IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Aug 1, 2025 61L58 KaneDistrict 1 Reconstruction and resurfacing of L.W. Besinger Drive from Lake Marian Road to IL 25 in Carpentersville. — Executed Nov 25 New Plote Construction, Inc. $5,096,305 ·
Aug 1, 2025 61L61 KaneDistrict 1 Resurfacing on Merrill Road from the Village limits to Bliss Road in Sugar Grove. — Executed Nov 25 New Builders Paving, LLC $448,788 ·
Aug 1, 2025 61L67 KaneDistrict 1 Reconstruction of Wheeler Road from Dugan Road to Esker Drive in Sugar Grove. — Executed Nov 25 New D. Construction, Inc. $472,933 ·
Aug 1, 2025 62N97 CookDistrict 1 Earth excavation, construction of storm sewers and drainage structures, combination curb and gutter, HMA base (2,965-Ft) Intersection improvement project consists of earth excavation, construction of storm sewers and drainage structures, combination curb and gutter, HMA base course widening, resurfacing with binder and surface courses, modernization of traffic signals, channelization with thermoplastic pavement markings. Location: IL 58 (Golf Rd) at Barrington Road and at Hoffman Estates Drive, located within the Village of Hoffman Estates. — Executed Nov 25 New Everlast Blacktop Inc. $6,691,406 ·
Aug 1, 2025 62V12 CookDistrict 1 Standard Overlay and ADA Improvements resurfacing the existing asphalt pavement with HMA surface and binder co This project consists of Standard Overlay and ADA Improvements resurfacing the existing asphalt pavement with HMA surface and binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. Located: Southwest Hwy US 6 (FAU 297) located along US 6 and begins at Will Cook Road and proceeds approximately 5,439 feet (1.03 miles) in a north-easterly direction to south of Wolf Road in the Village of Orland Park in Cook County. — Executed Nov 25 New Austin Tyler Construction, Inc. $664,171 ·
Aug 1, 2025 62V91 CookDistrict 1 HMA (overlay) with HMA binder and surface course, full depth PCC pavement removal and replacement, cold millin (1,830-Ft) Standard Overlay, Pavement Replacement, Designed Overlay and ADA improvements consists of HMA (overlay) with HMA binder and surface course, full depth PCC pavement removal and replacement, cold milling of existing asphalt surface, sidewalk removal and replacement, curb ramps for sidewalks (ADA) improvements, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings and raised reflective pavement markers. Located on Paul — Executed Nov 25 New D. Construction, Inc. $992,687 ·
Aug 1, 2025 62W21 DuPageDistrict 1 Joint replacement, substructure repairs and steel repairs of the bridge, located on I-55 at Cass Avenue (Overh (500-Ft) Bridge Deck Overlay on SN 022-0072 consists of joint replacement, substructure repairs and steel repairs of the bridge, located on I-55 at Cass Avenue (Overhead) in the Village of Darien, DuPage County, Illinois. — Executed Nov 25 New Martam Construction Incorporated $1,781,767 ·
Aug 1, 2025 62W57 CookDistrict 1 This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals at various locations in District 1. — Executed Nov 25 New Hecker and Company, Inc. $2,599,373 ·
Aug 1, 2025 62W58 CookDistrict 1 This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, controller, installation of accessible pedestrian signals, handholes, conduit, foundations at various locations in District 1. — Executed Nov 25 New
Aug 1, 2025 62X45 CookKaneKendallDistrict 1 Bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the This improvement consists of bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs, and inside and outside of dividing walls along walkways of the structure placement of modified urethane pavement markings. Located throughout Cook, Kane and Kendall Counties. — Executed Nov 25 New Mosley Construction 1, LLC $1,455,444 ·
