| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 20, 2023 | 76R68 | MadisonDistrict 8 | Pavement patching on the ramps at I-255 and I-55/70 interchange. | — | Executed | Keeley & Sons, Inc. $396,963 · | ||
| Jan 20, 2023 | 76R70 | MadisonDistrict 8 | Partial and full depth patching on IL 160 from John Street in Grantfork to US 4. | — | Executed | Christ Bros. Asphalt, Inc. $544,881 · | ||
| Jan 20, 2023 | 76R71 | MadisonDistrict 8 | Partial and full depth patching on IL 3 from McKinley Bridge to New Poag Road. | — | Executed | Kinney Contractors, Inc. $516,396 · | ||
| Jan 20, 2023 | 76R86 | ClintonDistrict 8 | 160- of HMA surface removal and overlay on eastbound I-64 over Sugar Creek Overflow and Sugar Creek, west of Damiansville. (SN 014-0040 and SN 014-0042) | — | Executed | The Kilian Corporation $101,479 · | ||
| Jan 20, 2023 | 78604 | JeffersonDistrict 9 | 10.8 miles of reconstruction/rehabilitation on I-64 from 0.3 miles east of Shiloh Road to just east of the Washington County line. | — | Executed | Plote Construction, Inc. $94,073,768 · | ||
| Jan 20, 2023 | 78682 | WhiteDistrict 9 | Replacement of SN 097-0013 carrying US 45 over Bear Creek and SN 097-0014 carrying US 45 over TR 381, approximately 2 miles south of Norris City. | — | Executed | E. T. Simonds Construction Company $2,693,689 · | ||
| Jan 20, 2023 | 78716 | SalineDistrict 9 | Remove and replace SN 083-0001 and 083-0002 carrying US 45 over North Fork of Saline River and overflow, 1 mile and 0.5 miles north of Texas City. | — | Executed | E. T. Simonds Construction Company $9,746,225 · | ||
| Jan 20, 2023 | 78778 | FranklinDistrict 9 | 1.5 miles of milling, rubbilizing and resurfacing on IL 148 from Ziegler-Royalton School to north of Yellow Banks Road. | — | Executed | Samron Midwest Contracting, Inc. $2,185,355 · | ||
| Jan 20, 2023 | 78866 | AlexanderDistrict 9 | Surface preparation and application of bridge deck concrete sealer at SN 002-0022 carrying I-57 over the Mississippi River. | — | Executed | All States Painting, Inc. $39,400 · | ||
| Jan 20, 2023 | 78909 | SalineDistrict 9 | Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg. , Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg. | — | Executed | Brown Electric, Inc. $412,836 · | ||
| Jan 20, 2023 | 78963 | JeffersonDistrict 9 | Joint reconstruction with strip seals, bridge deck and structure repair, crack sealer, and waterproofing with HMA overlay on SN 041-0096 carrying IL 148 over Big Muddy River. | — | Executed | E. T. Simonds Construction Company $830,574 · | ||
| Jan 20, 2023 | 78966 | UnionDistrict 9 | New bridge deck overlay on SN 091-0060 carrying IL 146 over Clear Creek, 2 miles east of IL 3. | — | Executed | E. T. Simonds Construction Company $200,126 · | ||
| Jan 20, 2023 | 78980 | VariousDistrict 9 | Weed spraying for the control of Johnson Grass along I-57 at various locations. | — | Executed | The Daltons Inc. $116,248 · | ||
| Jan 20, 2023 | 78981 | VariousDistrict 9 | Weed spraying for the control of broadleaf weeds at various locations along I-24 and I-57. | — | Executed | Endrizzi Contracting, Inc $159,610 · | ||
| Jan 20, 2023 | 85700 | LeeDistrict 2 | Construction of a shared-use path, concrete curb and gutter, driveways, drainage adjustments, boardwalk structures, retaining walls, lighting, and landscaping along an abandoned railroad from South Peoria Avenue to Depot Avenue in Dixon. | — | Executed | Martin & Company Excavating $4,313,104 · | ||
