| Apr 13, 2021 | 6378-13-001MMC - 637813001 | Gregg Tyler |
ROCK/RIPRAPUS 80 · | $84,000 | $99,600 | TOUCHSTONE RESOURCES, LLC | +18.6% | 2 |
| Apr 13, 2021 | 6376-34-001RMC - 637634001 | Jefferson Beaumont |
BRIDGE REPAIRUS 69 · | $86,426 | $69,624 | RAGLE CONSTRUCTION, INC. | -19.4% | 5 |
| Apr 13, 2021 | 6378-18-001MMC - 637818001 | Henderson Tyler |
MATERIALS ONLY: HYDRAULIC CEMENT CONCRETEUS 175 · | $61,400 | $58,200 | DIGG COMMERCIAL, LLC | -5.2% | 1 |
| Apr 13, 2021 | 6378-20-001MMC - 637820001 | Van Zandt Tyler |
MATERIALS ONLY: HYDRAULIC CEMENT CONCRETEUS 80 · | $61,400 | $58,200 | DIGG COMMERCIAL, LLC | -5.2% | 1 |
| Apr 13, 2021 | 6378-22-001MMC - 637822001 | Cherokee Tyler |
MATERIALS ONLY: HYDRAULIC CEMENT CONCRETEUS 69 · | $61,400 | $58,200 | DIGG COMMERCIAL, LLC | -5.2% | 1 |
| Apr 13, 2021 | 6378-24-001MMC - 637824001 | Wood Tyler |
MATERIALS ONLY: HYDRAULIC CEMENT CONCRETEUS 80 · | $61,400 | $58,200 | DIGG COMMERCIAL, LLC | -5.2% | 1 |
| Apr 13, 2021 | 6378-25-001MMC - 637825001 | Anderson Tyler |
MATERIALS ONLY: HYDRAULIC CEMENT CONCRETEUS 79 · | $61,400 | $58,200 | DIGG COMMERCIAL, LLC | -5.2% | 1 |
| Apr 13, 2021 | 6378-21-001MMC - 637821001 | Rusk Tyler |
MATERIALS ONLY: HYDRAULIC CEMENT CONCRETEUS 259 · | $61,400 | $58,200 | DIGG COMMERCIAL, LLC | -5.2% | 1 |
| Apr 13, 2021 | 6378-23-001MMC - 637823001 | Gregg Tyler |
MATERIALS ONLY: HYDRAULIC CEMENT CONCRETEUS 80 · | $61,400 | $58,200 | DIGG COMMERCIAL, LLC | -5.2% | 1 |
| Apr 13, 2021 | 6378-26-001MMC - 637826001 | Smith Tyler |
MATERIALS ONLY: HYDRAULIC CEMENT CONCRETEUS 69 · | $32,200 | $36,680 | 849 RED BARON SUPPLY COMPANY, LLC | +13.9% | 2 |
| Apr 13, 2021 | 6377-43-001MMC - 637743001 | Tyler Beaumont |
ROCK/RIPRAPUS 69 · | $45,000 | $32,400 | EAST TEXAS ASPHALT CO., LTD. | -28.0% | 4 |
| Apr 13, 2021 | 6379-29-001MMC - 637929001 | Jefferson Beaumont |
HOT MIXSH 347 · | $29,000 | $28,875 | TEXAS MATERIALS GROUP, INC. | -0.4% | 2 |
| Apr 13, 2021 | 6379-28-001MMC - 637928001 | Jefferson Beaumont |
FLEXIBLE BASESH 347 · | $24,500 | $23,100 | MARTIN MARIETTA MATERIALS, INC. | -5.7% | 3 |
| Apr 13, 2021 | 6379-30-001MMC - 637930001 | Tyler Beaumont |
EMULSIONUS 287 · | $2,050 | $1,850 | CLEVELAND ASPHALT PRODUCTS, INC. | -9.8% | 2 |
| Apr 12, 2021 | 6379-53-001MMC - 637953001 | Clay Wichita Falls |
HOT MIXUS 287 · | $207,600 | $193,025 | EUROVIA ATLANTIC COAST LLC | -7.0% | 3 |
| Apr 12, 2021 | 6379-59-001MMC - 637959001 | Cooke Wichita Falls |
HOT MIXUS 82 · | $176,500 | $176,200 | EUROVIA ATLANTIC COAST LLC | -0.2% | 4 |
| Apr 12, 2021 | 6378-40-001MMC - 637840001 | Houston Lufkin |
HOT-MIX COLD-LAIDSL 304 · | $91,800 | $80,500 | EAST TEXAS ASPHALT CO., LTD. | -12.3% | 2 |
| Apr 12, 2021 | 6378-43-001MMC - 637843001 | Houston Lufkin |
