| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 12, 2026 | 68K21 | WarrenDistrict 4 | Resurfacing BUS 67 from 0.5 mi. S. of 90th Ave., N. of Roseville to 0.4 mi. S. of 60th Ave., S. of Roseville. 2.79 miles gross length. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,549,883 · | ||
| Jun 12, 2026 | 68K85 | PeoriaTazewellWarrenDistrict 4 | Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties. | — | Executed | Oberlander Electric Co. $790,676 · | ||
| Jun 12, 2026 | 68K90 | FultonDistrict 4 | Partial depth HMA patching on US 24 and resurfacing (1,000 ft) rest area roadway in Fulton County. 0.402 mile total gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $693,984 · | ||
| Jun 12, 2026 | 68K93 | PeoriaTazewellDistrict 4 | Relocation of high mast light towers to new foundations on I-74 in Peoria and Tazewell Counties. | — | Executed | Oberlander Electric Co. $1,451,503 · | ||
| Jun 12, 2026 | 68K96 | TazewellDistrict 4 | Partial and full depth HMA patching on Morton Ave from north of Clark St to Jackson St (US 150) in Morton. 0.205 mile gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $649,043 · | ||
| Jun 12, 2026 | 68K98 | StarkDistrict 4 | Partial and full depth patching on IL 93 from IL 91 (S) to IL 40 in Stark County. 9.54 miles gross length. | — | Executed | Advanced Asphalt Company $376,414 · | ||
| Jun 12, 2026 | 70794 | McLeanDistrict 5 | 4.99 miles of pavement rehab Designed_Overlay Resurfacing (INT-4th), Pipe Underdrains, 1.8 miles south of Shirley to I-55/74 Interchange southwest of Bloomington. | — | Executed | Rowe Construction, a div of UCM, Inc. $20,217,017 · | ||
| Jun 12, 2026 | 70D62 | EdgarDistrict 5 | Replacement of SN 023-0014 with SN 023-0036 over the DandEI Railroad 0.3 miles west of the DandEI Railroad to 0.1 miles east of North 1800th St east of Paris. This requires roadway profile change on the eastern and western approaches to raise the grade of the bridge. | — | Executed | William Charles Construction Company, LLC $7,986,429 · | ||
| Jun 12, 2026 | 70F48 | McLeanDistrict 5 | Paving and parking lot improvements at three (3) McLean County IDOT storage facilities located in Bloomington, Leroy, and Towanda. The work includes paving over existing HMA and aggregate surfaces, painting dedicated parking stalls, and any other work necessary to complete the project. | — | Executed | H. J. Eppel & Co. $763,289 · | ||
| Jun 12, 2026 | 70H72 | VermilionDistrict 5 | Wing wall repair at Kickapoo Pond 0.2 mi west of Skykine Dr. west of Tilton. | — | Executed | MYS, Incorporated $267,850 · | ||
| Jun 12, 2026 | 70H86 | ChampaignDistrict 5 | 1.18 miles of patching and chip seal A-1 (Fog Seal), Ford Harris Rd to Hensley Rd north of Champaign. | — | Executed | Cross Construction, Inc. $526,225 · | ||
| Jun 12, 2026 | 70J03 | McLeanPiattDistrict 5 | Bridge painting of two structures on I-55 and I-72 in McLean and Piatt Counties. SN's 057-0177 and 074-0058. | — | Executed | Civil Coatings and Construction Inc. $396,171 · | ||
| Jun 12, 2026 | 72459 | PikeDistrict 6 | 6 miles of patching, HMA surface removal, HMA overlay, resurfacing HMA shoulders and aggregate wedge shoulders on IL 100 from 0.9 miles south of Oak Street in Milton to south of CH 10 (Vin Fiz Road) west of Pearl. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,193,703 · | ||
| Jun 12, 2026 | 72491 | SangamonDistrict 6 | Patching, curb and gutter replacement, HMA removal and overlay, guardrail replacement and traffic signal replacement on I-55 Business from 0.2 miles north of Fancy Creek in Sherman to 0.2 miles north of Dirksen Parkway in Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $10,156,787 · | ||