Aug 1, 2025 62X50 WillDistrict 1 Milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk remova (2,067-Ft) Designed Overlay, Curb Ramps improvements (ADA), Sidewalk Replacement consists of milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk removal and replacement, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, curb ramps for sidewalks, raised reflective pavement markers, Location: IL 53 (Baltimore Street), from Kankakee Street to West of Forked Creek within the — Executed Nov 25 New Gallagher Asphalt Corporation $975,357 ·
Aug 1, 2025 62X86 WillDistrict 1 Asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and sur (3,435-Ft) Design and Standard Overlay consists of asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and surface course, thermoplastic pavement markings. Located on Illinois Route FAU 388, I-55 Frontage Road NB in the Village of Channahon in Will County. — Executed Nov 25 New D. Construction, Inc. $250,346 ·
Aug 1, 2025 62Y25 CookDistrict 1 The demolition of (7) seven single family residences and detached garages, adjacent surface parking lot This is a building demolition contract and site clean-up contract consists of the demolition of (7) seven single family residences and detached garages, adjacent surface parking lot. The project is located west of 64th Place to 65th Street. Old Harlem Road is under the jurisdiction of Chicago in Cook County. — Executed Nov 25 New C & D Recycling Services, Inc. $340,540 ·
Aug 1, 2025 64C24 WinnebagoDistrict 2 2.09 miles of reconstruction of I-39/US 20 from 0.3 mile east of Mulford Rd to 0.2 mile north of Harrison Ave. — Executed Nov 25 New OHLA Central, Inc. $125,917,852 ·
Aug 1, 2025 64P28 WinnebagoDistrict 2 0.78 mile of patching, resurfacing, ADA and signals on IL 70 from Safford Rd to Glenwood Ave in Rockford. — Executed Nov 25 New Martin & Company Excavating $1,406,302 ·
Aug 1, 2025 64U53 WhitesideDistrict 2 0.5 miles of partial depth patching from Base St to 350' east of Milnes Dr in Morrison. — Executed Nov 25 New Martin & Company Excavating $303,113 ·
Aug 1, 2025 64U79 StephensonDistrict 2 Earthwork and embankment for temporary runaround at the intersection of US 20 and IL 73. US 20: from 0.4 mile west of IL 73 to 1 mile east of IL 73 (Reese Road). IL 73: from 0.4 mile north to 0.2 mile south of US 20. — Executed Nov 25 New Fischer Excavating, Inc. $652,317 ·
Aug 1, 2025 66R72 VariousDistrict 3 Vegetation management control along various routes in DeKalb, Grundy, Iroquois, Kendall, LaSalle, Livingston, and Ford Counties. — Executed Nov 25 New Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $328,314 ·
Aug 1, 2025 66R73 VariousDistrict 3 Tree removal at various locations throughout the District. — Executed Nov 25 New Clean Cut Tree Service, Inc. $530,912 ·
Aug 1, 2025 68898 PeoriaDistrict 4 Bridge replacement of structure carrying IL 116 (Harmon Highway) over BNSF and UPRR/Kickapoo Creek. — Executed Nov 25 New ICC Group Inc. $23,160,000 ·
Aug 1, 2025 68B70 PeoriaDistrict 4 0.19 mile ramp widening for an additional left turn lane, traffic signal installation to replace temporary traffic signals, mill and overlay, drainage improvements at IL 40 (Knoxville Ave) and IL 6, Ramp D in Peoria. — Executed Nov 25 New Otto Baum Company, Inc. $1,750,000 ·
Aug 1, 2025 68J12 HendersonDistrict 4 Bridge deck overlay, joint replacements and bridge repairs on IL 94 to SN's 036-0043 over Henderson Creek, 036-0041 over Jinks Hollow Creek, and 036-0047 over BNRR and Henderson Creek in Henderson County. — Executed Nov 25 New Laverdiere Construction, Inc. $2,803,521 ·