EMULSIONSL 304 · | $69,600 | $71,700 | CLEVELAND ASPHALT PRODUCTS, INC. | +3.0% | 3 |
| Apr 12, 2021 | 6378-37-001MMC - 637837001 | Angelina Lufkin |
CUTBACKSL 287 · | $21,300 | $17,700 | MARTIN RESOURCE MANAGEMENT CORPORATION | -16.9% | 2 |
| Apr 8, 2021 | 0016-03-114C 16-3-114 | Hays Austin |
HIGHWAY IMPROVEMENTIH 35 · | $86,878,934 | $81,218,266 | WEBBER, LLC | -6.5% | 6 |
| Apr 8, 2021 | 0066-05-065NH 2013(606) | Moore Amarillo |
HIGHWAY IMPROVEMENTUS 87 · | $31,825,597 | $36,800,374 | SEMA CONSTRUCTION, INC. | +15.6% | 3 |
| Apr 8, 2021 | 0521-05-148STP 2021(486)MM | Bexar San Antonio |
SURFACING/ROADWAY RESTORATIONIH 410 · | $23,897,567 | $22,297,586 | AUSTIN BRIDGE & ROAD SERVICES, LP | -6.7% | 8 |
| Apr 8, 2021 | 0041-02-016F 2021(441) | Hartley Amarillo |
REHABILITATE EXISTING ROADWAYUS 385 · | $8,784,107 | $9,656,579 | J. LEE MILLIGAN, INC. | +9.9% | 3 |
| Apr 8, 2021 | 0408-01-043BR 2021(484) | Fayette Yoakum |
BRIDGE REPLACEMENTSH 159 · | $5,909,756 | $5,331,594 | ACME BRIDGE COMPANY, INC. | -9.8% | 9 |
| Apr 8, 2021 | 3256-01-121C 3256-1-121 | Harris Houston |
LANDSCAPE DEVELOPMENTSL 8 · | $4,863,816 | $3,744,941 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -23.0% | 5 |
| Apr 8, 2021 | 0222-01-056STP 2021(464) | Titus Atlanta |
REHABILITATION OF AN EXISTING 4 LANE HIGHWAYSH 49 · | $3,942,707 | $3,739,807 | EAST TEXAS BRIDGE, INC. | -5.1% | 4 |
| Apr 8, 2021 | 0013-06-047STP 2021(494)HES | Wise Fort Worth |
INSTALL TRAFFIC SIGNALUS 81 · | $3,078,934 | $2,749,994 | AUSTIN BRIDGE & ROAD SERVICES, LP | -10.7% | 6 |
| Apr 8, 2021 | 1096-01-065STP 2021(471)HES | Hardin Beaumont |
HAZARD ELIMINATION & SAFETYFM 770 · | $2,513,155 | $2,206,602 | TEXAS MATERIALS GROUP, INC. | -12.2% | 5 |
| Apr 8, 2021 | 0334-03-021C 334-3-21 | Lee Austin |
ROADWAY REHABILITATION/RECONSTRUCTIONFM 696 · | $2,329,081 | $2,187,753 | KNIFE RIVER CORPORATION - SOUTH | -6.1% | 5 |
| Apr 8, 2021 | 0374-07-028STP 2021(476)HES | Hudspeth El Paso |
HAZARD ELIMINATION & SAFETYUS 62 · | $2,998,476 | $2,183,011 | J. A. R. CONCRETE, INC. | -27.2% | 5 |
| Apr 8, 2021 | 0182-01-017F 2021(451)HES | Eastland Brownwood |
IMPROVE GUARDRAIL TO DESIGN STANDARDS, S.E.T.'SSH 36 · | $2,471,575 | $2,098,184 | 3LW CIVIL LLC | -15.1% | 6 |
| Apr 8, 2021 | 0918-47-212STP 2021(496)HES | Dallas Dallas |
TRAFFIC SIGNAL IMPROVEMENTSCS · | $2,025,929 | $2,040,000 | DURABLE SPECIALTIES, INC. | +0.7% | 5 |
| Apr 8, 2021 | 0008-12-095CM 2021(341) | Tarrant Fort Worth |
TRAFFIC MANAGEMENT CENTER UPGRADEIH 20 · | $1,670,120 | $1,729,558 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +3.6% | 2 |
| Apr 8, 2021 | 0915-00-235F 2021(487) | Bexar San Antonio |
TRAFFIC SIGNAL IMPROVEMENTSVA · | $1,496,202 | $1,609,699 | D&G ENERGY CORPORATION | +7.6% | 4 |