| Jan 20, 2023 | 85730 | LeeDistrict 2 | Resurfacing, sidewalks, curb and guttr, segmantal block wall, signing and pavement markings on various routes in Dixon. | — | Executed | Martin & Company Excavating $2,010,320 · | ||
| Jan 20, 2023 | 85731 | OgleDistrict 2 | Remove 3 span steel girder bridge and replace with 3-span I-beam bridge with HMA approach, and raised roadway profile on Milledgeville Road over Buffalo Creek. | — | Executed | Sjostrom & Sons, Inc. $2,993,599 · | ||
| Jan 20, 2023 | 85732 | BooneDistrict 2 | Removal of a three-span concrete slab bridge and construction of a two-span PPC I-Beam bridge with integral abutments and approach roadway construction on Poplar Grove Road over Beaver Creek in Boone County. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,640,467 · | ||
| Jan 20, 2023 | 87673 | LaSalleDistrict 3 | Replace the bridge carrying CH 57 over the Vermilion River, 1.2 miles north of 18th Road. | — | Executed | D. Construction, Inc. $4,537,912 · | ||
| Jan 20, 2023 | 87759 | KankakeeDistrict 3 | HMA multi-use path with concrete sidewalk replacement, curb and gutter, concrete pavement replacement, HMA surface removal and replacement, erosion control, landscaping, lighting, on the north side of IL1/IL17 in Grant Park. | — | Executed | Ruben E. Smith Const. and R & R, Inc. $416,337 · | ||
| Jan 20, 2023 | 87783 | KendallDistrict 3 | Convert 4-way intersection to HMA roundabout with drainage improvements, lighting and a multi-use path with ADA ramps. | — | Executed | Lake County Grading Company, LLC $10,257,420 · | ||
| Jan 20, 2023 | 87799 | KankakeeDistrict 3 | Resurfacing CH 18 from IL 17 to IL 115. | — | Executed | Kankakee Valley Construction Company, Inc. $1,044,289 · | ||
| Jan 20, 2023 | 87807 | LaSalleDistrict 3 | Resurface Chartres Street from Raccuglia Drive to Pershing Road in LaSalle. | — | Rejected | Advanced Asphalt Company $400,127 · | ||
| Jan 20, 2023 | 89817 | WoodfordDistrict 4 | Resurface Santa Fe Trail from IL 26/Spring Bay Road to Ch 19/Lourdes Road. | — | Executed | Advanced Asphalt Company $952,797 · | ||
| Jan 20, 2023 | 89821 | PeoriaDistrict 4 | Rehabilitate the bridge carrying CH 23R over Timber Creek, 0.7 mile north of IL 8. | — | Executed | Stark Excavating, Inc. $727,272 · | ||
| Jan 20, 2023 | 89822 | PeoriaDistrict 4 | Replace existing box culvert on Graham Chapel Road at a Tributary of West Fork over Kickapoo Creek, 0.6 mile west of Stone School Road. | — | Executed | Illinois Civil Contractors, Inc. $1,333,481 · | ||
| Jan 20, 2023 | 89826 | PeoriaDistrict 4 | PCC pavement reconstruction, PCC Shoulders, curb and gutter, storm sewer replacement, traffic signal installation and lighting on Old Galena Road from IL 29 north to Neal Lane with a 0.26 mile omission north of IL 29 to south of Engine Drive. | — | Executed | Stark Excavating, Inc. $4,982,316 · | ||
| Jan 20, 2023 | 91609 | ChampaignDistrict 5 | Resurface Main Street from 0.1 mile west of Division Street to east of Lincoln Street, North Division Street from north of State Street to north of US 150, and State Street from 0.1 mile west of Division Street to 0.1 mile east of Division Street in Mahomet. | — | Executed | Cross Construction, Inc. $879,592 · | ||
