Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 17, 2022 97776 MonroeDistrict 8 Construct HMA shoulders and rumble strips for 6 miles on Mayestown Road from Waterloo city limits to Mill Street in Mayestown. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,247,754 ·
Jun 17, 2022 97777 MadisonDistrict 8 Traffic signal improvments along Troy Road from Monclaire Avenue to Illini Drive in Glen Carbon and Edwardsville. — Executed Nov 26 New Electrico, Inc. $705,276 ·
Jun 17, 2022 97778 MarionDistrict 8 Roadway reconstruction on Whittake Street from South college Street to 100' east of Pearl Street in Salem. — Executed Nov 26 New Guinzy Construction,Inc. $425,825 ·
Jun 17, 2022 97780 St. ClairDistrict 8 Pavement reconstruction, guardrail installation, and the installation of conduit on Sauget Business Boulevard from Curtiss-Steinberg Road to Mousette Lane in Sauget. — Executed Nov 26 New The Kilian Corporation $717,364 ·
Jun 17, 2022 97783 St. ClairDistrict 8 Resurfacing Collinsville Avenue from St. Clair Avenue to Summit Avenue in East St. Louis. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $797,699 ·
Jun 17, 2022 99632 JacksonDistrict 9 Construction of 5,700 feet of PCC sidewalk, pipe culverts, abutment construction, and a pedestrian truss superstructure along an abandoned rail line from New Era Road to Oakland Avenue in Carbondale. — Executed Nov 26 New Samron Midwest Contracting, Inc. $1,034,513 ·
Jun 17, 2022 99655 PerryDistrict 9 Resurface Pyatt-Culter Road from IL 4 to Union School Road. — Executed Nov 26 New E. T. Simonds Construction Company $1,751,544 ·
Jun 17, 2022 99676 WilliamsonDistrict 9 Resurface Thompsonville Road from Locust Grove road to Corinth Road. — Executed Nov 26 New E. T. Simonds Construction Company $985,189 ·
Jun 17, 2022 99677 GallatinDistrict 9 Resurface Ridgway/New Haven Road from Murphy Street in Ridgway, to Shawneetown Road. — Executed Nov 26 New E. T. Simonds Construction Company $775,030 ·
Jun 17, 2022 99682 FranklinDistrict 9 Resurface Creek Nation Blacktop from IL 184 to IL 148. — Executed Nov 26 New Samron Midwest Contracting, Inc. $974,794 ·
Jun 17, 2022 99685 MassacDistrict 9 Replace the bridge carrying Unionville Road over Mud Creek, 2.9 miles east of Unionville. — Executed Nov 26 New Dees, Inc. $374,572 ·
Jun 17, 2022 99686 WilliamsonDistrict 9 Resurface Pittsburg Road from Corinth Road to IL 13. — Rejected Nov 26 New Southern Illinois Asphalt Co., Inc. $2,744,365 ·
Jun 17, 2022 99688 JohnsonDistrict 9 Resurface Tunnel Hill Road from IL 37 to Parrish Ridge Lane. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,182,686 ·
Jun 17, 2022 99689 JacksonDistrict 9 Reconstruction of New Era Road from Glenn Road to Airport Road in Carbondale. — Executed Nov 26 New E. T. Simonds Construction Company $1,176,665 ·
Jun 17, 2022 99692 JeffersonDistrict 9 Resurfacing, HMA shoulders and rumble strips on Dix Irvington Road from east of US 51 to Boyd Road. — Rejected Nov 26 New Samron Midwest Contracting, Inc. $4,108,927 ·
Jul 15, 2022 46596 VariousDistrict 6 Pavement marking on various routes in various counties of District 6. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $1,107,528 ·
Jul 15, 2022 62N48 CookWillDistrict 1 (6.47-Mile) Crack and Joint Sealing. streiff ln to scrementi lane in Will and Cook Counties. — Executed Nov 26 New Freehill Asphalt, Inc. $318,776 ·
Jul 15, 2022 62N57 KaneDistrict 1 (9.07-Mile) Crack and Joint Sealing, Kane County. — Executed Nov 26 New Freehill Asphalt, Inc. $322,192 ·
