| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 14, 2024 | 72727 | MontgomeryDistrict 6 | Patching on IL 16 from west of the I-55 southbound ramp to OLD US 66, I-55 northbound ramp south of IL 16 to IL 16, and on Old US 66 from Ferdon Street to IL 16 in Litchfield. | — | Executed | Kinney Contractors, Inc. $466,566 · | ||
| Jun 14, 2024 | 72730 | SangamonDistrict 6 | Parking lot paving, access road paving, and security fence installation at the District 6 Bridge Maintenance Facility off of Chatham Road just north of I-72 in Springfield. | — | Executed | P. H. Broughton & Sons, Inc. $420,225 · | ||
| Jun 14, 2024 | 72733 | BrownMasonDistrict 6 | Installation of conduit, handholes, fiber optic cable runs and CCTV Cameras at various locations in Havana and Mt. Sterling. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $644,276 · | ||
| Jun 14, 2024 | 72734 | ChristianDistrict 6 | Installation of CCTV cameras at various locations in Pana and Taylorville. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $1,181,733 · | ||
| Jun 14, 2024 | 72737 | SangamonDistrict 6 | Tree removal, vegetation removal, erosion control, fence removal and replacement and temporary seeding on I-72 from 0.2 miles east of IL 4 to 0.1 miles east of Chatham Road in Springfield. | — | Executed | CSD Environmental Services, Inc. $376,080 · | ||
| Jun 14, 2024 | 72738 | SangamonDistrict 6 | Bridge bearing replacement at SN 084-0169 carrying J David Jones Parkway over Spring Creek in Springfield. | — | Executed | Sangamo Construction Company $165,054 · | ||
| Jun 14, 2024 | 72739 | PikeDistrict 6 | Bridge bearing replacement at SN 075-0080 carrying US 54 over The Sny, 1 mile southwest of IL 96. | — | Executed | Sangamo Construction Company $87,177 · | ||
| Jun 14, 2024 | 72911 | MorganDistrict 6 | Bridge deck patching on SN 069-0062 carrying IL 100 over Spring Creek. | — | Executed | County Contractors, Inc. $96,406 · | ||
| Jun 14, 2024 | 72912 | SangamonDistrict 6 | Bridge deck patching on SN 084-0037 carrying 11th Street over I-55 southeast of Springfield. | — | Executed | Sangamo Construction Company $247,365 · | ||
| Jun 14, 2024 | 72K98 | SangamonDistrict 6 | Bridge repairs, bridge widening, bridge deck removal and replacement on SN 084-0018 and 084-0019 carrying I-55 over the Sangamon River, 2.2 miles south of Business I-55 Sherman Interchange. | — | Executed | Freesen, a div of UCM, Inc. $29,560,161 · | ||
| Jun 14, 2024 | 74956 | WayneDistrict 7 | 6.9 miles of HMA shoulders with rumble strips, aggregate shoulders, and curb and gutter replacement on US 45 from just south of the Norfolk Southern Railroad to 0.1 miles south of County Road 150N. | — | Executed | Howell Paving, Inc. $3,173,189 · | ||
| Jun 14, 2024 | 74984 | EffinghamDistrict 7 | Culvert replacement on IL 37 over a stream 0.1 miles northeast of Iowa Street, northeast of Edgewood. (SN 025-8633) | — | Executed | Sangamo Construction Company $451,551 · | ||
| Jun 14, 2024 | 74985 | MaconDistrict 7 | 2.3 miles of resurfacing on Main Street from 0.1 miles north of Eldorado Street in Harristown north of Glasgow Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,920,080 · | ||
| Jun 14, 2024 | 74A65 | ClarkDistrict 7 | 9.5 miles of microsurfacing joint repair on I-70 from 0.7 miles east of the Martinsville interchange to 0.8 miles east of Clarksville Road. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $1,163,765 · | ||
