| 1 | 134-7002 |
BACKFILL (TY B) | 328.67 | STA |
$250.00 |
|
|
|
|
|
| 2 | 341-7050 |
D-GR HMA TY-D SAC-B PG70-22 | 3,094 | TON |
$140.00 |
|
|
|
|
|
| 3 | 346-7009 |
STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 8,436 | TON |
$180.00 |
|
|
|
|
|
| 4 | 346-7028 |
TACK COAT | 19,566 | GAL |
$5.00 |
|
|
|
|
|
| 5 | 351-7003 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 8,167 | SY |
$55.00 |
|
|
|
|
|
| 6 | 354-7074 |
PLANE ASPH CONC PAV (1.5") | 138,772 | SY |
$3.00 |
|
|
|
|
|
| 7 | 438-7004 |
CLEANING AND SEALING EXIST JOINTS (CL3) | 80 | LF |
$70.00 |
|
|
|
|
|
| 9 | 438-7008 |
CLEANING EXISTING JOINTS | 92 | LF |
$10.00 |
|
|
|
|
|
| 14 | 533-7001 |
MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 63,726 | LF |
$0.5000 |
|
|
|
|
|
| 15 | 662-7112 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 2,466 | EA |
$4.00 |
|
|
|
|
|
| 16 | 666-7009 |
REFL PAV MRK TY I (W)6"(DOT)(100MIL) | 199 | LF |
$1.00 |
|
|
|
|
|
| 17 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 2,358 | LF |
$1.20 |
|
|
|
|
|
| 18 | 666-7030 |
REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 739 | LF |
$1.50 |
|
|
|
|
|
| 19 | 666-7172 |
RE PM TY II (W) 6" (BRK) | 8,217 | LF |
$0.0300 |
|
|
|
|
|
| 20 | 666-7309 |
ALL-WTHER PM TY I (W)6"(SLD)(100MIL) | 30,664 | LF |
$1.00 |
|
|
|
|
|
| 21 | 666-7310 |
ALL-WTHER PM TY I (W)6"(BRK)(100MIL) | 8,256 | LF |
$1.25 |
|
|
|
|
|
| 22 | 666-7315 |
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL) | 32,122 | LF |
$1.00 |
|
|
|
|
|
| 23 | 668-7091 |
PREFAB PM TY C (W)(ARROW) | 2 | EA |
$350.00 |
|
|
|
|
|
| 24 | 668-7103 |
PREFAB PM TY C (W)(WORD) | 2 | EA |
$350.00 |
|
|
|
|
|
| 25 | 668-7111 |
PREFAB PM TY C (W)(36")(YLD TRI) | 32 | EA |
$27.00 |
|
|
|
|
|
| 26 | 672-7002 |
REFL PAV MRKR TY I-C | 18 | EA |
$5.00 |
|
|
|
|
|
| 27 | 672-7006 |
REFL PAV MRKR TY II-C-R | 413 | EA |
$5.10 |
|
|
|
|
|
| 1 | 134-7002 |
BACKFILL (TY B) | 328.67 | STA |
$250.00 |
$216.00 |
$180.00 |
$200.00 |
$216.94 |
$250.00 |
| 2 | 341-7050 |
D-GR HMA TY-D SAC-B PG70-22 | 9,816 | TON |
$140.00 |
$124.91 |
$154.00 |
$132.50 |
$167.01 |
$140.00 |
| 3 | 346-7009 |
STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 26,517 | TON |
$180.00 |
$165.12 |
$178.00 |
$203.55 |
$197.18 |
$180.00 |
| 4 | 346-7028 |
TACK COAT | 61,654 | GAL |
$5.00 |
$4.13 |
$3.00 |
$0.1000 |
$2.45 |
$5.00 |
| 5 | 351-7003 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 8,167 | SY |
$55.00 |
$39.29 |
$48.00 |
$49.00 |
$45.10 |
$40.00 |
| 6 | 354-7074 |
PLANE ASPH CONC PAV (1.5") | 138,772 | SY |
$3.00 |
$1.28 |
$1.15 |
$1.36 |
$1.82 |
$2.00 |
| 7 | 438-7004 |
CLEANING AND SEALING EXIST JOINTS (CL3) | 80 | LF |
$70.00 |
$107.00 |
$56.00 |
$132.00 |
$65.09 |
$125.00 |
| 8 | 438-7007 |
CLEANING AND SEALING EXIST JOINTS (CL7) | 80 | LF |