Jul 15, 2022 62N64 CookDistrict 1 Crack and joint sealing (4.8-Mile) This improvement consists of crack and joint sealing. The project is in the Villages of Barrington Hills, Barrington, Inverness and Palatine. — Executed Nov 26 New Freehill Asphalt, Inc. $213,224 ·
Jul 15, 2022 62P74 McHenryDistrict 1 (2,260-Ft) Standard Overlay and ADA Improvements: HMA removal and resurfacing, Class D patching, curb ramps (ADA) improvements, PMK of FAP 525: U.S. 20 from Page Street to Locust Street, located in the City of Marengo in McHenry County. — Executed Nov 26 New Peter Baker & Son Co. $638,758 ·
Jul 15, 2022 62R56 CookDistrict 1 Bridge beam repairs located on IL 171 from Joliet Rd to the Sanitary Ship Canal in the Villages of McCook and (1,827-Ft) The improvement consists of bridge beam repairs located on IL 171 from Joliet Rd to the Sanitary Ship Canal in the Villages of McCook and Summit in Cook County. — Executed Nov 26 New S & J Construction Co., Inc. $1,144,508 ·
Jul 15, 2022 62R64 DuPageDistrict 1 Reconstructing the bridge wing wall, structure excavation, removal and replacement of curb and gutter in the c (230-Ft) Bridge wing wall repair and the work consist of reconstructing the bridge wing wall, structure excavation, removal and replacement of curb and gutter in the city of Elmhurst, DuPage County. — Executed Nov 26 New Herlihy Mid-Continent Company $362,100 ·
Jul 15, 2022 62R86 VariousDistrict 1 The repair and installation of fence along various expressway and arterial highways in various counties throug This improvement consists of the repair and installation of fence along various expressway and arterial highways in various counties throughout District One. — Executed Nov 26 New Fence Masters, Inc. $841,454 ·
Jul 15, 2022 64P42 Jo DaviessDistrict 2 4.66 Miles - Cold Milling, Pavement Patching, ADA Ramps, and Hot-Mix Asphalt Galena Oaks Drive to 0.2 Miles West of Logemann Road. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $4,639,685 ·
Jul 15, 2022 66M52 GrundyDistrict 3 Removal and replacement of highway light poles, luminaries and breakaway couplings This work is located at the Interchange of I-80 and IL 47 in Grundy County. This work consists of removal and replacement of highway light poles, luminaries and breakaway couplings. — Active Nov 26 New Electric Conduit Construction $184,785 ·
Jul 15, 2022 68G71 WarrenDistrict 4 Bridge preservation to SN 094-0028 carrying Cameron Rd over US 34 (bridge deck waterproofing and deck overlay, bridge joint replacement/repair, misc repairs) and related collateral work. — Executed Nov 26 New Brandt Construction Co. $1,033,550 ·
Jul 15, 2022 68H07 PeoriaDistrict 4 Transverse and longitudinal partial-depth patching along IL 29 from North of Gardner Ln. to North of Lorentz Ave. in Peoria County. Total length is 2.45 miles. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,141,394 ·
Jul 15, 2022 68H10 PeoriaDistrict 4 1360 feet of PCC TY B Pavement Patching from Martin to Moss Avenue in Peoria. — Executed Nov 26 New G. M. Sipes Construction, Inc. $579,888 ·
Jul 15, 2022 70F89 DeWittMcLeanDistrict 5 0.282 Mile of Standard Overlay at Median Turnaround at Mclean I Dewitt County Line South of Heyworth and at Quest Drive Frontage Road South of Bloomington. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $242,701 ·
Jul 15, 2022 70F97 VariousDistrict 5 District Wide On-call Guardrail and Fence Repairs. — Executed Nov 26 New COLLINS & HERMANN, INC. $1,293,807 ·
Jul 15, 2022 72401 SangamonDistrict 6 Parking lot construction at the IDOT Central Office Headquarters and new District 6 facility in Springfield. — Executed Nov 26 New Kinney Contractors, Inc. $1,445,190 ·
