IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Apr 26, 2019 87708 LaSalleDistrict 3 Replace the bridges carrying TR 469 and TR 382 over Covel Creek, 6 miles east of Grand Ridge. — Executed Nov 26 New Riber Construction, Inc. $726,079 ·
Apr 26, 2019 87714 LaSalleDistrict 3 Resurfacing and intersection improvements on FAS Route 263 (CH 5) at Illinois Route 23. — Executed Nov 26 New Advanced Asphalt Company $216,236 ·
Apr 26, 2019 89474 KnoxDistrict 4 Replace the bridge carrying CH 4 over Walnut Creek, 0.5 mile west of Altona. — Executed Nov 26 New County Contractors, Inc. $699,269 ·
Apr 26, 2019 93723 MacoupinDistrict 6 Remove and replace guardrail and terminals at various locations in Macoupin County. — Executed Nov 26 New Clevenger Contractors, Inc. $1,612,957 ·
Apr 26, 2019 93725 AdamsDistrict 6 Resurfacing CH 4 from North 200th Avenue to North 400th Avenue. — Executed Nov 26 New Diamond Construction Company $472,774 ·
Apr 26, 2019 95798 MaconDistrict 7 Replace the bridge carrying CH 57 over a tributary to Big Creek, 0.2 mile south of Lehman Road. — Executed Nov 26 New County Contractors, Inc. $2,990,685 ·
Apr 26, 2019 95846 WabashDistrict 7 Replace the bridge carrying TR 173 over a drainage ditch, 1.5 miles south of Keensburg. — Executed Nov 26 New Lake Contracting, Inc. $244,759 ·
Apr 26, 2019 95847 MoultrieDistrict 7 Resurface CH 13 from County Road 1500 North to County Road 1400 North. — Executed Nov 26 New Ne-Co Asphalt Co., Inc. $254,906 ·
Apr 26, 2019 97654 St. ClairDistrict 8 Reconstruction of Cargill Elevator Road from the Mississippi River bridge_docks to IL 3 in Cahokia. — Executed Nov 26 New Baxmeyer Construction, Inc. $3,245,028 ·
Apr 26, 2019 97684 MadisonDistrict 8 Resurfacing Clifton Terrace Road from south of IL 3 to Rosenberg Lane in the Village of Godfrey. — Executed Nov 26 New Charles E. Mahoney Co. $329,987 ·
Apr 26, 2019 97690 MadisonDistrict 8 Resurfacing Wanda Road from IL 143 to New Poag Road. — Executed Nov 26 New The Kilian Corporation $1,635,887 ·
Apr 26, 2019 97694 St. ClairDistrict 8 Pavement reconstrcution, curb and gutter, storm sewer, sidewalks, and pavement markings on Simmons Road from Milburn School Road to Porter Road in O'Fallon. — Executed Nov 26 New Kamadulski Excavating and Grading Company, Inc. $1,218,315 ·
Apr 26, 2019 97695 MadisonDistrict 8 Resurfacing Washington Avenue from north of Salu Street to College Avenue in Alton. — Executed Nov 26 New Charles E. Mahoney Co. $622,115 ·
Apr 26, 2019 97696 RandolphDistrict 8 Resurfacing Baldwin Road from Wirth Lane to Ridge Road and from the St. Clair County line to north city limits of Baldwin. — Executed Nov 26 New The Kilian Corporation $1,302,949 ·
Apr 26, 2019 99575 SalineDistrict 9 Replace the bridge carrying DeNeal Road over an unnamed creek, 3 miles east of Mitchellsville. — Executed Nov 26 New Dees, Inc. $188,243 ·
Apr 26, 2019 99607 MassacDistrict 9 Replace the bridge carrying Portland Road over an unnamed stream, 2 miles northwest of Joppa. — Executed Nov 26 New Samron Midwest Contracting, Inc. $232,115 ·
Apr 26, 2019 99613 WilliamsonDistrict 9 Resurfacing CH 18 from Stonefort Road to East Boundary Road north of Creal Springs. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $605,762 ·
Apr 26, 2019 99616 JacksonDistrict 9 Resurfacing Ava Road from IL 4 to South of Francis Lane. — Executed Nov 26 New E. T. Simonds Construction Company $1,545,387 ·
Apr 26, 2019 99618 JeffersonDistrict 9 Resurfacing Marlow Road from IL 15 to Opdyke Road — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $382,099 ·