|
$214.00 |
$103.00 |
$253.00 |
$120.36 |
$200.00 |
| 9 | 438-7008 |
CLEANING EXISTING JOINTS | 92 | LF |
$10.00 |
$21.40 |
$40.00 |
$50.00 |
$45.44 |
$110.00 |
| 10 | 500-7001 |
MOBILIZATION | 1 | LS |
$1,016,992.00 |
$300,188.97 |
$400,000.00 |
$375,000.00 |
$245,526.39 |
$1,000,000.00 |
| 11 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$10,000.00 |
$24,600.00 |
$12,000.00 |
$19,800.00 |
$13,039.13 |
$50,000.00 |
| 12 | 505-7001 |
TMA (STATIONARY) | 44 | DAY |
$300.00 |
$200.00 |
$400.00 |
$330.00 |
$285.42 |
$500.00 |
| 13 | 505-7003 |
TMA (MOBILE OPERATION) | 28 | DAY |
$500.00 |
$300.00 |
$100.00 |
$330.00 |
$643.47 |
$500.00 |
| 14 | 533-7001 |
MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 199,282 | LF |
$0.5000 |
$0.2000 |
$0.2000 |
$0.2200 |
$0.2300 |
$0.1000 |
| 15 | 662-7112 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 2,466 | EA |
$4.00 |
$3.18 |
$0.8500 |
$3.30 |
$1.98 |
$2.00 |
| 16 | 666-7009 |
REFL PAV MRK TY I (W)6"(DOT)(100MIL) | 701 | LF |
$1.00 |
$1.07 |
$1.10 |
$1.10 |
$1.23 |
$1.15 |
| 17 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 9,208 | LF |
$1.20 |
$0.9600 |
$0.9500 |
$1.00 |
$1.11 |
$1.15 |
| 18 | 666-7030 |
REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 2,493 | LF |
$1.50 |
$2.68 |
$2.65 |
$2.75 |
$3.07 |
$7.00 |
| 19 | 666-7172 |
RE PM TY II (W) 6" (BRK) | 25,766 | LF |
$0.0300 |
$0.5400 |
$0.5500 |
$0.5600 |
$0.6100 |
$0.8000 |
| 20 | 666-7309 |
ALL-WTHER PM TY I (W)6"(SLD)(100MIL) | 30,260 | LF |
$1.00 |
$0.6600 |
$0.6500 |
$0.6800 |
$0.7600 |
$0.8000 |
| 21 | 666-7310 |
ALL-WTHER PM TY I (W)6"(BRK)(100MIL) | 8,256 | LF |
$1.25 |
$0.6600 |
$0.6500 |
$0.6800 |
$0.7600 |
$0.8000 |
| 22 | 666-7315 |
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL) | 32,062 | LF |
$1.00 |
$0.6600 |
$0.6500 |
$0.6800 |
$0.7600 |
$0.8000 |
| 23 | 668-7091 |
PREFAB PM TY C (W)(ARROW) | 8 | EA |
|
$240.75 |
$240.00 |
$250.00 |
$276.34 |
$300.00 |
| 24 | 668-7103 |
PREFAB PM TY C (W)(WORD) | 8 | EA |
|
$240.75 |
$240.00 |
$250.00 |
$276.34 |
$375.00 |
| 25 | 668-7111 |
PREFAB PM TY C (W)(36")(YLD TRI) | 124 | EA |
|
$32.10 |
$32.00 |
$33.00 |
$36.84 |
$50.00 |
| 26 | 672-7002 |
REFL PAV MRKR TY I-C | 90 | EA |
|
$5.35 |
$5.30 |
$5.50 |
$6.14 |
$8.00 |
| 27 | 672-7006 |
REFL PAV MRKR TY II-C-R | 413 | EA |
$5.10 |
$4.82 |
$5.00 |
$5.50 |
$5.53 |
$6.00 |
| 1 | 134-7002 |
BACKFILL (TY B) | 230.74 | STA |
$250.00 |
|
|
|
|
|
| 2 | 341-7050 |
D-GR HMA TY-D SAC-B PG70-22 | 2,380 | TON |
$140.00 |
|
|
|
|
|
| 3 | 346-7009 |
STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 5,923 | TON |
$180.00 |
|
|
|
|
|
| 4 | 346-7028 |
TACK COAT | 14,089 | GAL |
$5.00 |
|
|
|
|
|
| 5 | 351-7003 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 6,336 | SY |
$55.00 |
|
|
|
|
|
| 6 | 354-7074 |
