| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Aug 1, 2025 | 61L58 | KaneDistrict 1 | Reconstruction and resurfacing of L.W. Besinger Drive from Lake Marian Road to IL 25 in Carpentersville. | — | Executed | Plote Construction, Inc. $5,096,305 · | ||
| Aug 1, 2025 | 61L61 | KaneDistrict 1 | Resurfacing on Merrill Road from the Village limits to Bliss Road in Sugar Grove. | — | Executed | Builders Paving, LLC $448,788 · | ||
| Aug 1, 2025 | 61L67 | KaneDistrict 1 | Reconstruction of Wheeler Road from Dugan Road to Esker Drive in Sugar Grove. | — | Executed | D. Construction, Inc. $472,933 · | ||
| Aug 1, 2025 | 62N97 | CookDistrict 1 | Earth excavation, construction of storm sewers and drainage structures, combination curb and gutter, HMA base (2,965-Ft) Intersection improvement project consists of earth excavation, construction of storm sewers and drainage structures, combination curb and gutter, HMA base course widening, resurfacing with binder and surface courses, modernization of traffic signals, channelization with thermoplastic pavement markings. Location: IL 58 (Golf Rd) at Barrington Road and at Hoffman Estates Drive, located within the Village of Hoffman Estates. | — | Executed | Everlast Blacktop Inc. $6,691,406 · | ||
| Aug 1, 2025 | 62V12 | CookDistrict 1 | Standard Overlay and ADA Improvements resurfacing the existing asphalt pavement with HMA surface and binder co This project consists of Standard Overlay and ADA Improvements resurfacing the existing asphalt pavement with HMA surface and binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. Located: Southwest Hwy US 6 (FAU 297) located along US 6 and begins at Will Cook Road and proceeds approximately 5,439 feet (1.03 miles) in a north-easterly direction to south of Wolf Road in the Village of Orland Park in Cook County. | — | Executed | Austin Tyler Construction, Inc. $664,171 · | ||
| Aug 1, 2025 | 62V91 | CookDistrict 1 | HMA (overlay) with HMA binder and surface course, full depth PCC pavement removal and replacement, cold millin (1,830-Ft) Standard Overlay, Pavement Replacement, Designed Overlay and ADA improvements consists of HMA (overlay) with HMA binder and surface course, full depth PCC pavement removal and replacement, cold milling of existing asphalt surface, sidewalk removal and replacement, curb ramps for sidewalks (ADA) improvements, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings and raised reflective pavement markers. Located on Paul | — | Executed | D. Construction, Inc. $992,687 · | ||
| Aug 1, 2025 | 62W21 | DuPageDistrict 1 | Joint replacement, substructure repairs and steel repairs of the bridge, located on I-55 at Cass Avenue (Overh (500-Ft) Bridge Deck Overlay on SN 022-0072 consists of joint replacement, substructure repairs and steel repairs of the bridge, located on I-55 at Cass Avenue (Overhead) in the Village of Darien, DuPage County, Illinois. | — | Executed | Martam Construction Incorporated $1,781,767 · | ||
| Aug 1, 2025 | 62W57 | CookDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals at various locations in District 1. | — | Executed | Hecker and Company, Inc. $2,599,373 · | ||
| Aug 1, 2025 | 62W58 | CookDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, controller, installation of accessible pedestrian signals, handholes, conduit, foundations at various locations in District 1. | — | Executed | |||
| Aug 1, 2025 | 62X45 | CookKaneKendallDistrict 1 | Bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the This improvement consists of bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs, and inside and outside of dividing walls along walkways of the structure placement of modified urethane pavement markings. Located throughout Cook, Kane and Kendall Counties. | — | Executed | Mosley Construction 1, LLC $1,455,444 · | ||