Aug 1, 2025 68J13 FultonDistrict 4 Bridge deck overlay, joint replacements and bridge repairs to SN 029-0007 carrying US Route 24 over BNSF RR 1 mile east of the Schuyler County Line in Fulton County. — Executed Nov 25 New Freesen, a div of UCM, Inc. $496,456 ·
Aug 1, 2025 68J14 FultonDistrict 4 Bridge deck overlays on SN's 029-0057 over Coal Creek, 029-0061 over Turkey Creek, 029-0062 over Lost Grove Creek, and 029-0065 over Putt Creek in Fulton County. — Executed Nov 25 New Freesen, a div of UCM, Inc. $2,366,430 ·
Aug 1, 2025 68K35 VariousDistrict 4 Placing, grading and compacting an aggregate shoulder wedge level with adjacent HMA pavement or shoulder on various routes in various counties throughout the eastern section of District 4. — Executed Nov 25 New J.C. Dillon, Inc. $627,990 ·
Aug 1, 2025 70024 PiattDistrict 5 Remove and construct superstructures on SN 074-0069 (EB) and SN 074-0070 (WB) carrying FAI 72 over the Norfolk Southern Railway to rehabilitate the structures and replace approach pavements. — Executed Nov 25 New Stark Excavating, Inc. $8,849,135 ·
Aug 1, 2025 72949 AdamsDistrict 6 Expansion joint removal and deck/approach patching on SN 001-0074 carrying IL 96 over White Oak Creek, 1.6 miles south of Lima. — Executed Nov 25 New County Contractors, Inc. $414,675 ·
Aug 1, 2025 72958 SangamonDistrict 6 Expansion joint seal replacement on SN 084-0152 and SN 084-0153 carrying I-72 over the Sangamon River, 3.5 miles east of I-55. — Executed Nov 25 New Otto Baum Company, Inc. $68,200 ·
Aug 1, 2025 72965 LoganDistrict 6 Substructure repairs on SN 054-0103 carrying Old IL 121 over Branch of Kickapoo Creek, 0.5 miles north of Lincoln. — Executed Nov 25 New Otto Baum Company, Inc. $94,400 ·
Aug 1, 2025 72975 SangamonDistrict 6 Chip sealing on various routes in Sangamon County. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $325,622 ·
Aug 1, 2025 72K42 AdamsDistrict 6 2 miles of resurfacing, ADA improvements, traffic signal improvements and patching on IL 104 (Broadway Street) from west of 12th Street to west of 38th Street in Quincy. — Executed Nov 25 New Diamond Construction Company $14,948,037 ·
Aug 1, 2025 76M52 St. ClairDistrict 8 0.9 miles of resurfacing and ADA improvements on IL 159 from Washington Street to 0.2 miles south of IL 13/158 in Belleville. — Executed Nov 25 New The Kilian Corporation $2,621,744 ·
Aug 1, 2025 76M55 St. ClairDistrict 8 1.4 miles of resurfacing with ADA improvements on IL 203 from Collinsville Road to the Madison County line. — Executed Nov 25 New Keeley & Sons, Inc. $5,476,581 ·
Aug 1, 2025 76T74 VariousDistrict 8 Lighting upgrades on I-255 at I-55/70, on I-255 at Collinsville Road and on I-55/70 at Black Lane in Collinsville. — Executed Nov 25 New Electrico, Inc. $1,999,091 ·
Aug 1, 2025 76U44 VariousDistrict 8 Bridge structural repairs at various locations in various counties of District 8. — Executed Nov 25 New Keeley & Sons, Inc. $1,822,815 ·
Aug 1, 2025 76U45 VariousDistrict 8 Bridge deck patching on various interstate bridges in Madison and St. Clair Counties. — Executed Nov 25 New Keeley & Sons, Inc. $1,894,424 ·
Aug 1, 2025 76U60 RandolphDistrict 8 6.5 miles of pavement patching on IL 4 / IL 150 from 0.3 miles west of IL 4 (West Junction) to IL 4 (East Junction). — Rejected Nov 25 New
Aug 1, 2025 76U62 VariousDistrict 8 Weed spraying for broadleaf weeds along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. — Executed Nov 25 New The Daltons Inc. $192,882 ·
Aug 1, 2025 76U63 VariousDistrict 8 Weed spraying for Johnson Grass along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. — Executed Nov 25 New The Daltons Inc. $199,866 ·