| Jun 12, 2026 | 72509 | LoganDistrict 6 | Highway lighting upgrades on I-55 at the Broadwell interchange. | — | Executed | Bodine Electric of Decatur $569,259 · | ||
| Jun 12, 2026 | 72512 | MorganDistrict 6 | Bridge deck patching on SN 069-0512 carrying US 67 southbound over Mauvaise Terre Creek, 1.3 miles east of Concord/Arenzville Road. | — | Executed | Freesen, a div of UCM, Inc. $145,221 · | ||
| Jun 12, 2026 | 72547 | MenardSangamonDistrict 6 | 5.9 miles of resurfacing on IL 29 / IL 123 from 0.1 miles west of the Menard / Sangamon County line to the IL 29 / 123 junction and from the IL 123 junction to 0.1 miles south of Andrew Road. | — | Executed | P. H. Broughton & Sons, Inc. $2,868,316 · | ||
| Jun 12, 2026 | 72552 | CassDistrict 6 | Gutter removal and replacement on IL 78 from south of CH 7 (Chandlerville Road) to north of Virginia. | — | Executed | Phoenix Corporation of the Quad Cities $216,139 · | ||
| Jun 12, 2026 | 72601 | PikeDistrict 6 | Bridge deck overlay and bridge painting on SN 075-0098 and 075-0099 carrying I-72 over TR 92 (250th Street), NS Railroad, Hadley Creek and TR 149 (315th Street), 1.8 miles west of CH 4 at the Barry interchange. | — | Executed | Freesen, a div of UCM, Inc. $6,980,801 · | ||
| Jun 12, 2026 | 72639 | AdamsPikeDistrict 6 | 9.8 miles of shoulder repair on I-72 from I-172 to 0.9 miles east of IL 96 and on I-172 from I-72 to 0.9 miles south of IL 57. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $9,677,201 · | ||
| Jun 12, 2026 | 72D29 | AdamsDistrict 6 | HMA surface removal, HMA resurfacing, paved shoulders with rumble strips, concrete gutter replacement and guardrail replacement on US 24 from 0.1 miles east of IL 96 (N) to 0.1 miles east of 1343rd Lane (Old US 24) east of Fowler. | — | Executed | Diamond Construction Company $7,745,903 · | ||
| Jun 12, 2026 | 72E71 | LoganDistrict 6 | Bridge joint repairs at various locations on I-55 near Lincoln. | — | Executed | Otto Baum Company, Inc. $162,400 · | ||
| Jun 12, 2026 | 72E72 | HancockDistrict 6 | Shoulder repairs on IL 110, IL 336 from CH 10 to the Adams County line. | — | Executed | W. L. Miller Company $514,275 · | ||
| Jun 12, 2026 | 72E73 | SchuylerDistrict 6 | Riprap installation and minor bridge repairs on SN 085-0039 carrying IL 100 over Sugar Creek, 2.3 miles north of Frederick. | — | Executed | Otto Baum Company, Inc. $56,000 · | ||
| Jun 12, 2026 | 72E76 | SangamonDistrict 6 | Structural steel repairs on SN 084-0106 and 084-0111 over I-55 at the Divernon and Glenarm interchanges. | — | Executed | William Charles Construction Company, LLC $185,585 · | ||
| Jun 12, 2026 | 72J41 | AdamsDistrict 6 | 4.6 miles of resurfacing, ADA improvements and bridge deck repairs on IL 96 from south of Birch Street in Ursa to 0.4 miles north of US 24. | — | Executed | W. L. Miller Company $5,301,849 · | ||
| Jun 12, 2026 | 72J76 | SchuylerDistrict 6 | Microsilica concrete overlays on IL 99 at Cedar Creek 0.5 miles north of Camden and Missouri Creek and Little Missouri Creek 1 mile and 0.3 miles north of the Brown County line. (085-0031, 085-0030, and 085-0029) | — | Executed | Otto Baum Company, Inc. $1,870,400 · | ||
| Jun 12, 2026 | 74705 | MaconDistrict 7 | Replacement of 2 structures carrying I-72 over IL 121 and the IC Railroad, northwest of Decatur. (SN 058-0074 and 058-0075) | — | Executed | William Charles Construction Company, LLC $18,795,822 · | ||