| Aug 1, 2025 | 62X50 | WillDistrict 1 | Milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk remova (2,067-Ft) Designed Overlay, Curb Ramps improvements (ADA), Sidewalk Replacement consists of milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk removal and replacement, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, curb ramps for sidewalks, raised reflective pavement markers, Location: IL 53 (Baltimore Street), from Kankakee Street to West of Forked Creek within the | — | Executed | Gallagher Asphalt Corporation $975,357 · | ||
| Aug 1, 2025 | 62X86 | WillDistrict 1 | Asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and sur (3,435-Ft) Design and Standard Overlay consists of asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and surface course, thermoplastic pavement markings. Located on Illinois Route FAU 388, I-55 Frontage Road NB in the Village of Channahon in Will County. | — | Executed | D. Construction, Inc. $250,346 · | ||
| Aug 1, 2025 | 62Y25 | CookDistrict 1 | The demolition of (7) seven single family residences and detached garages, adjacent surface parking lot This is a building demolition contract and site clean-up contract consists of the demolition of (7) seven single family residences and detached garages, adjacent surface parking lot. The project is located west of 64th Place to 65th Street. Old Harlem Road is under the jurisdiction of Chicago in Cook County. | — | Executed | C & D Recycling Services, Inc. $340,540 · | ||
| Aug 1, 2025 | 64C24 | WinnebagoDistrict 2 | 2.09 miles of reconstruction of I-39/US 20 from 0.3 mile east of Mulford Rd to 0.2 mile north of Harrison Ave. | — | Executed | OHLA Central, Inc. $125,917,852 · | ||
| Aug 1, 2025 | 64P28 | WinnebagoDistrict 2 | 0.78 mile of patching, resurfacing, ADA and signals on IL 70 from Safford Rd to Glenwood Ave in Rockford. | — | Executed | Martin & Company Excavating $1,406,302 · | ||
| Aug 1, 2025 | 64U53 | WhitesideDistrict 2 | 0.5 miles of partial depth patching from Base St to 350' east of Milnes Dr in Morrison. | — | Executed | Martin & Company Excavating $303,113 · | ||
| Aug 1, 2025 | 64U79 | StephensonDistrict 2 | Earthwork and embankment for temporary runaround at the intersection of US 20 and IL 73. US 20: from 0.4 mile west of IL 73 to 1 mile east of IL 73 (Reese Road). IL 73: from 0.4 mile north to 0.2 mile south of US 20. | — | Executed | Fischer Excavating, Inc. $652,317 · | ||
| Aug 1, 2025 | 66R72 | VariousDistrict 3 | Vegetation management control along various routes in DeKalb, Grundy, Iroquois, Kendall, LaSalle, Livingston, and Ford Counties. | — | Executed | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $328,314 · | ||
| Aug 1, 2025 | 66R73 | VariousDistrict 3 | Tree removal at various locations throughout the District. | — | Executed | Clean Cut Tree Service, Inc. $530,912 · | ||
| Aug 1, 2025 | 68898 | PeoriaDistrict 4 | Bridge replacement of structure carrying IL 116 (Harmon Highway) over BNSF and UPRR/Kickapoo Creek. | — | Executed | ICC Group Inc. $23,160,000 · | ||
| Aug 1, 2025 | 68B70 | PeoriaDistrict 4 | 0.19 mile ramp widening for an additional left turn lane, traffic signal installation to replace temporary traffic signals, mill and overlay, drainage improvements at IL 40 (Knoxville Ave) and IL 6, Ramp D in Peoria. | — | Executed | Otto Baum Company, Inc. $1,750,000 · | ||
| Aug 1, 2025 | 68J12 | HendersonDistrict 4 | Bridge deck overlay, joint replacements and bridge repairs on IL 94 to SN's 036-0043 over Henderson Creek, 036-0041 over Jinks Hollow Creek, and 036-0047 over BNRR and Henderson Creek in Henderson County. | — | Executed | Laverdiere Construction, Inc. $2,803,521 · | ||
