| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 25, 2025 | 99727 | JacksonDistrict 9 | HMA resurfacing on South Wall Street from East park Street to East Main Street in Carbondale. Includes; ADA improvements and Storm Sewers. | — | Executed | Samron Midwest Contracting, Inc. $1,596,208 · | ||
| Jun 13, 2025 | 46658 | VariousDistrict 7 | Replacing guardrail reflectors and linear delineation panels on various routes throughout District 7. | — | Executed | Done Rite Construction Co., Inc. $227,213 · | ||
| Jun 13, 2025 | 46661 | VariousDistrict 2 | Removing existing guardrail delineators and barrier wall delineators and installing new guardrail delineators and barrier wall delineators within the limits of each individual work order. | — | Executed | O'Brien Civil Works, Inc. $167,625 · | ||
| Jun 13, 2025 | 46664 | VariousDistrict 4 | Repairing various widths of preformed plastic, epoxy, modified urethane pavement marking lines, letters and symbols and removal of existing pavement markings within the limits specified on each individual Work Order, and related collateral work necessary to complete the project on various routes throughout District 4. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,978,061 · | ||
| Jun 13, 2025 | 46937 | LaSalleDistrict 3 | Roadway improvements (HMA resurfacing, A3 oil and chip, drainage improvements and other work) within Illini State Park (IDNR) in LaSalle County, IL. 1.6 miles gross length. | — | Executed | D. Construction, Inc. $1,632,707 · | ||
| Jun 13, 2025 | 46941 | LaSalleDistrict 3 | PCC concrete patching of the parking lot at the lodge at Starved Rock State Park (IDNR) in LaSalle County, IL. | — | Executed | Advanced Asphalt Company $513,534 · | ||
| Jun 13, 2025 | 60R76 | WillDistrict 1 | Construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert e (1225-Ft) Bridge Deck Replacement consists of construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert extension located on I-57 at Pauling Road (Overhead) in Will County. | — | Executed | D. Construction, Inc. $4,142,053 · | ||
| Jun 13, 2025 | 61J86 | LakeDistrict 1 | Construction of new pavement to extend Hook Drive from Nicole Lane to Orchard Lane, and the construction of Nicole Lane from Hook Drive to Rollins Road in Round Lake Beach. Includes; Excavation, Aggregate base and sub-base, HMA Pavement, Sidewalk, curb and gutter, storm and sanitary sewer, water main, landscaping, lighting foundations and conduit. | — | Executed | Lake County Grading Company, LLC $4,391,124 · | ||
| Jun 13, 2025 | 61K96 | LakeDistrict 1 | HMA resurfacing and shoulder widening on Saunders Road from Duffy Lane to Riverwoods Road in Riverwoods. | — | Executed | |||
| Jun 13, 2025 | 61L34 | CookDistrict 1 | Add bike lanes on Church Street from Linder Avenue to McCormick Boulevard in Skokie. Includes PCC base course widening, curb and gutter, sidewalks, and traffic signal modifications. | — | Executed | Alliance Contractors, Inc. $2,111,750 · | ||
| Jun 13, 2025 | 61L40 | KaneDistrict 1 | Resurfacing and the construction of a multi-use path on Sleepy Hollow Road from Huntley Road to IL-72 in West Dendee. | — | Executed | Schroeder Asphalt Services, Inc. $1,348,856 · | ||
| Jun 13, 2025 | 61L49 | McHenryDistrict 1 | Construction of a triple-cell 12'X 5' box culvert to carry Oakwood Drive over Boone Creek in McHenry. Includes, HMA roadway, sidewalks, curb and gutter, storm sewer and utility adjustments. | — | Executed | Alliance Contractors, Inc. $1,194,482 · | ||
| Jun 13, 2025 | 61L50 | McHenryDistrict 1 | HMA resurfacing on Johnsburg Road from Fairview Avenue to the north city limits of Johnsburg. Includes aggregate shoulders. | — | Executed | Geske and Sons, Inc. $1,758,088 · | ||
| Jun 13, 2025 | 61L51 | McHenryDistrict 1 | Resurfacing Nish Road from Barreville Road to IL 176 in Prairie Grove. | — | Executed | Geske and Sons, Inc. $588,609 · | ||
| Jun 13, 2025 | 61L52 | LakeDistrict 1 | Construction of an HMA Bike Path in Round Lake. Includes sidewalk removal, storm sewer, pavement markings, and parkway restoration. | — | Executed | Alliance Contractors, Inc. $521,885 · | ||