| Jun 14, 2024 | 74B43 | CumberlandDistrict 7 | 7.25 miles of crack and joint sealing on I-70 from 7.5 miles east of the Effingham County line to 1.8 miles east of IL 130. | — | Executed | Complete Asphalt Service Co. $303,321 · | ||
| Jun 14, 2024 | 74B53 | CrawfordDistrict 7 | 7.2 miles of patching, milling and resurfacing on IL 33 from 0.2 miles east of Roosevelt Street in Oblong to 0.2 miles east of North Glendale Road in Robinson. | — | Executed | Ambraw Asphalt Materials, Inc. $3,979,109 · | ||
| Jun 14, 2024 | 74C42 | CumberlandDistrict 7 | 5.9 miles of patching, HMA surface removal and resurfacing on IL 121 from US 45 to the Montrose Blacktop. | — | Executed | Howell Paving, Inc. $2,571,379 · | ||
| Jun 14, 2024 | 74C70 | EdwardsRichlandDistrict 7 | 25.4 miles of shoulder reconstruction on IL 130 from 0.1 miles south of US 50 in Olney to Maple Street in Albion and on West Salem Road from IL 130 to 0.3 miles east of Meridian Road (700E). | — | Executed | AR Martin Construction, LLC $821,488 · | ||
| Jun 14, 2024 | 74C75 | ColesCumberlandDistrict 7 | 31.5 miles of aggregate shoulder reconstruction on US 45 from 0.1 miles north of the Lake Land College entrance to IL 121; on US 40 from the Effingham County line to IL 130 in Greenup; on IL 121 from the Montrose Blacktop to 0.1 miles east of 1500E in Toledo; on the Montrose Blacktop from IL 121 to the Effingham County line. | — | Executed | Phoenix Corporation of the Quad Cities $647,679 · | ||
| Jun 14, 2024 | 74C76 | MaconDistrict 7 | 9.5 miles of shoulder reconstruction on Old US 36 from the Sangamon County to 900' west of US 36 in Harristown. | — | Executed | Earth Worx Solutions LLC $592,526 · | ||
| Jun 14, 2024 | 74C77 | ShelbyDistrict 7 | 13 miles of shoulder reconstruction on IL 32 from IL 16 to the Effingham County line. | — | Executed | Phoenix Corporation of the Quad Cities $318,579 · | ||
| Jun 14, 2024 | 74C78 | MaconDistrict 7 | Parking lot rehabilitation at the Decatur Maintenance Yard. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $430,320 · | ||
| Jun 14, 2024 | 74C79 | WabashDistrict 7 | Removing and replacing the concrete apron in front of the Browns Maintenance Yard. | — | Executed | Shores Builders, Inc. $92,347 · | ||
| Jun 14, 2024 | 74C87 | EffinghamDistrict 7 | 5 miles of patching on I-57 and I-70, including ramps, from the Little Wabash River south of Effingham to I-57 north of Effingham. | — | Executed | Kinney Contractors, Inc. $881,645 · | ||
| Jun 14, 2024 | 74C93 | MaconDistrict 7 | Painting of 6 structures at various locations in Macon County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,055,308 · | ||
| Jun 14, 2024 | 74C94 | ColesDistrict 7 | 19.75 miles of patching on I-57 from milepost 182 to milepost 202. | — | Executed | Kinney Contractors, Inc. $816,794 · | ||
| Jun 14, 2024 | 74C95 | VariousDistrict 7 | Repair of existing guardrail damage and on call repair of guardrail damage at various locations throughout District 7. | — | Executed | COLLINS & HERMANN, INC. $730,168 · | ||
| Jun 14, 2024 | 74C99 | VariousDistrict 7 | Applying a bituminous surface treatment, A2, to the Robinson, Lawrence, and Olney Maintenance Yards in District 7. | — | Executed | Mt. Carmel Stabilization Group, Inc. $133,758 · | ||
| Jun 14, 2024 | 76H70 | MarionDistrict 8 | Bridge demolition on Old US 51 over East Fork Kaskaskia Overflow, 5 miles north of Sandoval (SN 061-0009). | — | Executed | Guinzy Construction,Inc. $43,254 · | ||