| Jun 12, 2026 | 74B79 | RichlandDistrict 7 | Bridge joint replacement, bridge deck patching, bridge deck scarification and overlay, and new approaches on SN 080-0009 carrying IL 130 over East Fork Fox River, 0.4 miles north of County Road 1275N, north of Olney. | — | Executed | Sangamo Construction Company $1,036,447 · | ||
| Jun 12, 2026 | 74D42 | EffinghamDistrict 7 | Demolition of buildings, tree removal, sign removal, and seeding on US 40 / IL 33 (Fayette Avenue) from Banker Street to Willow Street in Effingham. | — | Executed | Phoenix Corporation of the Quad Cities $641,335 · | ||
| Jun 12, 2026 | 74D51 | EffinghamDistrict 7 | Fencing removing and replacement at the Effingham Maintenance Yard. | — | Executed | COLLINS & HERMANN, INC. $289,716 · | ||
| Jun 12, 2026 | 74D52 | ClarkDistrict 7 | 17.5 miles of resurfacing on US 40 from IL 49 to IL 1 in Marshall. | — | Executed | Howell Paving, Inc. $12,896,618 · | ||
| Jun 12, 2026 | 74D54 | ColesDistrict 7 | 8 miles of resurfacing, aggregate wedge shoulder, HMA shoulders and patching on Old IL 316, 0.2 miles north of IL 16 in Mattoon to D Street in Charleston. | — | Executed | Howell Paving, Inc. $1,860,730 · | ||
| Jun 12, 2026 | 74D55 | MaconDistrict 7 | 4.3 miles of patching, milling and resurfacing on US 51 from 0.8 miles south of US 36 to 0.3 miles east of US 51 Business southwest of Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $9,289,444 · | ||
| Jun 12, 2026 | 74D58 | WayneDistrict 7 | Applying chip seal at the Fairfield Maintenance Yard. | — | Executed | Mt. Carmel Stabilization Group, Inc. $70,388 · | ||
| Jun 12, 2026 | 74E26 | WabashDistrict 7 | 7.7 miles of shoulder reconstruction on IL 1 from E. 1200 Road (Bridgeport Road) to the Lawrence County line. | — | Executed | Phoenix Corporation of the Quad Cities $205,339 · | ||
| Jun 12, 2026 | 76M95 | WashingtonDistrict 8 | Resurfacing on I-64 from 0.5 miles west of Beaver Pond Creek to 0.9 miles west of CH 11. | — | Executed | Samron Midwest Contracting, Inc. $74,388,393 · | ||
| Jun 12, 2026 | 76R32 | MadisonDistrict 8 | New bridge deck on SN 060-0120 carrying IL 111 / IL 3 over Rodgers Avenue and Bloomer Drive in Alton. | — | Executed | Stutz Excavating, Inc. $4,611,184 · | ||
| Jun 12, 2026 | 76R36 | St. ClairDistrict 8 | Bridge deck patching, microsilica concrete overlay, joint replacement, end diaphragm replacement, and cleaning and painting of beam ends and fascia beams on I-64 over Little Silver Creek and Silver Creek, 1.5 miles west of the IL 4 interchange. (SN 082-0186, 082-0188, 082-0187 and 082-0189) | — | Executed | The Kilian Corporation $4,888,194 · | ||
| Jun 12, 2026 | 76U38 | MadisonSt. ClairDistrict 8 | Traffic signal replacement at various locations in Madison and St. Clair Counties. | — | Executed | Gerstner Electric, Inc. $2,898,157 · | ||
| Jun 12, 2026 | 76U54 | BondDistrict 8 | 9.6 miles of micro-surfacing on IL 127 from the Montgomery County line to 0.1 miles north of IL 140. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $830,276 · | ||
| Jun 12, 2026 | 76U76 | St. ClairDistrict 8 | Bridge deck repairs and deck overlay on SN 082-0007 carrying I-55 / I-64 over Trendley Avenue in East St. Louis. | — | Executed | Keeley & Sons, Inc. $1,093,567 · | ||
| Jun 12, 2026 | 76U77 | MarionDistrict 8 | Bridge repairs, deck repairs and joint replacement/repairs on SN 061-0077 carrying US 51 over IC Railroad. | — | Executed | Samron Midwest Contracting, Inc. $1,125,909 · | ||