| Jun 13, 2025 | 61L53 | CookDistrict 1 | Resurfacing Glenview Road from Milwaukee Avenue to Shermer Road in Glenview. | — | Executed | Peter Baker & Son Co. $2,007,772 · | ||
| Jun 13, 2025 | 61L59 | KaneDistrict 1 | HMA resurfacing on State Street from Hampshire Creek to Allen Road in Hampshire. Includes pavement patching, curb and gutter, and drainage structure adjustments. | — | Executed | Curran Contracting Company $308,598 · | ||
| Jun 13, 2025 | 61L60 | KaneDistrict 1 | HMA resurfacing on South Elgin Boulevard from East Main Street to the north village limits of South Elgin. Includes curb and gutter, drainage structures, and parkway restoration. | — | Executed | Plote Construction, Inc. $1,197,423 · | ||
| Jun 13, 2025 | 61L62 | CookDistrict 1 | Resurfacing Beckwith Road from Shermer Road to Austin Avenue in Morton Grove. | — | Executed | Peter Baker & Son Co. $1,660,324 · | ||
| Jun 13, 2025 | 61L63 | CookDistrict 1 | Resurfacing Gross Point Road from Main Street to Oakton Street in Morton Grove. | — | Executed | Peter Baker & Son Co. $929,683 · | ||
| Jun 13, 2025 | 61L64 | CookDistrict 1 | Resurfacing Central Avenue from Golf Road to Dempster Street in Morton Grove. | — | Executed | Peter Baker & Son Co. $1,669,904 · | ||
| Jun 13, 2025 | 61L65 | CookDistrict 1 | Resurfacing Shermer Road from Gold Road to Harlem Avenue in Morton Grove. | — | Executed | A Lamp Concrete Contractors, Inc. $939,244 · | ||
| Jun 13, 2025 | 62G52 | WillDistrict 1 | (1.716-Mile) Designed Overlay improvements include: Curb and gutter spot repair , asphalt surface removal and replacement with new binder and surface (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement markings, raised reflective pavement markers, detector loops replacement. Location: IL 53 (Independence Boulevard), from Joliet Road to Belmont Drive within the Village of Romeoville. | — | Executed | K-Five Construction Corporation $3,382,064 · | ||
| Jun 13, 2025 | 62L61 | McHenryDistrict 1 | (10,700-Ft) Designed Overlay and Shoulder Reconstruction, project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full depth (HMA) shoulder, pavement markings, raised reflective pavement markers. Located along IL 47 (Eastwood Drive) from North of IL 176 (North Junction) to South of US 14 in the City of Woodstock. | — | Executed | Curran Contracting Company $2,693,463 · | ||
| Jun 13, 2025 | 62N39 | CookDuPageDistrict 1 | (9.38-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization, and ADA Improvements. Located along 22nd St / Cermak Rd from York Rd to IL 50 (Cicero Ave.) in the Village of Oak Brook in DuPage County, and in the Villages of Hillside, Westchester, Broadview North Riverside, Forest Park, the City of Berwyn, and the Town of Cicero,in Cook County. | — | Executed | Meade Inc. $20,875,047 · | ||
| Jun 13, 2025 | 62P73 | LakeDistrict 1 | US RTE 12 (10 The projects consist of US RTE 12 (10.39 miles) - SMART Overlay, shoulders, shoulder rumble strips, channelization, and pavement markings and IL RTE 176 (0.71 miles) - shoulder and centerline rumble strips and pavement markings. Project located in Villages of Fox Lake, Volo, Lakemoor, Wauconda and Mundelein | — | Executed | Curran Contracting Company $16,944,587 · | ||
| Jun 13, 2025 | 62T22 | CookDistrict 1 | Bridge and approach slab scarification, replacement of joints at abutments and piers with strip seals, cleanin (405-Ft) Bridge Deck Overlay on SN 016-1005 and SN 016-1006 and associated bridge rehabilitation consists of bridge and approach slab scarification, replacement of joints at abutments and piers with strip seals, cleaning/ adjusting shoulder drains, concrete sealer of deck and parapets, HMA overlay on bridge approaches, slope wall repair and replacement, maintenance of traffic control, pavement marking. Located along IL-171 at Joliet Road and BNSF Railroad Spur in the Village of McCook, Cook Coun | — | Executed | Martam Construction Incorporated $1,747,368 · | ||