| Jan 20, 2023 | 91616 | ChampaignDistrict 5 | Construct a shared use PCC path with prefabricated pedestrian truss superstructure, eathwork, seeding and erosion control, along Crystal Lake park and west of Broadway Avenue in Urbana. | — | Executed | Stark Excavating, Inc. $430,250 · | ||
| Jan 20, 2023 | 91623 | DouglasDistrict 5 | Resurface Oakland Road from 5 miles south of US 36 to Township Road 2100 N. | — | Executed | Howell Paving, Inc. $1,157,695 · | ||
| Jan 20, 2023 | 93785 | SangamonDistrict 6 | Replace existing structure with a single span steel girder superstructure with concrete deck and aggregate approaches that carrys Irwin Bridge Road over Richland Creek, 1.5 miles east of Salisbury. | — | Executed | County Contractors, Inc. $1,349,897 · | ||
| Jan 20, 2023 | 93793 | LoganDistrict 6 | Replace the bridge carrying CH 15 over the Sugar Creek Overflow, 1.5 miles South of New Holland. | — | Executed | Otto Baum Company, Inc. $1,048,500 · | ||
| Jan 20, 2023 | 93795 | MacoupinDistrict 6 | Reconstruction of Brighton Bunker Hill Road from Fostesburg Road to Shipman Cutoff Road. Includes Replacement of the bridge over Girdes Branch. | — | Executed | Stutz Excavating, Inc. $5,238,573 · | ||
| Jan 20, 2023 | 93798 | PikeDistrict 6 | Full Depth Reclamation and resurfacing with aggregate wedge shoulders, sidewalk, storm sewer, and pavement markings on CH 2 from CH 3 in New Salem to IL 107. | — | Executed | Diamond Construction Company $3,489,688 · | ||
| Jan 20, 2023 | 95927 | ClarkDistrict 7 | Curb and Gutter, Sidewalks, ADA Ramps, Storm Sewers, and Street Lights, at various locations in Marshall. | — | Rejected | Feutz Contractors, Inc. $1,521,510 · | ||
| Jan 20, 2023 | 97785 | MadisonDistrict 8 | Reconstruct North Buchanan Street from East Union Street to Hillsboro Avenue in Edwaardsville. | — | Executed | Stutz Excavating, Inc. $1,291,558 · | ||
| Jan 20, 2023 | 97787 | MadisonDistrict 8 | Reconstruction of clay Street from North Main Street to North Dewey Street in Troy. | — | Rejected | Baxmeyer Construction, Inc. $1,536,288 · | ||
| Jan 20, 2023 | 97791 | MarionDistrict 8 | Pulverize and regarde existing pavement, aggregate base, HMA resurfacing, aggregate shoulders, pipe culverts, curb and gutter, and pavment markings on Gragg Street from Lincoln Boulevard to Country Club Road in Centralia. | — | Executed | Guinzy Construction,Inc. $1,778,437 · | ||
| Jan 20, 2023 | 97794 | St. ClairDistrict 8 | Resurfacing, curb and gutter replacement, sidewalks, and pavement markings on State Street/Old Vincennes Trail from Smiley Street to Scott Troy Road in O'Fallon. | — | Executed | The Kilian Corporation $987,743 · | ||
| Jan 20, 2023 | 97796 | JerseyDistrict 8 | Resurfcing, HMA shoulder widening, pipe under-drains, shoulder and centerline rumble strips, reshaping fore slopes, guardrail, and pavement markings on Otterville Road from IL 16 to Main Street in Otterville. | — | Executed | Charles E. Mahoney Co. $4,204,411 · | ||
| Jan 20, 2023 | 97797 | MonroeDistrict 8 | Replace the bridge carrying CH 12 over a drainage canal located 0.10 mile west of the Valmeyer corporate limits. | — | Executed | Keeley & Sons, Inc. $699,925 · | ||
| Mar 10, 2023 | 46611 | VariousDistrict 2 | Removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order. | — | Executed | O'Brien Civil Works, Inc. $144,456 · | ||
