215Let jobs
$1,256,625,251Total low bids
$1,247,150,394Total estimates
+0.8%Low bids vs estimates
Feb 2025 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 12, 2025 | 6469-71-001RMC - A00210587 | Denton Dallas |
RPM Denton FY 25IH0035 · Routine Maintenance Project - Sealed | $149,439 | $89,078 | TRP INFRASTRUCTURE SERVICES, LLC | -40.4% | 3 |
| Feb 12, 2025 | 6471-06-001MMC - A00211497 | Denton Dallas |
04 Hot Mix Material - 10/2024US0380 · Material Maintenance Project | $86,800 | $78,950 | JAGOE-PUBLIC COMPANY | -9.0% | 4 |
| Feb 12, 2025 | 6462-79-001RMC - A00206885 | Navarro Dallas |
Raised Pavement Markers 01 0225IH0045 · Routine Maintenance Project - Sealed | $73,172 | $48,005 | TRP INFRASTRUCTURE SERVICES, LLC | -34.4% | 4 |
| Feb 12, 2025 | 6478-32-001SUP - A00213264 | Brazoria Houston |
SUP Brazoria Janitorial FY25-FY26FM0523 · State Use Project | $31,590 | — | 0 | ||
| Feb 11, 2025 | 6476-12-001MMC - A00212750 | Gregg Tyler |
FY25 Emulsion LongviewUS0259 · Material Maintenance Project | $875,500 | $884,010 | ERGON ASPHALT & EMULSIONS, INC. | +1.0% | 1 |
| Feb 11, 2025 | 6472-81-001RMC - A00212048 | Jefferson Beaumont |
FY 25 Striping RMCIH0010 · Routine Maintenance Project | $719,054 | $847,583 | TRP INFRASTRUCTURE SERVICES, LLC | +17.9% | 3 |
| Feb 11, 2025 | 6477-10-001RMC - A00212932 | Henderson Tyler |
FY 25 Henderson Co. ROW MowingUS0175 · Routine Maintenance Project | $943,587 | $736,320 | 12TWELVE ROAD AND BRIDGE LLC | -22.0% | 6 |
| Feb 11, 2025 | 6476-16-001MMC - A00212759 | Henderson Tyler |
FY25 Emulsion - AthensSH0031 · Material Maintenance Project | $680,750 | $591,400 | ERGON ASPHALT & EMULSIONS, INC. | -13.1% | 1 |
| Feb 11, 2025 | 6467-49-001MMC - A00209742 | El Paso El Paso |
Hot Mix Asphalt- HMA- El Paso CountyIH0010 · Material Maintenance Project | $595,000 | $547,600 | JOBE MATERIALS, L.P. | -8.0% | 1 |
| Feb 11, 2025 | 6478-95-001RMC - A00213677 | Brazos Bryan |
FY25 - District Shortline - 02SH0006 · Routine Maintenance Project | $574,688 | $542,050 | RHINO EQUITY, LLC | -5.7% | 6 |
| Feb 11, 2025 | 6479-18-001MMC - A00213827 | Walker Bryan |
FY25 - Huntsville AO Hyd. Cement - 02IH0045 · Material Maintenance Project | $536,016 | $521,178 | TOUCHSTONE RESOURCES, LLC | -2.8% | 3 |
| Feb 11, 2025 | 6477-26-001MMC - A00212970 | Ector Odessa |
6477-26-001 Hot MixIH0020 · Material Maintenance Project | $578,000 | $492,692 | SOUTHERN SOURCING SOLUTIONS, LLC | -14.8% | 2 |
| Feb 11, 2025 | 6479-32-001MMC - A00213847 | Robertson Bryan |
FY25 - Robertson HMA -02SH0006 · Material Maintenance Project | $597,500 | $481,500 | BIG CREEK CONSTRUCTION, LTD. | -19.4% | 3 |
| Feb 11, 2025 | 6479-11-001RMC - A00213817 | Burleson Bryan |