| Jun 13, 2025 | 62T95 | CookDistrict 1 | (1,082.40-Ft) The improvement includes earth excavation, non-special waste disposal, erosion control and protection, temporary drainage, traffic control and protection. The project is located along the east side of the NB Mannheim Ramp between Mannheim Road and the CN Railroad tracks and I-190 and Willow Creek. | — | Executed | Lindahl Brothers, Inc. $8,580,778 · | ||
| Jun 13, 2025 | 62U39 | WillDistrict 1 | Removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavemen Project consists of removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavement improvements necessary for this replacement. Located on FAI 80 (I-80) at Francis Road, Will County, IL. | — | Executed | D. Construction, Inc. $5,328,033 · | ||
| Jun 13, 2025 | 62V14 | CookDistrict 1 | Resurfacing the existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, ADA (1.472-Mile) This project consists of resurfacing the existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. Located along Sacramento Blvd in the City of Chicago in Cook County. | — | Executed | MAT Construction Leasing, Inc. $2,054,601 · | ||
| Jun 13, 2025 | 62V39 | LakeDistrict 1 | Resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplas (1.91-Mile) Project consists of resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplastic pavement markings. This project is located along US 45 in the Village of Antioch and the Township of Antioch in Lake County. | — | Executed | Payne & Dolan, Inc. $1,630,685 · | ||
| Jun 13, 2025 | 62V52 | McHenryDistrict 1 | (9,601-Ft) SMART Overlay and Standard Overlay, ADA sidewalk ramp improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, pavement markings, sidewalk ramp improvements. Project located on IL 176 (State Road) in the Village of Island Lake. | — | Executed | Curran Contracting Company $2,389,468 · | ||
| Jun 13, 2025 | 62V57 | McHenryDistrict 1 | (2.62-Mile) Designed overlay and new (HMA) shoulder reconstruction project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full-depth (HMA) shoulder, pavement markings, raised reflective pavement markers, shoulder and centerline rumble strips. Located along IL Route 176 from East of Haligus Road to West of US 14 (Virginia Street) in the City of Crystal Lake. | — | Executed | Curran Contracting Company $2,685,966 · | ||
| Jun 13, 2025 | 62V58 | LakeDistrict 1 | (2.02-Mile) SMART Overlay, Shoulder Repair and ADA Improvements consists (HMA) removal, earth excavation, pavement patching, resurfacing with (HMA) asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, installation of raised reflective pavement markers, ADA ramps, traffic signals, detector loops. Project located on IL 131 (Green Bay Road) from IL 173 (Rosecrans Road) to Russell Road in the City of Zion. | — | Executed | Peter Baker & Son Co. $3,524,201 · | ||
| Jun 13, 2025 | 62V88 | DuPageDistrict 1 | Curb and gutter spot repairs, sidewalk removal and replacement for curb ramps for sidewalks (ADA), cold asphal (3,848-Ft) Designed Overlay, ADA Improvements, New Shoulders consists of curb and gutter spot repairs, sidewalk removal and replacement for curb ramps for sidewalks (ADA), cold asphalt pavement milling, patches (Class D), replace existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, longitudinal joint sealing, resurfacing (inlay) with HMA binder and surface course, new thermoplastic pavement markings and raised reflective pavement markers, accessible pedestrian sig | — | Executed | R. W. Dunteman Company $1,208,153 · | ||
| Jun 13, 2025 | 62W15 | WillDistrict 1 | (1.59-Mile) Replace light towers with poles, LED luminaries, foundations, conduits/cables, restorations. Project located in the Villages of Mokena, Orland Park, and Tinley Park in Will County, at I-80 and US-45 interchange. | — | Executed | John Burns Construction Company $1,709,237 · | ||
| Jun 13, 2025 | 62W90 | VariousDistrict 1 | Replacement of old controllers, replace fiber optic cable, network switches, PTZ cameras, and controllers among other equipment to allow for remote access and monitoring capabilities, complete the ATMS system in Lake County allowing for fully remote access to all intersection. There are one hundred fifteen locations proposed on this project located in mainly in Lake County with fewer location in Cook and McHenry Counties. | — | Executed | H & H Electric Co. $3,357,143 · | ||