| Jun 12, 2026 | 76U81 | MadisonSt. ClairDistrict 8 | Bridge cleaning at various locations in Madison and St. Clair counties. | — | Executed | M & M Concrete, Inc. $560,000 · | ||
| Jun 12, 2026 | 76U82 | St. ClairDistrict 8 | Bridge deck repairs on SN 082-0251 and 082-0252 carrying I-55 / I-64 over IL 3 ramps and UP Railroad. | — | Executed | Keeley & Sons, Inc. $2,195,979 · | ||
| Jun 12, 2026 | 76U86 | MadisonDistrict 8 | Bridge painting on IL 3 over NS Railroad in Granite City. (SN 060-0193 and 060-0194) | — | Executed | Eagle Painting & Maintenance Company, Inc. $314,406 · | ||
| Jun 12, 2026 | 76U96 | VariousDistrict 8 | Highway lighting and traffic signal maintenance at various locations throughout District 8. | — | Executed | Electrico, Inc. $2,003,468 · | ||
| Jun 12, 2026 | 76U97 | VariousDistrict 8 | Guardrail and cable median repairs at various locations in District 8. | — | Executed | Illini Excavation & Reclamation, Inc. $5,201,570 · | ||
| Jun 12, 2026 | 76U98 | VariousDistrict 8 | Maintenance and service of all ITS equipment at various locations throughout District 8. | — | Executed | Electrico, Inc. $573,010 · | ||
| Jun 12, 2026 | 76V03 | MadisonDistrict 8 | Bridge painting on SN 060-0350 and 060-0351 carrying I-270 over the Mississippi River. | — | Executed | Capital Industrial Services, LLC $2,933,300 · | ||
| Jun 12, 2026 | 76V06 | JerseyMadisonDistrict 8 | 40.25 miles of tree removal at various locations in Madison and Jersey Counties. | — | Executed | Homer Tree Service, Inc. $762,370 · | ||
| Jun 12, 2026 | 76V08 | VariousDistrict 8 | Various interstate bridge deck patching on a callout basis throughout District 8. | — | Executed | Keeley & Sons, Inc. $2,580,521 · | ||
| Jun 12, 2026 | 76V09 | VariousDistrict 8 | Structural repairs to various bridges at various locations throughout District 8. | — | Executed | Keeley & Sons, Inc. $3,642,071 · | ||
| Jun 12, 2026 | 76V12 | St. ClairDistrict 8 | 0.4 miles of patching and slurry seal on South 26th Street from Bond Avenue to IL 15 in East St. Louis. | — | Executed | Kinney Contractors, Inc. $414,711 · | ||
| Jun 12, 2026 | 76V13 | VariousDistrict 8 | Traffic signal modernization at various locations throughout District 8. | — | Executed | Gerstner Electric, Inc. $1,847,416 · | ||
| Jun 12, 2026 | 76V17 | MadisonDistrict 8 | 10.4 miles of bridge repairs and resurfacing on I-55/I-70/US 40 from 0.5 miles west of Black Lane to 0.4 miles east of IL 159. | — | Executed | The Kilian Corporation & Christ Brothers Asphalt & Keeley & Sons, Inc. tri-venture $24,110,330 · | ||
| Jun 12, 2026 | 76V18 | ClintonSt. ClairDistrict 8 | 6.5 miles of longitudinal joint repair on I-64 from 0.5 miles west of IL 4 in Mascoutah to 0.3 miles east of the Clinton County line. | — | Executed | The Kilian Corporation $3,286,837 · | ||
| Jun 12, 2026 | 78791 | AlexanderDistrict 9 | Removal and replacement of SN 002-0012 carrying IL 3 over a drainage ditch 0.5 miles west of IL 127. | — | Executed | Samron Midwest Contracting, Inc. $3,285,578 · | ||
| Jun 12, 2026 | 78977 | FranklinDistrict 9 | Reconstruction of Benton Square (IL 14 / IL 37) with improved turning movements and island crosswalks. | — | Executed | Samron Midwest Contracting, Inc. $967,393 · | ||
| Jun 12, 2026 | 78A13 | UnionDistrict 9 | Box culvert replacements at 4 locations: 1) SN 091-2005 carrying IL 127 over a stream, 3.0 miles northwest of Jonesboro; 2) SN 091-2012 carrying IL 146 over a stream, 0.6 miles west of Jonesboro 3) SN 091-7022 carrying Old US 51 over an unnamed ditch south of Dongola 4) SN 091-7027 carrying US 51 over an unnamed ditch. 3.0 miles south of Anna. | — | Executed | E. T. Simonds Construction Company $2,686,720 · | ||