FY25 - Brenham AO Tree RemovalSH0036 · Routine Maintenance Project | $523,900 | $410,528 | ICOS MANAGEMENT, LLC | -21.6% | 5 |
| Feb 11, 2025 | 6479-30-001MMC - A00213845 | Burleson Bryan |
FY25 - Burleson HMA -02SH0036 · Material Maintenance Project | $502,000 | $401,000 | BIG CREEK CONSTRUCTION, LTD. | -20.1% | 4 |
| Feb 11, 2025 | 6479-13-001RMC - A00213819 | Robertson Bryan |
FY25 - Robertson Mowing -02US0190 · Routine Maintenance Project | $382,988 | $352,364 | R&M INCORPORATED | -8.0% | 5 |
| Feb 11, 2025 | 6477-24-001RMC - A00212968 | Pecos Odessa |
6477-24-001 Striping CalloutIH0010 · Routine Maintenance Project | $304,000 | $242,300 | L&L COMPANY | -20.3% | 4 |
| Feb 11, 2025 | 6477-22-001MMC - A00212966 | Pecos Odessa |
6477-22-001 Hot MixIH0010 · Material Maintenance Project | $280,000 | $237,500 | A. L. HELMCAMP, INC. | -15.2% | 2 |
| Feb 11, 2025 | 6479-19-001RMC - A00213828 | Liberty Beaumont |
FY 25 Liberty Tree and Brush RemovalUS0090 · Routine Maintenance Project | $273,650 | $218,625 | GV LANDSCAPE AND CONSTRUCTION LLC | -20.1% | 8 |
| Feb 11, 2025 | 6479-37-001MMC - A00213854 | Jefferson Beaumont |
FY 25 Asphalt Patching MaterialUS0069 · Material Maintenance Project - Sealed | $208,500 | $193,390 | WALLER COUNTY ASPHALT INC. | -7.2% | 1 |
| Feb 11, 2025 | 6479-27-001MMC - A00213839 | Walker Bryan |
FY25 - Huntsville AO TY B Gr 5 - 02IH0045 · Material Maintenance Project | $170,000 | $146,895 | SOUTHERN SOURCING SOLUTIONS, LLC | -13.6% | 5 |
| Feb 7, 2025 | 0009-11-254F 2025(365) | Dallas Dallas |
IH 30 Canyon from IH 35E to IH 45IH 30 · Widen Freeway | $795,333,911 | $888,696,937 | BALFOUR BEATTY INFRASTRUCTURE, INC. | +11.7% | 3 |
| Feb 7, 2025 | 0275-02-075BR 2025(429) | Carson Amarillo |
BI 40D EB Bridge ReplacementIH 40 · Bridge Replacement | $10,602,018 | $9,874,035 | ALTUS CONSTRUCTION LLC | -6.9% | 6 |
| Feb 7, 2025 | 0053-08-079C 53-8-79 | Scurry Abilene |
US 84 0053-08 N OF FM 1611 TO AVE E WBUS 84 · Overlay | $10,972,084 | $8,390,976 | RK HALL, LLC | -23.5% | 5 |
| Feb 7, 2025 | 0072-12-201C 72-12-201 | Bexar San Antonio |
IH 10: 0072-12-201: OVIH 10 · Overlay | $8,104,179 | $6,824,351 | LONE STAR PAVING COMPANY | -15.8% | 5 |
| Feb 7, 2025 | 0156-06-066C 156-6-66 | Baylor Wichita Falls |
US 82; US 183 to CR 218US 82 · Overlay | $6,736,851 | $5,952,851 | A. L. HELMCAMP, INC. | -11.6% | 5 |
| Feb 7, 2025 | 0319-04-091F 2B24(066) | Angelina Lufkin |
SH 94_E of SL 287 to Herndon St - OVSH 94 · Overlay | $4,212,021 | $4,633,048 | TEXAS MATERIALS GROUP, INC. | +10.0% | 2 |
| Feb 7, 2025 | 0042-06-077BR 2025(364) | Donley Childress |
US 287 @ Drainage DitchUS 287 · Bridge Replacement | $3,194,305 | $4,458,100 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +39.6% | 3 |
| Feb 7, 2025 | 0206-05-033C 206-5-33 | Cherokee Tyler |
