(1,2)RS-9,SR
- Let date
- Friday, June 12, 2026
- Contract
- 72D29 · job page
- District
- District 6
- County
- Adams
- Highway
- Limits
- HMA surface removal, HMA resurfacing, paved shoulders with rumble strips, concrete gutter replacement and guardrail replacement on US 24 from 0.1 miles east of IL 96 (N) to 0.1 miles east of 1343rd Lane (Old US 24) east of Fowler.
- Classification
- ·
- Project number
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Diamond Construction Company Low bidder | $7,745,903 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Diamond Constru… |
|---|---|---|---|---|---|---|
| 1 | X2020060 | EXC & GR EX SHLD SPL | 503 | UNIT | $490.00 | |
| 2 | X4240420 | PC CONC SIDEWALK 4 SP | 192 | SQ FT | $74.50 | |
| 3 | X4406812 | PCC SURF REM 1 1/2 | 455 | SQ YD | $15.00 | |
| 4 | X7011800 | TRAF CONT-PROT BLR 21 | 1 | L SUM | $10,000.00 | |
| 5 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $65,000.00 | |
| 6 | Z0049799 | PROT RESET SURVEY MRK | 7 | EACH | $700.00 | |
| 7 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | |
| 8 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | |
| 9 | 20200100 | EARTH EXCAVATION | 1,254 | CU YD | $82.50 | |
| 10 | 25000200 | SEEDING CL 2 | 0.9 | ACRE | $14,100.00 | |
| 11 | 25000400 | NITROGEN FERT NUTR | 87 | POUND | $10.50 | |
| 12 | 25000500 | PHOSPHORUS FERT NUTR | 87 | POUND | $10.50 | |
| 13 | 25000600 | POTASSIUM FERT NUTR | 87 | POUND | $10.50 | |
| 14 | 25000700 | AGR GROUND LIMESTONE | 2 | TON | $550.00 | |
| 15 | 25100115 | MULCH METHOD 2 | 0.9 | ACRE | $9,500.00 | |
| 16 | 28100205 | STONE RIPRAP CL A3 | 32 | TON | $200.00 | |
| 17 | 28200200 | FILTER FABRIC | 46 | SQ YD | $8.00 | |
| 18 | 35101400 | AGG BASE CSE B | 717 | TON | $85.00 | |
| 19 | 40200800 | AGG SURF COURSE TY B | 12 | TON | $350.00 | |
| 20 | 40600290 | BIT MATLS TACK CT | 58,701 | POUND | $4.00 | |
| 21 | 40600370 | LONG JOINT SEALANT | 32,811 | FOOT | $4.50 | |
| 22 | 40600405 | MATL TRANSFER DEVICE | 6,236 | TON | $6.00 | |
| 23 | 40600982 | HMA SURF REM BUTT JT | 1,808 | SQ YD | $50.00 | |
| 24 | 40600985 | PCC SURF REM BUTT JT | 173 | SQ YD | $50.00 | |
| 25 | 40600990 | TEMPORARY RAMP | 276 | SQ YD | $25.00 | |
| 26 | 40603080 | HMA BC IL-19.0 N50 | 4,236 | TON | $175.00 | |
| 27 | 40604150 | P HMA SC IL-9.5 C N50 | 5,800 | TON | $185.00 | |
| 28 | 40604162 | P HMA SC IL-9.5 D N70 | 1,124 | TON | $250.00 | |
| 29 | 40800029 | BIT MATLS TACK CT | 1,015 | POUND | $4.00 | |
| 30 | 40800050 | INCIDENTAL HMA SURF | 359 | TON | $500.00 | |
| 31 | 42400800 | DETECTABLE WARNINGS | 20 | SQ FT | $65.00 | |
| 32 | 44000155 | HMA SURF REM 1 1/2 | 90,897 | SQ YD | $5.00 | |
| 33 | 44000200 | DRIVE PAVEMENT REM | 113 | SQ YD | $45.00 | |
| 34 | 44000400 | GUTTER REM | 3,081 | FOOT | $25.50 | |
| 35 | 44000600 | SIDEWALK REM | 237 | SQ FT | $8.50 | |
| 36 | 44200132 | PAVT PATCH T2 11 | 224 | SQ YD | $375.00 | |