| Jun 12, 2026 | 78A85 | AlexanderDistrict 9 | Pavement patching, HMA removal, HMA resurfacing, shoulder work and ADA upgrades on US 51 from 0.29 miles south of New Cross Street to 3.38 miles south of New Cross Street. Includes small portions of Patierdale Road, Kessler Road and Turner Lane. | — | Executed | E. T. Simonds Construction Company $5,912,328 · | ||
| Jun 12, 2026 | 78B49 | JeffersonDistrict 9 | 0.4 miles of pavement removal with PCC replacement, aggregate subgrade improvement, shoulders, curb and gutter, median island and ramp pavement patching on I-64 from Bunny Farm Road to just past the I-64 westbound ramp. | — | Executed | Samron Midwest Contracting, Inc. $4,558,321 · | ||
| Jun 12, 2026 | 78B59 | FranklinDistrict 9 | 1.8 miles of resurfacing on IL 148 from IL 14 to Yellow Bank Road. | — | Executed | Samron Midwest Contracting, Inc. $1,230,184 · | ||
| Jun 12, 2026 | 78B94 | SalineDistrict 9 | Mast arm upgrades at the intersection of US 45 and IL 13. | — | Executed | Brown Electric, Inc. $612,761 · | ||
| Jun 12, 2026 | 78C10 | WhiteDistrict 9 | Repairs to SN 097-0062 carrying US 45 over Skillet Fork Creek, 0.8 miles south of Mill Shoals. | — | Executed | E. T. Simonds Construction Company $583,277 · | ||
| Jun 12, 2026 | 78C13 | WilliamsonDistrict 9 | Slope repairs on IL 148 over Crab Orchard Lake, 1.5 miles south of Old IL 13. | — | Executed | Samron Midwest Contracting, Inc. $328,825 · | ||
| Jun 12, 2026 | 78C15 | WhiteDistrict 9 | Painting two bridges over I-64 in White County. (SN 097-0045 and 097-0050) | — | Executed | Eagle Painting & Maintenance Company, Inc. $409,970 · | ||
| Jun 12, 2026 | 78C20 | VariousDistrict 9 | Various electrical repairs and/or replacements at various locations throughout District 9. | — | Executed | F. W. Electric, Inc. $318,316 · | ||
| Jun 12, 2026 | 78C24 | PerryDistrict 9 | 5.8 miles of resurfacing on IL 127 from 0.3 miles north of Deer Run Road to the Washington County line. | — | Executed | Samron Midwest Contracting, Inc. $1,989,087 · | ||
| Jun 12, 2026 | 78C25 | PerryDistrict 9 | 2.8 miles of resurfacing on IL 150 from 0.2 miles north of Cutler (Reeses Hill Road) to IL 154. | — | Executed | Samron Midwest Contracting, Inc. $1,618,916 · | ||
| Jun 12, 2026 | 80B17 | WillDistrict 1 | Thermoplastic pavement markings, and incidental work (2,809-Ft) Smart Overlay consists of thermoplastic pavement markings, and incidental work. Located in the City of Crete in Will County. | — | Executed | Iroquois Paving Corporation $197,734 · | ||
| Jun 12, 2026 | 80B22 | CookDistrict 1 | (3.71-Mile) SMART overlay, proposed pavement markings, ADA ramp details at the ramps listed, installing APS push buttons at all signalized intersections listed, and replacement of all loop detectors impacted by the resurfacing. Project located at US 41 (Skokie Blvd)/ IL 50 (Cicero Ave) from Golf Road to Devon Ave is in the Villages of Skokie and Lincolnwood in Cook County, IL. | — | Executed | K-Five Construction Corporation $7,389,202 · | ||
| Jun 12, 2026 | 80B23 | KaneDistrict 1 | Pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings (2.81-Mile) SMART Overlay and Shoulder Repair consist of pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings, shoulder work, rumble strips. The improvement is in the Villages of Gilberts and Pingree Grove in Kane County. | — | Executed | Plote Construction, Inc. $3,171,166 · | ||