| Mar 10, 2023 | 46612 | VariousDistrict 2 | Placing various widths of modified urethane and thermoplastic pavement marking lines, letters and symbols within the limits specified on each individual work order. | — | Executed | A. C. Pavement Striping Co. $1,999,000 · | ||
| Mar 10, 2023 | 46614 | VariousDistrict 6 | Removing and replacing damaged raised reflective pavement markers or lenses at various locations within District 6. | — | Executed | P & P Construction Co. $627,090 · | ||
| Mar 10, 2023 | 60Y72 | CookDistrict 1 | (2.21-Mile) Roadway reconstruction, traffic signal modernization, drainage improvement, stormwater detention storage, construction of new sidewalk and multi-use path, new roadway lighting and signage, and aesthetic landscaping to Wood Street from 161st Street to Thornton Road, located in the City of Harvey and Village of Dixmoor, Cook County. | — | Executed | Judlau Contracting, Inc. $57,274,935 · | ||
| Mar 10, 2023 | 61H59 | CookDistrict 1 | Reconstruct the intersection of Touhy Avenue and Gross Point Road to include roadway widening, sidewalk replacement, multi-use path, curb and gutter, storm sewer, roadway lighting, traffic signals and pavment markings in Niles. | — | Executed | Alliance Contractors, Inc. $3,923,898 · | ||
| Mar 10, 2023 | 61J06 | LakeDistrict 1 | HMA Resurfacing, PCC sidewalk with ADA improvements, patching, drainage improvements, and pavement markings along Deer Park Boulevard in Deer Park. | — | Executed | Geske and Sons, Inc. $576,911 · | ||
| Mar 10, 2023 | 61J07 | CookDistrict 1 | HMA Resurfacing, curb and gutter, and pavment markings on 76th Avenue in Palos Heights. | — | Executed | D. Construction, Inc. $302,483 · | ||
| Mar 10, 2023 | 61J15 | LakeDistrict 1 | HMA resurfacing and widening at the Lakeview Parkway and Hawthorn Parkway intersection and at the Lakeview Parkway and IL 60 intersection. Includes PCC path, ADA ramps, storm sewers, traffic signals and lighting modifications in Vernon Hills. | — | Executed | Alliance Contractors, Inc. $6,074,312 · | ||
| Mar 10, 2023 | 61J16 | CookDistrict 1 | Traffic signal modernization, HMA resurfacing, Pedestrian safety enhancements, storm sewers, landscaping, and pavement markings at the intersection of US 41 and Lake Avenue in Wilmette. | — | Executed | Capitol Cement Co., Inc. $2,066,472 · | ||
| Mar 10, 2023 | 61J26 | CookDistrict 1 | Install bike shelter, bike racks, repair stations, and sidewalk replacement at the Van Buren Street Parking Lot and at the northwest corner of Harlem Avenue and Harrison Street in Forest Park. | — | Executed | |||
| Mar 10, 2023 | 61J29 | McHenryDistrict 1 | HMA surface removal and resurfacing, pavement patching, aggregate shoulders, and pavement markings along Pingree Road in Lake in the Hills. | — | Executed | Geske and Sons, Inc. $283,920 · | ||
| Mar 10, 2023 | 61J31 | DuPageDistrict 1 | HMA removal and resurfacing, Sidewalk ADA ramp upgrades, curb and gutter, and pavement markings algon various routes in Lisle. | — | Executed | Schroeder Asphalt Services, Inc. $695,387 · | ||
| Mar 10, 2023 | 61J32 | DuPageDistrict 1 | HMA resurfacing, pavement markings, sidewalk ADA ramps, curb and gutter along Technology Boulevard in West Chicago. | — | Executed | Plote Construction, Inc. $758,000 · | ||
| Mar 10, 2023 | 61J36 | CookDistrict 1 | Bike shelter installation, bike lane pavement, markings and signage at various location in Northbrook. | — | Executed | Alliance Contractors, Inc. $196,357 · | ||