Aug 1, 2025 76U65 MadisonDistrict 8 1.4 miles of slurry seal on IL 159 from Clay Street to Kinloch Avenue in Collinsville. — Executed Nov 25 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $537,958 ·
Aug 1, 2025 78916 WilliamsonDistrict 9 Signal modifications, railroad interconnects and fiber optic installation on IL 37 from IL 13 to Boyton Street in Marion. — Executed Nov 25 New Gerstner Electric, Inc. $1,302,315 ·
Aug 1, 2025 78A74 JohnsonWilliamsonDistrict 9 9.5 miles of resurfacing on IL 166 from 0.1 miles south of Tune Road to US 45. Also includes ADA improvements in Creal Springs. — Executed Nov 25 New E. T. Simonds Construction Company $3,949,325 ·
Aug 1, 2025 78B39 VariousDistrict 9 Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. — Executed Nov 25 New COLLINS & HERMANN, INC. $1,540,098 ·
Aug 1, 2025 78B73 JohnsonDistrict 9 Patching on IL 37 from Hunter Street to Carter Street in Cypress. — Executed Nov 25 New Samron Midwest Contracting, Inc. $106,695 ·
Aug 1, 2025 87864 DeKalbDistrict 3 Traffic signal modernization at various locations in DeKalb County. — Executed Nov 25 New Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $624,037 ·
Aug 1, 2025 87904 LaSalleDistrict 3 Construct PCC sidewalk at various locations in La Salle. Includes; ADA ramps, curb and gutter, and driveways. — Executed Nov 25 New Gensini Excavating, Inc. $340,268 ·
Aug 1, 2025 91653 McLeanDistrict 5 Reconstruction and re-alignment of Hamilton Road from west of Bunn Street to existing Hamilton Road at Commerce Parkway, and reconstruction of Rhodes Lane from Hamilton Road to Morrissey Drive in Bloomington. — Executed Nov 25 New Rowe Construction, a div of UCM, Inc. $16,110,130 ·
Aug 1, 2025 93833 SangamonDistrict 6 Extension of MaArthur Boulevard between Woodside Road and Knights Recreation Drive. Includes full-depth HMA, resurfacing, curb and gutter, pipe culverts, storm sewer, lighting, and signage. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $6,690,296 ·
Aug 1, 2025 93840 HancockDistrict 6 Replace the bridge carrying 2350 N over Grove Creek 3.56 miles northwest of Burnside. Includes; HMA approach, Earthen shoulders, riprap, and seeding. — Executed Nov 25 New County Contractors, Inc. $535,985 ·
Aug 1, 2025 95981 CumberlandDistrict 7 HMA overlay with aggregate wedge shoulders on E 400 Road, from the Shelby County line to 2.6 miles east. — Executed Nov 25 New Howell Paving, Inc. $612,883 ·
Aug 1, 2025 97863 St. ClairDistrict 8 Construction of a Multi-Use Trail along LandN Avenue from IL 4 to South Railway Street in Mascoutah. Includes lime modified soils, sidewalks, storm sewers, and seeding. — Executed Nov 25 New Baxmeyer Construction, Inc. $1,251,808 ·
Aug 1, 2025 97867 ClintonDistrict 8 Construct a single-span PPC deck beam bridge to carry CH 20 (Lake Road) over Bond Branch, 1 mile northeast of Carlyle. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $729,988 ·
Aug 1, 2025 99284 WilliamsonDistrict 9 Extend Ritter Road north to Grand Avenue in Herrin. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,069,759 ·
Aug 1, 2025 99760 WilliamsonDistrict 9 Construction of a PCC multi-use path from the RIDES Mass Transit Center and VA Hospital along Main Street and Halfway Road in Marion. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,142,142 ·
Sep 19, 2025 46668 VariousDistrict 7 Repairing various types of pavement markings at various locations throughout District 7. — Executed Nov 25 New Varsity Striping & Construction Co. $719,860 ·