| Jun 13, 2025 | 62X02 | CookDistrict 1 | (420.25-Ft) HMA Pavement Patching and resurfacing, storm sewer installation, drainage structure installation, bridge deck overlay, superstructure repairs, substructure repairs. This project is in the City of Chicago and Village of Riverdale, Cook County, on IL 1 (Halsted Street, FAU 3730) over Little Calumet River. | — | Executed | D. Construction, Inc. $4,238,796 · | ||
| Jun 13, 2025 | 62X29 | CookDistrict 1 | Joint sealing, concrete removal, concrete superstructure, wing wall modifications, approach slab repair, struc (900-Ft) Bridge joint repair and replacement, and bridge approach pavement improvement consists of joint sealing, concrete removal, concrete superstructure, wing wall modifications, approach slab repair, structural repair of concrete, HMA surface removal, butt joints, PCC surface removal, HMA surface course, full depth HMA Class D patches, guardrail removal, guardrail, pavement markings, Class SI concrete, tree removal, This project is located in the Village of Thornton, in Cook County. | — | Executed | MYS, Incorporated $882,083 · | ||
| Jun 13, 2025 | 62X33 | KaneDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface (6.70-Mile) Design overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Rte. FAP 567, IL 38, from Dekalb County Line to IL 47 (Main Street) within the Village of Elburn in Kane County. | — | Rejected | Builders Paving, LLC $4,414,888 · | ||
| Jun 13, 2025 | 62X34 | WillDistrict 1 | Asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, conc (2.88-Mile) Designed overlay and pedestrian ramp (ADA) project consists of asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal replacement, resurfacing with asphalt binder course and asphalt surface course, pavement markings. The improvement is in the Cities of Braidwood and Wilmington in Will County. | — | Executed | Iroquois Paving Corporation $1,353,712 · | ||
| Jun 13, 2025 | 62X35 | McHenryDistrict 1 | Pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface cours (2.68-Mile) This project consists of pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in Dorr Township and in the City of Woodstock in McHenry County. | — | Executed | Plote Construction, Inc. $2,341,185 · | ||
| Jun 13, 2025 | 62X42 | CookDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals located in various locations in District 1. | — | Executed | Hecker and Company, Inc. $1,733,690 · | ||
| Jun 13, 2025 | 62X59 | KaneDistrict 1 | (1.12-Mile) Designed Overlay, Traffic Signal Modernization, ADA Improvement consists asphalt surface removal, pavement patching, (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, traffic signal modernization, accessible pedestrian signal improvements, detector loop replacement, raised reflective pavement markers, pavement marking. Located within the City of Elgin in Kane County. | — | Executed | Plote Construction, Inc. $2,838,180 · | ||
| Jun 13, 2025 | 62X60 | DuPageDistrict 1 | Designed overlay, ADA improvements, and collateral work necessary to complete the project (2,909-Ft) Improvement consists of Designed overlay, ADA improvements, and collateral work necessary to complete the project. Located on Gary-s Mill Road from IL. 38 to IL. 59 in the City of West Chicago. | — | Executed | R. W. Dunteman Company $842,712 · | ||
| Jun 13, 2025 | 62X61 | KaneDistrict 1 | Hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermop (2,955-Ft) Design Overlay and ADA improvements consist of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Project is located in the Cities of Highwood and Highland Park, Lake County. | — | Executed | Peter Baker & Son Co. $922,469 · | ||
| Jun 13, 2025 | 62X62 | CookDistrict 1 | (1466-Ft) Pavement patching, hot-mix asphalt surface removal, resurfacing with hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in Evanston Township and in the City of Evanston. | — | Executed | Peter Baker & Son Co. $1,005,325 · | ||