Apr 26, 2019 99619 WhiteDistrict 9 Resurfacing CH 7 from 650 North Road to IL 141. — Executed Nov 26 New E. T. Simonds Construction Company $1,527,191 ·
Jun 14, 2019 46497 VariousDistrict 6 PAVEMENT MARKING ON VARIOUS ROUTES THROUGHOUT DISTRICT 6 — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $1,337,766 ·
Jun 14, 2019 46505 DuPageMcHenryDistrict 1 Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Dupage and McHenry counties. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $422,500 ·
Jun 14, 2019 46506 CookDistrict 1 Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Cook County. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $820,000 ·
Jun 14, 2019 46507 LakeWillDistrict 1 Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Lake and Will counties. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $593,000 ·
Jun 14, 2019 46508 VariousDistrict 1 Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, 8, 12 and 24 inches in width throughout District One. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $699,050 ·
Jun 14, 2019 46509 CookDistrict 1 Remove and replace reflectors and pavement marker castings within limits shown. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $246,018 ·
Jun 14, 2019 46511 VariousDistrict 3 REPLACING REFLECTORIZED GUARDRAIL MARKERS, TERMINAL MARKERS, AND PLACING LINEAR DELINEATOR PANELS WITHIN THE LIMITS OF THE CONTRACT. — Executed Nov 26 New Northern Contracting, Inc. $202,126 ·
Jun 14, 2019 46512 VariousDistrict 3 REMOVING REFLECTORS, PLACING NEW REFLECTORS, REMOVING DAMAGED RAISED RFLECTIVE PAVEMENT MARKER CASTINGS AND REPLACING WITH NEW WITHIN THE LIMITS SHOWN. — Executed Nov 26 New P & P Construction Co. $125,347 ·
Jun 14, 2019 46513 VariousDistrict 3 REMOVING AND REPLACING REFLCTORS, AND RAISED REFLECTIVE PAVEMENT MARKER CASTINGS WITHIN THE LIMITS SHOWN. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $202,445 ·
Jun 14, 2019 46514 VariousDistrict 3 Remove and replace reflectors, remove and replace damaged raised reflective pavement marker castings within limits shown. — Executed Nov 26 New P & P Construction Co. $153,496 ·
Jun 14, 2019 46515 VermilionDistrict 5 38.57 MILES OF GROOVING AND PAVEMENT STRIPING. — Executed Nov 26 New Varsity Striping & Construction Co. $524,436 ·
Jun 14, 2019 46516 VariousDistrict 4 Remove and replace raised reflective pavement markers within limits shown. — Executed Nov 26 New P & P Construction Co. $571,845 ·
Jun 14, 2019 46517 VariousDistrict 4 REMOVAL OF EXISTING PAVEMENT MARKINGS AND REPLACING WITH EPOXY AND MODIFIED URETHANE PAVEMENT MARKING LINES WITHIN THE LIMITS SPECIFIED ON EACH WORK ORDER. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,098,686 ·
Jun 14, 2019 46518 VariousDistrict 6 REPAIRING OR REPLACING DAMAGED SIGN COMPONENTS, FURNISHING AND INSTALLING NEW SIGN SUPPORTS, REPAIRING OR REPLACING DAMAGED SIGN COMPONENTS, FURNISHING NEW OVERHEAD SIGN STRUCTURES AND REAPIRS TO OVERHEAD SIGN STRUCTURES AT VARIOUS LOCATIONS THROUGHOUT THE STATE. — Executed Nov 26 New Kujo, Inc. $2,556,621 ·
Jun 14, 2019 46519 VariousDistrict 2 REMOVING EXISTING GUARDRAIL DELINEATORS AND INSTALLING NEW GUARDRAIL DELINEATORS WITHIN THE LIMITS SPECIFIED ON EACH INDIVIDUAL WORK ORDER. — Executed Nov 26 New Endrizzi Contracting, Inc $279,807 ·
Jun 14, 2019 46520 VariousDistrict 2 PLACING VARIOUS WIDTHS OF MODIFIED URETHANE AND THERMOPLASTIC PAVEMENT MARKING LINES, LETTERS, AND SYMBOLS WITHIN THE LIMITS SPECIFIED ON EACH WORK ORDER. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,587,475 ·