Sep 19, 2025 61K93 CookDistrict 1 Reconstruction of Tonne road from Lanmeier Road to Clearmont Drive in Elk Grove Village. — Executed Nov 25 New Lima Contractors $12,620,000 ·
Sep 19, 2025 61L21 CookDistrict 1 Remove and replace traffic signals and pedestrian accommodations along Desplaines River Road and Balmoral Avenue in Rosemont. — Rejected Nov 25 New H & H Electric Co. $4,177,932 ·
Sep 19, 2025 61L28 KaneDistrict 1 Construction of additonal through lanes on each side of Randall Road at the intersection of IL 72, widening to 3 NB and SB lanes. Includes HMA multi- use patch, curb and gutter, drainage improvements, traffic signal modifications, and lighting. — Executed Nov 25 New Martam Construction Incorporated $11,987,774 ·
Sep 19, 2025 61L35 CookDistrict 1 Construct an HMA Multi-Use Path, sidewalk replacement and traffic signal modifications along Lake Street from Church Street to Gary Avenue in Hanover Park. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $1,344,596 ·
Sep 19, 2025 61L68 CookDistrict 1 Resurfacing, sidewalk replacement, curb and gutter, and accessible pedestrian signals on Pratt Avenue, from Lincolnwood Drive to McCormick Boulevard in Lincolnwood. — Executed Nov 25 New
Sep 19, 2025 61L69 DuPageDistrict 1 Construct a prefabicated pedestrian truss bridge to carry Cricket Trail extension over IL 83 in Elmhurst. — Executed Nov 25 New D. Construction, Inc. $3,634,117 ·
Sep 19, 2025 61L70 CookDistrict 1 Sidewalk construction on Prairie Avenue from Hillside Avenue to South Street, and South Street from Summit Street to Prairie Avenue in Barrington. — Executed Nov 25 New Triggi Construction, Inc. $220,672 ·
Sep 19, 2025 61L71 CookDistrict 1 HMA resurfacing on Dee Road from Devon Avenue to the Union Pacific Railroad in Park Ridge. — Executed Nov 25 New Builders Paving, LLC $2,778,778 ·
Sep 19, 2025 61L72 CookDistrict 1 HMA Resurfacing of State Street from 127th Street to Cass Street in Lemont. Includes; ADA Ramps, curb and gutter, and drainage adjustments. — Executed Nov 25 New P. T. Ferro Construction Co. $1,092,187 ·
Sep 19, 2025 61L74 KaneDistrict 1 Construction of PCC Sidewalk along various routes in Hampshire. Includes; HMA an PCC Driveways and pavement markings. — Executed Nov 25 New Triggi Construction, Inc. $354,811 ·
Sep 19, 2025 62B64 CookDistrict 1 (1,354-Ft) Intersection and ADA Improvements include pavement widening, HMA resurfacing, patching, traffic signal modernization, drainage improvements, pavement markings and landscaping. Located at Joliet Rd and Brainard Ave. in the City of Countryside in Cook County. — Executed Nov 25 New R. W. Dunteman Company $2,431,246 ·
Sep 19, 2025 62F86 CookDistrict 1 Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps (3,542-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers, accessible pedestrian signals. Located in the Villages of Arlington Heights, Buffalo Grove, and Wheeling in Cook County. — Executed Nov 25 New
Sep 19, 2025 62J29 LakeDistrict 1 Tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83 (3.27-Mile) The improvement consists of tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83. The project is located within the Villages of Hawthorn Woods, Kildeer and Long Grove and within Lake County. — Executed Nov 25 New Clean Cut Tree Service, Inc. $586,632 ·
Sep 19, 2025 62K78 KaneDistrict 1 Cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and sur (2.54-Mile) Designed Overlay, New Shoulders, and ADA Improvements: The proposed consists of cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, pavement markings and raised reflective Location: IL 25 (Saint Char — Executed Nov 25 New Plote Construction, Inc. $4,318,000 ·
