(105,106)RS-3
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Howell Paving, Inc. Low bidder | $11,501,896 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Howell Paving, … |
|---|---|---|---|---|---|---|
| 1 | X1200030 | FILL INLETS TEMP | 2 | EACH | $4,790.00 | |
| 2 | X1400326 | R R FL BEACON A COMP | 6 | EACH | $10,433.59 | |
| 3 | X5870015 | BR DK CONCRETE SEALER | 9,266 | SQ FT | $2.95 | |
| 4 | X6010003 | PIPE DRAIN REMOVAL | 316 | FOOT | $18.85 | |
| 5 | X6050700 | REMOVE INLET BOX | 4 | EACH | $789.15 | |
| 6 | X6660445 | ROW/PROPERTY CORNERS | 2 | EACH | $464.13 | |
| 7 | X7200201 | WIDTH RESTRICT SIGN | 1 | L SUM | $3,570.00 | |
| 8 | Z0001495 | BR APPROACH SHLD REM | 39 | SQ YD | $33.80 | |
| 9 | Z0001903 | STRUCT STEEL REMOV | 3,340 | POUND | $6.65 | |
| 10 | Z0007101 | C&D LEAD PT CL RS N1 | 1 | L SUM | $11,155.00 | |
| 11 | Z0010501 | CLEAN & PT STL BR N1 | 1 | L SUM | $73,890.00 | |
| 12 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $60,216.91 | |
| 13 | Z0016001 | DECK SLAB REP (FD-T1) | 1.3 | SQ YD | $8,915.45 | |
| 14 | Z0016200 | DECK SLAB REP (PART) | 11 | SQ YD | $667.85 | |
| 15 | Z0034105 | MATL TRANSFER DEVICE | 31,574 | TON | $2.76 | |
| 16 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $66,372.55 | |
| 17 | Z0076600 | TRAINEES | 4,000 | HOUR | $0.8000 | |
| 18 | Z0076604 | TRAINEES TPG | 4,000 | HOUR | $15.00 | |
| 19 | 20200100 | EARTH EXCAVATION | 15 | CU YD | $317.35 | |
| 20 | 20200600 | EXC & GR EX SHOULDER | 643 | UNIT | $584.11 | |
| 21 | 21400100 | GRADING & SHAP DITCH | 50 | FOOT | $117.85 | |
| 22 | 25000210 | SEEDING CL 2A | 0.25 | ACRE | $8,160.00 | |
| 23 | 25000400 | NITROGEN FERT NUTR | 25 | POUND | $12.24 | |
| 24 | 25000500 | PHOSPHORUS FERT NUTR | 25 | POUND | $12.24 | |
| 25 | 25000600 | POTASSIUM FERT NUTR | 25 | POUND | $12.24 | |
| 26 | 25100115 | MULCH METHOD 2 | 0.25 | ACRE | $8,160.00 | |
| 27 | 28100205 | STONE RIPRAP CL A3 | 9 | TON | $493.45 | |
| 28 | 28100207 | STONE RIPRAP CL A4 | 80 | TON | $197.15 | |
| 29 | 28100707 | STONE DUMP RIP CL A4 | 24 | SQ YD | $221.20 | |
| 30 | 28200200 | FILTER FABRIC | 84 | SQ YD | $12.85 | |
| 31 | 28400100 | GABIONS | 60 | CU YD | $520.20 | |
| 32 | 40600290 | BIT MATLS TACK CT | 12,176 | POUND | $1.31 | |
| 33 | 40600370 | LONG JOINT SEALANT | 60,370 | FOOT | $2.91 | |
| 34 | 40600982 | HMA SURF REM BUTT JT | 1,678 | SQ YD | $27.92 | |
| 35 | 40600990 | TEMPORARY RAMP | 3,111 | SQ YD | $9.93 | |
| 36 | 40603085 | HMA BC IL-19.0 N70 | 18,946 | TON | $139.37 | |
| 37 | 40604062 | HMA SC IL-9.5 D N70 | 12,628 | TON | $142.88 | |
| 38 | 40800029 | BIT MATLS TACK CT | 756 | POUND | $5.02 | |
| 39 | 40800050 | INCIDENTAL HMA SURF | 190 | TON | $371.04 | |
| 40 | 42300200 | PCC DRIVEWAY PAVT 6 | 7 | SQ YD | $576.30 | |
| 41 | 42400100 | PC CONC SIDEWALK 4 | 915 | SQ FT | $31.11 | |
| 42 | 42400800 | DETECTABLE WARNINGS | 60 | SQ FT | $45.90 | |
| 43 | 44000164 | HMA SURF REM 3 3/4 | 150,364 | SQ YD | $6.79 | |
| 44 | 44000200 | DRIVE PAVEMENT REM | 7 | SQ YD | $306.00 | |
| 45 | 44000600 | SIDEWALK REM | 600 | SQ FT | $6.12 | |
| 46 | 44200050 | WELDED WIRE REINF | 348 | SQ YD | $25.50 | |
| 47 | 44201031 | CL B PATCH T2 15 | 49 | SQ YD | $300.90 | |
| 48 | 44201035 | CL B PATCH T3 15 | 44 | SQ YD | $306.00 | |
| 49 | 44201037 | CL B PATCH T4 15 | 304 | SQ YD | $311.10 | |
| 50 | 44201294 | CL B PATCH EXPAN JT | 24 | FOOT | $76.50 | |
| 51 | 44201299 | DOWEL BARS 1 1/2 | 320 | EACH | $13.26 | |
| 52 | 44213200 | SAW CUTS | 810 | FOOT | $10.97 | |
| 53 | 44213204 | TIE BARS 3/4 | 37 | EACH | $4.34 | |
| 54 | 48102100 | AGG WEDGE SHLD TYPE B | 3,838 | TON | $56.18 | |
| 55 | 48203029 | HMA SHOULDERS 8 | 28,520 | SQ YD | $56.37 | |