| Aug 1, 2025 | 68J13 | FultonDistrict 4 | Bridge deck overlay, joint replacements and bridge repairs to SN 029-0007 carrying US Route 24 over BNSF RR 1 mile east of the Schuyler County Line in Fulton County. | — | Executed | Freesen, a div of UCM, Inc. $496,456 · | ||
| Aug 1, 2025 | 68J14 | FultonDistrict 4 | Bridge deck overlays on SN's 029-0057 over Coal Creek, 029-0061 over Turkey Creek, 029-0062 over Lost Grove Creek, and 029-0065 over Putt Creek in Fulton County. | — | Executed | Freesen, a div of UCM, Inc. $2,366,430 · | ||
| Aug 1, 2025 | 68K35 | VariousDistrict 4 | Placing, grading and compacting an aggregate shoulder wedge level with adjacent HMA pavement or shoulder on various routes in various counties throughout the eastern section of District 4. | — | Executed | J.C. Dillon, Inc. $627,990 · | ||
| Aug 1, 2025 | 70024 | PiattDistrict 5 | Remove and construct superstructures on SN 074-0069 (EB) and SN 074-0070 (WB) carrying FAI 72 over the Norfolk Southern Railway to rehabilitate the structures and replace approach pavements. | — | Executed | Stark Excavating, Inc. $8,849,135 · | ||
| Aug 1, 2025 | 72949 | AdamsDistrict 6 | Expansion joint removal and deck/approach patching on SN 001-0074 carrying IL 96 over White Oak Creek, 1.6 miles south of Lima. | — | Executed | County Contractors, Inc. $414,675 · | ||
| Aug 1, 2025 | 72958 | SangamonDistrict 6 | Expansion joint seal replacement on SN 084-0152 and SN 084-0153 carrying I-72 over the Sangamon River, 3.5 miles east of I-55. | — | Executed | Otto Baum Company, Inc. $68,200 · | ||
| Aug 1, 2025 | 72965 | LoganDistrict 6 | Substructure repairs on SN 054-0103 carrying Old IL 121 over Branch of Kickapoo Creek, 0.5 miles north of Lincoln. | — | Executed | Otto Baum Company, Inc. $94,400 · | ||
| Aug 1, 2025 | 72975 | SangamonDistrict 6 | Chip sealing on various routes in Sangamon County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $325,622 · | ||
| Aug 1, 2025 | 72K42 | AdamsDistrict 6 | 2 miles of resurfacing, ADA improvements, traffic signal improvements and patching on IL 104 (Broadway Street) from west of 12th Street to west of 38th Street in Quincy. | — | Executed | Diamond Construction Company $14,948,037 · | ||
| Aug 1, 2025 | 76M52 | St. ClairDistrict 8 | 0.9 miles of resurfacing and ADA improvements on IL 159 from Washington Street to 0.2 miles south of IL 13/158 in Belleville. | — | Executed | The Kilian Corporation $2,621,744 · | ||
| Aug 1, 2025 | 76M55 | St. ClairDistrict 8 | 1.4 miles of resurfacing with ADA improvements on IL 203 from Collinsville Road to the Madison County line. | — | Executed | Keeley & Sons, Inc. $5,476,581 · | ||
| Aug 1, 2025 | 76T74 | VariousDistrict 8 | Lighting upgrades on I-255 at I-55/70, on I-255 at Collinsville Road and on I-55/70 at Black Lane in Collinsville. | — | Executed | Electrico, Inc. $1,999,091 · | ||
| Aug 1, 2025 | 76U44 | VariousDistrict 8 | Bridge structural repairs at various locations in various counties of District 8. | — | Executed | Keeley & Sons, Inc. $1,822,815 · | ||
| Aug 1, 2025 | 76U45 | VariousDistrict 8 | Bridge deck patching on various interstate bridges in Madison and St. Clair Counties. | — | Executed | Keeley & Sons, Inc. $1,894,424 · | ||
| Aug 1, 2025 | 76U60 | RandolphDistrict 8 | 6.5 miles of pavement patching on IL 4 / IL 150 from 0.3 miles west of IL 4 (West Junction) to IL 4 (East Junction). | — | Rejected | |||
| Aug 1, 2025 | 76U62 | VariousDistrict 8 | Weed spraying for broadleaf weeds along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. | — | Executed | The Daltons Inc. $192,882 · | ||
| Aug 1, 2025 | 76U63 | VariousDistrict 8 | Weed spraying for Johnson Grass along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. | — | Executed | The Daltons Inc. $199,866 · | ||