| Apr 8, 2021 | 2326-01-029STP 2021(479)HES | El Paso El Paso |
HAZARD ELIMINATION & SAFETYFM 2529 · | $1,619,626 | $1,569,799 | INTERNATIONAL EAGLE ENTERPRISES, INC. | -3.1% | 6 |
| Apr 8, 2021 | 3136-01-191C 3136-1-191 | Travis Austin |
CONSTRUCTION OF NEW RAMP & INTERSECTION IMPROVEMTSSL 1 · | $1,384,918 | $1,525,579 | DAN WILLIAMS COMPANY | +10.2% | 5 |
| Apr 8, 2021 | 2523-02-069C 2523-2-69 | Brazoria Houston |
PLANING, PAVEMENT REPAIR, SEAL COAT AND 1.5" ACPFM 2004 · | $1,620,858 | $1,417,776 | DURWOOD GREENE CONSTRUCTION CO. | -12.5% | 4 |
| Apr 8, 2021 | 0922-00-073C 922-00-73 | Webb Laredo |
HAZARD ELIMINATION & SAFETYVA · | $1,705,936 | $1,371,915 | HIGHWAY BARRICADES AND SERVICES, LLC | -19.6% | 7 |
| Apr 8, 2021 | 3136-01-194C 3136-1-194 | Travis Austin |
LANDSCAPING AND IRRIGATIONSL 1 · | $1,905,731 | $1,369,464 | APEX LANDSCAPE & IRRIGATION, LLC | -28.1% | 5 |
| Apr 8, 2021 | 6369-74-001RMC - 636974001 | Harris Houston |
BRIDGE MAINTENANCESL 8 · | $1,185,843 | $1,085,110 | ISI CONTRACTING, INC. | -8.5% | 3 |
| Apr 8, 2021 | 0913-22-052BR 2020(609) | Gonzales Yoakum |
BRIDGE REPLACEMENTCR · | $1,108,767 | $1,049,085 | SEFBO PIPELINE BRIDGE, INCORPORATED | -5.4% | 12 |
| Apr 8, 2021 | 0128-01-116F 2021(450)HES | Brown Brownwood |
SAFETY TREAT FIXED OBJECTS & RUMBLE STRIPSUS 377 · | $974,104 | $937,757 | 3LW CIVIL LLC | -3.7% | 7 |
| Apr 8, 2021 | 6375-33-001RMC - 637533001 | Collin Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 981 · | $1,206,736 | $925,543 | D. L. LENNON INCORPORATED - CONTRACTOR | -23.3% | 4 |
| Apr 8, 2021 | 0915-00-229C 915-00-229 | Bexar San Antonio |
HIGHWAY IMPROVEMENTVA · | $1,084,790 | $916,531 | INTERSTATE BARRICADES & MARKINGS, INC. | -15.5% | 5 |
| Apr 8, 2021 | 0804-02-013F 2021(454) | Archer Wichita Falls |
REHABILITATE EXISTING ROADWAYFM 368 · | $904,400 | $853,940 | BLACKSMITH VENTURES LLC | -5.6% | 6 |
| Apr 8, 2021 | 6369-01-001RMC - 636901001 | Travis Austin |
SIGNAL REPAIR WITH EMERGENCY CALL-OUTSFM 685 · | $936,747 | $816,842 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -12.8% | 1 |
| Apr 8, 2021 | 6369-57-001RMC - 636957001 | Gonzales Yoakum |
ON CALL SPOT REPAIRSUA 90 · | $1,007,000 | $756,100 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -24.9% | 7 |
| Apr 8, 2021 | 6379-40-001RMC - 637940001 | Cameron Pharr |
SWEEPING AND DEBRIS REMOVALIH 69E · | $975,887 | $716,667 | STRIPE-A-ZONE, INC. | -26.6% | 3 |
| Apr 8, 2021 | 6368-86-001RMC - 636886001 | Travis Austin |
TRAFFIC SIGNAL MAINTENANCEIH 35 · | $633,365 | $693,686 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +9.5% | 1 |
| Apr 8, 2021 | 0186-01-025NH 2021(480) | Milam Bryan |
INSTALL FLASHING BEACONSSH 36 · | $787,447 | $557,418 | THIRD COAST SERVICES LLC | -29.2% | 6 |
| Apr 8, 2021 | 6371-95-001BPM - 637195001 | Kimble San Angelo |