US79,RUSKC/L-SH110,RRRUS 79 · Rehabilitation of Existing Road | $6,215,435 | $4,258,941 | MADDEN CONTRACTING COMPANY, LLC. | -31.5% | 7 |
| Feb 7, 2025 | 0049-13-010C 49-13-10 | Falls Waco |
Rehab & Widen | FM 46 |SH 6| RoberstonCLFM 46 · Rehabilitation of Existing Road | $4,914,109 | $3,949,757 | BIG CREEK CONSTRUCTION, LTD. | -19.6% | 6 |
| Feb 7, 2025 | 0903-00-128C 903-00-128 | Wichita Wichita Falls |
FY 25 District wide Bridge PMVarious · Bridge Maintenance | $4,035,462 | $3,651,021 | THK CONSTRUCTION LLC | -9.5% | 8 |
| Feb 7, 2025 | 0110-03-084C 110-3-84 | Montgomery Houston |
SH 75, SL 336N to SH 105SH 75 · Overlay | $4,233,683 | $3,303,124 | VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC | -22.0% | 6 |
| Feb 7, 2025 | 0739-02-183F 2025(460) | Jefferson Beaumont |
IH 10FR(HAMSHIRE RD-N. FORK TAYLOR BAYOUIH 10 · Rehabilitation of Existing Road | $4,738,305 | $3,084,194 | TEXAS MATERIALS GROUP, INC. | -34.9% | 6 |
| Feb 7, 2025 | 0363-01-148C 363-1-148 | Tarrant Fort Worth |
SH 183; E US 377 to W Big Fossil CrkSH 183 · Overlay | $3,511,801 | $3,019,197 | JAGOE-PUBLIC COMPANY | -14.0% | 5 |
| Feb 7, 2025 | 0495-07-087F 2025(411) | Gregg Tyler |
IH 20, UPRR - HARRISON CLIH 20 · Restoration | $2,575,629 | $2,992,886 | GREY SKY CONSTRUCTION LLC | +16.2% | 3 |
| Feb 7, 2025 | 6477-70-001RMC - A00213106 | Brown Brownwood |
THERMOPLASTIC STRIPING AND PAVEMENTUS0183 · Routine Maintenance Project - Sealed | $2,970,423 | $2,694,773 | D. I. J. CONSTRUCTION, INC. | -9.3% | 7 |
| Feb 7, 2025 | 0141-18-008BR 2025(379) | Kimble San Angelo |
0141-18-008 Bridge RehabRM 1674 · Bridge Maintenance | $2,310,598 | $1,716,914 | MPB, INC. | -25.7% | 9 |
| Feb 7, 2025 | 0915-00-271F 2025(465) | Bexar San Antonio |
VA: 0915-00-271; TCDVarious · Traffic Control Devices | $1,462,178 | $1,500,970 | ELECNOR BELCO ELECTRIC, INC. | +2.7% | 3 |
| Feb 7, 2025 | 0045-12-096C 45-12-96 | Red River Paris |
US 82 SidewalkBU 82J · Pedestrian, Sidewalks & Curb Ramps | $1,743,510 | $1,486,446 | AAD CONTRACTING INC. | -14.7% | 11 |
| Feb 7, 2025 | 0922-00-088C 922-00-88 | Webb Laredo |
Districtwide PVMTVarious · Traffic Control Devices | $1,995,220 | $1,443,019 | CENTERLINE TECHNOLOGIES, LLC | -27.7% | 9 |
| Feb 7, 2025 | 0905-00-124C 905-00-124 | Lubbock Lubbock |
FY 2025 RPMsVarious · Traffic Control Devices | $1,520,504 | $1,393,454 | TRP INFRASTRUCTURE SERVICES, LLC | -8.4% | 5 |
| Feb 7, 2025 | 0210-02-029STP 2025(361)HES | Milam Bryan |
US 77 at FM 1712 - Turn Lane FY 24US 77 · Safety Improvement Projects | $1,917,132 | $1,382,358 | LARRY YOUNG PAVING, INC. | -27.9% | 7 |
| Feb 7, 2025 | 0912-00-615F 2025(242) | Harris Houston |
Districtwide Lighting FM 2234 & FM 518Various · Traffic Control Devices | $1,501,240 | $1,290,192 | THIRD COAST SERVICES LLC | -14.1% | 10 |