| Jun 13, 2025 | 62X64 | CookDistrict 1 | (4,602-Ft) Smart Overlay improvements include curb and gutter spot repairs (remove and replace), hot-mix asphalt (HMA) surface removal and replacement with (cold milling and inlay), full-depth patches (Class D), thermoplastic pavement markings, raised reflective pavement markers, detector loops. Located on I-55 North Frontage Road from County Line Road to Commonwealth Drive within the Village of Burr Ridge. | — | Executed | K-Five Construction Corporation $511,057 · | ||
| Jun 13, 2025 | 62X66 | McHenryDistrict 1 | Pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, (2.93-Mile) Standard Overlay consists of pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, thermoplastic and hot spray pavement markings, grading and shaping ditches. This project located in Coral Township, in McHenry County. | — | Executed | Plote Construction, Inc. $1,405,173 · | ||
| Jun 13, 2025 | 62X67 | KaneDistrict 1 | Asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings SMART Overlay and Standard Overlay improvement project consists of asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings. The project is located in the villages of Hampshire and Pingree Grove within Kane County. | — | Executed | Curran Contracting Company $2,654,662 · | ||
| Jun 13, 2025 | 62X68 | McHenryDistrict 1 | (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface (1.06-Mile) Standard Overlay and Pedestrian Ramp (ADA) project consists of (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface course and binder course, thermoplastic and hot spray pavement marking, combination concrete curb and gutter removal and replacement. Project is in the City of Marengo in Marengo, Seneca, and Coral Townships in McHenry County. | — | Executed | Schroeder Asphalt Services, Inc. $881,875 · | ||
| Jun 13, 2025 | 62X69 | KaneDistrict 1 | (1.79-Mile) SMART and Designed Overlay, ADA Improvements, New Shoulders Improvements include curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), (HMA) surface removal and replacement, (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement marking, pedestrian signals (APS) improvements and detector loops. Location: IL 56 (Butterfield Road), from East of IL 25 River Road to We | — | Executed | Geneva Construction Company LLC. $2,713,457 · | ||
| Jun 13, 2025 | 62X70 | CookDistrict 1 | 0.48-mile) Standard Overlay, ADA Improvements includes curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps (ADA), hot-mix asphalt surface removal and replacements (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, new thermoplastic pavement markings and raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Location: Niles Center Road, from south of M | — | Executed | A Lamp Concrete Contractors, Inc. $755,632 · | ||
| Jun 13, 2025 | 62X71 | CookDistrict 1 | Asphalt surface removal, mix asphalt resurfacing, sidewalk removal, placement of thermoplastic pavement markin (1.08-Mile) Standard Overlay project consists of asphalt surface removal, mix asphalt resurfacing, sidewalk removal, placement of thermoplastic pavement markings, combination curb and gutter removal and replacement, installation of concrete sidewalk and detectable warnings, drainage structure adjustments and pedestrian ramp improvements. Located on Pershing Road from 56th Court to ILL 50 (Cicero Avenue) within the Village of Stickney and the Town of Cicero in Cook County. | — | Executed | K-Five Construction Corporation $1,538,560 · | ||
| Jun 13, 2025 | 62X74 | CookDistrict 1 | Repairing bridge drainage system as shown on the plans and any incidental collateral work necessary to complet This improvement consists of repairing bridge drainage system as shown on the plans and any incidental collateral work necessary to complete the improvements Located in the Cities of Chicago and Blue Island and Village of Hillside in Cook County. | — | Executed | D. Construction, Inc. $913,615 · | ||