Sep 19, 2025 62L15 CookDistrict 1 (2.23-Mile) Designed Overlay and ADA Improvements consisting of asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, concrete curb and gutter replacement, curb ramps for sidewalks (ADA) improvements and new thermoplastic pavement marking on Lincoln Avenue from 138th Street to IL 83 (Sibley Boulevard) within the Village of Dolton, in in Cook County. — Executed Nov 25 New D. Construction, Inc. $2,190,770 ·
Sep 19, 2025 62R22 WillDistrict 1 (3,775-Ft) Realignment and Reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, storm sewer, drainage structures, detention ponds, earth excavation and grading, retaining and noise walls, barrier and moment slab construction, bridge rehabilitation and replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, d — Executed Nov 25 New D. Construction, Inc. $93,597,946 ·
Sep 19, 2025 62T23 McHenryDistrict 1 Advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete The project scope of work consists of advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete the project shown on the plans. This project is in the City of Crystal Lake, City of McHenry, Village of Prairie Grove, and Nunda Township in McHenry County. — Executed Nov 25 New Clean Cut Tree Service, Inc. $257,146 ·
Sep 19, 2025 62U11 CookWillDistrict 1 Drainage Improvements. Work includes ditch regrading, culvert replacement and other drainage improvements. Locations: US 30 between 84th Avenue and 82nd Avenue in Will County; US 52 at Draves Road and Offner Road in Will County; Intersection of 115th Street and Homan Avenue in Cook County; Intersection of Taft Avenue and Elm Avenue in Cook County; Along Palatine Road, West of Roselle Road in Cook County. — Executed Nov 25 New Everlast Blacktop Inc. $1,530,704 ·
Sep 19, 2025 62W62 CookDuPageWillDistrict 1 This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1. — Executed Nov 25 New John Burns Construction Company $2,170,856 ·
Sep 19, 2025 62W89 VariousDistrict 1 This project involves the partial modernization of thirty-six (36) intersection to include Accessible Pedestrian Pushbuttons (APS) and/or Leading Pedestrian Interval (LPI) timing updates. Thirty-six (36) intersections located in the following District 1 counties: Cook, McHenry, Lake, Kane, and Dupage. — Executed Nov 25 New Meade Inc. $1,997,198 ·
Sep 19, 2025 62X00 LakeDistrict 1 Advance tree removal as well as all incidental and collateral work necessary to complete the project The scope of work consists of advance tree removal as well as all incidental and collateral work necessary to complete the project. This project is in the City of Highland in Lake County. — Executed Nov 25 New Clean Cut Tree Service, Inc. $151,131 ·
Sep 19, 2025 62X01 WillDistrict 1 (7.04-Mile) Designed Overlay and Shoulder Reconstruction includes (HMA) removal earth excavation, pavement patching, resurfacing with HMA asphalt, full depth HMA shoulder, pavement markings, raised reflective markers, curb and gutter removal and replacement. Project located on US 45/52 (96th Ave / LaGrange Road) from North of Monee Manhattan Road to Wilmington Peotone Road in the Townships of Green Garden, Peotone and Wilton Center in Will County. — Executed Nov 25 New Iroquois Paving Corporation $7,332,294 ·
Sep 19, 2025 62X58 CookDistrict 1 Resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement marki (4,646-Ft) The resurfacing project consists of resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement markings located FAU 2916 (State Street) from Sauk Trail to Steger Road in the Villages of South Chicago Heights and Steger in Cook County. Also included is a box culvert (SN 016-1413), cleaning project consists of debris removal. The Torrence Avenue over a ditch in the Village of Sauk Village in Cook County. — Executed Nov 25 New Gallagher Asphalt Corporation $549,468 ·