| Feb 7, 2025 | 0151-09-149F 2025(430) | Travis Austin |
US 183 from IH 135 to US290US 183 · Overlay | $1,418,010 | $1,181,539 | LONE STAR PAVING COMPANY | -16.7% | 3 |
| Feb 7, 2025 | 0918-46-355C 918-46-355 | Denton Dallas |
Various Locations in Denton CountyVarious · Rehabilitation of Existing Road | $1,928,563 | $1,152,494 | STRIPE-A-ZONE, LLC | -40.2% | 4 |
| Feb 7, 2025 | 0906-00-247C 906-00-247 | Ector Odessa |
Traffic Signal Program (2025)Various · Traffic Control Devices | $1,075,350 | $1,136,733 | GREY SKY CONSTRUCTION LLC | +5.7% | 3 |
| Feb 7, 2025 | 6477-55-001RMC - A00213065 | Lamar Paris |
Site Specific TY I Striping FY25US0082 · Routine Maintenance Project - Sealed | $1,605,550 | $1,063,284 | STRIPE-A-ZONE, LLC | -33.8% | 8 |
| Feb 7, 2025 | 6476-41-001MMC - A00212806 | Wichita Wichita Falls |
2025 - EmulsionUS0287 · Material Maintenance Project | $1,304,200 | $1,044,600 | ERGON ASPHALT & EMULSIONS, INC. | -19.9% | 2 |
| Feb 7, 2025 | 6468-09-001RMC - A00210073 | Burnet Austin |
FY 25 Burnet Co. GuardrailUS0281 · Routine Maintenance Project - Sealed | $3,830,745 | $1,043,063 | BK FIELD OPERATIONS LLC | -72.8% | 4 |
| Feb 7, 2025 | 0271-07-352F 2025(301) | Harris Houston |
IH 10 at Brittmoore Rd.IH 10 · Freeway Operational Improvements | $1,407,604 | $926,322 | MC2 CIVIL, LLC | -34.2% | 3 |
| Feb 7, 2025 | 0151-05-123C 151-5-123 | Williamson Austin |
US 183 - Detention PondUS 183 · Environmental Work Activities | $1,098,651 | $922,697 | AARON CONCRETE CONTRACTORS, LLC | -16.0% | 4 |
| Feb 7, 2025 | 0915-15-101C 915-15-101 | Kerr San Antonio |
VA: 0915-15-101; TPWVarious · Texas Park and Wildlife | $1,115,563 | $908,186 | LONE STAR PAVING COMPANY | -18.6% | 7 |
| Feb 7, 2025 | 3136-01-207BR 2025(435) | Travis Austin |
LP 1 - 25BMIPSL 1 · Bridge Maintenance | $645,768 | $720,110 | GIBSON & ASSOCIATES, INC. | +11.5% | 5 |
| Feb 7, 2025 | 1499-01-032STP 2025(509)HRR | Frio San Antonio |
SAT_FM1581: 1499-01-032: SFTFM 1581 · Safety Improvement Projects | $704,587 | $614,054 | HUNTER INDUSTRIES, LTD. | -12.8% | 7 |
| Feb 7, 2025 | 3223-01-010F 2025(633) | Fort Bend Houston |
FM 3155: Richmond State School to UA 90FM 3155 · Overlay | $628,502 | $585,949 | DURWOOD GREENE CONSTRUCTION CO. | -6.8% | 7 |
| Feb 7, 2025 | 0610-07-123STP 2025(447)HES | Bowie Atlanta |
IH 30 at University AveIH 30 · Safety Improvement Projects | $329,797 | $414,401 | WG ENGINEERING & CONSTRUCTION, LLC | +25.7% | 3 |
| Feb 7, 2025 | 0111-08-127STP 2025(503)VRU | Brazoria Houston |
BS 288B At Kyle RoadBS 288B · Safety Improvement Projects | $311,201 | $354,848 | TRAF-TEX, INC. | +14.0% | 4 |
| Feb 6, 2025 | 0365-03-050STP 2024(401)MM | Johnson Fort Worth |