| Mar 10, 2023 | 62J30 | CookDistrict 1 | Intersection widening, drainage, traffic signal modernization, lighting and sidewalk The project consists of Intersection widening, drainage, traffic signal modernization, lighting and sidewalk. The project is in the Village of Schaumburg and Hanover Park in Schaumburg Township. The total length of this project is 1338 ft. | — | Executed | R. W. Dunteman Company $2,443,180 · | ||
| Mar 10, 2023 | 62K03 | CookDistrict 1 | (3032-Ft) Installation of permanent traffic signals, proposed left lane addition on both legs of central avenue, as well as left turn lane storage extension on 183rd Street, widening existing shoulders, raising the profile 2.5 foot at the intersection, thermoplastic pavement markings, raised reflective pavement marker installation within the Village of Tinley Park in Cook County. | — | Executed | D. Construction, Inc. $2,706,023 · | ||
| Mar 10, 2023 | 62M65 | CookLakeDistrict 1 | Location 1: (9,353-Ft) Designed overlay improvement on Barrington Rd in the villages of Inverness, Barrington, South Barrington and Barrington Hills in Cook County. Location 2: (366-Ft) Drainage improvement on Lake Cook Rd in the village of Deer Park. | — | Executed | Plote Construction, Inc. $1,750,124 · | ||
| Mar 10, 2023 | 62N80 | CookDistrict 1 | (2.89-Mile) 3P SMART overlay project on Willow Rd from Landwehr Rd to west of IL 43. Located in the Villages of Glenview and Northbrook in Cook County. | — | Executed | Arrow Road Construction Co. $3,921,219 · | ||
| Mar 10, 2023 | 62N85 | CookDistrict 1 | (1.1-mile) Intersection improvement, traffic signal modernization project along IL50/IL 83 (Cicero Ave) at Midlothian Turnpike, 135th St and Cal Sag Rd located in the Village of Crestwood in Cook County. | — | Executed | D. Construction, Inc. $3,101,824 · | ||
| Mar 10, 2023 | 62R17 | CookDistrict 1 | Loc 1: (1.63-Mile); Loc 2: (3,578-Ft); Loc 3: (372-ft); Standard Overlay, HMA Shoulders, ADA Improvements. Loc 1: Algonquin Rd (IL 83 to Wolf Street); Loc 2 Algonquin Rd (I-294 to Sibley St); Loc 3: IL 83 (Main St) (US 14 to Evergreen Ave) in the Cities of Des Plaines and Park Ridge and the Village of Mount Prospect in Cook County. | — | Executed | Arrow Road Construction Co. $2,823,438 · | ||
| Mar 10, 2023 | 62R50 | McHenryDistrict 1 | Removal and replacement of culvert culvert at US 14 over Ditch (3 Miles South of State Line) located in the un (345-Ft) Proposed improvement consists of removal and replacement of culvert culvert at US 14 over Ditch (3 Miles South of State Line) located in the unincorporated Chemung Township in McHenry County. | — | Executed | Sjostrom & Sons, Inc. $1,004,302 · | ||
| Mar 10, 2023 | 62R54 | CookDistrict 1 | (3592 FEET), Design overlay and ADA improvements, Belmont Ave (25th Ave to 225 feet West of Elm St) in the village of Franklin Park in the township of Leyden in Cook County. | — | Executed | Arrow Road Construction Co. $1,381,362 · | ||
| Mar 10, 2023 | 62R55 | WillDistrict 1 | (980-Ft) project which includes replacement and widening of the bridge carrying Briggs Street over FAI 80 in Joliet Township within Will County. | — | Executed | D. Construction, Inc. $7,287,827 · | ||