Sep 19, 2025 62X84 CookDistrict 1 (2.28-Mile) Standard Overlay (1st HMA overlay of bare PCC pavement), ADA Improvements. Work includes curb and gutter removal and replacement, curb ramps for sidewalk (ADA), pedestrian signals (APS), pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, detector loops. Location: Pershing Road, from US 34 Ogden Avenue to West of Central Avenue within the municipalities of Berwyn, Cicero, Lyons and — Rejected Nov 25 New K-Five Construction Corporation $4,154,377 ·
Sep 19, 2025 62X87 CookDistrict 1 Asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concre (3,089-Ft) Standard Overlay consists of asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. Located along Dolton Avenue from 142nd Street to I-94 (Bishop Ford Freeway) in the Village of Dolton. — Executed Nov 25 New D. Construction, Inc. $682,549 ·
Sep 19, 2025 62Y06 VariousDistrict 1 Removing trees, as well as all incidental and collateral work necessary to complete the project The project consists of removing trees, as well as all incidental and collateral work necessary to complete the project. This project is in several locations throughout District One within Cook, Kane, Kendall, Lake McHenry and Will Counties. — Executed Nov 25 New Homer Tree Service, Inc. $1,042,409 ·
Sep 19, 2025 62Y12 CookDistrict 1 (269-Ft) Bridge Preservation Project: deck overlay, joint replacement/ repair. Work includes hydroscarification, deck repairs, latex modified concrete overlay diamond grinding, structural repair of concrete, joint replacement with strip seals, relief joints cleaning, approach slab repair, concrete sealer, HMA butt joints, curb and gutter replacement, sidewalk replacement and collateral and incidental work. Location: Bridge carrying Foster Avenue over the North Shore Channel, just East of North A — Executed Nov 25 New Martam Construction Incorporated $955,094 ·
Sep 19, 2025 62Y13 CookDistrict 1 Staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge (304-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair consists of staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge. The scope also includes sidewalk and curb and gutter removal and replacement. (Existing Structure No. 016-2672). This project is on IL 19 (Irving Park Road) at Des Plaines River in Schiller Park, IL. in Cook County. — Executed Nov 25 New Martam Construction Incorporated $966,309 ·
Sep 19, 2025 62Y32 VariousDistrict 1 New guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardra This project consists of new guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardrail components and replacing all removed guardrail components. This work is located on various State maintained arterial and expressway routes and at other district-wide locations within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. — Executed Nov 25 New Kujo, Inc. $2,998,621 ·
Sep 19, 2025 64P02 OgleDistrict 2 Pedestrian button upgrades, sidewalk ADA improvements on IL 2: Market St to Lincoln St and IL 72: IL 2 to Diamond St. 3,480 gross feet. — Executed Nov 25 New Stenstrom Excavation & Blacktop, Inc. $1,269,521 ·
Sep 19, 2025 64P76 HenryDistrict 2 2.34 miles of cold milling, pavement patching, HMA resurfacing, and inlet erosion repair on IL 81 from 1st St. in Cambridge to 0.2 mile east of IL 82(N). — Executed Nov 25 New Advanced Asphalt Company $2,339,070 ·