Aug 5, 2022 46602 VariousDistrict 0 Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in Regions Two and Three. — Executed Nov 26 New Western Remac, Inc. $3,841,166 ·
Aug 5, 2022 46603 VariousDistrict 0 Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in regions four and five. — Executed Nov 26 New Western Remac, Inc. $3,839,966 ·
Aug 5, 2022 61A96 WillDistrict 1 Pavement reconstruction, storm sewer, curb and gutter, sidewalks, retaining wall, traffic signal modernization and lighting on Bell Road from 151st Street to 159th Street in Homer Glen. — Executed Nov 26 New D. Construction, Inc. $9,988,295 ·
Aug 5, 2022 61H86 DuPageDistrict 1 Resurfacing Devon Avenue/Ontarioville Road from 0.5 mile west of Church Road to US 20 (Lake Street) in Hanover Park.. — Executed Nov 26 New J. A. Johnson Paving Company $527,500 ·
Aug 5, 2022 61H87 CookDistrict 1 Construction of an aggregate and HMA shared-use path to include a boardwalk structure, pedestrian truss stucture and traffic signal modernization. Project is Segment 3 of the Des Plaines River Trail from south of Lawrence Avenue to the Bryn Mawr Bike Bridge over the Des Plaines River in Chicago. — Executed Nov 26 New Copenhaver Construction, Inc. $7,213,329 ·
Aug 5, 2022 62F75 CookWillDistrict 1 (1.24-Mile) Standard Overlay, ADA, Culvert Repairs in Orland Park and Mokena. — Executed Nov 26 New D. Construction, Inc. $2,049,959 ·
Aug 5, 2022 62N27 WillDistrict 1 This is a various locations drainage and grading improvements project along IL 1 (Exchange St to Kentucky Rd) and IL 394 (0.2 miles S/O Exchange St) located in the Village of Crete and Unincorporated areas. — Executed Nov 26 New D. Construction, Inc. $1,159,774 ·
Aug 5, 2022 62N42 VariousDistrict 1 (76,700-Ft) Crack and Joint Sealing. Project located along I-55 from Weber Rd to Willow Springs Rd in Will, DuPage and Cook Counties. — Executed Nov 26 New SKC Construction, Inc. $1,264,073 ·
Aug 5, 2022 62N54 KaneDistrict 1 (1.710-Mile) This is a SMART resurfacing project consisting of pavement patching, hot-mix asphalt surface removal, resurfacing with surface course, detector loop replacement, curb and gutter replacement in the city of Elgin and Village of East Dundee. — Executed Nov 26 New Plote Construction, Inc. $1,051,036 ·
Aug 5, 2022 62N66 LakeDistrict 1 (3,294-Ft) Smart Overlay and ADA improvements located in Village of Buffalo Grove — Executed Nov 26 New Builders Paving, LLC $1,250,000 ·
Aug 5, 2022 62N68 CookDistrict 1 (9.21-Mile) Crack and joint sealing; Palos Heights, Palos Hills, Palos Park and Alsip. — Executed Nov 26 New Denler, Inc. $437,582 ·
Aug 5, 2022 62N81 CookDistrict 1 (22,113-Ft) Designed Overlay, ADA Improvements and Rumble Strip located on Willow Springs Road from IL. 171 (Archer Ave) to North of 55th St. in Cook County. — Executed Nov 26 New K-Five Construction Corporation $3,271,013 ·
Aug 5, 2022 62P04 LakeDistrict 1 (410-Ft) Wingwall replacement and culvert repairs for the culvert carrying Peterson Road over Ditch (0.4 Miles East of US 45) located in the Village of Libertyville in Lake County. — Executed Nov 26 New Alliance Contractors, Inc. $219,788 ·
Aug 5, 2022 62P70 WillDistrict 1 (2,657-Ft) Weigh Station Repairs. I-80 EB Frankfort Weigh Station (East of Townline Rd), Will County. — Executed Nov 26 New D. Construction, Inc. $1,453,486 ·
Aug 5, 2022 64R13 StephensonDistrict 2 Bridge deck overlay, expansion joint replacement and miscellaneous repairs on SN 089-0066 carrying IL 73 over Cedar Creek at the South edge of Winslow. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $392,203 ·