PLANE ASPH CONC PAV (1.5") | 97,424 | SY |
$3.00 |
|
|
|
|
|
| 8 | 438-7007 |
CLEANING AND SEALING EXIST JOINTS (CL7) | 80 | LF |
$55.00 |
|
|
|
|
|
| 14 | 533-7001 |
MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 44,918 | LF |
$0.5000 |
|
|
|
|
|
| 15 | 662-7112 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 1,731 | EA |
$4.00 |
|
|
|
|
|
| 16 | 666-7009 |
REFL PAV MRK TY I (W)6"(DOT)(100MIL) | 352 | LF |
$1.00 |
|
|
|
|
|
| 17 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 3,242 | LF |
$1.20 |
|
|
|
|
|
| 18 | 666-7030 |
REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 603 | LF |
$1.50 |
|
|
|
|
|
| 19 | 666-7172 |
RE PM TY II (W) 6" (BRK) | 5,768 | LF |
$0.0300 |
|
|
|
|
|
| 20 | 666-7309 |
ALL-WTHER PM TY I (W)6"(SLD)(100MIL) | 21,958 | LF |
$1.00 |
|
|
|
|
|
| 21 | 666-7310 |
ALL-WTHER PM TY I (W)6"(BRK)(100MIL) | 5,868 | LF |
$1.25 |
|
|
|
|
|
| 22 | 666-7315 |
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL) | 23,040 | LF |
$1.00 |
|
|
|
|
|
| 23 | 668-7091 |
PREFAB PM TY C (W)(ARROW) | 6 | EA |
$350.00 |
|
|
|
|
|
| 24 | 668-7103 |
PREFAB PM TY C (W)(WORD) | 6 | EA |
$350.00 |
|
|
|
|
|
| 25 | 668-7111 |
PREFAB PM TY C (W)(36")(YLD TRI) | 92 | EA |
$27.00 |
|
|
|
|
|
| 26 | 672-7002 |
REFL PAV MRKR TY I-C | 72 | EA |
$5.00 |
|
|
|
|
|
| 27 | 672-7006 |
REFL PAV MRKR TY II-C-R | 297 | EA |
$5.10 |
|
|
|
|
|
| 1 | 134-7002 |
BACKFILL (TY B) | 144.98 | STA |
$250.00 |
|
|
|
|
|
| 2 | 341-7050 |
D-GR HMA TY-D SAC-B PG70-22 | 1,329 | TON |
$140.00 |
|
|
|
|
|
| 3 | 346-7009 |
STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 3,722 | TON |
$180.00 |
|
|
|
|
|
| 4 | 346-7028 |
TACK COAT | 8,570 | GAL |
$5.00 |
|
|
|
|
|
| 5 | 351-7003 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 3,802 | SY |
$55.00 |
|
|
|
|
|
| 6 | 354-7074 |
PLANE ASPH CONC PAV (1.5") | 61,214 | SY |
$3.00 |
|
|
|
|
|
| 14 | 533-7001 |
MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 27,666 | LF |
$0.5000 |
|
|
|
|
|
| 15 | 662-7112 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 1,070 | EA |
$4.00 |
|
|
|
|
|
| 16 | 666-7009 |
REFL PAV MRK TY I (W)6"(DOT)(100MIL) | 43 | LF |
$1.00 |
|
|
|
|
|
| 17 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 846 | LF |
$1.20 |
|
|
|
|
|
| 18 | 666-7030 |
REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 276 | LF |
$1.50 |
|
|
|
|
|
| 19 | 666-7172 |
RE PM TY II (W) 6" (BRK) | 3,564 | LF |
$0.0300 |
|
|
|
|
|
| 20 | 666-7309 |
ALL-WTHER PM TY I (W)6"(SLD)(100MIL) | 13,410 | LF |
$1.00 |
|
|
|
|
|
| 21 | 666-7310 |
ALL-WTHER PM TY I (W)6"(BRK)(100MIL) | 3,564 | LF |
$1.25 |
|
|
|
|
|
| 22 | 666-7315 |
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL) | 13,296 | LF |
$1.00 |
|
|
|
|
|
| 27 | 672-7006 |
REFL PAV MRKR TY II-C-R | 178 | EA |
$5.10 |
|
|
|
|
|