| 37 | 44200136 | PAVT PATCH T3 11 | 103 | SQ YD | $375.00 | |
| 38 | 44200138 | PAVT PATCH T4 11 | 148 | SQ YD | $375.00 | |
| 39 | 48102100 | AGG WEDGE SHLD TYPE B | 1,541 | TON | $60.00 | |
| 40 | 48203023 | HMA SHOULDERS 6 1/2 | 23,033 | SQ YD | $55.00 | |
| 41 | 48203100 | HMA SHOULDERS | 2,685 | TON | $190.00 | |
| 42 | 50105220 | PIPE CULVERT REMOV | 144 | FOOT | $43.00 | |
| 43 | 54262715 | METAL FL END SEC 15" | 4 | EACH | $840.00 | |
| 44 | 60100955 | PIPE DRAINS 15 | 144 | FOOT | $110.00 | |
| 45 | 60403400 | GRATES TA | 4 | EACH | $6,400.00 | |
| 46 | 60600095 | CLASS SI CONC OUTLET | 45 | CU YD | $2,650.00 | |
| 47 | 60602500 | CONCRETE GUTTER TY A | 3,691 | FOOT | $97.00 | |
| 48 | 63000001 | SPBGR TY A 6FT POSTS | 488 | FOOT | $42.50 | |
| 49 | 63100167 | TR BAR TRM T1 SPL TAN | 8 | EACH | $4,850.00 | |
| 50 | 63200310 | GUARDRAIL REMOV | 960 | FOOT | $25.00 | |
| 51 | 64200108 | SHOULDER RUM STRIP 8 | 60,224 | FOOT | $0.4000 | |
| 52 | 67000400 | ENGR FIELD OFFICE A | 12 | CAL MO | $5,000.00 | |
| 53 | 67100100 | MOBILIZATION | 1 | L SUM | $420,000.00 | |
| 54 | 70100100 | TRAF CONT-PROT 701316 | 4 | EACH | $30,000.00 | |
| 55 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $20,000.00 | |
| 56 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $125,000.00 | |
| 57 | 70100500 | TRAF CONT-PROT 701326 | 1 | L SUM | $45,000.00 | |
| 58 | 70100820 | TRAF CONT-PROT 701451 | 1 | L SUM | $12,500.00 | |
| 59 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $9,000.00 | |
| 60 | 70106500 | TEMP BR TRAF SIGNALS | 4 | EACH | $17,500.00 | |
| 61 | 70106700 | TEMP RUMBLE STRIPS | 24 | EACH | $1,000.00 | |
| 62 | 70107025 | CHANGEABLE MESSAGE SN | 646 | CAL DA | $95.00 | |
| 63 | 70300100 | SHORT TERM PAVT MKING | 2,859 | FOOT | $5.00 | |
| 64 | 70300150 | SHRT TRM PAVT MK REM | 952 | SQ FT | $6.00 | |
| 65 | 72501000 | TERMINAL MARKER - DA | 8 | EACH | $55.00 | |
| 66 | 78004600 | PREF PL PM TD STD LTR/SYM | 149 | SQ FT | $38.00 | |
| 67 | 78004720 | PREF PL PM TD STD L24 | 83 | FOOT | $41.00 | |
| 68 | 78009005 | MOD URETH PM LINE 5 | 99,982 | FOOT | $0.7000 | |
| 69 | 78009006 | MOD URETH PM LINE 6 | 552 | FOOT | $3.25 | |
| 70 | 78009008 | MOD URETH PM LINE 8 | 379 | FOOT | $6.50 | |
| 71 | 78009012 | MOD URETH PM LINE 12 | 224 | FOOT | $11.00 | |
| 72 | 78011000 | GRV RCSD PM LTR & SYM | 149 | SQ FT | $6.50 | |
| 73 | 78011030 | GRV RCSD PVT MRKG 6 | 99,982 | FOOT | $0.2000 | |
| 74 | 78011035 | GRV RCSD PVT MRKG 7 | 552 | FOOT | $2.20 | |
| 75 | 78011045 | GRV RCSD PVT MRKG 9 | 379 | FOOT | $4.40 | |
| 76 | 78011065 | GRV RCSD PVT MRKG 13 | 224 | FOOT | $5.50 | |
| 77 | 78011125 | GRV RCSD PVT MRKG 25 | 83 | FOOT | $11.00 | |
| 78 | 78100100 | RAISED REFL PAVT MKR | 489 | EACH | $51.50 | |
| 79 | 78300200 | RAISED REF PVT MK REM | 489 | EACH | $10.00 | |
| 80 | 78300201 | PVT MKG REM GRINDING | 2,876 | SQ FT | $2.65 |