2020-257-T
- Let date
- Friday, August 5, 2022
- Contract
- 62N27 · job page
- District
- District 1
- County
- Will
- Highway
- Limits
- This is a various locations drainage and grading improvements project along IL 1 (Exchange St to Kentucky Rd) and IL 394 (0.2 miles S/O Exchange St) located in the Village of Crete and Unincorporated areas.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $1,159,774 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… |
|---|---|---|---|---|---|---|
| 1 | X0321809 | PERMANENT GRND ANCHOR | 11 | EACH | $21,230.00 | |
| 2 | X0325592 | REM REPL STONE RIPRAP | 48 | CU YD | $100.00 | |
| 3 | X0539200 | DROP MAN CONNECTION | 1 | EACH | $20,000.00 | |
| 4 | X0900075 | COFFERDAM TYP 1 IS WW | 4 | EACH | $4,000.00 | |
| 5 | X2502014 | SEEDING CL 4A MOD | 1.5 | ACRE | $3,190.00 | |
| 6 | X2502024 | SEEDING CL 4B MOD | 1.5 | ACRE | $3,850.00 | |
| 7 | X4421767 | CL D PATCH T3 10 SPL | 24 | SQ YD | $200.00 | |
| 8 | X4421829 | CL D PTCH T3 9 SPL | 35 | SQ YD | $180.00 | |
| 9 | X6020084 | MANHOLE SPECIAL | 1 | EACH | $2,500.00 | |
| 10 | X6700407 | ENGR FLD OFF A D1 | 12 | CAL MO | $4,200.00 | |
| 11 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $42,500.00 | |
| 12 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $10,000.00 | |
| 13 | Z0015500 | DEBRIS REMOVAL | 1 | L SUM | $5,000.00 | |
| 14 | Z0030850 | TEMP INFO SIGNING | 156 | SQ FT | $25.00 | |
| 15 | 20100110 | TREE REMOV 6-15 | 12 | UNIT | $340.00 | |
| 16 | 20200100 | EARTH EXCAVATION | 370 | CU YD | $45.00 | |
| 17 | 20201200 | REM & DISP UNS MATL | 60 | CU YD | $50.00 | |
| 18 | 20800150 | TRENCH BACKFILL | 51 | CU YD | $55.00 | |
| 19 | 21101505 | TOPSOIL EXC & PLAC | 854 | CU YD | $30.00 | |
| 20 | 21101615 | TOPSOIL F & P 4 | 1,737 | SQ YD | $5.50 | |
| 21 | 21400100 | GRADING & SHAP DITCH | 3,139 | FOOT | $12.00 | |
| 22 | 25000210 | SEEDING CL 2A | 0.5 | ACRE | $3,300.00 | |
| 23 | 25000400 | NITROGEN FERT NUTR | 180 | POUND | $4.40 | |
| 24 | 25000600 | POTASSIUM FERT NUTR | 180 | POUND | $4.40 | |
| 25 | 25100115 | MULCH METHOD 2 | 2 | ACRE | $1,980.00 | |
| 26 | 25100630 | EROSION CONTR BLANKET | 2,288 | SQ YD | $1.21 | |
| 27 | 25100635 | HD EROS CONTR BLANKET | 7,131 | SQ YD | $1.76 | |
| 28 | 28000250 | TEMP EROS CONTR SEED | 194 | POUND | $3.30 | |
| 29 | 28000305 | TEMP DITCH CHECKS | 734 | FOOT | $9.90 | |
| 30 | 28000400 | PERIMETER EROS BAR | 4,940 | FOOT | $2.37 | |
| 31 | 28000500 | INLET & PIPE PROTECT | 2 | EACH | $198.00 | |
| 32 | 28001100 | TEMP EROS CONTR BLANK | 9,394 | SQ YD | $1.21 | |
| 33 | 28100103 | STONE RIPRAP CL A2 | 16 | SQ YD | $100.00 | |
| 34 | 28100109 | STONE RIPRAP CL A5 | 9 | SQ YD | $175.00 | |
| 35 | 28200200 | FILTER FABRIC | 25 | SQ YD | $5.00 | |
| 36 | 30300001 | AGG SUBGRADE IMPROVE | 16 | CU YD | $120.00 | |
| 37 | 35501316 | HMA BASE CSE 8 | 49 | SQ YD | $85.00 | |
| 38 | 40600275 | BIT MATLS PR CT | 459 | POUND | $0.0100 | |
| 39 | 40600290 | BIT MATLS TACK CT | 71 | POUND | $0.0100 | |
| 40 | 40604060 | HMA SC IL-9.5 D N50 | 6 | TON | $200.00 | |
| 41 | 44004250 | PAVED SHLD REMOVAL | 111 | SQ YD | $20.00 | |
| 42 | 48101498 | AGGREGATE SHLDS B 4 | 314 | SQ YD | $12.00 | |
| 43 | 48203029 | HMA SHOULDERS 8 | 132 | SQ YD | $85.00 | |