| Aug 1, 2025 | 76U65 | MadisonDistrict 8 | 1.4 miles of slurry seal on IL 159 from Clay Street to Kinloch Avenue in Collinsville. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $537,958 · | ||
| Aug 1, 2025 | 78916 | WilliamsonDistrict 9 | Signal modifications, railroad interconnects and fiber optic installation on IL 37 from IL 13 to Boyton Street in Marion. | — | Executed | Gerstner Electric, Inc. $1,302,315 · | ||
| Aug 1, 2025 | 78A74 | JohnsonWilliamsonDistrict 9 | 9.5 miles of resurfacing on IL 166 from 0.1 miles south of Tune Road to US 45. Also includes ADA improvements in Creal Springs. | — | Executed | E. T. Simonds Construction Company $3,949,325 · | ||
| Aug 1, 2025 | 78B39 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,540,098 · | ||
| Aug 1, 2025 | 78B73 | JohnsonDistrict 9 | Patching on IL 37 from Hunter Street to Carter Street in Cypress. | — | Executed | Samron Midwest Contracting, Inc. $106,695 · | ||
| Aug 1, 2025 | 87864 | DeKalbDistrict 3 | Traffic signal modernization at various locations in DeKalb County. | — | Executed | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $624,037 · | ||
| Aug 1, 2025 | 87904 | LaSalleDistrict 3 | Construct PCC sidewalk at various locations in La Salle. Includes; ADA ramps, curb and gutter, and driveways. | — | Executed | Gensini Excavating, Inc. $340,268 · | ||
| Aug 1, 2025 | 91653 | McLeanDistrict 5 | Reconstruction and re-alignment of Hamilton Road from west of Bunn Street to existing Hamilton Road at Commerce Parkway, and reconstruction of Rhodes Lane from Hamilton Road to Morrissey Drive in Bloomington. | — | Executed | Rowe Construction, a div of UCM, Inc. $16,110,130 · | ||
| Aug 1, 2025 | 93833 | SangamonDistrict 6 | Extension of MaArthur Boulevard between Woodside Road and Knights Recreation Drive. Includes full-depth HMA, resurfacing, curb and gutter, pipe culverts, storm sewer, lighting, and signage. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $6,690,296 · | ||
| Aug 1, 2025 | 93840 | HancockDistrict 6 | Replace the bridge carrying 2350 N over Grove Creek 3.56 miles northwest of Burnside. Includes; HMA approach, Earthen shoulders, riprap, and seeding. | — | Executed | County Contractors, Inc. $535,985 · | ||
| Aug 1, 2025 | 95981 | CumberlandDistrict 7 | HMA overlay with aggregate wedge shoulders on E 400 Road, from the Shelby County line to 2.6 miles east. | — | Executed | Howell Paving, Inc. $612,883 · | ||
| Aug 1, 2025 | 97863 | St. ClairDistrict 8 | Construction of a Multi-Use Trail along LandN Avenue from IL 4 to South Railway Street in Mascoutah. Includes lime modified soils, sidewalks, storm sewers, and seeding. | — | Executed | Baxmeyer Construction, Inc. $1,251,808 · | ||
| Aug 1, 2025 | 97867 | ClintonDistrict 8 | Construct a single-span PPC deck beam bridge to carry CH 20 (Lake Road) over Bond Branch, 1 mile northeast of Carlyle. | — | Executed | C-Hill Civil Contractors, Inc. $729,988 · | ||
| Aug 1, 2025 | 99284 | WilliamsonDistrict 9 | Extend Ritter Road north to Grand Avenue in Herrin. | — | Executed | Samron Midwest Contracting, Inc. $2,069,759 · | ||
| Aug 1, 2025 | 99760 | WilliamsonDistrict 9 | Construction of a PCC multi-use path from the RIDES Mass Transit Center and VA Hospital along Main Street and Halfway Road in Marion. | — | Executed | Samron Midwest Contracting, Inc. $2,142,142 · | ||
| Sep 19, 2025 | 46668 | VariousDistrict 7 | Repairing various types of pavement markings at various locations throughout District 7. | — | Executed | Varsity Striping & Construction Co. $719,860 · | ||
| Sep 19, 2025 | 61K93 | CookDistrict 1 | Reconstruction of Tonne road from Lanmeier Road to Clearmont Drive in Elk Grove Village. | — | Executed | Lima Contractors $12,620,000 · | ||
