Electric, Inc. $742,777 · | ||
| Jun 14, 2019 | 62H78 | VariousDistrict 1 | Concrete bridge deck sealing upon the entire top surface of the deck, top of sidewalks and inside and top of parapets at various locations throughout District 1. | — | Active | Lion Construction 1, LLC $193,434 · | ||
| Jun 14, 2019 | 62H88 | LakeDistrict 1 | Demolition and site clean-up of three single-family residences on IL 22 between Quentin Road and west of IL 83 in Long Grove and Kildeer. | — | Executed | McDonagh Demolition, Inc. $122,288 · | ||
| Jun 14, 2019 | 62H89 | CookDistrict 1 | 259 FT OF BRIDGE DECK SEALING, NEOPRENE EXPANSION JOINT REMOVAL, INSTALLING PREFORMED JOINT SEALS, CLEANING BRIDGE DRAINAGE SYSTEM, AND DECK SLAB REPAIRS ON STEVENSON EXPRESSWAY AT PULASKI RD. | — | Executed | Vixen Construction, Inc. $628,701 · | ||
| Jun 14, 2019 | 62H94 | CookDuPageDistrict 1 | Expressway sweeping on I-55 (Stevenson Expressway) from I-355 to I-90/94 and on I-94, US 41 from US 14 (Dempster Street) to IL 68 (Dundee Road). | — | Executed | Elgin Sweeping Services, Inc. $2,196,168 · | ||
| Jun 14, 2019 | 62J01 | DuPageDistrict 1 | Demolition of a single-family residence at 22W432 IL 53 in Glen Ellyn. | — | Executed | Scanlon Excavating & Concrete, Inc. $83,910 · | ||
| Jun 14, 2019 | 62J07 | CookDistrict 1 | Intermittent resurfacing project on various state maintained arterial routes in various cities. | — | Executed | J. A. Johnson Paving Company $4,887,777 · | ||
| Jun 14, 2019 | 62J08 | WillDistrict 1 | Intermittent pavement resurfacing project located on various state maintained arterial routes. | — | Executed | P. T. Ferro Construction Co. $425,756 · | ||
| Jun 14, 2019 | 62J09 | CookDuPageDistrict 1 | Intermittent resurfacing project on various expressway routes. | — | Executed | R. W. Dunteman Company $1,653,207 · | ||
| Jun 14, 2019 | 62J10 | CookDistrict 1 | Intermittent resurfacing on various state maintained arterial routes in Cook County | — | Executed | R. W. Dunteman Company $1,600,201 · | ||
| Jun 14, 2019 | 62J11 | CookKaneMcHenryDistrict 1 | Intermittent resurfacing on various routes in McHenry, Kane and Cook counties. | — | Executed | J. A. Johnson Paving Company $1,797,700 · | ||
| Jun 14, 2019 | 62J12 | CookWillDistrict 1 | Intermittent resurfacing on various state maintained expressway routes in Cook and Will counties. | — | Executed | D. Construction, Inc. $826,171 · | ||
| Jun 14, 2019 | 62J13 | DuPageKaneDistrict 1 | Intermittent resurfacing on various state maintained arterial routes in Dupage and Kane counties. | — | Executed | J. A. Johnson Paving Company $762,500 · | ||
| Jun 14, 2019 | 62J14 | LakeMcHenryDistrict 1 | Intermittent resurfacing on various routes in Lake and McHenry counties. | — | Executed | J. A. Johnson Paving Company $1,964,700 · | ||
| Jun 14, 2019 | 62J15 | CookDuPageDistrict 1 | INTRMITTENT RESURFACING PROJECT ON VARIOUS ROUTES IN VARIOUS CITIES. | — | Executed | R. W. Dunteman Company $2,872,070 · | ||
| Jun 14, 2019 | 62J22 | KaneDistrict 1 | Repairing the Hankes Road Bridge over IL 56. | — | Executed | ERA-Valdivia Contractors, Inc. $317,420 · | ||
| Jun 14, 2019 | 62J24 | VariousDistrict 1 | Impact attenuators and sand barrels on various expressways in District One. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,834,250 · | ||
| Jun 14, 2019 | 64K76 | HenryRock IslandDistrict 2 | Remove and replace 3 overhead dynamic message signs, structure components, and supports at various locations. | — | Executed | John Burns Construction Company $1,090,515 · | ||
| Jun 14, 2019 | 64N20 | Rock IslandDistrict 2 | Pavement patching on IL 5 and IL 5/IL 92 from Colona Road/Avenue of the Cities to the I-80/I-88 interchange. | — | Executed | G. M. Sipes Construction, Inc. $525,686 · | ||
| Jun 14, 2019 | 64N51 | CarrollDistrict 2 | 2,500 FT APPLICATION OF A THIN POLYMER OVERLAY ON THE DECK OF SN 008--0052 IN SAVANNA. | — | Executed | ERA-Valdivia Contractors, Inc. $503,834 · | ||