| Mar 10, 2023 | 62R68 | WillDistrict 1 | Bridge joint replace/repairs of structure carrying Arsenal Road (SN 099-3392) over BNSF Railroad and Jackson C (575-Ft) Improvements consist of bridge joint replace/repairs of structure carrying Arsenal Road (SN 099-3392) over BNSF Railroad and Jackson Creek in the Village of Elwood, Will County. | — | Executed | P. T. Ferro Construction Co. $258,287 · | ||
| Mar 10, 2023 | 62R70 | CookDistrict 1 | (2,203-Ft) Pavement Rehabilitation (Standard Overlay), ADA Improvements. Location: Old Arlington Heights Road from Arlington Heights Road to IL 68 (Dundee Road) in the Villages of Buffalo Grove and Arlington Heights. | — | Executed | J. A. Johnson Paving Company $607,596 · | ||
| Mar 10, 2023 | 62T97 | CookDistrict 1 | Substructure and sidewalk repairs of the structure (016-2033) carrying 123rd Street over I-57 in the Village o This improvement consists of substructure and sidewalk repairs of the structure (016-2033) carrying 123rd Street over I-57 in the Village of Calumet Park in Cook County. | — | Executed | D. Construction, Inc. $347,375 · | ||
| Mar 10, 2023 | 62U14 | CookDistrict 1 | Cleaning and painting existing steel on the structures No The improvement consists of cleaning and painting existing steel on the structures No. 1: 127th Street West of Homan Ave.; No. 2: IL-7, 86th Ave. Over L-7 SW Hwy, in Village Village of Palos Park and in City of Blue Island, in Cook County. , The improvement consists of cleaning and painting existing steel on the structures No. 1: 127th Street West of Homan Ave.; No. 2: IL-7, 86th Ave. over IL-7 SW Hwy, in Village of Palos Park and in City of Blue Island, in Cook County. | — | Executed | Capital Industrial Services $883,300 · | ||
| Mar 10, 2023 | 62U35 | CookDistrict 1 | Bridge joint sealing, bridge deck concrete sealer upon the entire top surface of the bridge decks, in the city This improvement consists of bridge joint sealing, bridge deck concrete sealer upon the entire top surface of the bridge decks, in the city of Chicago, Cook County. | — | Executed | Rausch Infrastructure, LLC $594,565 · | ||
| Mar 10, 2023 | 62U38 | CookDistrict 1 | Bridge deck sealing of structures along IL 171 just North and South of I-55 (Stevenson Expressway) in the Vill The improvement consists of bridge deck sealing of structures along IL 171 just North and South of I-55 (Stevenson Expressway) in the Villages of McCook, Summit and Lyons, Cook County. Net length 8448 feet (1.6 miles). | — | Executed | M & M Concrete, Inc. $131,491 · | ||
| Mar 10, 2023 | 62U45 | CookDistrict 1 | This contract consists, of debris and litter cleaning along I-55 (Stevenson Expwy) from Lake Shore Dr to IL-43 (Harlem Ave). | — | Executed | Orlando Lawn Service, Inc. $301,500 · | ||
| Mar 10, 2023 | 62U51 | CookDistrict 1 | Debris and litter cleaning along I-94 (Bishop Ford Expwy) from I-90/94 (Dan Ryan Expwy) to 1-80, Stony Island This contract consists of debris and litter cleaning along I-94 (Bishop Ford Expwy) from I-90/94 (Dan Ryan Expwy) to 1-80, Stony Island Ave from I-94 to US-12 (95th SO, and 103rd St from Cottage Groove to Stony Island. | — | Executed | MYS, Incorporated $539,949 · | ||
| Mar 10, 2023 | 62U57 | CookDistrict 1 | Debris and litter cleaning along I-190/90/94 (Kennedy Expressway) from US-12/45 (Mannheim Road) to Congress Pa This contract consists of debris and litter cleaning along I-190/90/94 (Kennedy Expressway) from US-12/45 (Mannheim Road) to Congress Parkway. | — | Executed | MYS, Incorporated $298,812 · | ||