| Jun 14, 2024 | 76K05 | St. ClairDistrict 8 | 4.5 miles of patching and resurfacing of mainline I-255, ramps and shoulders, structure rehabilitation, concrete barrier wall replacement, lighting replacement, guardrail replacement, pipe underdrain replacement and other drainage repairs, and sign truss replacement and repairs on I-255 from IL 15 to IL 157. | — | Executed | The Kilian Corporation & Keeley & Sons, Inc. $65,422,089 · | ||
| Jun 14, 2024 | 76L11 | MarionDistrict 8 | 11.5 miles of resurfacing and ADA improvements on IL 37 from Cherry Street in Kinmundy to Madison Street in Salem. | — | Executed | Howell Paving, Inc. $11,501,896 · | ||
| Jun 14, 2024 | 76P46 | MadisonDistrict 8 | Bridge repair on SN 060-0124, HMA overlay and joint repair on IL 111 over NW and CNW and MCT Bike Trail, 0.2 miles north of IL 162 in Pontoon Beach. | — | Executed | Keeley & Sons, Inc. $2,475,979 · | ||
| Jun 14, 2024 | 76P58 | MadisonDistrict 8 | 2.2 miles of resurfacing and ADA improvements on Beltline Road from IL 157 to IL 159 in Collinsville. | — | Executed | Christ Bros. Asphalt, Inc. $3,984,987 · | ||
| Jun 14, 2024 | 76R78 | St. ClairDistrict 8 | Modernization of 16 traffic signals along IL 159 from the intersection of Ludwig/Salem Avenue to the intersection of IL 161/N. Belt West Road. Limits of this project also includes I-64 from IL 159 westward to milepost 10.8. | — | Active | Gerstner Electric, Inc. $3,960,000 · | ||
| Jun 14, 2024 | 76T26 | St. ClairDistrict 8 | Bridge deck repairs and bridge joint replacement on SN 082-0289 carrying IL 177 over Loop Creek, 0.3 miles east of IL 158. | — | Executed | The Kilian Corporation $777,410 · | ||
| Jun 14, 2024 | 76T28 | MadisonDistrict 8 | Bridge joint repair/replacement and bridge deck repairs on IL 4 over US 40. | — | Executed | Keeley & Sons, Inc. $1,211,533 · | ||
| Jun 14, 2024 | 76T38 | St. ClairDistrict 8 | Deep well and pump repairs at various locations in District 8. | — | Executed | Haier Plumbing and Heating, Inc. $135,590 · | ||
| Jun 14, 2024 | 76T47 | St. ClairDistrict 8 | Adding a new precast concrete vault that will contain two new flow meters installed on 12-inch piping that is the discharge from the 25th Street Pump Station-s deep groundwater wells in East St. Louis. | — | Executed | Hank's Excavating & Landscaping, Inc. $124,250 · | ||
| Jun 14, 2024 | 76T50 | St. ClairDistrict 8 | Intersection improvements and resurfacing at IL 3 and IL 157 in Cahokia Heights. | — | Executed | Christ Bros. Asphalt, Inc. $989,704 · | ||
| Jun 14, 2024 | 76T58 | VariousDistrict 8 | Guardrail and cable median repairs at various locations in District 8. | — | Executed | Illini Excavation & Reclamation, Inc. $3,771,520 · | ||
| Jun 14, 2024 | 76T62 | VariousDistrict 8 | Provide operable and properly maintained traffic signals, flashing beacons, highway lighting, navigation/aviation lighting, data collection stations at various locations throughout District 8. | — | Executed | Electrico, Inc. $1,627,506 · | ||
| Jun 14, 2024 | 76T63 | VariousDistrict 8 | Maintain and service all ITS equipment at various locations throughout District 8. | — | Executed | Electrico, Inc. $421,036 · | ||
| Jun 14, 2024 | 76T76 | RandolphDistrict 8 | 48.7 miles of pavement patching on IL 3 from the Monroe County line to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line. | — | Executed | E. T. Simonds Construction Company $1,124,540 · | ||
| Jun 14, 2024 | 76T81 | MarionDistrict 8 | 1 mile of patching on US 50 from 0.1 miles east of Selmaville Road to 0.2 miles east of Baldridge Lane and from 0.1 miles west of Weymeyer Avenue to 0.1 miles west of Lackey Street. | — | Executed | Kinney Contractors, Inc. $952,947 · | ||