| 44 | 50102400 | CONC REM | 9.7 | CU YD | $2,000.00 | |
| 45 | 50104400 | CONC HDWL REM | 2 | EACH | $500.00 | |
| 46 | 50105220 | PIPE CULVERT REMOV | 44 | FOOT | $23.00 | |
| 47 | 50200100 | STRUCTURE EXCAVATION | 78 | CU YD | $65.00 | |
| 48 | 50300225 | CONC STRUCT | 6.1 | CU YD | $2,000.00 | |
| 49 | 50800205 | REINF BARS, EPOXY CTD | 2,020 | POUND | $3.00 | |
| 50 | 52200020 | TEMP SOIL RETEN SYSTM | 1,318 | SQ FT | $50.00 | |
| 51 | 52200100 | FUR SOLDIER PILES HP | 457 | FOOT | $125.00 | |
| 52 | 52200200 | DRILL SET SLD PI SOIL | 2,858 | CU FT | $35.00 | |
| 53 | 52200255 | TREATED TIMBER LAG | 723 | SQ FT | $30.00 | |
| 54 | 54002020 | EXPAN BOLTS 3/4 | 10 | EACH | $65.00 | |
| 55 | 54003000 | CONC BOX CUL | 11.6 | CU YD | $2,000.00 | |
| 56 | 542A1900 | P CUL CL A 3 15 | 105 | FOOT | $105.00 | |
| 57 | 542A1921 | P CUL CL A 3 36 | 18 | FOOT | $200.00 | |
| 58 | 54213660 | PRC FLAR END SEC 15 | 2 | EACH | $950.00 | |
| 59 | 54263236 | CONC ES 542011 36 1:2 | 1 | EACH | $6,000.00 | |
| 60 | 58600101 | GRANULAR BACKFILL STR | 17.25 | CU YD | $70.00 | |
| 61 | 59100100 | GEOCOMPOSITE WALL DR | 63 | SQ YD | $35.00 | |
| 62 | 59300100 | CONTR LOW-STRENG MATL | 3 | CU YD | $500.00 | |
| 63 | 60146304 | P UNDR FOR STRUCT 4 | 192 | FOOT | $25.00 | |
| 64 | 60207605 | CB TC T8G | 1 | EACH | $2,800.00 | |
| 65 | 60224446 | MAN TA 7 DIA T1F CL | 1 | EACH | $17,000.00 | |
| 66 | 60905305 | BOX CUL TO BE CLEANED | 100 | FOOT | $55.00 | |
| 67 | 60920012 | PIPE CULV CLEANED 12 | 120 | FOOT | $7.70 | |
| 68 | 60920015 | PIPE CULV CLEANED 15 | 341 | FOOT | $7.70 | |
| 69 | 60920018 | PIPE CULV CLEANED 18 | 373 | FOOT | $11.00 | |
| 70 | 60920024 | PIPE CULV CLEANED 24 | 207 | FOOT | $16.50 | |
| 71 | 63000001 | SPBGR TY A 6FT POSTS | 450 | FOOT | $39.18 | |
| 72 | 63100045 | TRAF BAR TERM T2 | 1 | EACH | $1,457.84 | |
| 73 | 63100167 | TR BAR TRM T1 SPL TAN | 3 | EACH | $3,794.69 | |
| 74 | 63200310 | GUARDRAIL REMOV | 482 | FOOT | $8.07 | |
| 75 | 64200108 | SHOULDER RUM STRIP 8 | 125 | FOOT | $26.96 | |
| 76 | 66900200 | NON SPL WASTE DISPOSL | 115 | CU YD | $87.50 | |
| 77 | 66900530 | SOIL DISPOSAL ANALY | 8 | EACH | $1,350.00 | |
| 78 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,000.00 | |
| 79 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,000.00 | |
| 80 | 66901006 | REG SUB MON | 19 | CAL DA | $900.00 | |
| 81 | 67100100 | MOBILIZATION | 1 | L SUM | $37,345.09 | |
| 82 | 70103815 | TR CONT SURVEILLANCE | 60 | CAL DA | $0.0100 | |
| 83 | 70107025 | CHANGEABLE MESSAGE SN | 60 | CAL DA | $50.00 | |
| 84 | 70300150 | SHRT TRM PAVT MK REM | 1,175 | SQ FT | $2.00 | |
| 85 | 70307120 | TEMP PVT MK L4 T4 TAPE | 3,524 | FOOT | $2.00 | |
| 86 | 70400100 | TEMP CONC BARRIER | 962.5 | FOOT | $32.00 | |
| 87 | 70400125 | PIN TEMP CONC BARRIER | 9 | EACH | $25.00 | |
| 88 | 70600250 | IMP ATTN TEMP NRD TL3 | 3 | EACH | $6,250.00 | |
| 89 | 72501000 | TERMINAL MARKER - DA | 3 | EACH | $42.09 | |
| 90 | 78000200 | THPL PVT MK LINE 4 | 550 | FOOT | $3.30 | |
| 91 | 78000400 | THPL PVT MK LINE 6 | 378 | FOOT | $5.50 | |
| 92 | 78200005 | GRDRAIL REF TYPE A | 9 | EACH | $11.89 | |
| 93 | 78300202 | PAVMT MRKG REM WTR BL | 190 | SQ FT | $16.50 |