Jun 14, 2019 46521 VariousDistrict 9 REMOVING REFLECTORS, PLACING NEW REFLECTORS, REMOVING DAMAGED RAISED REFLECTIVE PAVEMENT MARKER CASTINGS AND INSTALLING NEW CASTINGS ON VARIOUS ROUTES THROUGH- OUT DISTRICT 9. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $227,183 ·
Jun 14, 2019 46526 MadisonDistrict 8 Pump station improvements at 2 locations: 1) I-255 at Grey's Farm/Sparks Lane in Collinsville; 2) I-270/Fun and Sun at West Chain of Rocks in Mitchell. — Rejected Nov 26 New Electrico, Inc. $60,485 ·
Jun 14, 2019 46528 LoganDistrict 6 INSTALLATION OF NEW AUTOMATIC TRANSFER SWITCH AT THE STORM WATER PUMP STATION ON IL 121. — Rejected Nov 26 New Kovilic Construction Company, Inc. $147,850 ·
Jun 14, 2019 46529 EffinghamLawrenceMaconDistrict 7 New automatic transfer switch and miscellaneous improvements to 3 pump stations: 1) Westport Pump House along IL 33 in Lawrence County; 2) Effingham Pump House at US 40 and US 45 in Effingham County; 3) Decatur Pump House on Garfield Avenue east of IL 121 in Macon County. — Executed Nov 26 New Bodine Electric of Decatur $230,811 ·
Jun 14, 2019 46916 ClintonDistrict 8 RESURFACING OF PARK ROADS AND PARKING LOT. ADA SIDEWALK AND RAMP UPGRADES AND REPLACEMENT OF CULVERTS AT ELDON HAZLET STATE PARK. — Executed Nov 26 New Howell Paving, Inc. $1,323,717 ·
Jun 14, 2019 46917 BureauDistrict 3 2 miles of resurfacing park roads and parking lots with A-2 Oil and Chip at Mautino State Fish and Wildlife Area. Project includes some roadway widening, culvert replacement and drainage improvements. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $476,639 ·
Jun 14, 2019 60R80 CookDistrict 1 Bridge deck and approach overlay, repairs and reconstruction of deck joints on structures carrying Sheridan Road over ravines in the Village of Glencoe and City of Highland Park. (SN 016-0616, 0617, 0618, 0619) — Executed Nov 26 New Copenhaver Construction, Inc. $1,624,894 ·
Jun 14, 2019 61E01 KaneDistrict 1 Construction of a pedestrian tunnel under the UP Railroad to reconnect the Fox River Trail on the west side of the tracks to the Prairie Path on the east side of the tracks, in the Raymond Street Forest Preserve. — Executed Nov 26 New Martam Construction Incorporated $3,439,622 ·
Jun 14, 2019 61F06 CookDistrict 1 PCC multi-use path construction with ADA ramp improvements on Shermer Road from West Lake Avenue to willow Road in the Village of Glenview. — Executed Nov 26 New M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $999,270 ·
Jun 14, 2019 61F37 CookDistrict 1 Roadway reconstruction, traffic signals, interconnection with railroad signals, curb and gutter, sidewalk and street lighting at the intersection of 95th Street and Museum Avenue in Oak Lawn. — Executed Nov 26 New Alliance Contractors, Inc. $1,728,958 ·
Jun 14, 2019 61F76 WillDistrict 1 Construction of a multi-use path adjacent to University Parkway from Steger- Monee Road to Western Avenue in the Village of University Park. — Executed Nov 26 New Iroquois Paving Corporation $525,868 ·
Jun 14, 2019 61F78 McHenryDistrict 1 Sidewalk and lighting improvements on Pearl Street from Illinois Route 31 to Riverside Drive in the City of McHenry. — Executed Nov 26 New Sumit Construction Co., Inc. $530,035 ·
Jun 14, 2019 61F80 McHenryDistrict 1 Resurfacing Curran Road from Illinois Route 120 to Ojibwa Lane in the City of McHenry. — Executed Nov 26 New Curran Contracting Company $525,561 ·
Jun 14, 2019 61F83 DuPageDistrict 1 Bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carryi Work consists of bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carrying 83rd Street over I-355 between Wharf Dr. and Woodward Avenue in the village of Woodridge. — Executed Nov 26 New D. Construction, Inc. $288,756 ·