| Jun 14, 2024 | 76T88 | MadisonDistrict 8 | Patching, milling and resurfacing on US 67 from 10th Street in Alton to IL 111 in Godfrey. | — | Executed | Charles E. Mahoney Co. $4,047,724 · | ||
| Jun 14, 2024 | 76U10 | VariousDistrict 8 | Oil and chip at various maintenance yards throughout District 8. | — | Executed | Baxmeyer Construction, Inc. $193,468 · | ||
| Jun 14, 2024 | 78376 | HamiltonDistrict 9 | Removal of SN 033-9900, pavement removal, curb and gutter removal, full-depth HMA pavement, Combination concrete curb and gutter, PCC sidewalk, storm sewer and tree removal on IL 14 from Pearl Street to Virginia Street in McLeansboro. | — | Executed | Sierra Bravo Contractors, LLC $810,944 · | ||
| Jun 14, 2024 | 78718 | JohnsonDistrict 9 | Removal and replacement of SN 044-2007 carrying US 45 over an unnamed stream, 1 mile south of New Burnside. | — | Executed | Samron Midwest Contracting, Inc. $831,831 · | ||
| Jun 14, 2024 | 78776 | PerryDistrict 9 | 0.75 miles of pavement reconstruction on US 51 from Park Street to Stacy Street in DuQuoin. | — | Executed | E. T. Simonds Construction Company $6,658,488 · | ||
| Jun 14, 2024 | 78861 | AlexanderDistrict 9 | HMA surface removal, HMA resurfacing and pavement patching on Old IL 3 from the Old IL 3 and IL 3 intersection approximately 0.1 miles south of Bean Ridge Road in Thebes to the Old IL 3 and IL 3 intersection approximately 0.1 miles south of Levee Road. | — | Executed | E. T. Simonds Construction Company $704,746 · | ||
| Jun 14, 2024 | 78885 | JeffersonDistrict 9 | Expanding approximately 6.4 miles of I-57 (north of the Atchison Creek Bridge, near mile marker 85 to the Tri-Level south of Mt. Vernon) by adding an additional lane in each direction, installing a median barrier, resurfacing the existing lanes, adding storm sewers and drainage structures, replacement of SN 041-0003 over Dodd-s Creek and overlay of SN 041-0005 over Casey Fork Creek. | — | Executed | E. T. Simonds Construction Company $51,942,477 · | ||
| Jun 14, 2024 | 78961 | FranklinDistrict 9 | 4.7 miles of resurfacing on IL 149 from the Williamson County line to 1.5 miles east of IL 184 in Royalton. | — | Executed | Samron Midwest Contracting, Inc. $2,919,919 · | ||
| Jun 14, 2024 | 78A28 | JeffersonWhiteDistrict 9 | Bridge repairs/rehabilitation at three locations: 1) SN 041-0051 carrying County Highway 10 (E. Richview Road) over I-57, 0.4 miles north of I-64; 2) SN 041-0053 carrying Township Road 1A (N. Old Centralia Lane) over I-57 in Jefferson County, 2.5 miles north of I-64; 3) SN 097-0045 carrying Township Road 214 (County Road 950 E) over I-64, 3 miles east of Burnt Prairie. | — | Executed | E. T. Simonds Construction Company $968,076 · | ||
| Jun 14, 2024 | 78A30 | WhiteDistrict 9 | 0.75 miles of patching, HMA surface removal, resurfacing, and ADA upgrades on Norris City Road from US 45 in Norris City to IL 1. | — | Executed | Samron Midwest Contracting, Inc. $589,589 · | ||
| Jun 14, 2024 | 78A41 | UnionDistrict 9 | Pavement patching and pavement marking at two locations: 1) Entirety of Choate Mental Health Road (also known as Anna Quarry Road); 2) US 51 southbound left turn lane onto IL 146 in Anna. | — | Executed | E. T. Simonds Construction Company $182,105 · | ||
| Jun 14, 2024 | 78A50 | GallatinHardinDistrict 9 | 12.6 miles of tree pruning along IL 1 and IL 34 in Gallatin and Hardin Counties. | — | Executed | Mosley Construction 1, LLC $498,000 · | ||