| Jun 13, 2025 | 62X99 | WillDistrict 1 | Building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any The work consists of building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any structure above and below the ground, main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees, grading and seeding. Located in the City of Joliet, in the vicinity of FAI Route 80 (Interstate 80) and Des Plaines River in Will County. | — | Executed | C & D Recycling Services, Inc. $469,833 · | ||
| Jun 13, 2025 | 62Y02 | CookKaneDistrict 1 | Cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work (0.01-Mile) This is a bridge painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work. This project has two locations: (SN 045-0037 and SN 047-0029) 1) Galena Blvd over IL-56 in the Village of Sugar Grove. 2) US 30 over Blackberry Creek in the Village of Montgomery. | — | Executed | Capital Industrial Services, LLC $499,333 · | ||
| Jun 13, 2025 | 62Y04 | CookDistrict 1 | Bridge substructure repairs to the SN 016-0511 (EB) and SN 016-0512 (WB) Structures of I-190 over Des Plaines (349- FT) Scope of work consist of bridge substructure repairs to the SN 016-0511 (EB) and SN 016-0512 (WB) Structures of I-190 over Des Plaines River Road. Improvement is located in the Village of Rosemont in Cook County. | — | Executed | Areatha Construction Co., Inc. $694,687 · | ||
| Jun 13, 2025 | 62Y07 | CookDistrict 1 | Cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work (0.01-Mile) Bridge Painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work. This project has two locations: (SN 016-2665 and SN 016-0537) 1) US 12/ 20/ 45 (LaGrange Rd) over I-55, in the City of Countryside and Village of Hodgkins;2) Willow Springs Rd over I-55 in the City of Countryside. | — | Executed | ERA-Valdivia Contractors, Inc. $642,843 · | ||
| Jun 13, 2025 | 62Y08 | VariousDistrict 1 | Repair and replacement work order contract for Impact Attenuators, Sand Barrels and Miscellaneous Traffic Control in coordination with MCHD to enhance roadway safety and manage traffic flow effectively. Location on various State maintained expressway and arterial routes within the counties of Cook, DuPage, Will, Lake, McHenry and Kane. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,141,300 · | ||
| Jun 13, 2025 | 62Y10 | VariousDistrict 1 | Pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic co This project consists of pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic control on a work basis. Located in District One (counties of Cook, DuPage, Kane, Lake, McHenry, and Will). | — | Executed | Homer Tree Service, Inc. $536,830 · | ||
| Jun 13, 2025 | 64B40 | Jo DaviessDistrict 2 | 4.07 miles of reconstruction of US 20 from 0.2 mile west of Logemann Rd to Rush St in Stockton. | — | Executed | Civil Constructors, Inc. d/b/a Helm Civil and Fischer Excavating, Inc. J.V. $31,655,626 · | ||
| Jun 13, 2025 | 64J66 | WinnebagoDistrict 2 | 1.21 miles ADA sidewalk ramps, HMA patching, RTL widening, video detection systems, and sign replacement from Fairview Ave to Rockford College Dr. | — | Executed | Stenstrom Excavation & Blacktop, Inc. $1,848,165 · | ||
| Jun 13, 2025 | 64M38 | WinnebagoDistrict 2 | 2.184 mi Designed Overlay, patching, milling, retaining wall repair, and ADA Improvements from Snow Ave in Loves Park to Whitman St in Rockford and Forest Hills Rd from Landstrom Rd to IL 251. | — | Executed | Rock Road Companies, Inc. $7,698,386 · | ||
| Jun 13, 2025 | 64M76 | LeeDistrict 2 | Remove and replace culvert over a drainage way 0.3 mile south of US 30, north of Amboy on US 52. | — | Executed | Martin & Company Excavating $493,527 · | ||
| Jun 13, 2025 | 64P13 | OgleDistrict 2 | Hot-Mix Asphalt resurfacing south of IL-72 (W) to south of Willow St and ADA improvements on IL-72. 4.51 gross miles. | — | Executed | Martin & Company Excavating $4,385,762 · | ||
| Jun 13, 2025 | 64R15 | BooneWinnebagoDistrict 2 | 1.05 miles of HMA resurfacing (SMART overlay) from 0.3 miles east of Kishwaukee River to 0.4 miles west of Wheeler Rd on US 20. | — | Executed | Rock Road Companies, Inc. $2,406,956 · | ||