| Jun 12, 2026 | 80B28 | CookDistrict 1 | (4,957.13-Ft) HMA overlay of existing concrete pavement and ADA improvements. The roadway scope of work includes HMA pavement, curb removal and replacement, median removal and replacement, pavement patching, driveway removal and replacement, thermoplastic pavement markings, ADA improvements, and traffic signal/APS improvements. Project is located along IL Route 62 (Algonquin Road) from Radisson Way to Barker Avenue in Rolling Meadows and Schaumburg, Illinois. | — | Executed | K-Five Construction Corporation $3,929,710 · | ||
| Jun 12, 2026 | 80B33 | CookDistrict 1 | (HMA) surface removal, pavement patching, (HMA) shoulders, resurfacing with (HMA) binder and surface course, c (5,764-Ft) Design Overlay, ADA Improvements consists of (HMA) surface removal, pavement patching, (HMA) shoulders, resurfacing with (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. The project is located within the City of Harvey in Cook County. | — | Executed | D. Construction, Inc. $933,943 · | ||
| Jun 12, 2026 | 80B35 | CookDistrict 1 | (1.53-Mile) SMART overlay and ADA Improvement project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing hot-mix asphalt, pavement markings, raised reflective pavement markers, ADA ramps, traffic signals, and detector loops. Project is in the Village of River Grove, Village of Schiller Park and City of Chicago in Cook County. | — | Executed | K-Five Construction Corporation $2,873,926 · | ||
| Jun 12, 2026 | 80B47 | CookDistrict 1 | Reconstruction of the expansion joints with strip seals, slope wall repair and substructure repair Bridge Painting project consists of reconstruction of the expansion joints with strip seals, slope wall repair and substructure repair. Project is located on FAI 90/94 (Kennedy Expressway) under Ainslie Street in the City of Chicago. (SN 016-1105) | — | Executed | Areatha Construction Co., Inc. $641,982 · | ||
| Jun 12, 2026 | 80B51 | CookDistrict 1 | Cleaning and painting steel surfaces as designated on the plans and any incidental work (0.20-Mile) Bridge Painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental work. The project is located at structure No. 1 (SN. 016-0436) carrying the IHB Railroad over US 12/20 (95th ST) in the Village of Bridgeview in Cook County. | — | Executed | Capital Industrial Services, LLC $493,330 · | ||
| Jun 12, 2026 | 80B58 | CookDistrict 1 | Drainage structure cleaning, frame and grate replacement and any collateral or incident work located in the Vi (3.20-Mile) Project consists of drainage structure cleaning, frame and grate replacement and any collateral or incident work located in the Villages of Forest Park, Maywood, Broadview, Bellwood and Westchester within Cook County. | — | Executed | MYS, Incorporated $652,635 · | ||
| Jun 12, 2026 | 80B66 | CookDistrict 1 | Installation of permanent protective shielding as shown on the plans and any incidental and collateral work ne This is a permanent protective shielding project and the work to be performed under this contract consists of installation of permanent protective shielding as shown on the plans and any incidental and collateral work necessary to complete located at various structures carrying Circle Ave, Harlem Ave and California Ave Over I-290 (Eisenhower) in the Villages of Oak Park, Forest Park and City of Chicago, in Cook County. | — | Executed | Lorig Construction Company $397,833 · | ||