CONCRETE REPAIRSUS 377 · | $561,718 | $498,855 | BLACKSMITH VENTURES LLC | -11.2% | 9 |
| Apr 8, 2021 | 6375-95-001RMC - 637595001 | Dimmit Laredo |
MISCELLANEOUS CONCRETE REPAIRUS 83 · | $337,927 | $490,655 | DIGG COMMERCIAL, LLC | +45.2% | 2 |
| Apr 8, 2021 | 6353-85-001RMC - 635385001 | Waller Houston |
REFLECTIVE PAVEMENT MARKINGS LONG LINEUS 290 · | $693,699 | $474,037 | BATTERSON, LLP | -31.7% | 6 |
| Apr 8, 2021 | 6377-80-001RMC - 637780001 | Tarrant Fort Worth |
SWEEPING AND DEBRIS REMOVALIH 20 · | $429,089 | $456,154 | SHALOM SERVICES CORPORATION | +6.3% | 4 |
| Apr 8, 2021 | 6377-33-001RMC - 637733001 | Orange Beaumont |
BUILDING CONSTRUCTIONIH 10 · | $368,280 | $449,000 | DIGG COMMERCIAL, LLC | +21.9% | 1 |
| Apr 8, 2021 | 6377-88-001RMC - 637788001 | McLennan Waco |
MISCELLANEOUS CONCRETE REPAIRFM 1860 · | $433,285 | $386,492 | DBI SERVICES, LLC | -10.8% | 6 |
| Apr 8, 2021 | 6379-50-001RMC - 637950001 | Jones Abilene |
MOWING HIGHWAY RIGHT OF WAYUS 180 · | $327,860 | $355,074 | CROSS PLUS CONSTRUCTION, LLC | +8.3% | 2 |
| Apr 8, 2021 | 6379-38-001RMC - 637938001 | Callahan Abilene |
MOWING HIGHWAY RIGHT OF WAYIH 20 · | $346,620 | $340,442 | CROSS PLUS CONSTRUCTION, LLC | -1.8% | 1 |
| Apr 8, 2021 | 6369-00-001RMC - 636900001 | Caldwell Austin |
MOWING HIGHWAY ROWUS 183 · | $298,140 | $280,161 | CEN-TEX IRRIGATION SYSTEMS, INC. | -6.0% | 3 |
| Apr 8, 2021 | 0074-06-253F 2021(550) | Nueces Corpus Christi |
ADVANCED TRAFFIC MANAGEMENT SYSTEM CONNECTIONUS 181 · | $294,470 | $269,165 | HIGHWAY BARRICADES AND SERVICES, LLC | -8.6% | 5 |
| Apr 8, 2021 | 6377-69-001RMC - 637769001 | McLennan Waco |
FULL DEPTH CONCRETE REPAIRUS 77 · | $141,131 | $136,233 | CROSS PLUS CONSTRUCTION, LLC | -3.5% | 4 |
| Apr 7, 2021 | 2452-02-083F 2021(488) | Bexar San Antonio |
WIDEN ROAD - ADD LANESSL 1604 · | $166,009,497 | $148,073,104 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | -10.8% | 5 |
| Apr 7, 2021 | 1188-02-100C 1188-2-100 | Midland Odessa |
HIGHWAY IMPROVEMENTSL 250 · | $22,306,271 | $18,245,178 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -18.2% | 8 |
| Apr 7, 2021 | 0016-08-039BR 2021(485) | Bexar San Antonio |
BRIDGE REPLACEMENTSL 368 · | $7,127,370 | $6,974,797 | RELMCO, INC. | -2.1% | 8 |
| Apr 7, 2021 | 6377-30-001RMC - 637730001 | Dallas Dallas |
METAL BEAM GUARD FENCE REPAIRSL 12 · | $3,677,635 | $2,944,585 | ROY JORGENSEN ASSOCIATES, INC. | -19.9% | 7 |
| Apr 7, 2021 | 0138-10-029STP 2021(287)HES | Cass Atlanta |
SAFETY TREAT FIXED OBJECTSFM 248 · | $3,270,636 | $2,714,171 | H. V. CAVER, INC. | -17.0% | 9 |
| Apr 7, 2021 | 3510-06-026C 3510-6-26 | Harris Houston |
LANDSCAPE DEVELOPMENTSH 99 · | $3,600,122 | $2,373,434 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -34.1% | 6 |