Sep 19, 2025 64U45 StephensonWinnebagoDistrict 2 Installation of stop ahead/stop signs, advance flashing beacons, and pavement markings on IL 75 at Rock City Rd.; and Springfield Ave. at Safford Rd. in Stephenson and Winnebago Counties. — Executed Nov 25 New CSD Environmental Services, Inc. $144,477 ·
Sep 19, 2025 64U54 Rock IslandDistrict 2 Tree removal along I-74 from 0.9 miles south of 23rd Ave. in Moline to 0.5 miles south of IL 5 and along IL 5 from west of 16th St. to 0.2 miles west of 38th St. (approximately 2.0 miles total). — Executed Nov 25 New Homer Tree Service, Inc. $297,068 ·
Sep 19, 2025 66295 GrundyDistrict 3 Railroad Separation Structure Replacement at WCL Railroad over I-80 (SN 032-9906) and Bridge Repair at Wabena Rd. over I-80 (SN 032-0065 in Kendall and Grundy Counties. — Executed Nov 25 New D. Construction, Inc. $14,268,635 ·
Sep 19, 2025 66R59 LaSalleDistrict 3 Scour mitigation by placing stone dumped riprap at both ends of the culvert and other related construction items at SN 050-2006 carrying IL 18 over Eagle Creek approximately 1.7 miles west of IL Route 23 near Streator. — Executed Nov 25 New D. Construction, Inc. $27,740 ·
Sep 19, 2025 66R60 BureauDistrict 3 Shoulder removal and replacement, concrete removal, remove and replace expansion bearings, expansion joint replacement at SN 006-0116 carrying Backbone Rd. over I-80, 1.8 miles west of IL Route 26 near Princeton. — Executed Nov 25 New Martin & Company Excavating $373,944 ·
Sep 19, 2025 66R62 LivingstonDistrict 3 Deck slab repairs (patching on the bridge deck and approach slabs) included in this work is structural concrete repairs to piers and debris removal on SN 053-0150 carrying IL Route 17 over the east branch of the Mazon River approximately 6.1 miles east of IL Route 47 in Livingston County. — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $255,575 ·
Sep 19, 2025 66R70 LivingstonDistrict 3 Scour mitigation by placing stone dumped riprap and other related construction items at SN 053-0011 carrying OR 66 over Wolf Creek approximately 5.15 miles northeast of IL Route 23 near Pontiac. — Executed Nov 25 New Tobey's Construction & Cartage, Inc. $64,451 ·
Sep 19, 2025 68J20 VariousDistrict 4 Culvert lining of various sizes at various locations. — Executed Nov 25 New Hoerr Construction, Inc. $1,852,445 ·
Sep 19, 2025 68J62 PeoriaDistrict 4 Resurfacing of IL 8 from East Kickapoo Creek to Main St in Peoria. 1.68 miles. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,699,505 ·
Sep 19, 2025 68K24 PeoriaDistrict 4 Upgrade HPS to LED luminaries along Interstate 74 (I-74) on existing light towers, light poles, and inside tunnels from Sterling Ave. in Peoria to Illinois River in Peoria County. — Executed Nov 25 New Laser Electric, Inc. $1,766,478 ·
Sep 19, 2025 68K25 PeoriaTazewellDistrict 4 Installation of LED luminaries along I-74 on existing light towers, light poles, and inside tunnels from Knoxville Interchange in Peoria to Washington St. Interchange in East Peoria in Peoria and Tazewell Counties. — Executed Nov 25 New Gerstner Electric, Inc. $1,018,866 ·
Sep 19, 2025 68K26 VariousDistrict 4 Installation of traffic signal controllers, cabinets, battery backup system, and CCTV cameras along various routes in District 4. — Executed Nov 25 New Oberlander Electric Co. $1,190,380 ·
Sep 19, 2025 70C33 McLeanDistrict 5 0.88 miles of drainage improvements at the intersection of and along US 136 and IL 54, 2.0 miles SW of Bellflower. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $1,043,581 ·
Sep 19, 2025 70D66 VermilionDistrict 5 Staged removaland replacement of dual structures (SN's 092-001 and 092-002) on I-74 at Stony Creek. — Executed Nov 25 New Stark Excavating, Inc. $7,049,795 ·
7,201–7,300 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.