Aug 5, 2022 64R50 BooneDistrict 2 Deck repair, microsilica overlay and miscellaneous repair on SN 004-0017 carrying US 20 over Coon Creek, 2 miles East of Belvidere. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $386,559 ·
Aug 5, 2022 64R77 WinnebagoDistrict 2 Milling and resurfacing on US 20 from 0.4 mile West of Keith Road to 0.5 mile East of Keith Road. — Executed Nov 26 New Curran Contracting Company $129,713 ·
Aug 5, 2022 68H09 PeoriaDistrict 4 Mill and resurface parking area and install parking striping at the Peoria West storage yard (6500 W. Highway 150, Edwards, IL., 2.5 Miles west of Peoria ou US 150). — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $204,296 ·
Aug 5, 2022 68H12 TazewellDistrict 4 The installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstr This profect consists of the installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstruction, and all related collateral work necessary to complete the improvements on this project. Located at the intersection of VFW Rd. and 14th St. in Pekin, Tazewell Co. — Executed Nov 26 New Otto Baum Company, Inc. $649,720 ·
Aug 5, 2022 70C07 ChampaignDistrict 5 Drainage improvements on FAS 1512 (US 150) from CR2650 to Market St. and on FAP 836 (IL 49) from US 150 to Prairie Ave. in Ogden. — Executed Nov 26 New Stark Excavating, Inc. $1,718,544 ·
Aug 5, 2022 72011 SchuylerDistrict 6 Substructure and erosion repairs on SN 085-0030 and SN 085-0031 carrying IL 99 over Missouri Creek and Little Missouri Creek in southern Schuyler County. — Executed Nov 26 New Otto Baum Company, Inc. $98,250 ·
Aug 5, 2022 72012 MacoupinDistrict 6 Deck patching on SN 059-0042 carrying TR 457 over I-55, 2 miles south of IL 138. — Executed Nov 26 New Kinney Contractors, Inc. $163,426 ·
Aug 5, 2022 72016 SangamonDistrict 6 Bridge bearing replacements on two I-72 overhead structures at Waverly Road / New Berlin Interchange and Oak Crest Road. — Executed Nov 26 New White Construction LLC $235,723 ·
Aug 5, 2022 72201 MorganDistrict 6 Patching on I-72 from the Scott County line to the US 67 interchange. — Executed Nov 26 New Kinney Contractors, Inc. $649,335 ·
Aug 5, 2022 72205 AdamsPikeDistrict 6 Class A Patches from 1 This project consists of Class A Patches from 1.5 mile north of the Adams/Pike County line 101 mile east of IL 96. — Executed Nov 26 New G. M. Sipes Construction, Inc. $349,600 ·
Aug 5, 2022 72898 VariousDistrict 6 On-call repair of guardrail, cable median barrier, impact attenuators and fence at various locations throughout District 6 as needed. — Executed Nov 26 New COLLINS & HERMANN, INC. $1,259,903 ·
Aug 5, 2022 74998 FayetteDistrict 7 Bridge deck overlay, bridge joint repair and replacement, bridge deck repairs over Camp Creek, 2-miles East of Vandalia. — Executed Nov 26 New Keeley & Sons, Inc. $3,487,584 ·
Aug 5, 2022 76K46 BondDistrict 8 8.1 miles of resurfacing, patching, ADA improvements, guardrail improvements, detector loop replacement and earth excavation on US 40 from 0.3 miles west of IL 127 in Greenville to the Fayette County line. Includes bridge overlay and structural repairs on SN 003-0018 and SN 003-0019 in Smithboro. — Rejected Nov 26 New The Kilian Corporation $9,984,015 ·
Aug 5, 2022 76M77 St. ClairDistrict 8 4.6 miles of new shoulders on IL 163 from IL 157 to South Prairie DuPont Creek. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $2,337,628 ·
Aug 5, 2022 76P12 MadisonDistrict 8 Bridge painting on I-255 southbound Ramp 1 and Roadway B, just north of I-55/70 (SN 060-0253 and SN 060-0214). — Executed Nov 26 New Thomas Industrial Coatings, Inc. $634,809 ·