| Apr 7, 2021 | 6376-12-001RMC - 637612001 | Jasper Beaumont |
RAISED PAVEMENT MARKINGSFM 82 · | $2,983,240 | $2,271,664 | STRIPE-A-ZONE, INC. | -23.9% | 8 |
| Apr 7, 2021 | 0002-06-058F 2021(411) | Hudspeth El Paso |
HAZARD ELIMINATION & SAFETYIH 10 · | $1,812,113 | $1,994,619 | DIAMOND SURFACE, INC. | +10.1% | 5 |
| Apr 7, 2021 | 0905-00-093C 905-00-93 | Lubbock Lubbock |
INSTALL/REPLACE SIGNSVA · | $2,218,153 | $1,705,956 | L&L COMPANY | -23.1% | 6 |
| Apr 7, 2021 | 6378-65-001RMC - 637865001 | Nueces Corpus Christi |
SWEEPING AND DEBRIS REMOVALUS 77 · | $2,221,497 | $1,699,246 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -23.5% | 2 |
| Apr 7, 2021 | 0914-25-008BR 1802(787) | Llano Austin |
BRIDGE REPLACEMENTCR · | $1,355,813 | $1,599,440 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +18.0% | 8 |
| Apr 7, 2021 | 6378-66-001RMC - 637866001 | San Patricio Corpus Christi |
PAVEMENT MARKINGSUS 181 · | $1,947,199 | $1,499,114 | HIGHWAY BARRICADES AND SERVICES, LLC | -23.0% | 5 |
| Apr 7, 2021 | 1690-01-132F 2021(497) | Lamar Paris |
PREVENTIVE MAINTENANCEUS 271 · | $1,413,729 | $1,317,402 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | -6.8% | 4 |
| Apr 7, 2021 | 2552-05-002F 2021(656) | El Paso El Paso |
HAZARD ELIMINATION & SAFETYSL 375 · | $1,214,385 | $1,287,746 | LESNA CONSTRUCTION, INC. | +6.0% | 2 |
| Apr 7, 2021 | 0913-09-102BR 2020(610) | Wharton Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $1,366,306 | $1,244,084 | SB CONTRACTORS LLC | -8.9% | 7 |
| Apr 7, 2021 | 6375-79-001RMC - 637579001 | Dallas Dallas |
TRAFFIC SIGNAL MAINTENANCEIH 35E · | $1,117,825 | $1,153,793 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +3.2% | 4 |
| Apr 7, 2021 | 6377-91-001MMC - 637791001 | Lamar Paris |
FLEXIBLE BASEUS 82 · | $995,000 | $995,475 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | +0.0% | 3 |
| Apr 7, 2021 | 6373-96-001RMC - 637396001 | Washington Bryan |
HMA MILL AND INLAYUS 290 · | $984,574 | $986,327 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +0.2% | 4 |
| Apr 7, 2021 | 0459-01-080BR 2021(483) | Freestone Bryan |
BRIDGE MAINTENANCEFM 488 · | $1,007,868 | $926,052 | GIBSON & ASSOCIATES, INC. | -8.1% | 11 |
| Apr 7, 2021 | 6376-14-001RMC - 637614001 | Walker Bryan |
SPOT BASE REPAIRIH 45 · | $1,129,830 | $828,385 | BIG CREEK CONSTRUCTION, LTD. | -26.7% | 5 |
| Apr 7, 2021 | 6376-98-001RMC - 637698001 | El Paso El Paso |
ASPHALT PAVEMENT REPAIRIH 10 · | $732,700 | $636,334 | SYNERGY PROJECT CONTRACTORS, INC. | -13.2% | 3 |
| Apr 7, 2021 | 2121-04-112STP 2021(477)HES | El Paso El Paso |
HAZARD ELIMINATION & SAFETYIH 10 · | $406,492 | $580,229 | TRI STATE ELECTRIC, LTD. | +42.7% | 2 |
| Apr 7, 2021 | 6376-97-001RMC - 637697001 | El Paso El Paso |