| Jun 12, 2026 | 80B77 | WillDistrict 1 | The removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb The project consists of the removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb and gutter removal and replacement, median surface removal and replacement, sidewalk improvements, pavement marking, landscaping, and erosion control located in Village of Bolingbrook, Will County, Illinois. | — | Executed | D. Construction, Inc. $1,130,242 · | ||
| Jun 12, 2026 | 80B78 | CookDistrict 1 | Refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes with limits from (1.90-Mile) Project consists of refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes with limits from 51st Street to 59th Street in the City of Chicago, in Cook County. | — | Rejected | MYS, Incorporated $1,409,040 · | ||
| Jun 12, 2026 | 80B87 | CookDistrict 1 | A design overlay of the existing pavement with HMA surface course and binder course, thermoplastic pavement ma (5.37-Mile) Project consists of a design overlay of the existing pavement with HMA surface course and binder course, thermoplastic pavement markings, ADA improvements for curb ramps, combination concrete curb and gutter located in the Villages of Wheeling and Arlington Heights and the City of Prospect Heights in Cook County. | — | Executed | Builders Paving, LLC $3,116,448 · | ||
| Jun 12, 2026 | 80C45 | McHenryDistrict 1 | (1.2-Mile) Standard Overlay for US 14 and SMART Overlay for South Frontage Road project includes pavement patches, HMA surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, raised reflective pavement markers. The project is located within the City of Woodstock. | — | Executed | Peter Baker & Son Co. $1,605,106 · | ||
| Jun 12, 2026 | 80C48 | LakeDistrict 1 | (3,760-Ft) Standard Overlay, HMA surface removal and overlay, pavement patching maintenance of traffic, pavement marking, landscaping, ADA curb ramps, APS improvements, curb and gutter removal and replacement, median removal and replacement, guardrail removal and replacement, impact attenuator installation, bridge pier crash wall repairs. Located on W. Peterson Road from west of IL 137 to US 45 in the Village of Libertyville in Lake County. | — | Executed | Peter Baker & Son Co. $2,084,785 · | ||
| Jun 12, 2026 | 80C89 | CookLakeDistrict 1 | This work includes mast arm and pole replacement, installation of LED signal heads, installation of accessible pedestrian signals, controller replacement and all incidental and collateral work necessary to complete the project. This project is located in Lake and Cook Counties in District 1. | — | Executed | H & H Electric Co. $2,718,198 · | ||
| Jun 12, 2026 | 80C90 | CookDistrict 1 | Repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-0396) over Racine Avenue and Norfol (2,470-Ft) Bridge repair work consists of repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-0396) over Racine Avenue and Norfolk Southern Railroad east and west spurs. Work includes installation of temporary shoring towers, structural steel repair, protective shielding, pavement marking and signing, traffic control and protection in the City of Chicago, Cook County | — | Rejected | F. H. Paschen, S.N. Nielsen & Associates LLC $2,448,235 · | ||
| Jun 12, 2026 | 80C96 | VariousDistrict 1 | Forestry, weed control, and landscape work includes pruning, tree removal, and selective clearing of trees, shrubs, and brush, controlling and removing invasive weeds repairing, installing, and establishing new vegetative material including trees, shrubs, and seeding. Located within the right-of-way limits within the municipal limits of Chicago, Lincolnwood, Skokie, Morton Grove, Wilmette, Northfield, Glencoe, and Northbrook. | — | Executed | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $3,638,649 · | ||