Jun 14, 2019 61F84 CookDistrict 1 Construction of a pedestrian path adjacent to Roselle Road from Algonquin Road to Shire Circle in the Village of Palatine. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $379,874 ·
Jun 14, 2019 62B75 LakeDistrict 1 Intersection reconstruction at IL 131 and Kenosha Road in the Village of Beach Park. — Executed Nov 26 New Campanella and Sons, Inc. $3,348,311 ·
Jun 14, 2019 62C06 McHenryDistrict 1 Intersection improvement, roadway realignment and traffic signal installation where IL 176 intersects with Mt. Thabor Road and Haligus Road in Crystal Lake. — Executed Nov 26 New Plote Construction, Inc. $3,852,700 ·
Jun 14, 2019 62C08 CookDistrict 1 Intersection widening, traffic signal modernization and resurfacing at Kedzie Avenue and 119th Street in Merrionette. — Executed Nov 26 New D. Construction, Inc. $920,917 ·
Jun 14, 2019 62D39 McHenryDistrict 1 Replace culvert, roadway reconstruction and resurfacing on IL 120 in Greenwood Township. — Executed Nov 26 New Alliance Contractors, Inc. $243,993 ·
Jun 14, 2019 62F19 DuPageDistrict 1 Channelization and traffic sigal modernization at IL 59 and Army Trail Road. — Executed Nov 26 New Benchmark Construction Co., Inc. $3,488,015 ·
Jun 14, 2019 62G30 LakeDistrict 1 3.1 miles of resurfacing on IL 22 from N. Quentin Road to IL 83 in the Villages of Kildeer and Long Grove. — Executed Nov 26 New Builders Paving, LLC $1,698,888 ·
Jun 14, 2019 62G83 LakeDistrict 1 1.9 miles of resurfacing, shoulders, milled rumble strips, ADA ramps and pedestrian traffic signals at 2 locations in Gurnee, Livertyville, Waukegan and Park City: 1) IL 120 from east of I-94 to IL 43; 2)IL 21 at Red Top Drive. — Executed Nov 26 New Peter Baker & Son Co. $2,893,697 ·
Jun 14, 2019 62H09 CookDuPageKaneDistrict 1 Guardrail end section replacement at various locations in Cook, DuPage and Kane Counties. — Executed Nov 26 New Midwest Fence Corporation $433,668 ·
Jun 14, 2019 62H10 LakeMcHenryDistrict 1 Guardrail improvements at varous locations in McHenry and Lake Counties. — Executed Nov 26 New Kujo, Inc. $655,072 ·
Jun 14, 2019 62H11 CookWillDistrict 1 Guardrail end section replacement at various locations in Cook and Will Counties. — Executed Nov 26 New Midwest Fence Corporation $559,277 ·
Jun 14, 2019 62H18 LakeDistrict 1 Culvert wing wall replacement on IL 120 just west of IL 83 in Grayslake. — Executed Nov 26 New Meru Corporation $147,965 ·
Jun 14, 2019 62H33 VariousDistrict 1 DRAINAGE IMPROVEMENTS ON VARIOUS STATE MAINTAINED ROUTES IN COOK, DUPAGE, AND LAKE COUNTIES. — Executed Nov 26 New Copenhaver Construction, Inc. $872,848 ·
Jun 14, 2019 62H37 DuPageDistrict 1 Wing Wall and culvert repairs at the structure carrying IL 59 in Warrenville. Includes grading and shaping of the ditch on the south side of US 20, E of Garden Avenue in Roselle. — Executed Nov 26 New Lakes & Rivers Contracting, Inc. $290,571 ·
Jun 14, 2019 62H46 VariousDistrict 1 Trombone mast arm replacement at various locations in District 1. — Executed Nov 26 New Home Towne Electric, Inc. $742,777 ·
Jun 14, 2019 62H78 VariousDistrict 1 Concrete bridge deck sealing upon the entire top surface of the deck, top of sidewalks and inside and top of parapets at various locations throughout District 1. — Active Nov 26 New Lion Construction 1, LLC $193,434 ·
Jun 14, 2019 62H88 LakeDistrict 1 Demolition and site clean-up of three single-family residences on IL 22 between Quentin Road and west of IL 83 in Long Grove and Kildeer. — Executed Nov 26 New McDonagh Demolition, Inc. $122,288 ·