SH 171; US 377 TO SH 174SH 171 · Rehabilitation of Existing Road | $32,329,714 | $26,976,280 | JAY MILLS CONTRACTING, INCORPORATED | -16.6% | 4 |
| Feb 6, 2025 | 0140-13-020C 140-13-20 | Crockett San Angelo |
0140-13-020 IH 10 ACP OVERLAYIH 10 · Overlay | $33,606,433 | $24,564,337 | KIEWIT INFRASTRUCTURE SOUTH CO. | -26.9% | 6 |
| Feb 6, 2025 | 0025-09-081F 2025(506) | Bexar San Antonio |
FM 78; 0025-09-081; OVFM 78 · Overlay | $33,898,933 | $21,789,871 | TEXAS MATERIALS GROUP, INC. | -35.7% | 4 |
| Feb 6, 2025 | 0748-04-042C 748-4-42 | Frio San Antonio |
FM 140: 0748-04-042; RERFM 140 · Rehabilitation of Existing Road | $20,954,835 | $14,824,127 | HUNTER INDUSTRIES, LTD. | -29.3% | 6 |
| Feb 6, 2025 | 0018-06-181C 18-6-181 | Webb Laredo |
0018-06, IH35 SBML OVIH 35 · Overlay | $11,256,118 | $10,599,420 | ANDERSON COLUMBIA CO., INC. | -5.8% | 4 |
| Feb 6, 2025 | 1417-01-034F 2025(461) | Montgomery Houston |
FM 1484, FM 2432 to SH 105FM 1484 · Overlay | $12,606,975 | $8,353,736 | DURWOOD GREENE CONSTRUCTION CO. | -33.7% | 6 |
| Feb 6, 2025 | 0111-08-125F 2025(501) | Brazoria Houston |
SH 288: SH 36 to Dow Drainage CanalSH 288 · Overlay | $7,210,341 | $8,297,801 | DURWOOD GREENE CONSTRUCTION CO. | +15.1% | 3 |
| Feb 6, 2025 | 0164-01-078F 2025(450) | Henderson Tyler |
BS 31, BS 19 - SL 7BS 31H · Rehabilitation of Existing Road | $8,623,673 | $8,087,241 | BIG CREEK CONSTRUCTION, LTD. | -6.2% | 4 |
| Feb 6, 2025 | 0247-01-058STP 2025(566)HES | Panola Atlanta |
US 79 from US 59 to Sabine RiverUS 79 · Safety Improvement Projects | $9,792,224 | $8,013,112 | MADDEN CONTRACTING COMPANY, LLC. | -18.2% | 4 |
| Feb 6, 2025 | 0025-02-226C 25-2-226 | Bexar San Antonio |
IH10: 0025-02-226; FR OVIH 10 · Overlay | $9,598,054 | $7,922,686 | DEAN WORD COMPANY, LTD. | -17.5% | 6 |
| Feb 6, 2025 | 0905-00-123C 905-00-123 | Lubbock Lubbock |
FY 2025 Striping - LonglineVarious · Traffic Control Devices | $8,598,938 | $7,105,938 | L&L COMPANY | -17.4% | 7 |
| Feb 6, 2025 | 0700-01-049STP 2025(431)HES | Burnet Austin |
SH 71 - At CR 401SH 71 · Safety Improvement Projects | $6,847,445 | $7,072,728 | HUNTER INDUSTRIES, LTD. | +3.3% | 8 |
| Feb 6, 2025 | 0137-05-035BR 2025(418) | Archer Wichita Falls |
SH 25 at Mid Fork Little Wichita RiverSH 25 · Bridge Replacement | $6,856,853 | $6,506,472 | ALTUS CONSTRUCTION LLC | -5.1% | 7 |
| Feb 6, 2025 | 0816-02-089C 816-2-89 | Denton Dallas |
FM 455 East of Marion Rd to US 377FM 455 · Rehabilitation of Existing Road | $6,322,241 | $5,118,708 | JAGOE-PUBLIC COMPANY | -19.0% | 8 |
| Feb 6, 2025 | 0581-01-165STP 2025(367)VRU | Dallas Dallas |
SL 12 at Peavy RdSL 12 · Safety Improvement Projects | $4,268,721 | $5,047,479 | WG ENGINEERING & CONSTRUCTION, LLC | +18.2% | 1 |