| Jun 14, 2019 | 64N61 | WhitesideDistrict 2 | EXPANSION JOINT REPLACEMENT, DECK PATCHING. AND MICROSILICA OVERLAY ON SN 098-0052. | — | Executed | ERA-Valdivia Contractors, Inc. $291,726 · | ||
| Jun 14, 2019 | 66428 | KankakeeDistrict 3 | 6.530 miles of 3P milling and resurfacing from IL 17 to the north city limits of St. Anne; and traffic signal improvements at the intersection of IL 17 and IL 1. | — | Executed | Gallagher Asphalt Corporation & Kankakee Valley Construction Company, Inc. JV $2,938,460 · | ||
| Jun 14, 2019 | 66A03 | FordDistrict 3 | 3.9 MILES OF MILLING AND RESURFACING 2.5 INCHES ON IL 165 MAINLINE FROM THE MCLEAN CO LINE TO IL 47 IN SIBLEY, IL. | — | Executed | Iroquois Paving Corporation $893,506 · | ||
| Jun 14, 2019 | 66E21 | BureauDistrict 3 | 4.34 MILES OF 3P MILLING AND RESURFACING 2.25" OF MAINLINE FROM 0.2 MILES N OF COUNTY ROAD 1500N ON US 6 TO ST MARY AND FROM US 6 TO W ILLINOIS ST. IT INCLUDES PAVEMENT MARKINGS AND REPLACING EXISTING DETECTOR LOOPS. | — | Executed | Advanced Asphalt Company $3,128,659 · | ||
| Jun 14, 2019 | 66H03 | DeKalbDistrict 3 | 2.72 MILES OF 3P RESURFACING WORK WITH PAVEMENT PATCHING AND ADA RAMP IMPROVEMENTS FROM STATE ST. IN GENOA TO THE JUNCTION WITH IL 23 (N). | — | Executed | Curran Contracting Company $1,578,679 · | ||
| Jun 14, 2019 | 66J12 | DeKalbDistrict 3 | 2.51 MILES OF SHOULDER WIDENING AND RUMBLE STRIP INSTALLATION ON IL72 FROM E OF IRENE RD TO JUST W OF MALTA RD. | — | Executed | Curran Contracting Company $442,521 · | ||
| Jun 14, 2019 | 66J23 | DeKalbDistrict 3 | 1.596 MILES OF RESURFACING AND ADA IMPROVEMENTS FROM LITTLE ROCK CREEK TO 0.3 MILES E OF REES ST. IN HINCKLEY. | — | Executed | Builders Paving, LLC $866,688 · | ||
| Jun 14, 2019 | 66J51 | VariousDistrict 3 | One year contract to repair damaged high tension cable median barrier, guardrail, attenuators, etc., caused by motorists along various routes. | — | Executed | COLLINS & HERMANN, INC. $1,188,019 · | ||
| Jun 14, 2019 | 66J56 | KendallDistrict 3 | 2.39 MILES OF 3P MILLING AND RESURFACING OF 2.25" FOR MAINLINE PAVEMENT AND SHOULDER FROM S OF GALENA RD TO S KENNEDY DR IN YORKVILLE. | — | Executed | D. Construction, Inc. $1,160,355 · | ||
| Jun 14, 2019 | 66J74 | LaSalleDistrict 3 | MEDIAN CROSSOVER and SHOULDER RECONSTRUCTION 0.5 MILES W OF SN 050-0228/0228 TO 0.5 MILES E OF SN 050-0220/0221 IN LASALLE. | — | Executed | Advanced Asphalt Company $744,730 · | ||
| Jun 14, 2019 | 66J81 | IroquoisDistrict 3 | Weed spraying and seeding for prairie grass at various areas along IL 1 near Milford. | — | Executed | F & W Lawn Care and Landscaping Company $54,611 · | ||
| Jun 14, 2019 | 66J83 | KankakeeDistrict 3 | Centerline and longitudinal joint crack sealing on various routes and centerline joint microsurfacing on FAP 330 from Will County line to Manteno- Deselm Road. | — | Executed | SKC Construction, Inc. $298,715 · | ||
| Jun 14, 2019 | 66J84 | LaSalleDistrict 3 | 8.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from Marshall co Line to 0.4 miles north of CH 54 west of Tonica. | — | Executed | Beniach Construction Co., Inc. $667,472 · | ||
| Jun 14, 2019 | 66J85 | LaSalleDistrict 3 | 6.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from US 34 to 0.3 mile south of Lee County line. | — | Executed | G. M. Sipes Construction, Inc. $1,030,963 · | ||
| Jun 14, 2019 | 66J87 | BureauDistrict 3 | 10.5 MILES OF ROUTING AND SEALING TRANSVERSE AND PRIMARY LONGITUDINAL CRACKS GREATER THAN 0.25" WIDE AS WELL AS CLEANING AND SEALING SECONDARY CRACKS GREATER THAN 0.25" WIDE ON IL 26 FROM I-80 TO THE SOUTH OF RAILROAD AVE IN PRINCETON. MICROSURFACING THE CENTERLINE FROM 0.1 MILES N OF 2600N RD TO I-80. | — | Executed | A. C. Pavement Striping Co. $328,924 · | ||
| Jun 14, 2019 | 66J88 | LaSalleLivingstonDistrict 3 | 12.4 miles of routing and sealing on IL 23 from just north of Oakley Avenue to Grove Street in Streator, and on IL 23 from 1 mile south of the LaSalle County Line to 9th Street in Cornell. | — | Executed | Denler, Inc. $73,110 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.