| Sep 19, 2025 | 61L21 | CookDistrict 1 | Remove and replace traffic signals and pedestrian accommodations along Desplaines River Road and Balmoral Avenue in Rosemont. | — | Rejected | H & H Electric Co. $4,177,932 · | ||
| Sep 19, 2025 | 61L28 | KaneDistrict 1 | Construction of additonal through lanes on each side of Randall Road at the intersection of IL 72, widening to 3 NB and SB lanes. Includes HMA multi- use patch, curb and gutter, drainage improvements, traffic signal modifications, and lighting. | — | Executed | Martam Construction Incorporated $11,987,774 · | ||
| Sep 19, 2025 | 61L35 | CookDistrict 1 | Construct an HMA Multi-Use Path, sidewalk replacement and traffic signal modifications along Lake Street from Church Street to Gary Avenue in Hanover Park. | — | Executed | A Lamp Concrete Contractors, Inc. $1,344,596 · | ||
| Sep 19, 2025 | 61L68 | CookDistrict 1 | Resurfacing, sidewalk replacement, curb and gutter, and accessible pedestrian signals on Pratt Avenue, from Lincolnwood Drive to McCormick Boulevard in Lincolnwood. | — | Executed | |||
| Sep 19, 2025 | 61L69 | DuPageDistrict 1 | Construct a prefabicated pedestrian truss bridge to carry Cricket Trail extension over IL 83 in Elmhurst. | — | Executed | D. Construction, Inc. $3,634,117 · | ||
| Sep 19, 2025 | 61L70 | CookDistrict 1 | Sidewalk construction on Prairie Avenue from Hillside Avenue to South Street, and South Street from Summit Street to Prairie Avenue in Barrington. | — | Executed | Triggi Construction, Inc. $220,672 · | ||
| Sep 19, 2025 | 61L71 | CookDistrict 1 | HMA resurfacing on Dee Road from Devon Avenue to the Union Pacific Railroad in Park Ridge. | — | Executed | Builders Paving, LLC $2,778,778 · | ||
| Sep 19, 2025 | 61L72 | CookDistrict 1 | HMA Resurfacing of State Street from 127th Street to Cass Street in Lemont. Includes; ADA Ramps, curb and gutter, and drainage adjustments. | — | Executed | P. T. Ferro Construction Co. $1,092,187 · | ||
| Sep 19, 2025 | 61L74 | KaneDistrict 1 | Construction of PCC Sidewalk along various routes in Hampshire. Includes; HMA an PCC Driveways and pavement markings. | — | Executed | Triggi Construction, Inc. $354,811 · | ||
| Sep 19, 2025 | 62B64 | CookDistrict 1 | (1,354-Ft) Intersection and ADA Improvements include pavement widening, HMA resurfacing, patching, traffic signal modernization, drainage improvements, pavement markings and landscaping. Located at Joliet Rd and Brainard Ave. in the City of Countryside in Cook County. | — | Executed | R. W. Dunteman Company $2,431,246 · | ||
| Sep 19, 2025 | 62F86 | CookDistrict 1 | Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps (3,542-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers, accessible pedestrian signals. Located in the Villages of Arlington Heights, Buffalo Grove, and Wheeling in Cook County. | — | Executed | |||
| Sep 19, 2025 | 62J29 | LakeDistrict 1 | Tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83 (3.27-Mile) The improvement consists of tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83. The project is located within the Villages of Hawthorn Woods, Kildeer and Long Grove and within Lake County. | — | Executed | Clean Cut Tree Service, Inc. $586,632 · | ||
| Sep 19, 2025 | 62K78 | KaneDistrict 1 | Cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and sur (2.54-Mile) Designed Overlay, New Shoulders, and ADA Improvements: The proposed consists of cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, pavement markings and raised reflective Location: IL 25 (Saint Char | — | Executed | Plote Construction, Inc. $4,318,000 · | ||
