2024-1030-RS
- Let date
- Friday, June 13, 2025
- Contract
- 62X70 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- 0.48-mile) Standard Overlay, ADA Improvements includes curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps (ADA), hot-mix asphalt surface removal and replacements (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, new thermoplastic pavement markings and raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Location: Niles Center Road, from south of M
- Classification
- ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | A Lamp Concrete Contractors, Inc. Low bidder | $755,632 | ||
| 2 | Peter Baker & Son Co. | $975,858 | +29.1% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 A Lamp Concrete… | #2 Peter Baker & S… |
|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $5,000.00 | $3,500.00 | |
| 2 | X0325207 | TV INSPECT OF SEWER | 100 | FOOT | $35.00 | $32.00 | |
| 3 | X4400501 | CC&G RMVL REPL < = 10 | 379 | FOOT | $70.00 | $120.00 | |
| 4 | X5537800 | SS CLEANED 12 | 475 | FOOT | $3.00 | $4.00 | |
| 5 | X6030310 | FR & LIDS ADJUST SPL | 26 | EACH | $1,250.00 | $1,350.00 | |
| 6 | X6700407 | ENGRS FLD OFC TY A D1 | 6 | CAL MO | $3,500.00 | $1,000.00 | |
| 7 | X7200061 | TEMP INFO SIGNING | 51.4 | SQ FT | $18.00 | $18.00 | |
| 8 | X8860105 | DET LOOP REPL | 734 | FOOT | $79.20 | $27.11 | |
| 9 | Z0018500 | DRAINAGE STR CLEANED | 38 | EACH | $350.00 | $315.00 | |
| 10 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $5,000.00 | $10,000.00 | |
| 11 | 20200100 | EARTH EXCAVATION | 20 | CU YD | $145.00 | $85.00 | |
| 12 | 21101615 | TOPSOIL F & P 4 | 64 | SQ YD | $20.00 | $20.00 | |
| 13 | 25200110 | SODDING SALT TOLERANT | 64 | SQ YD | $35.00 | $60.00 | |
| 14 | 40600290 | BIT MATLS TACK CT | 7,635 | POUND | $0.0100 | $0.0100 | |
| 15 | 40600370 | LONG JOINT SEALANT | 4,840 | FOOT | $3.36 | $4.50 | |
| 16 | 40600400 | MIX CR JTS FLANGEWYS | 17 | TON | $325.00 | $1,115.00 | |
| 17 | 40600982 | HMA SURF REM BUTT JT | 444 | SQ YD | $10.00 | $1.00 | |
| 18 | 40603200 | P HMA BC IL-4.75 N50 | 467 | TON | $155.00 | $150.00 | |
| 19 | 40604062 | HMA SC IL-9.5 D N70 | 951 | TON | $113.00 | $125.00 | |
| 20 | 42001300 | PROTECTIVE COAT | 176 | SQ YD | $1.00 | $3.00 | |
| 21 | 42400200 | PC CONC SIDEWALK 5 | 920 | SQ FT | $12.25 | $17.00 | |
| 22 | 42400800 | DETECTABLE WARNINGS | 191 | SQ FT | $35.00 | $60.00 | |
| 23 | 44000158 | HMA SURF REM 2 1/4 | 11,311 | SQ YD | $3.50 | $6.50 | |
| 24 | 44000600 | SIDEWALK REM | 920 | SQ FT | $2.50 | $5.00 | |
| 25 | 44201803 | CL D PATCH T2 13 | 566 | SQ YD | $50.00 | $250.00 | |
| 26 | 44201807 | CL D PATCH T3 13 | 340 | SQ YD | $50.00 | $220.00 | |
| 27 | 44201809 | CL D PATCH T4 13 | 227 | SQ YD | $50.00 | $195.00 | |
| 28 | 550A0050 | STORM SEW CL A 1 12 | 16 | FOOT | $850.00 | $450.00 | |
| 29 | 55100500 | STORM SEWER REM 12 | 16 | FOOT | $50.00 | $50.00 | |
| 30 | 60300105 | FR & GRATES ADJUST | 3 | EACH | $485.00 | $900.00 | |
| 31 | 60300305 | FR & LIDS ADJUST | 9 | EACH | $550.00 | $900.00 | |
| 32 | 66900200 | NON SPL WASTE DISPOSL | 20 | CU YD | $90.00 | $150.00 | |
| 33 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,785.00 | $1,785.00 | |
| 34 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,400.00 | $3,400.00 | |
| 35 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $500.00 | |
| 36 | 66901006 | REG SUB MON | 10 | CAL DA | $700.00 | $700.00 | |
| 37 | 67100100 | MOBILIZATION | 1 | L SUM | $45,300.00 | $99,159.00 | |
| 38 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $147,000.00 | $51,165.00 | |
| 39 | 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $2,247.00 | $2,247.00 | |
| 40 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $2,247.00 | $2,247.00 | |
| 41 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $2,247.00 | $7,619.00 | |
| 42 | 70300100 | SHORT TERM PAVT MKING | 846 | FOOT | $0.1000 | $0.6000 | |
| 43 | 70300150 | SHRT TRM PAVT MK REM | 94 | SQ FT | $0.1000 | $20.00 | |
| 44 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 984 | SQ FT | $0.1000 | $1.75 | |
| 45 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 6,927 | FOOT | $0.1000 | $0.3500 | |
| 46 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 2,259 | FOOT | $0.1000 | $0.5300 | |
| 47 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 3,183 | FOOT | $0.1000 | $1.06 | |
| 48 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 924 | FOOT | $0.1000 | $1.60 | |
| 49 | 70307120 | TEMP PVT MK L4 T4 TAPE | 282 | FOOT | $0.1000 | $7.20 | |
| 50 | 78000100 | THPL PVT MK LTR & SYM | 328 | SQ FT | $5.00 | $5.00 | |
| 51 | 78000200 | THPL PVT MK LINE 4 | 2,309 | FOOT | $1.00 | $1.00 | |
| 52 | 78000400 | THPL PVT MK LINE 6 | 753 | FOOT | $2.00 | $2.00 | |
| 53 | 78000600 | THPL PVT MK LINE 12 | 1,061 | FOOT | $4.00 | $4.00 | |
| 54 | 78000650 | THPL PVT MK LINE 24 | 308 | FOOT | $5.00 | $5.00 | |
| 55 | 78100100 | RAISED REFL PAVT MKR | 91 | EACH | $62.00 | $62.00 | |
| 56 | 78300200 | RAISED REF PVT MK REM | 82 | EACH | $22.00 | $20.00 | |
| 57 | 78300202 | PVT MKG REM WTR BLAST | 94 | SQ FT | $48.00 | $48.00 |