| Jun 13, 2025 | 64R16 | Rock IslandDistrict 2 | 5.39 miles of milling and resurfacing on I-74: I-280/US 6 Interchange to Henry County Line and I-280: Milan Beltway to the I-74/US 6 Interchange. | — | Executed | Advanced Asphalt Company $11,584,709 · | ||
| Jun 13, 2025 | 64S25 | WinnebagoDistrict 2 | Deck repair, joint replacement, deck overlay, and other miscellaneous repairs carrying SN 101-0145 over Baxter Road, 1 mile north of Ogle County Line. | — | Executed | Martin & Company Excavating $1,028,867 · | ||
| Jun 13, 2025 | 64S28 | WhitesideDistrict 2 | Bridge deck overlay, joint replacement and miscellaneous repairs on SN 098-0055 carrying Cordova Rd over I-88, 2.5 miles west of Erie. | — | Executed | Brandt Construction Co. $705,219 · | ||
| Jun 13, 2025 | 64S51 | WinnebagoDistrict 2 | 2.98 miles of pavement patching, cold milling, HMA resurfacing, ADA improvement, and traffic signal modifications on IL 251 from Windsor Rd in Loves Park to 0.3 miles south of Il 173 in Machesney Park. | — | Executed | Rock Road Companies, Inc. $8,243,328 · | ||
| Jun 13, 2025 | 64T30 | OgleWinnebagoDistrict 2 | Crack joint sealing on US 20 from 0.2 mi W of Falconer Rd to Simpson Rd and US BUS 20 from US 20 to Weldon Rd SW of Rockford. US 64 from 0.1 mi E of US 52 to ILL 26. IL 70 from Pecatonica River to 0.1 mi W of Safford Rd in Rockford. 4.91 miles gross length. | — | Executed | |||
| Jun 13, 2025 | 64T31 | LeeDistrict 2 | Crack joint sealing on US 52 from Water St in Amboy to north of Henkel Rd and on IL 2 from Page Dr in Dixon to US 52/IL 26. 4,227 ft gross length. | — | Executed | Denler, Inc. $255,552 · | ||
| Jun 13, 2025 | 64T32 | HenryDistrict 2 | 1.82 miles of crack joint sealing on IL 81 from Galva-Atkinson Rd to WestSt in Kewanee and from US 150 to 0.4 miles west of I-74. | — | Executed | Denler, Inc. $160,257 · | ||
| Jun 13, 2025 | 64T33 | WhitesideDistrict 2 | 2.85 miles of crack joint sealing on IL 84 from US 30 to south of 12th Ave in Albany and on US 30 from IandM Feeder Canal 0.3 miles east of ILL 40 in Rock Falls to Lee County Line. | — | Executed | Denler, Inc. $195,171 · | ||
| Jun 13, 2025 | 64T74 | WinnebagoDistrict 2 | 0.725 miles advanced tree removal along US 20 from Mill Rd to 0.3 miles east of Kishwaukee River. | — | Executed | Homer Tree Service, Inc. $87,480 · | ||
| Jun 13, 2025 | 64T97 | OgleDistrict 2 | Bridge deck repairs, joint replacement, and miscellaneous repairs on SN 071-0064, carrying Ritchie Rd over I-39, 0.5 miles south of I-88. | — | Executed | Martin & Company Excavating $315,487 · | ||
| Jun 13, 2025 | 64T98 | StephensonDistrict 2 | Bridge deck repairs, joint replacement and miscellaneous repairs on SN 089-0068 carrying IL 73 over tributary of Yellow Creek, 0.50 miles south of US 20. | — | Executed | Martin & Company Excavating $758,588 · | ||
| Jun 13, 2025 | 64T99 | StephensonDistrict 2 | Bridge deck repairs, joint replacement and miscellaneous repairs on SN 089-0072, carrying IL 26 over drainage ditch, 0.40 miles south of McConnell Rd. | — | Executed | Martin & Company Excavating $394,921 · | ||
| Jun 13, 2025 | 64U00 | WinnebagoDistrict 2 | Bridge deck repairs, joint replacement and miscellaneous repairs on SN 101-0046, carrying US 20 WB over US 20 BR EB, 3 miles west of Rockford. | — | Executed | Martin & Company Excavating $485,744 · | ||
| Jun 13, 2025 | 64U19 | OgleDistrict 2 | 7.92 miles of HMA milling and resurfacing on IL 72 from IL 26 in Forreston to 0.3 mi E of Mt. Morris Rd E of Leaf River. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $5,307,008 · | ||
| Jun 13, 2025 | 64U22 | OgleDistrict 2 | 9.33 miles of patching, milling, and resurfacing on IL 26 from south of Willow St. in Forreston to Hillside Dr. north of Polo on FAP_316. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $5,308,846 · | ||
| Jun 13, 2025 | 64U24 | StephensonDistrict 2 | 4.06 miles of designed overlay, milling, and patching from Brush Creek to Cedar Creek at NCL of Cedarville on IL 26. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,355,396 · | ||
| Jun 13, 2025 | 64U26 | WinnebagoDistrict 2 | 4.96 miles of HMA pavement overlay on FAP 734 from 0.8 miles north of Roscoe Rd to Prairie Hill Rd in South Beloit. | — | Executed | Rock Road Companies, Inc. $2,041,578 · | ||