| Sep 19, 2025 | 62L15 | CookDistrict 1 | (2.23-Mile) Designed Overlay and ADA Improvements consisting of asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, concrete curb and gutter replacement, curb ramps for sidewalks (ADA) improvements and new thermoplastic pavement marking on Lincoln Avenue from 138th Street to IL 83 (Sibley Boulevard) within the Village of Dolton, in in Cook County. | — | Executed | D. Construction, Inc. $2,190,770 · | ||
| Sep 19, 2025 | 62R22 | WillDistrict 1 | (3,775-Ft) Realignment and Reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, storm sewer, drainage structures, detention ponds, earth excavation and grading, retaining and noise walls, barrier and moment slab construction, bridge rehabilitation and replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, d | — | Executed | D. Construction, Inc. $93,597,946 · | ||
| Sep 19, 2025 | 62T23 | McHenryDistrict 1 | Advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete The project scope of work consists of advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete the project shown on the plans. This project is in the City of Crystal Lake, City of McHenry, Village of Prairie Grove, and Nunda Township in McHenry County. | — | Executed | Clean Cut Tree Service, Inc. $257,146 · | ||
| Sep 19, 2025 | 62U11 | CookWillDistrict 1 | Drainage Improvements. Work includes ditch regrading, culvert replacement and other drainage improvements. Locations: US 30 between 84th Avenue and 82nd Avenue in Will County; US 52 at Draves Road and Offner Road in Will County; Intersection of 115th Street and Homan Avenue in Cook County; Intersection of Taft Avenue and Elm Avenue in Cook County; Along Palatine Road, West of Roselle Road in Cook County. | — | Executed | Everlast Blacktop Inc. $1,530,704 · | ||
| Sep 19, 2025 | 62W62 | CookDuPageWillDistrict 1 | This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1. | — | Executed | John Burns Construction Company $2,170,856 · | ||
| Sep 19, 2025 | 62W89 | VariousDistrict 1 | This project involves the partial modernization of thirty-six (36) intersection to include Accessible Pedestrian Pushbuttons (APS) and/or Leading Pedestrian Interval (LPI) timing updates. Thirty-six (36) intersections located in the following District 1 counties: Cook, McHenry, Lake, Kane, and Dupage. | — | Executed | Meade Inc. $1,997,198 · | ||
| Sep 19, 2025 | 62X00 | LakeDistrict 1 | Advance tree removal as well as all incidental and collateral work necessary to complete the project The scope of work consists of advance tree removal as well as all incidental and collateral work necessary to complete the project. This project is in the City of Highland in Lake County. | — | Executed | Clean Cut Tree Service, Inc. $151,131 · | ||
| Sep 19, 2025 | 62X01 | WillDistrict 1 | (7.04-Mile) Designed Overlay and Shoulder Reconstruction includes (HMA) removal earth excavation, pavement patching, resurfacing with HMA asphalt, full depth HMA shoulder, pavement markings, raised reflective markers, curb and gutter removal and replacement. Project located on US 45/52 (96th Ave / LaGrange Road) from North of Monee Manhattan Road to Wilmington Peotone Road in the Townships of Green Garden, Peotone and Wilton Center in Will County. | — | Executed | Iroquois Paving Corporation $7,332,294 · | ||
| Sep 19, 2025 | 62X58 | CookDistrict 1 | Resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement marki (4,646-Ft) The resurfacing project consists of resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement markings located FAU 2916 (State Street) from Sauk Trail to Steger Road in the Villages of South Chicago Heights and Steger in Cook County. Also included is a box culvert (SN 016-1413), cleaning project consists of debris removal. The Torrence Avenue over a ditch in the Village of Sauk Village in Cook County. | — | Executed | Gallagher Asphalt Corporation $549,468 · | ||