| Mar 10, 2023 | 62U58 | CookDistrict 1 | Debris and litter cleaning along I-90/94 (Dan Ryan Expressway) from Congress Pkwy to I-57/I-94 (Bishop Ford Ex This contract consists of debris and litter cleaning along I-90/94 (Dan Ryan Expressway) from Congress Pkwy to I-57/I-94 (Bishop Ford Expwy). | — | Executed | MYS, Incorporated $475,040 · | ||
| Mar 10, 2023 | 62U59 | CookDistrict 1 | Debris and litter cleaning along I-290 and IL-110 (Eisenhower Expwy) from Austing Blvd to Wells Street This contract consists of debris and litter cleaning along I-290 and IL-110 (Eisenhower Expwy) from Austing Blvd to Wells Street. | — | Executed | Orlando Lawn Service, Inc. $417,600 · | ||
| Mar 10, 2023 | 62U60 | CookDuPageDistrict 1 | Debris and litter cleaning along I-290 and I-290 Extension from IL-83 (Kingery Hwy) to Austin Blvd This contract consists of debris and litter cleaning along I-290 and I-290 Extension from IL-83 (Kingery Hwy) to Austin Blvd. | — | Executed | MYS, Incorporated $163,621 · | ||
| Mar 10, 2023 | 62U65 | CookDistrict 1 | Debris and litter cleaning along I-57 from I-90/94 to I-80 This contract consists of debris and litter cleaning along I-57 from I-90/94 to I-80. | — | Executed | MYS, Incorporated $196,345 · | ||
| Mar 10, 2023 | 62U66 | CookLakeDistrict 1 | Debris and litter cleaning along I-94/US-41 (Edens Expressway) from I-90 (Kennedy Expressway) to Clavey Road This contract consists of debris and litter cleaning along I-94/US-41 (Edens Expressway) from I-90 (Kennedy Expressway) to Clavey Road. | — | Executed | MYS, Incorporated $179,983 · | ||
| Mar 10, 2023 | 62U67 | CookDuPageDistrict 1 | Debris and litter cleaning along I-290/IL-53 from Lake Cook Road to IL-83 This contract consists of debris and litter cleaning along I-290/IL-53 from Lake Cook Road to IL-83. | — | Executed | The Final Connection, Inc. $248,640 · | ||
| Mar 10, 2023 | 64M40 | WinnebagoDistrict 2 | 2.7 miles of Cold Milling and Hot Mix Asphalt Resurfacing on US 20 from Rock River to 0.7 miles West of Alpine Rd in Rockford. | — | Executed | Rock Road Companies, Inc. $9,575,729 · | ||
| Mar 10, 2023 | 64N66 | Rock IslandDistrict 2 | 2.61 Miles - Cold Milling, Pavement Patching, and HMA Resurfacing - US 150 from US 6 to East 3rd Street in Coal Valley. | — | Executed | Advanced Asphalt Company $1,458,298 · | ||
| Mar 10, 2023 | 64S12 | WhitesideDistrict 2 | Bridge painting on SN's 098-0059 and 098-0060. | — | Executed | Civil Coatings and Construction Inc. $367,125 · | ||
| Mar 10, 2023 | 64S15 | Rock IslandDistrict 2 | Bridge deck overlay, misc bridge repairs on carrying SN 081-0131 over I-88. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $421,357 · | ||
| Mar 10, 2023 | 64S20 | WinnebagoDistrict 2 | 1.07 mile, Standard Overlay from Charles St to Harrison Ave. | — | Executed | Rock Road Companies, Inc. $1,034,117 · | ||
| Mar 10, 2023 | 64S21 | Rock IslandDistrict 2 | Milling and resurfacing the Silvis Maintenance Yard. | — | Executed | Advanced Asphalt Company $166,800 · | ||
| Mar 10, 2023 | 64S22 | LeeDistrict 2 | Milling and resurfacing the Amboy Maintenance yard. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $219,492 · | ||
| Mar 10, 2023 | 64S24 | Rock IslandDistrict 2 | Bridge joint repair, misc bridge repairs carrying SN 081-0125 over I-88. | — | Executed | General Constructors Inc. of the Quad Cities $533,147 · | ||