SPALL REPAIRIH 10 · | $433,500 | $490,400 | LESNA CONSTRUCTION, INC. | +13.1% | 3 |
| Apr 7, 2021 | 0912-31-286C 912-31-286 | Brazoria Houston |
SURFACING/ROADWAY RESTORATIONCR · | $523,683 | $481,707 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -8.0% | 3 |
| Apr 7, 2021 | 0062-07-094STP 2021(325) | Harrison Atlanta |
IMPROVE TRAFFIC SIGNALSUS 59 · | $516,818 | $468,446 | STRIPING TECHNOLOGY, L.P. | -9.4% | 2 |
| Apr 7, 2021 | 0909-22-180BR 1802(502) | McLennan Waco |
REPLACE BRIDGE AND APPROACHESFD · | $468,265 | $458,027 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -2.2% | 8 |
| Apr 7, 2021 | 6375-80-001RMC - 637580001 | Galveston Houston |
PUMP STATION & DRAINAGE SYSTEM CLEANINGSH 146 · | $404,343 | $439,193 | SHALOM SERVICES CORPORATION | +8.6% | 2 |
| Apr 7, 2021 | 0882-02-059STP 2021(474)HES | Orange Beaumont |
HAZARD ELIMINATION & SAFETYFM 1006 · | $597,314 | $403,662 | SJ&J CONSTRUCTION, LLC | -32.4% | 6 |
| Apr 7, 2021 | 0907-14-009BR 2021(023) | Coke San Angelo |
BRIDGE REPLACEMENTCR · | $364,847 | $398,585 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +9.2% | 5 |
| Apr 7, 2021 | 6368-89-001RMC - 636889001 | Travis Austin |
DISTRICTWIDE LARGE SIGN MAINTENANCEUS 183 · | $329,960 | $388,451 | THE LEVY COMPANY, INC. | +17.7% | 3 |
| Apr 7, 2021 | 0368-03-037STP 2021(467)HES | Jefferson Beaumont |
CONSTRUCT NEW ROADWAY LANESSH 124 · | $426,699 | $362,017 | TEXAS MATERIALS GROUP, INC. | -15.2% | 4 |
| Apr 7, 2021 | 0388-03-081STP 2021(475)HES | Liberty Beaumont |
HAZARD ELIMINATION & SAFETYSH 146 · | $389,911 | $352,845 | TEXAS MATERIALS GROUP, INC. | -9.5% | 6 |
| Apr 7, 2021 | 1767-03-020F 2021(455) | Montague Wichita Falls |
REHABILITATE EXISTING ROADWAYFM 1816 · | $327,495 | $305,567 | EUROVIA ATLANTIC COAST LLC | -6.7% | 5 |
| Apr 7, 2021 | 6378-85-001RMC - 637885001 | Webb Laredo |
CLEANING AND SWEEPING HIGHWAYSIH 35 · | $644,315 | $302,340 | STRIPE-A-ZONE, INC. | -53.1% | 4 |
| Apr 7, 2021 | 0914-05-209C 914-5-209 | Williamson Austin |
LANDSCAPE DEVELOPMENTVA · | $286,294 | $288,957 | TIGHT LINE CONSTRUCTION, LLC | +0.9% | 4 |
| Apr 7, 2021 | 6375-67-001RMC - 637567001 | Lubbock Lubbock |
MOWING HIGHWAY RIGHT OF WAYIH 27 · | $342,468 | $284,118 | CLASSIC IRRIGATION & LANDSCAPE LLC | -17.0% | 3 |
| Apr 7, 2021 | 0720-02-097F 2021(493) | Montgomery Houston |
INTERSECTION IMPROVEMENTS WITH RIGHT TURN LANEFM 149 · | $462,569 | $272,610 | CITYLYNX, INC. | -41.1% | 3 |
| Apr 7, 2021 | 6376-11-001RMC - 637611001 | Harris Houston |
PAVEMENT MARKINGSSH 99 · | $446,084 | $262,181 | STRIPE LINES, INC. | -41.2% | 8 |
| Apr 7, 2021 | 0033-05-095C 33-5-95 | Jones Abilene |
CONCRETE PAVEMENTUS 83 · | $264,888 | $251,560 | O. TREVINO CONSTRUCTION, LLC | -5.0% | 6 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.