Aug 5, 2022 76P66 MadisonDistrict 8 Installation of dynamic message signs on I-270 at the Chain of Rocks Canal Bridge and on IL 255 north of I-270. — Executed Nov 26 New Wissehr Electric, Inc. $1,247,940 ·
Aug 5, 2022 76P95 VariousDistrict 8 Maintain and service all ITS equipment at various locations throughout District 8 and replacement of the dynamic message board on westbound I-70 at mile marker 16.8. — Executed Nov 26 New Wissehr Electric, Inc. $457,609 ·
Aug 5, 2022 78700 JacksonDistrict 9 Resurfacing, patching, sidewalks and ADA upgrades at the District 9 headquarters parking lot. — Executed Nov 26 New E. T. Simonds Construction Company $302,610 ·
Aug 5, 2022 78892 VariousDistrict 9 Repairing or fixing guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a workorder basis throughout District 9. — Executed Nov 26 New COLLINS & HERMANN, INC. $1,060,735 ·
Aug 5, 2022 78913 JacksonDistrict 9 Bridge joint reconstruction, strip seals, bridge deck scarification and bridge deck microsilica concrete overlay on SN 039-0056 on IL 149 over Kinkaid Creek, 0.9 miles east of IL 3. — Executed Nov 26 New E. T. Simonds Construction Company $492,697 ·
Aug 5, 2022 78956 FranklinJeffersonDistrict 9 Patching, milling and resurfacing on I-57 from 1.5 miles south of IL 154 to 1.25 miles north of the Campground Road overpass bridge. — Executed Nov 26 New E. T. Simonds Construction Company $1,169,133 ·
Aug 5, 2022 93737 MasonDistrict 6 0.56 miles of sidewalk along US Route 136 (Laurel Street) from Charlotte Avenue to William Boulevard in Havana. — Executed Nov 26 New Laverdiere Construction, Inc. $597,432 ·
Aug 5, 2022 93792 SangamonDistrict 6 7.38 miles of shoulder removal and replacement with 3' wide HMA Shoulders and aggregate base along Waverly Road from Gibson Road to Old Route 54. — Executed Nov 26 New Truman L. Flatt & Sons Co., Inc. $1,847,217 ·
Aug 5, 2022 95925 RichlandDistrict 7 Construction of a Soil-Cement base course with a HMA overlay and aggregate shoulders on Dundas Lane from IL 130 to East Road. — Executed Nov 26 New Ambraw Asphalt Materials, Inc. $948,546 ·
Aug 5, 2022 97784 ClintonDistrict 8 Hot-Mix asphalt resurfacing and shoulder widening on Germantown Road from the Breese city limits to the Germantown city limits, and Hot-Mix asphalt removal and resurfacting within the city limits of each municpality. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,991,478 ·
Aug 5, 2022 97786 MadisonDistrict 8 6.35 miles of bituminous pavement surface removal and Hot-Mix asphalt pavement and shoulder resurfacting on Renken Road from Washington Street in Prairietown to the Macoupin County line. — Executed Nov 26 New The Kilian Corporation $2,334,698 ·
Aug 5, 2022 99675 JacksonDistrict 9 Hot-Mix Asphalt Surface Removal and Resurfacing with HMA shoulders on Elkville Road from Haulage Road in Elkville to US 51. — Executed Nov 26 New Samron Midwest Contracting, Inc. $697,697 ·
Aug 5, 2022 99693 MassacDistrict 9 Resurfacing New Columbia Road from Teague Hill Road to Benton Road. — Executed Nov 26 New E. T. Simonds Construction Company $887,854 ·
Sep 23, 2022 46576 VariousDistrict 1 Placing various width of thermoplastic, preform plastic, modified urethane and hot spray thermoplastic pavemen The work consists of placing various width of thermoplastic, preform plastic, modified urethane and hot spray thermoplastic pavement marking lines, letters and symbols and the removal of existing pavement markings and the installation of grooved pavement markings within the limits specified on each individual work order on various routes in various counties in District 1. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $5,800,895 ·