| Sep 19, 2025 | 62X84 | CookDistrict 1 | (2.28-Mile) Standard Overlay (1st HMA overlay of bare PCC pavement), ADA Improvements. Work includes curb and gutter removal and replacement, curb ramps for sidewalk (ADA), pedestrian signals (APS), pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, detector loops. Location: Pershing Road, from US 34 Ogden Avenue to West of Central Avenue within the municipalities of Berwyn, Cicero, Lyons and | — | Rejected | K-Five Construction Corporation $4,154,377 · | ||
| Sep 19, 2025 | 62X87 | CookDistrict 1 | Asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concre (3,089-Ft) Standard Overlay consists of asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. Located along Dolton Avenue from 142nd Street to I-94 (Bishop Ford Freeway) in the Village of Dolton. | — | Executed | D. Construction, Inc. $682,549 · | ||
| Sep 19, 2025 | 62Y06 | VariousDistrict 1 | Removing trees, as well as all incidental and collateral work necessary to complete the project The project consists of removing trees, as well as all incidental and collateral work necessary to complete the project. This project is in several locations throughout District One within Cook, Kane, Kendall, Lake McHenry and Will Counties. | — | Executed | Homer Tree Service, Inc. $1,042,409 · | ||
| Sep 19, 2025 | 62Y12 | CookDistrict 1 | (269-Ft) Bridge Preservation Project: deck overlay, joint replacement/ repair. Work includes hydroscarification, deck repairs, latex modified concrete overlay diamond grinding, structural repair of concrete, joint replacement with strip seals, relief joints cleaning, approach slab repair, concrete sealer, HMA butt joints, curb and gutter replacement, sidewalk replacement and collateral and incidental work. Location: Bridge carrying Foster Avenue over the North Shore Channel, just East of North A | — | Executed | Martam Construction Incorporated $955,094 · | ||
| Sep 19, 2025 | 62Y13 | CookDistrict 1 | Staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge (304-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair consists of staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge. The scope also includes sidewalk and curb and gutter removal and replacement. (Existing Structure No. 016-2672). This project is on IL 19 (Irving Park Road) at Des Plaines River in Schiller Park, IL. in Cook County. | — | Executed | Martam Construction Incorporated $966,309 · | ||
| Sep 19, 2025 | 62Y32 | VariousDistrict 1 | New guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardra This project consists of new guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardrail components and replacing all removed guardrail components. This work is located on various State maintained arterial and expressway routes and at other district-wide locations within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. | — | Executed | Kujo, Inc. $2,998,621 · | ||
| Sep 19, 2025 | 64P02 | OgleDistrict 2 | Pedestrian button upgrades, sidewalk ADA improvements on IL 2: Market St to Lincoln St and IL 72: IL 2 to Diamond St. 3,480 gross feet. | — | Executed | Stenstrom Excavation & Blacktop, Inc. $1,269,521 · | ||
| Sep 19, 2025 | 64P76 | HenryDistrict 2 | 2.34 miles of cold milling, pavement patching, HMA resurfacing, and inlet erosion repair on IL 81 from 1st St. in Cambridge to 0.2 mile east of IL 82(N). | — | Executed | Advanced Asphalt Company $2,339,070 · | ||
| Sep 19, 2025 | 64U45 | StephensonWinnebagoDistrict 2 | Installation of stop ahead/stop signs, advance flashing beacons, and pavement markings on IL 75 at Rock City Rd.; and Springfield Ave. at Safford Rd. in Stephenson and Winnebago Counties. | — | Executed | CSD Environmental Services, Inc. $144,477 · | ||