| Mar 10, 2023 | 66M37 | LivingstonDistrict 3 | 5.52 miles of shoulder widening and rumble strip installation on IL 17 from IL 170 (N 1500E Rd) to N 2100E Rd in Livingston County. | — | Executed | D. Construction, Inc. $1,244,052 · | ||
| Mar 10, 2023 | 66M64 | LivingstonDistrict 3 | 1.55 mi. Ditch grading and shaping, CMP culvert removal, concrete slope wall removal, installing Precast Concrete Box Culverts, Precast Box Culvert End Sections, earthwork, seeding. Beginning at the Intersection of IL 116 and Deerfield Rd and ending at approximately 192 feet east of SN 053-0066. | — | Executed | Tobey's Construction & Cartage, Inc. $384,412 · | ||
| Mar 10, 2023 | 66M72 | KendallDistrict 3 | This project is located on FAU 2503 68 (IL 25) and FAP 860 (IL 31). | — | Executed | SKC Construction, Inc. $47,368 · | ||
| Mar 10, 2023 | 66N01 | BureauDistrict 3 | Removal of existing light structures and construction of new light poles and electrical control unit. | — | Executed | Electric Conduit Construction $406,731 · | ||
| Mar 10, 2023 | 66N04 | GrundyDistrict 3 | Bridge Painting: 032-0005 NB, 032-0006 SB over the Mazon River, 4.0 mi. south of Reed Rd.; 032-0007 NB, 032-0008 SB over the Union Pacific Railroad, 3.2 mi. south of Reed Rd. | — | Executed | ERA-Valdivia Contractors, Inc. $1,046,975 · | ||
| Mar 10, 2023 | 66N07 | BureauDistrict 3 | The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control at the Great Sauk Trail Rest Area grounds on Eastbound and Westbound I-80 in Bureau County at approximately mile marker 51. | — | Rejected | |||
| Mar 10, 2023 | 66N08 | LivingstonDistrict 3 | The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control at the Limestone Rest Area grounds on Northbound and Southbound I-55 in Livingston County at approximately mile marker 193/194. | — | Rejected | |||
| Mar 10, 2023 | 66N09 | IroquoisDistrict 3 | This project is located at the Main Line Station Rest Area grounds on NB and SB I-57 in Iroquois County at approximately mile marker 269. The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control. | — | Rejected | |||
| Mar 10, 2023 | 66N10 | VariousDistrict 3 | Weed spraying to aid in weed control This project is located along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. The work consists of weed spraying to aid in weed control. | — | Executed | Endrizzi Contracting, Inc $141,133 · | ||
| Mar 10, 2023 | 66N13 | LivingstonDistrict 3 | Milling, resurfacing and drainage work at the Pontiac Traffic Facility at 401 S. Ladd St. in Pontiac. | — | Executed | H. J. Eppel & Co. $203,759 · | ||
| Mar 10, 2023 | 68G35 | StarkDistrict 4 | Microsurfacing (1-Pass) on IL 91 from IL 93 to IL 17. | — | Executed | A. C. Pavement Striping Co. $559,696 · | ||
| Mar 10, 2023 | 68G40 | PeoriaDistrict 4 | The project includes bridge deck overlay and scour mitigation to SN 072-0162 carrying IL 8 over Walnut Creek, East of IL 78. The project improvement length is 0.058 miles. | — | Executed | Otto Baum Company, Inc. $523,800 · | ||
| Mar 10, 2023 | 68G41 | HendersonDistrict 4 | The project includes bridge repairs and bridge deck overlays to S.N. 036-0044 over Camp Creek and S.N. 036-0045 over Weaver Creek, including bridge joint replacement on S.N. 036-0045. Project length is 0.106 mile. | — | Executed | Brandt Construction Co. $1,365,000 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.