Sep 23, 2022 46598 VariousDistrict 7 Various lengths of pavement marking rehabilitation throughout District 7. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $718,175 ·
Sep 23, 2022 46604 WillDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. — Executed Nov 26 New Superior Road Striping, Inc. $1,669,973 ·
Sep 23, 2022 46605 KaneDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. — Executed Nov 26 New Precision Pavement Markings Inc. $502,490 ·
Sep 23, 2022 61H23 CookDistrict 1 Roadway reconstruction and traffic signal installation on Gross Point Road from Old Orchard Road to Gold Road in Skokie. — Rejected Nov 26 New Benchmark Construction Co., Inc. $6,618,000 ·
Sep 23, 2022 61H31 WillDistrict 1 0.30 mile HMA multi-use path, PCC sidewalk, drainage items, and other necessary work along Bridge Street from McKinley Woods Road to Blackberry land in Channahon. — Executed Nov 26 New D. Construction, Inc. $1,097,532 ·
Sep 23, 2022 61H81 CookDistrict 1 0.39 miles of sidewalk and bike path contraction, pedestrian push buttons, crosswalks, drainage and pavement markings from existing North Branch Trail to the intersection of Touhy Avenue and Calwell Avenue in Niles. — Executed Nov 26 New Capitol Cement Co., Inc. $539,769 ·
Sep 23, 2022 61H90 CookDistrict 1 Resurfacing Eastern Avenue from Madison Street to Harrison Street in Bellwood. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $668,229 ·
Sep 23, 2022 61H92 LakeDistrict 1 Resurfacing Wildspring Road from IL 120 to Townline Road, and resurfacing Amarias Drive from Townline Road to Cedar Lake Road in Round Lake. — Executed Nov 26 New Peter Baker & Son Co. $1,477,000 ·
Sep 23, 2022 61H94 CookDistrict 1 Modify existing signals, ADA ramp reconstruction, intersection widening and oth other necessary work at various intersections on Ridge Avenue between Oakton Street and Church Street in Evanston. — Executed Nov 26 New Acura Inc. $1,137,649 ·
Sep 23, 2022 61H96 DuPageDistrict 1 Installation of conduit, handholes and fiber optic interconnet cable to connect existing traffic signal controllers to the existing DuPage County Central System Network. Includes installation of new PTZ cameras, Layer II (Data Link) switches, Layer III (Network) switches, new traffic signal controllers and cabinets. Project is located in various locations in Dupage County. — Executed Nov 26 New Thorne Electric, Inc. $6,484,160 ·
Sep 23, 2022 61H97 KaneDistrict 1 Traffic Signal installation and reconstruction of the crosswalk at Montgomery Road and Virgil Gilman Trail in Montgomery. — Executed Nov 26 New Geneva Construction Company $187,124 ·
Sep 23, 2022 62N04 CookDistrict 1 (6.1 mile), 1-94 from Lincoln Ave to Montrose Ave, Lighting replacement, new light poles, LED luminaires, foundations, conduit and cables, restorations. City of Chicago, Villages of Lincolnwood, Morton Grove and Skokie. — Executed Nov 26 New Meade Inc. $6,060,454 ·
Sep 23, 2022 62N05 CookLakeDistrict 1 (66.6-Mile), 1-94 from Lake Cook Rd to Lincoln Ave, Lighting replacement, new light poles, LED luminaires, foundations, lighting controllers, conduit and cables, restorations. Located in City of Highland Park and Villages of and Morton Grove, Northbrook, Northfield, Skokie, and Wilmette. — Executed Nov 26 New Meade Inc. $7,139,420 ·
Sep 23, 2022 62P22 DuPageDistrict 1 (4.18-Mile) Traffic signal modernization and intersection improvements of IL 59 at Joliet St/Edgewood Walk and at James Ave, pavement removal, HMA resurfacing, curb and gutter removal and replacement, median removal, traffic signal removal and replacement, adjustment of drainage structures, and pavement markings. Located in the City of West Chicago and Winfield Township. — Executed Nov 26 New Geneva Construction Company $1,558,813 ·