| Feb 6, 2025 | 1926-01-019BR 2025(496) | Coryell Waco |
RER | FM 1829 | US 84 | FM 107FM 1829 · Rehabilitation of Existing Road | $5,558,480 | $4,787,272 | BIG CREEK CONSTRUCTION, LTD. | -13.9% | 6 |
| Feb 6, 2025 | 0098-05-036C 98-5-36 | Knox Childress |
SH 6 FM 2534, S to SH 222SH 6 · Overlay | $5,728,332 | $4,478,136 | ZACK BURKETT CO. | -21.8% | 5 |
| Feb 6, 2025 | 6453-59-001RMC - A00203365 | Harris Houston |
Bundle Bid Rdwy Maint. IH 45, etc.IH0045 · Routine Maintenance Project | $6,402,371 | $4,149,300 | ROY JORGENSEN ASSOCIATES, INC. | -35.2% | 4 |
| Feb 6, 2025 | 0027-13-257F 2025(497) | Harris Houston |
IH 69: From Fort Bend/Harris CL to ClayIH 69 · Landscape & Scenic Enhancement | $4,442,820 | $3,952,210 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -11.0% | 4 |
| Feb 6, 2025 | 0094-05-068C 94-5-68 | Tarrant Fort Worth |
SH 183; TRAFFIC CI TO MALL CISH 183 · Overlay | $3,983,176 | $3,831,815 | FOUTSCO PAVING COMPANY, LLC | -3.8% | 6 |
| Feb 6, 2025 | 0919-00-090F 2025(452) | Bowie Atlanta |
FY 24 District Seal Coat MarkingsVarious · Seal Coat | $3,703,987 | $3,631,143 | STRIPE-A-ZONE, LLC | -2.0% | 7 |
| Feb 6, 2025 | 0500-01-156BR 2025(500) | Galveston Houston |
IH 45 at Causeway (Recoating)IH 45 · Bridge Maintenance | $2,992,425 | $3,566,080 | ICOS MANAGEMENT, LLC | +19.2% | 5 |
| Feb 6, 2025 | 0913-21-055BR 2024(086) | Matagorda Yoakum |
AVE H BRIDGE REPLACEMENT 2609AVE H · Bridge Replacement | $3,775,699 | $3,170,844 | SCOUT 5 CONSTRUCTION LLC | -16.0% | 9 |
| Feb 6, 2025 | 0918-00-431C 918-00-431 | Dallas Dallas |
Various Locations in DAL- FY 25PMVarious · Rehabilitation of Existing Road | $4,630,470 | $2,930,055 | STRIPE-A-ZONE, LLC | -36.7% | 4 |
| Feb 6, 2025 | 0923-00-071C 923-00-71 | Brown Brownwood |
Districtwide Thermo Striping FY 2025Various · Traffic Control Devices | $4,088,340 | $2,883,374 | STRIPE-A-ZONE, LLC | -29.5% | 6 |
| Feb 6, 2025 | 0024-01-113C 24-1-113 | Uvalde San Antonio |
US 90: 0024-01-113; PEDUS 90 · Pedestrian, Sidewalks & Curb Ramps | $3,252,006 | $2,879,646 | RELMCO, INC. | -11.5% | 10 |
| Feb 6, 2025 | 0110-05-138C 110-5-138 | Harris Houston |
IH 45: FM 1960 to Montgomery C/LIH 45 · Traffic Control Devices | $2,899,005 | $2,797,767 | TRP INFRASTRUCTURE SERVICES, LLC | -3.5% | 5 |
| Feb 6, 2025 | 0354-01-056F 2B24(423) | Winkler Odessa |
SH_115_WINKLER_COUNTY_REHABSH 115 · Rehabilitation of Existing Road | $2,856,103 | $2,658,948 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -6.9% | 7 |
| Feb 6, 2025 | 0089-03-096C 89-3-96 | Jackson Yoakum |
US 59 SAFETY TREAT 2502US 59 · Safety Improvement Projects | $2,734,062 | $2,550,268 | BEAR CREEK CONTRACTING, LLC | -6.7% | 3 |
| Feb 6, 2025 | 6475-52-001RMC - A00212579 | Harris Houston |