| Sep 19, 2025 | 64U54 | Rock IslandDistrict 2 | Tree removal along I-74 from 0.9 miles south of 23rd Ave. in Moline to 0.5 miles south of IL 5 and along IL 5 from west of 16th St. to 0.2 miles west of 38th St. (approximately 2.0 miles total). | — | Executed | Homer Tree Service, Inc. $297,068 · | ||
| Sep 19, 2025 | 66295 | GrundyDistrict 3 | Railroad Separation Structure Replacement at WCL Railroad over I-80 (SN 032-9906) and Bridge Repair at Wabena Rd. over I-80 (SN 032-0065 in Kendall and Grundy Counties. | — | Executed | D. Construction, Inc. $14,268,635 · | ||
| Sep 19, 2025 | 66R59 | LaSalleDistrict 3 | Scour mitigation by placing stone dumped riprap at both ends of the culvert and other related construction items at SN 050-2006 carrying IL 18 over Eagle Creek approximately 1.7 miles west of IL Route 23 near Streator. | — | Executed | D. Construction, Inc. $27,740 · | ||
| Sep 19, 2025 | 66R60 | BureauDistrict 3 | Shoulder removal and replacement, concrete removal, remove and replace expansion bearings, expansion joint replacement at SN 006-0116 carrying Backbone Rd. over I-80, 1.8 miles west of IL Route 26 near Princeton. | — | Executed | Martin & Company Excavating $373,944 · | ||
| Sep 19, 2025 | 66R62 | LivingstonDistrict 3 | Deck slab repairs (patching on the bridge deck and approach slabs) included in this work is structural concrete repairs to piers and debris removal on SN 053-0150 carrying IL Route 17 over the east branch of the Mazon River approximately 6.1 miles east of IL Route 47 in Livingston County. | — | Executed | Tobey's Construction & Cartage, Inc. $255,575 · | ||
| Sep 19, 2025 | 66R70 | LivingstonDistrict 3 | Scour mitigation by placing stone dumped riprap and other related construction items at SN 053-0011 carrying OR 66 over Wolf Creek approximately 5.15 miles northeast of IL Route 23 near Pontiac. | — | Executed | Tobey's Construction & Cartage, Inc. $64,451 · | ||
| Sep 19, 2025 | 68J20 | VariousDistrict 4 | Culvert lining of various sizes at various locations. | — | Executed | Hoerr Construction, Inc. $1,852,445 · | ||
| Sep 19, 2025 | 68J62 | PeoriaDistrict 4 | Resurfacing of IL 8 from East Kickapoo Creek to Main St in Peoria. 1.68 miles. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $2,699,505 · | ||
| Sep 19, 2025 | 68K24 | PeoriaDistrict 4 | Upgrade HPS to LED luminaries along Interstate 74 (I-74) on existing light towers, light poles, and inside tunnels from Sterling Ave. in Peoria to Illinois River in Peoria County. | — | Executed | Laser Electric, Inc. $1,766,478 · | ||
| Sep 19, 2025 | 68K25 | PeoriaTazewellDistrict 4 | Installation of LED luminaries along I-74 on existing light towers, light poles, and inside tunnels from Knoxville Interchange in Peoria to Washington St. Interchange in East Peoria in Peoria and Tazewell Counties. | — | Executed | Gerstner Electric, Inc. $1,018,866 · | ||
| Sep 19, 2025 | 68K26 | VariousDistrict 4 | Installation of traffic signal controllers, cabinets, battery backup system, and CCTV cameras along various routes in District 4. | — | Executed | Oberlander Electric Co. $1,190,380 · | ||
| Sep 19, 2025 | 70C33 | McLeanDistrict 5 | 0.88 miles of drainage improvements at the intersection of and along US 136 and IL 54, 2.0 miles SW of Bellflower. | — | Executed | Phoenix Corporation of the Quad Cities $1,043,581 · | ||
| Sep 19, 2025 | 70D66 | VermilionDistrict 5 | Staged removaland replacement of dual structures (SN's 092-001 and 092-002) on I-74 at Stony Creek. | — | Executed | Stark Excavating, Inc. $7,049,795 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.