| 56 | 48203100 | HMA SHOULDERS | 4,695 | TON | $132.30 | |
| 57 | 50102400 | CONC REM | 30.7 | CU YD | $1,883.15 | |
| 58 | 50105220 | PIPE CULVERT REMOV | 5 | FOOT | $153.00 | |
| 59 | 50300100 | FLOOR DRAINS | 12 | EACH | $2,315.45 | |
| 60 | 50300255 | CONC SUP-STR | 54.7 | CU YD | $2,987.35 | |
| 61 | 50800205 | REINF BARS, EPOXY CTD | 8,450 | POUND | $3.95 | |
| 62 | 50800515 | BAR SPLICERS | 60 | EACH | $59.80 | |
| 63 | 542D0220 | P CUL CL D 1 15 | 27 | FOOT | $193.80 | |
| 64 | 54213660 | PRC FLAR END SEC 15 | 1 | EACH | $1,887.00 | |
| 65 | 54261712 | STEEL FL END SEC 12" | 4 | EACH | $684.00 | |
| 66 | 60100945 | PIPE DRAINS 12 | 318 | FOOT | $53.80 | |
| 67 | 61000050 | CONC THRUST BLOCKS | 4 | EACH | $671.15 | |
| 68 | 61000335 | TY G INLET BOX 610001 | 4 | EACH | $4,390.00 | |
| 69 | 63000001 | SPBGR TY A 6FT POSTS | 1,684 | FOOT | $33.05 | |
| 70 | 63000030 | SPGR ATT TO CULVERT | 79 | FOOT | $411.40 | |
| 71 | 63000350 | LSG OV CUL 12'6" SPAN | 37.5 | FOOT | $70.00 | |
| 72 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $4,640.00 | |
| 73 | 63100167 | TR BAR TRM T1 SPL TAN | 11 | EACH | $4,270.00 | |
| 74 | 63200310 | GUARDRAIL REMOV | 2,197 | FOOT | $13.70 | |
| 75 | 64200108 | SHOULDER RUM STRIP 8 | 82,702 | FOOT | $0.2200 | |
| 76 | 66201120 | CONC SHLD CURB | 36 | FOOT | $117.50 | |
| 77 | 66900200 | NON SPL WASTE DISPOSL | 40 | CU YD | $914.72 | |
| 78 | 66900530 | SOIL DISPOSAL ANALY | 6 | EACH | $1,300.00 | |
| 79 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,200.00 | |
| 80 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,200.00 | |
| 81 | 66901006 | REG SUB MON | 6 | CAL DA | $1,240.00 | |
| 82 | 67000400 | ENGR FIELD OFFICE A | 12 | CAL MO | $2,974.35 | |
| 83 | 67100100 | MOBILIZATION | 1 | L SUM | $793,297.63 | |
| 84 | 70100405 | TRAF CONT-PROT 701321 | 1 | EACH | $26,555.00 | |
| 85 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $28,165.00 | |
| 86 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $179,942.05 | |
| 87 | 70100500 | TRAF CONT-PROT 701326 | 1 | L SUM | $85,820.98 | |
| 88 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $25,719.35 | |
| 89 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $2,520.00 | |
| 90 | 70103815 | TR CONT SURVEILLANCE | 10 | CAL DA | $1,276.21 | |
| 91 | 70106500 | TEMP BR TRAF SIGNALS | 1 | EACH | $18,360.00 | |
| 92 | 70106700 | TEMP RUMBLE STRIPS | 6 | EACH | $714.00 | |
| 93 | 70107025 | CHANGEABLE MESSAGE SN | 56 | CAL DA | $120.00 | |
| 94 | 70300100 | SHORT TERM PAVT MKING | 5,514 | FOOT | $2.94 | |
| 95 | 70300150 | SHRT TRM PAVT MK REM | 1,838 | SQ FT | $5.36 | |
| 96 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 153,409 | FOOT | $0.1700 | |
| 97 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 144 | FOOT | $2.00 | |
| 98 | 70400100 | TEMP CONC BARRIER | 562.5 | FOOT | $49.85 | |
| 99 | 70400200 | REL TEMP CONC BARRIER | 562.5 | FOOT | $11.85 | |
| 100 | 70600251 | IMP ATTN TEMP NRN TL3 | 2 | EACH | $3,980.00 | |
| 101 | 70600352 | IMP ATTN REL NRN TL3 | 2 | EACH | $1,185.00 | |
| 102 | 72400100 | REMOV SIN PAN ASSY TA | 4 | EACH | $572.19 | |
| 103 | 72400500 | RELOC SIN PAN ASSY TA | 1 | EACH | $1,144.40 | |
| 104 | 72501000 | TERMINAL MARKER - DA | 11 | EACH | $50.00 | |
| 105 | 78000400 | THPL PVT MK LINE 6 | 153,409 | FOOT | $0.6200 | |
| 106 | 78000650 | THPL PVT MK LINE 24 | 144 | FOOT | $27.00 | |
| 107 | 78100100 | RAISED REFL PAVT MKR | 826 | EACH | $37.31 | |
| 108 | 78200005 | GRDRAIL REF TYPE A | 32 | EACH | $10.00 | |
| 109 | 78300200 | RAISED REF PVT MK REM | 826 | EACH | $0.0100 | |
| 110 | 78300202 | PVT MKG REM WTR BLAST | 76,994 | SQ FT | $0.5600 |