| Jun 13, 2025 | 64U41 | LeeDistrict 2 | .3 miles of longitudinal joint repair along IL 38 in Franklin Grove. | — | Executed | Martin & Company Excavating $58,245 · | ||
| Jun 13, 2025 | 64U51 | WinnebagoDistrict 2 | 1.48 miles of bridge fabrication on I-39 from 0.3 miles east of Mulford Rd to 0.2 miles north of Harrison Ave. | — | Executed | DeLong's Inc. of Missouri $10,408,494 · | ||
| Jun 13, 2025 | 64U52 | WinnebagoDistrict 2 | 4.3 miles of pavement patching, widening, and fence repairs on I-39 from 0.8 mi north_of Blackhawk Rd to 0.4 mi north of Harrison Ave (including interchange ramps) and US 20 from 0.6 miles west of Mulford Rd to I-39. | — | Active | G. M. Sipes Construction, Inc. $3,920,847 · | ||
| Jun 13, 2025 | 64U55 | VariousDistrict 2 | Tree removal along various routes throughout District 2. | — | Executed | Homer Tree Service, Inc. $151,000 · | ||
| Jun 13, 2025 | 66B58 | FordDistrict 3 | Spot improvement, drainage ditch approximately 3.7 miles south of IL 116 on IL 115. | — | Executed | Riber Construction, Inc. $1,643,145 · | ||
| Jun 13, 2025 | 66F94 | IroquoisDistrict 3 | Bridge Deck Replacement for SN 038-0048 carrying IL 54 over I 57 at the interchange in Onarga. | — | Executed | Iroquois Paving Corporation $5,007,493 · | ||
| Jun 13, 2025 | 66H59 | IroquoisDistrict 3 | 7.7 gross miles of HMA milling and resurfacing, pavement patching, structure repairs, rest area repairs including: ADA ramps, curb and gutter repairs, pavement joint repairs, pavement marking, and raised reflectors on I-57 from the Buckley Interchange to the Ford County Line. | — | Executed | Iroquois Paving Corporation $30,611,903 · | ||
| Jun 13, 2025 | 66K63 | DeKalbDistrict 3 | 1370 ft of Superstructure Replacement (SN 019-0030) over Owens Creek, 1.3 miles west of Kirkland. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $3,866,805 · | ||
| Jun 13, 2025 | 66K71 | BureauDistrict 3 | Bridge replacement of SN 006-0089 and interchange lighting at IL-40 (overhead), 3.4 miles north of Buda. | — | Executed | D. Construction, Inc. $9,911,953 · | ||
| Jun 13, 2025 | 66M23 | IroquoisDistrict 3 | Bridge replacements of SN 038-0151 and SN 038-0152 on FAI 57(I-57) over Louis Creek, 0.7 miles north of Buckley interchange. | — | Executed | Iroquois Paving Corporation $5,792,936 · | ||
| Jun 13, 2025 | 66N05 | LaSalleDistrict 3 | Cleaning and painting all structural steel of two structures, Location 1: SN 050-0195 carrying US 6 over I-39, 2.7 mi. east of IL 351 near LaSalle; Location 2: SN 053-0181 carrying CH 19 (F.A.S. 270) over I-39, 2.3 mi. north of US 52. | — | Executed | ERA-Valdivia Contractors, Inc. $946,914 · | ||
| Jun 13, 2025 | 66N36 | LaSalleDistrict 3 | Latex Overlay, Expansion Joints, and Deck Repairs to SN 050-0177/-0178 on I-39 at SN 050-0177/0178 carrying I-39 over I-80, 2.6 miles west of IL 178. | — | Executed | D. Construction, Inc. $3,715,629 · | ||
| Jun 13, 2025 | 66P52 | GrundyDistrict 3 | Bridge Repairs TR 110 (SN 032-0077) over I-55 0.3 MI N of the Livingston County Line. | — | Executed | D. Construction, Inc. $952,217 · | ||
| Jun 13, 2025 | 66P53 | LaSalleDistrict 3 | Bridge deck repairs,bridge deck latex overlay, pavement patching, and pavement marking replacement_on IL 23 in Ottawa. | — | Executed | D. Construction, Inc. $1,897,015 · | ||
| Jun 13, 2025 | 66P54 | LaSalleDistrict 3 | Milling and resurfacing designed overlay of Il 251 including 4' safety shoulders, shoulder rumble strips, and centerline rumble strips from US 52 to the north limit. 10.99 miles gross. | — | Executed | Advanced Asphalt Company $6,445,788 · | ||
| Jun 13, 2025 | 66R18 | KankakeeDistrict 3 | Centerline joint sealing, microsurfacing, shoulder widening and rumble strips on IL Route 17 at two locations, 1: beginning at the east approach of SN 046-0027 and ending 0.5 mi. east of 19000W Rd; 2: beginning 0.01 mi. west of 12000W Rd. and ending 0.11 mi. east of 5000W Rd. | — | Executed | Kankakee Valley Construction Company, Inc. $1,599,488 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.