| Jun 14, 2024 | 78A51 | SalineDistrict 9 | 0.8 miles of resurfacing on US 45 / IL 34 from Poplar Street to IL 145 in Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $979,979 · | ||
| Jun 14, 2024 | 78A55 | JacksonDistrict 9 | Replacing the joints at each end of SN 039-0074 carrying IL 4 over Beaucup Creek, 0.5 miles west of IL 13/127. | — | Executed | Samron Midwest Contracting, Inc. $269,269 · | ||
| Jun 14, 2024 | 78A64 | VariousDistrict 9 | Electrical repair and/or replacement on various routes in District 9. | — | Executed | F. W. Electric, Inc. $223,160 · | ||
| Jun 14, 2024 | 85751 | Rock IslandDistrict 2 | Construct a PCC Shared-Use Path with aggregate base, storm sewer pipes, and riprap along the Mississippi River from 17th Street to intersection of 1st Avenue/19th Street in Moline. | — | Executed | McCarthy Improvement Company $374,446 · | ||
| Jun 14, 2024 | 85760 | OgleDistrict 2 | Resurface Caron Road from 7th Avenue south of Creston Road, and resurface Creston Road from West ;of Carton Road to the I-39 overpass in Rochelle. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,545,544 · | ||
| Jun 14, 2024 | 87722 | DeKalbDistrict 3 | Replace the bridge carrying Pearl Street over South branch of the Kishwaukee ri ver in the Village of Kirkland. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $3,263,762 · | ||
| Jun 14, 2024 | 87749 | DeKalbDistrict 3 | HMA bike path with concrete sidewalk, curb and gutter, storm sewers, and other work along Fairview Drive from Macom Drive to West of Peace Road in the City of Dekalb. | — | Executed | Elliott and Wood, Inc. $498,000 · | ||
| Jun 14, 2024 | 87789 | DeKalbDistrict 3 | Replace the bridge carrying Perry Road over Branch Battle Creek located 1 mile East of Somonauk Road. | — | Executed | Sjostrom & Sons, Inc. $626,763 · | ||
| Jun 14, 2024 | 87801 | LaSalleDistrict 3 | HMA Resurfacing and widening with HMA shoulders, aggregate shoulder, culvert re placement, pavement marking, shoulder rubmble strips, gaurdrail replacement, an d other work along county highway from 21st road to the Livingston county line. | — | Executed | Advanced Asphalt Company $6,972,036 · | ||
| Jun 14, 2024 | 87816 | BureauDistrict 3 | Replace the bridge carring TR 85 over Masters Creek, 3 miles southest of Ohio. | — | Executed | Curnyn Construction Co. $539,871 · | ||
| Jun 14, 2024 | 87817 | BureauDistrict 3 | Replace the bridge carrying CH 12 over East Bureau Creek, 2 miles west of Arlington. | — | Executed | Sjostrom & Sons, Inc. $436,742 · | ||
| Jun 14, 2024 | 87818 | DeKalbDistrict 3 | Replace the bridge carrying TR 230 over West branch of Big Rock Creek located 0 .8 miles Northeast of Hinckley Scott Road. | — | Executed | Sjostrom & Sons, Inc. $1,281,196 · | ||
| Jun 14, 2024 | 87819 | FordDistrict 3 | Constuct a cast-in-place box culvert with HMA approaches and guardrail to carry Thawville Road over an unnamed creek. | — | Executed | Tobey's Construction & Cartage, Inc. $462,541 · | ||
| Jun 14, 2024 | 87823 | LivingstonDistrict 3 | Construct a single-span PPC deck beam bridge on spill-through abutments to carry TR 18C (400 E Road) over Scattering Point Creek, 1 mile south of Flanagan . Projects includes HMA approaches, aggregate shoulders, channel excavation, and seeding. | — | Executed | Tobey's Construction & Cartage, Inc. $432,451 · | ||
| Jun 14, 2024 | 87825 | DeKalbDistrict 3 | HMA resurfacing with 3-foot HMA shoulders on Glidden Road from IL 72 to IL 64. | — | Executed | Rock Road Companies, Inc. $2,477,234 · | ||