Jun 14, 2019 62H89 CookDistrict 1 259 FT OF BRIDGE DECK SEALING, NEOPRENE EXPANSION JOINT REMOVAL, INSTALLING PREFORMED JOINT SEALS, CLEANING BRIDGE DRAINAGE SYSTEM, AND DECK SLAB REPAIRS ON STEVENSON EXPRESSWAY AT PULASKI RD. — Executed Nov 26 New Vixen Construction, Inc. $628,701 ·
Jun 14, 2019 62H94 CookDuPageDistrict 1 Expressway sweeping on I-55 (Stevenson Expressway) from I-355 to I-90/94 and on I-94, US 41 from US 14 (Dempster Street) to IL 68 (Dundee Road). — Executed Nov 26 New Elgin Sweeping Services, Inc. $2,196,168 ·
Jun 14, 2019 62J01 DuPageDistrict 1 Demolition of a single-family residence at 22W432 IL 53 in Glen Ellyn. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $83,910 ·
Jun 14, 2019 62J07 CookDistrict 1 Intermittent resurfacing project on various state maintained arterial routes in various cities. — Executed Nov 26 New J. A. Johnson Paving Company $4,887,777 ·
Jun 14, 2019 62J08 WillDistrict 1 Intermittent pavement resurfacing project located on various state maintained arterial routes. — Executed Nov 26 New P. T. Ferro Construction Co. $425,756 ·
Jun 14, 2019 62J09 CookDuPageDistrict 1 Intermittent resurfacing project on various expressway routes. — Executed Nov 26 New R. W. Dunteman Company $1,653,207 ·
Jun 14, 2019 62J10 CookDistrict 1 Intermittent resurfacing on various state maintained arterial routes in Cook County — Executed Nov 26 New R. W. Dunteman Company $1,600,201 ·
Jun 14, 2019 62J11 CookKaneMcHenryDistrict 1 Intermittent resurfacing on various routes in McHenry, Kane and Cook counties. — Executed Nov 26 New J. A. Johnson Paving Company $1,797,700 ·
Jun 14, 2019 62J12 CookWillDistrict 1 Intermittent resurfacing on various state maintained expressway routes in Cook and Will counties. — Executed Nov 26 New D. Construction, Inc. $826,171 ·
Jun 14, 2019 62J13 DuPageKaneDistrict 1 Intermittent resurfacing on various state maintained arterial routes in Dupage and Kane counties. — Executed Nov 26 New J. A. Johnson Paving Company $762,500 ·
Jun 14, 2019 62J14 LakeMcHenryDistrict 1 Intermittent resurfacing on various routes in Lake and McHenry counties. — Executed Nov 26 New J. A. Johnson Paving Company $1,964,700 ·
Jun 14, 2019 62J15 CookDuPageDistrict 1 INTRMITTENT RESURFACING PROJECT ON VARIOUS ROUTES IN VARIOUS CITIES. — Executed Nov 26 New R. W. Dunteman Company $2,872,070 ·
Jun 14, 2019 62J22 KaneDistrict 1 Repairing the Hankes Road Bridge over IL 56. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $317,420 ·
Jun 14, 2019 62J24 VariousDistrict 1 Impact attenuators and sand barrels on various expressways in District One. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $2,834,250 ·
Jun 14, 2019 64K76 HenryRock IslandDistrict 2 Remove and replace 3 overhead dynamic message signs, structure components, and supports at various locations. — Executed Nov 26 New John Burns Construction Company $1,090,515 ·
Jun 14, 2019 64N20 Rock IslandDistrict 2 Pavement patching on IL 5 and IL 5/IL 92 from Colona Road/Avenue of the Cities to the I-80/I-88 interchange. — Executed Nov 26 New G. M. Sipes Construction, Inc. $525,686 ·
Jun 14, 2019 64N51 CarrollDistrict 2 2,500 FT APPLICATION OF A THIN POLYMER OVERLAY ON THE DECK OF SN 008--0052 IN SAVANNA. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $503,834 ·
Jun 14, 2019 64N61 WhitesideDistrict 2 EXPANSION JOINT REPLACEMENT, DECK PATCHING. AND MICROSILICA OVERLAY ON SN 098-0052. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $291,726 ·
Jun 14, 2019 66428 KankakeeDistrict 3 6.530 miles of 3P milling and resurfacing from IL 17 to the north city limits of St. Anne; and traffic signal improvements at the intersection of IL 17 and IL 1. — Executed Nov 26 New Gallagher Asphalt Corporation & Kankakee Valley Construction Company, Inc. JV $2,938,460 ·