FY2025 - Maintenance of Traffic SignalsIH0610 · Routine Maintenance Project - Sealed | $2,669,174 | $1,987,328 | LINDSEY ELECTRIC, L.P. | -25.5% | 3 |
| Feb 6, 2025 | 2681-01-029F 2025(528) | Denton Dallas |
FM 2499 FM 1171 to Tarrant CLFM 2499 · Rehabilitation of Existing Road | $2,467,225 | $1,920,305 | ROY JORGENSEN ASSOCIATES, INC. | -22.2% | 6 |
| Feb 6, 2025 | 1685-03-105F 2025(275) | Harris Houston |
FM 1960, FM 2100 to Liberty C/LFM 1960 · Overlay | $2,565,249 | $1,835,597 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -28.4% | 7 |
| Feb 6, 2025 | 0989-01-043STP 2025(467)HES | Jim Wells Corpus Christi |
CRP_FM0624_2_1_JIMWELLS_HSIPFM 624 · Safety Improvement Projects | $2,235,251 | $1,711,943 | HUNTER INDUSTRIES, LTD. | -23.4% | 6 |
| Feb 6, 2025 | 6468-19-001MMC - A00210094 | Travis Austin |
FY25 East Seal Coat AsphaltIH0035 · Material Maintenance Project | $1,863,900 | $1,708,860 | ERGON ASPHALT & EMULSIONS, INC. | -8.3% | 1 |
| Feb 6, 2025 | 0910-00-150F 2025(412) | Smith Tyler |
25 DISTRICT WIDE THERMO 3Various · Traffic Control Devices | $2,641,703 | $1,665,532 | STRIPING TECHNOLOGY, L.P. | -37.0% | 5 |
| Feb 6, 2025 | 6461-70-001BPM - A00206078 | Potter Amarillo |
BPM FY 2025IH0040 · Bridge Preventative Maintenance - Sealed | $2,003,276 | $1,595,496 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | -20.4% | 7 |
| Feb 6, 2025 | 6477-69-001RMC - A00213103 | Brown Brownwood |
MBGF REPAIR (CALLOUT)US0377 · Routine Maintenance Project - Sealed | $1,972,330 | $1,320,359 | ROSS SA ENTERPRISE LLC | -33.1% | 7 |
| Feb 6, 2025 | 0205-01-046STP 2025(360)HES | Robertson Bryan |
US 79 at FM 2549 - Intersection FY 25US 79 · Safety Improvement Projects | $891,318 | $897,290 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +0.7% | 7 |
| Feb 6, 2025 | 0454-02-055STP 2025(058)VRU | Tom Green San Angelo |
IMPROVE TRAFFIC & PED SIGNALSSH 208 · Traffic Control Devices | $431,837 | $480,048 | E-Z BEL CONSTRUCTION, LLC | +11.2% | 3 |
| Feb 6, 2025 | 0914-00-481F 2025(432) | Travis Austin |
FY 2025 Districtwide SignsVarious · Traffic Control Devices | $565,323 | $338,134 | THE LEVY COMPANY, LLC | -40.2% | 7 |
| Feb 6, 2025 | 0114-03-108BR 2025(433) | Travis Austin |
US 290 - At Cottonwd & B Dry Ck, 25BMIPUS 290 · Bridge Maintenance | $418,141 | $304,980 | BK FIELD OPERATIONS LLC | -27.1% | 13 |
| Feb 6, 2025 | 0337-02-053BR 2025(434) | Williamson Austin |
SH 29 - AT San Gabriel Rv, 25BMIPSH 29 · Bridge Maintenance | $394,699 | $279,317 | BK FIELD OPERATIONS LLC | -29.2% | 10 |
| Feb 5, 2025 | 6477-87-001RMC - A00213140 | Webb Laredo |
RMC Webb County MowingIH0035 · Routine Maintenance Project - Sealed | $822,872 | $746,057 | R&M INCORPORATED | -9.3% | 2 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.