| Jun 12, 2026 | 80C97 | CookDistrict 1 | Advanced shoring at structures (SN 016-2047 and SN 016-2049) along I-90/94 at Ogden Avenue (110-Ft) Project consists of advanced shoring at structures (SN 016-2047 and SN 016-2049) along I-90/94 at Ogden Avenue. The total length of the project is 110 feet (0.02 miles). The project is in the City of Chicago in Cook County. | — | Executed | Rausch Infrastructure, LLC $727,711 · | ||
| Jun 12, 2026 | 80D00 | CookDistrict 1 | (4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb and gutter removal and replacement, brick paver removal and reinstallation, detector loop replacement, Accessible Pedestrian Signal (APS), ADA curb ramps improvements, raised reflective markers, thermoplastic and modified urethane pavement marking. Location is in the Village of Schiller Park within Co | — | Executed | Plote Construction, Inc. $2,322,000 · | ||
| Jun 12, 2026 | 80D36 | WillDistrict 1 | This is an advanced procurement of selective mechanical and electrical components for the existing movable bridge (SN 099-0101) including the furnishing of the machinery brakes, motor brakes, and select bearings for the movable structure located at US 30 (Cass Street) Bridge over the Des Plaines River in the City of Joliet in Will County. | — | Executed | GRANITE CONSTRUCTION COMPANY $900,000 · | ||
| Jun 12, 2026 | 80D46 | LakeDistrict 1 | The scope of work for this improvement includes a new 5x3 culvert under US 41 with associated pavement removal and patching, ditch grading, pavement removal and patching, temporary concrete barriers, curb and gutter, barrier median and landscaping. Located in the Village of Lake Bluff and Shields Township in Lake County. | — | Executed | Curran Contracting Company $1,087,000 · | ||
| Jun 12, 2026 | 85791 | WinnebagoDistrict 2 | Construction of a shared-use path along Rockton Road from 0.1 mile west of Aspland Drive to Old Meadow Lane in the village of Rockton. | — | Executed | N-Trak Group LLC $659,834 · | ||
| Jun 12, 2026 | 85794 | Rock IslandDistrict 2 | Sidewalk replacement and construction of new sidewalks at various locations in the city of Rock Island. | — | Executed | Centennial Contractors of the Quad Cities, Inc. $609,125 · | ||
| Jun 12, 2026 | 87851 | KankakeeDistrict 3 | Replace the bridge carrying CH 14 over Trim Creek located 3.3 miles south of IL 17. | — | Executed | Riber Construction, Inc. $1,225,921 · | ||
| Jun 12, 2026 | 87859 | IroquoisDistrict 3 | Resurfacing of E 980N Road from IL 99 to the west corporate limits of Milford. | — | Executed | Iroquois Paving Corporation $3,970,513 · | ||
| Jun 12, 2026 | 87895 | IroquoisDistrict 3 | Resurface 800 N Road from I-57 ramps to US 45. | — | Executed | Iroquois Paving Corporation $967,933 · | ||
| Jun 12, 2026 | 89864 | MercerDistrict 4 | Removal and replacement of sidewalk along SW 6th St. from west of College Ave. (IL 94) to west of SW 9th Ave. in the city of Aledo. | — | Executed | Phoenix Corporation of the Quad Cities $180,475 · | ||
| Jun 12, 2026 | 89892 | MercerDistrict 4 | Cape seal with pavement markings on CH 2 and bituminous surface treatment on CH 9 and CH 16 in Mercer County. | — | Executed | A. C. Pavement Striping Co. $1,647,297 · | ||
| Jun 12, 2026 | 93848 | AdamsDistrict 6 | HMA resurfacing of North 36th St. from Wavering Park Rd. to Wisman Ln. | — | Executed | Diamond Construction Company $1,087,655 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.