Jun 14, 2019 66A03 FordDistrict 3 3.9 MILES OF MILLING AND RESURFACING 2.5 INCHES ON IL 165 MAINLINE FROM THE MCLEAN CO LINE TO IL 47 IN SIBLEY, IL. — Executed Nov 26 New Iroquois Paving Corporation $893,506 ·
Jun 14, 2019 66E21 BureauDistrict 3 4.34 MILES OF 3P MILLING AND RESURFACING 2.25" OF MAINLINE FROM 0.2 MILES N OF COUNTY ROAD 1500N ON US 6 TO ST MARY AND FROM US 6 TO W ILLINOIS ST. IT INCLUDES PAVEMENT MARKINGS AND REPLACING EXISTING DETECTOR LOOPS. — Executed Nov 26 New Advanced Asphalt Company $3,128,659 ·
Jun 14, 2019 66H03 DeKalbDistrict 3 2.72 MILES OF 3P RESURFACING WORK WITH PAVEMENT PATCHING AND ADA RAMP IMPROVEMENTS FROM STATE ST. IN GENOA TO THE JUNCTION WITH IL 23 (N). — Executed Nov 26 New Curran Contracting Company $1,578,679 ·
Jun 14, 2019 66J12 DeKalbDistrict 3 2.51 MILES OF SHOULDER WIDENING AND RUMBLE STRIP INSTALLATION ON IL72 FROM E OF IRENE RD TO JUST W OF MALTA RD. — Executed Nov 26 New Curran Contracting Company $442,521 ·
Jun 14, 2019 66J23 DeKalbDistrict 3 1.596 MILES OF RESURFACING AND ADA IMPROVEMENTS FROM LITTLE ROCK CREEK TO 0.3 MILES E OF REES ST. IN HINCKLEY. — Executed Nov 26 New Builders Paving, LLC $866,688 ·
Jun 14, 2019 66J51 VariousDistrict 3 One year contract to repair damaged high tension cable median barrier, guardrail, attenuators, etc., caused by motorists along various routes. — Executed Nov 26 New COLLINS & HERMANN, INC. $1,188,019 ·
Jun 14, 2019 66J56 KendallDistrict 3 2.39 MILES OF 3P MILLING AND RESURFACING OF 2.25" FOR MAINLINE PAVEMENT AND SHOULDER FROM S OF GALENA RD TO S KENNEDY DR IN YORKVILLE. — Executed Nov 26 New D. Construction, Inc. $1,160,355 ·
Jun 14, 2019 66J74 LaSalleDistrict 3 MEDIAN CROSSOVER and SHOULDER RECONSTRUCTION 0.5 MILES W OF SN 050-0228/0228 TO 0.5 MILES E OF SN 050-0220/0221 IN LASALLE. — Executed Nov 26 New Advanced Asphalt Company $744,730 ·
Jun 14, 2019 66J81 IroquoisDistrict 3 Weed spraying and seeding for prairie grass at various areas along IL 1 near Milford. — Executed Nov 26 New F & W Lawn Care and Landscaping Company $54,611 ·
Jun 14, 2019 66J83 KankakeeDistrict 3 Centerline and longitudinal joint crack sealing on various routes and centerline joint microsurfacing on FAP 330 from Will County line to Manteno- Deselm Road. — Executed Nov 26 New SKC Construction, Inc. $298,715 ·
Jun 14, 2019 66J84 LaSalleDistrict 3 8.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from Marshall co Line to 0.4 miles north of CH 54 west of Tonica. — Executed Nov 26 New Beniach Construction Co., Inc. $667,472 ·
Jun 14, 2019 66J85 LaSalleDistrict 3 6.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from US 34 to 0.3 mile south of Lee County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $1,030,963 ·
Jun 14, 2019 66J87 BureauDistrict 3 10.5 MILES OF ROUTING AND SEALING TRANSVERSE AND PRIMARY LONGITUDINAL CRACKS GREATER THAN 0.25" WIDE AS WELL AS CLEANING AND SEALING SECONDARY CRACKS GREATER THAN 0.25" WIDE ON IL 26 FROM I-80 TO THE SOUTH OF RAILROAD AVE IN PRINCETON. MICROSURFACING THE CENTERLINE FROM 0.1 MILES N OF 2600N RD TO I-80. — Executed Nov 26 New A. C. Pavement Striping Co. $328,924 ·
Jun 14, 2019 66J88 LaSalleLivingstonDistrict 3 12.4 miles of routing and sealing on IL 23 from just north of Oakley Avenue to Grove Street in Streator, and on IL 23 from 1 mile south of the LaSalle County Line to 9th Street in Cornell. — Executed Nov 26 New Denler, Inc. $73,110 ·
1,301–1,400 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.