| Jun 14, 2024 | 87832 | DeKalbDistrict 3 | Construction of single lane roundabout at the intersection of Lucinda Avenue an d Normal Road in the City of Dekalb. Work includes aggregate subgrade improveme nt, HMA pavement, driveways, sewer construction, pavement markings, traffic sig nal removal, lighting, and other necessary work. | — | Executed | Elliott and Wood, Inc. $1,820,000 · | ||
| Jun 14, 2024 | 87835 | KankakeeDistrict 3 | Construct a three-span PPC deck beam bridge with HMA approaches and guardrail to carry CH 17 over Exline Slough, 5.9 miles northeast of Manteno. | — | Executed | Tobey's Construction & Cartage, Inc. $910,990 · | ||
| Jun 14, 2024 | 87838 | LaSalleDistrict 3 | Reconstruction of Plank Road to provide a 3 lane roadway with bi-directional tu rn lane from Ed Urban Drive to Midtown Road in the City of Peru. | — | Executed | Advanced Asphalt Company $2,875,373 · | ||
| Jun 14, 2024 | 87839 | DeKalbDistrict 3 | Resurface Sycamore Street from the CN Railroad to Walnut Street, and resurface West Hill Street from Emmett Street to Sycamore Street in Genoa. | — | Executed | Peter Baker & Son Co. $253,877 · | ||
| Jun 14, 2024 | 87849 | GrundyDistrict 3 | Remove and replace two precast channel beam superstructures on Gardner Road over Johnny Run and West Fork of Mazon River. Includes the salvage and reinstallation of S1 bridge rail and HMA approach pavment. | — | Executed | D. Construction, Inc. $1,144,745 · | ||
| Jun 14, 2024 | 87867 | GrundyDistrict 3 | HMA resurfacing, curb and gutter, sidewalks and pavement markings on Carbon Hill Road from IL 113 to Spring Road in Coal City. | — | Executed | P. T. Ferro Construction Co. $438,984 · | ||
| Jun 14, 2024 | 89845 | KnoxDistrict 4 | PCC sidewalk with ADA Ramps and drainage improvements at various locations in Galesburg. | — | Executed | Centennial Contractors of the Quad Cities, Inc. $407,609 · | ||
| Jun 14, 2024 | 89851 | MercerDistrict 4 | Construction of sidewalk with storm sewers, seeding, and other work along South east 6th street from College Avenue to Southeast 8th Avenue in the City of Aled o. | — | Executed | Valley Construction Co. $374,224 · | ||
| Jun 14, 2024 | 91641 | VermilionDistrict 5 | Guardrail improvements at various locations in Vermilion County. | — | Executed | Midwest Fence Corporation $1,109,158 · | ||
| Jun 14, 2024 | 91646 | ChampaignDistrict 5 | Rehabiliatate the structure carrying TR 27 over Wilcat Slough, 4 miles northwest of Rantoul. | — | Executed | Stark Excavating, Inc. $247,673 · | ||
| Jun 14, 2024 | 91647 | ChampaignDistrict 5 | Rehabilitate the structure carrying TR 312 over an unnamed stream, 3 miles southeast of St. Joseph. | — | Executed | Stark Excavating, Inc. $283,600 · | ||
| Jun 14, 2024 | 91648 | ChampaignDistrict 5 | Rehabilitate the structure carrying TR 155 over Stony Creek, 2.5 miles south of Royal. | — | Executed | Big O Services, LLC $260,662 · | ||
| Jun 14, 2024 | 93654 | SangamonDistrict 6 | Removal of existing structure and construction of steel girder structure with c ast-in-place concrete deck, aggregate approach roadways, guardrail, and other w ork on Oak Crest Road over the Sangamon River. | — | Executed | Sangamo Construction Company $3,910,795 · | ||
| Jun 14, 2024 | 93808 | ChristianDistrict 6 | Replace the bridge carrying TR 12A over Clear Creek, 2.5 miles northwest of Morrisonville. | — | Executed | C-Hill Civil Contractors, Inc. $481,888 · | ||