Sep 23, 2022 62R81 CookDistrict 1 Installation of new fiber optic cable, network switches, PTZ cameras at 55 locations in Schaumburg area. — Executed Nov 26 New Electric Conduit Construction $1,490,238 ·
Sep 23, 2022 62T88 VariousDistrict 1 Repairing high tension cable median barrier systems throughout District 1 on a work order basis The work to be completed under this consists of repairing high tension cable median barrier systems throughout District 1 on a work order basis. — Executed Nov 26 New Kujo, Inc. $648,821 ·
Sep 23, 2022 64M81 Rock IslandDistrict 2 4.28 miles, cold milling, pavement patching and Hot-Mix Asphalt resurfacing on I-280 from East of the IL 92_interchange to 0.1 miles East of Milan Beltway. — Rejected Nov 26 New Valley Construction Co. $15,997,534 ·
Sep 23, 2022 64R70 WinnebagoDistrict 2 4.686 miles Advance Tree Removal at I-39/US20 System Interchange. — Executed Nov 26 New Clean Cut Tree Service, Inc. $172,588 ·
Sep 23, 2022 64S10 VariousDistrict 2 On-call maintenance of electrical facilities along State Maintained Routes in East half of District 2. — Executed Nov 26 New William Charles Construction Co, LLC $370,373 ·
Sep 23, 2022 64S11 VariousDistrict 2 On-call maintenance of electrical facilities along State Maintained Routes in West half of District 2. — Executed Nov 26 New Davenport Electric Contract Company $190,450 ·
Sep 23, 2022 66D26 KendallDistrict 3 The reconstruction of IL 71 from 0 Project consists of the reconstruction of IL 71 from 0.16 mi. E of IL 126 to W of Orchard Rd_in Kendall County. Additional work involves several structure replacements within project limits, construction of shared-use path, tree removal, traffic signal and lighting upgrades. Length of the job is 3.8 miles. The job will be staged. — Executed Nov 26 New D. Construction, Inc. $32,993,337 ·
Sep 23, 2022 66F92 LivingstonDistrict 3 Removal and replacement of the existing bridge (SN 053-0029) carrying IL 17 over Manville Drainage Ditch The project consists of removal and replacement of the existing bridge (SN 053-0029) carrying IL 17 over Manville Drainage Ditch. The work also includes slope/ditch grading, guardrail upgrades, and resurfacing. The temporary steel support shall be salvaged from the existing structure. A detour will be used. — Executed Nov 26 New Riber Construction, Inc. $1,025,425 ·
Sep 23, 2022 66M39 VariousDistrict 3 This project includes the installation of various combinations of new traffic signal heads, retroreflective backplates, and LED signal face lens covers. The work is proposed at eight intersections located in DeKalb, Kankakee, Kendall, and LaSalle Counties. — Executed Nov 26 New H & H Electric Co. $449,954 ·
Sep 23, 2022 66M68 PutnamDistrict 3 HMA milling and resurfacing (designed overlay), pavement marking, and raised reflectors This project is located on FAS 2370/OR 26 (IL 26) from Old IL 26 0.32 mile North to the factory entrance. The work consists of HMA milling and resurfacing (designed overlay), pavement marking, and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $762,771 ·
Sep 23, 2022 66M91 BureauLaSalleDistrict 3 Centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors This project is located on FAI 80 (I-80) from 0.7 mile East of I-180 to 0.7 mile West of Il 251. The work consists of centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $1,093,285 ·
4,401–4,500 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.