| Jun 14, 2024 | 93819 | CassDistrict 6 | Construct an HMA/PCC Multi-Use Path along 15th Street and Sangamon Street in Beardstown. Includes curb and gutter, inlet and storm sewer improvements, striping and signage. | — | Executed | Rees Construction Company of Quincy $857,080 · | ||
| Jun 14, 2024 | 93820 | SangamonDistrict 6 | Sidewalk construction with detectable warnings, incidental HMA resurfacing, see ding, and other related work at various locations in the Village of New Berlin. | — | Executed | Kinney Contractors, Inc. $318,662 · | ||
| Jun 14, 2024 | 95953 | ClayDistrict 7 | Replace the structure carrying Campground Lane over Brush Creek, 1 mile East of Eenia. | — | Executed | Samron Midwest Contracting, Inc. $525,905 · | ||
| Jun 14, 2024 | 95958 | ColesDistrict 7 | Reconstruction of Douglas Street from Hayes Avenue to Coolidge Avenue in the Ci ty of Charleston. | — | Executed | McCarthy Improvement Company $4,262,900 · | ||
| Jun 14, 2024 | 95959 | CrawfordDistrict 7 | Replace the bridge carrying TR 47 over Hutson Creek, 2 miles west of Hutsonville. | — | Executed | Samron Midwest Contracting, Inc. $837,910 · | ||
| Jun 14, 2024 | 95960 | ColesDistrict 7 | Resurfacing, with pavement markings and rumble strips on Westfield Road from Lincoln National Memorial to the Coles/Clark County Line. | — | Executed | Ne-Co Asphalt Co., Inc. $2,999,290 · | ||
| Jun 14, 2024 | 95961 | ShelbyDistrict 7 | Resurfacing on CH 5 from N 2075 E Road to N 1875 E Road. | — | Executed | Howell Paving, Inc. $1,494,484 · | ||
| Jun 14, 2024 | 95962 | JasperDistrict 7 | Reconstruct CH 10 with soil-cement base course and bituminous cover coat from IL 130 to St. Marie Road. | — | Executed | Mt. Carmel Stabilization Group, Inc. $667,704 · | ||
| Jun 14, 2024 | 95964 | MoultrieDistrict 7 | Cement processed modified soil base with bituminous surface treatment and aggregate shoulders on CH 8 from 2200 N Rd. to Il 133, and from 2500 N Rd. to 2400 N Road. | — | Executed | Dunn Company $1,294,568 · | ||
| Jun 14, 2024 | 97829 | MadisonDistrict 8 | Resurface Third Street from Ewing Avenue to McCambridge Avenue in Madison. | — | Executed | Stutz Excavating, Inc. $1,028,780 · | ||
| Jun 14, 2024 | 97831 | St. ClairDistrict 8 | HMA resurfacing and installation of waterproofing system on three separate PPC deck beam structures. Includes removal of existng HMA surface and waterproofing membrane system, repairs to the beam keyways and dowel bar grout. | — | Executed | The Kilian Corporation $353,072 · | ||
| Jun 14, 2024 | 97832 | MadisonDistrict 8 | Resurface South Moreland Road from IL 143 to 0.2 miles south of IL 140. | — | Executed | The Kilian Corporation $1,971,366 · | ||
| Jun 14, 2024 | 97835 | MadisonDistrict 8 | HMA resurfacing with pavement patching, dowel bar retrofitting, thermoplastic pavement markings and signage on University Drive from University Park Drive to Stadium Drive on the SIU Campus in Edwardsville. | — | Executed | The Kilian Corporation $864,757 · | ||
| Jun 14, 2024 | 97836 | MadisonDistrict 8 | Rehabilitate the structure carrying Brown Street over Shields Branch in Alton. Includes linging the existing structure with precast concrete box culvert sections, HMA resurfacing, sidewalk, guardrail, pedestrian railing, riprap, storm sewer, pavment markings, and other work. | — | Executed | Stutz Excavating, Inc. $730,633 · | ||
| Jun 14, 2024 | 99724 | SalineDistrict 9 | Resurfacing Harco Road from IL 34 to IL 13. | — | Executed | E. T. Simonds Construction Company $1,930,584 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.