| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Aug 2, 2019 | 97704 | MadisonDistrict 8 | Sidewalk replacement, decorative posts and patterned pavement imprinting along Ferguson Avenue betwen Old St. Louis Road and 2nd Street in Wood River. | — | Executed | RCS Construction, Inc. $456,469 · | ||
| Aug 2, 2019 | 99617 | WhiteDistrict 9 | Replace the bridge carrying TR 412A over French Creek, 1 mile north of Calvin. | — | Executed | Samron Midwest Contracting, Inc. $348,241 · | ||
| Aug 2, 2019 | 99623 | JeffersonDistrict 9 | Resurfacing Tolle Lane from Fairfield Road to Miller Lake Lane in Mt. Vernon. | — | Executed | Southern Illinois Asphalt Co., Inc. $958,187 · | ||
| Aug 2, 2019 | 99628 | WhiteDistrict 9 | replace the bridge carrying CH 18 over Bear Creek Tributary with a 19' X 7' box culvert, located 2 miles southwest of Norris City. | — | Executed | Sierra Bravo Contractors, LLC $184,218 · | ||
| Sep 20, 2019 | 46531 | VariousDistrict 7 | VARIOUS LENGTHS OF PAVEMENT MARKING REHABILITATION THROUGHOUT DISTRICT 7. | — | Executed | STF, LLC d/b/a Traffic Control Company $556,835 · | ||
| Sep 20, 2019 | 46535 | VariousDistrict 9 | REPAIRING VARIOUS WIDTHS OF THERMOPLASTIC, PREFORMED PLASTIC, AND URETHANE AND POLYUREA PAVEMENT MARKING LINES, LETTERS AND SYMBOLS AND THE REMOVAL OF EXISTING PAVEMENT MARKINGS ON A WORK ORDER BASIS THROUGHOUT DISTRICT 9. | — | Executed | STF, LLC d/b/a Traffic Control Company $781,385 · | ||
| Sep 20, 2019 | 60K72 | CookDistrict 1 | BRIDGE REHAB AND PAINTING ON WESTERN AVENUE OVER CAL-SAG CHANNEL (SN 016-0777). | — | Executed | D. Construction, Inc. $10,689,369 · | ||
| Sep 20, 2019 | 61D65 | LakeDistrict 1 | Reconstruct the intersection of Hart Road at US Route 14 in the Villages of Barrington and Barrington Hills. | — | Executed | Plote Construction, Inc. $7,965,000 · | ||
| Sep 20, 2019 | 61E69 | DuPageDistrict 1 | Landscaping and sign installation along the Elgin O'Hare Western Access Corridor at Lake Street (US 20), Roselle Road, Plum Grove Road and Rohlwing Road. Project is located in the villages of Roselle, Itasca and Hanover Park. | — | Rejected | Alliance Contractors, Inc. $1,264,017 · | ||
| Sep 20, 2019 | 61F25 | LakeDistrict 1 | Pavement reconstruction and the construction of a HMA pedestrian path next to Weiland Road from Aptakisic Road to Deerfield Parkway, and on Aptakistic Road from Joseph Court to Industrial Drive in the villages of Buffalo Grove and Lincolnshire. | — | Executed | Berger Excavating Contractors, Inc. $12,469,513 · | ||
| Sep 20, 2019 | 61F58 | McHenryDistrict 1 | Reconstruct the intersection of Main Street at Crystal Lake Avenue in the city of Crystal Lake. | — | Executed | Copenhaver Construction, Inc. $4,028,645 · | ||
| Sep 20, 2019 | 61F85 | DuPageDistrict 1 | Streetscape to include sidewalk replacement, curb and gutter replacement, lighting improvements, landscaping, pavement imprinting and resurfacing. Project is located on Prospect Avenue from Ann Street to Burlington Avenue in the Village of Clarendon Hills. | — | Executed | A Lamp Concrete Contractors, Inc. $1,434,658 · | ||
| Sep 20, 2019 | 61F93 | CookDistrict 1 | Resurfacing Broadway Avenue from Division Street to North Avenue in the Village of Melrose Park. | — | Executed | J. A. Johnson Paving Company $650,700 · | ||
| Sep 20, 2019 | 61F96 | CookDistrict 1 | Construction of Poplar Creek Trail from east of the intersection of Shoe Factory Road and the CN Railroad to west of the intersection of IL Route 59. Project is located within the Forest Preserve of Cook County Arthur Janura Forest Preserve in the Village of Hoffman Estates. | — | Executed | Chicagoland Paving Contractors, Inc. $270,000 · | ||
| Sep 20, 2019 | 61F98 | McHenryDistrict 1 | Sidewalk construction and culvert replacement on Main Street from Winn Road to West of Bilvin Street in the Village of Spring Grove. | — | Executed | Alliance Contractors, Inc. $443,926 · | ||
| Sep 20, 2019 | 61G00 | LakeDistrict 1 | Reconstruction and resurfacing Rockland Road from east of the Des Plaines River bridge to St. Mary's Road, located in Libertyville Township, Lake County. | — | Executed | Berger Excavating Contractors, Inc. $1,964,385 · | ||
| Sep 20, 2019 | 62G56 | McHenryDistrict 1 | OVERLAY, NEW SHOULDERS AND MILLED RUMBLE STRIPS ON IL 31 FROM SHAMROCK LANE TO NORTH OF EDGEWOOD ROAD IN THE CITY OF MCHENRY AND VILLAGE OF PRAIRIE GROVE. | — | Executed | Peter Baker & Son Co. $988,722 · | ||
| Sep 20, 2019 | 62H74 | CookDistrict 1 | PAVEMENT MARKING ROOSEVELT RD TO US 1 2/20 (95TH ST). | — | Executed | A. C. Pavement Striping Co. & RoadSafe Traffic Systems & Marking Specialists Corp. $2,611,663 · | ||
| Sep 20, 2019 | 62J04 | CookDistrict 1 | 1.9 MILES OF OVERLAY AND PEDESTRIAN RAMP IMPROVEMENTS ON IL 58 FROM BASSWOOD STREET TO I-290 / IL 53 IN THE VILLAGE OF SCHAUMBURG. | — | Executed | Arrow Road Construction Co. $3,206,907 · | ||
| Sep 20, 2019 | 62J18 | CookDistrict 1 | SUBSTRUCTURE BRIDGE REPAIR OF SN 016-1094 CARRYING MILWAUKEE AVENUE OVER THE OHIO FEEDER IN THE CITY OF CHICAGO. | — | Executed | Areatha Construction Co., Inc. $759,728 · | ||
| Sep 20, 2019 | 62J19 | CookDistrict 1 | 11.9 MILES OF PAVEMENT MARKING REMOVAL, PAVEMENT MARKING INSTALLATION AND RAISED REFLECTIVE PAVEMENT MARKERS ON I-90/94 (DAN RYAN EXPRESSWAY) FROM ROOSEVELT ROAD TO US 12/20 (95TH STREET) WITHIN THE CITY OF CHICAGO. | — | Executed | A. C. Pavement Striping Co. & RoadSafe Traffic Systems & Marking Specialists Corp. $2,714,768 · | ||
| Sep 20, 2019 | 62J61 | VariousDistrict 1 | HIGH TENSION CABLE BARRIER REPAIRS AT VARIOUS LOCATIONS ON VARIOUS EXPRESSWAY MEDIANS THROUGHOUT DISTRICT ONE. | — | Executed | Northern Contracting, Inc. $342,330 · | ||
| Sep 20, 2019 | 64L16 | OgleDistrict 2 | Pedestrian "ADA" ramps a various locations in Oregon and Polo. | — | Rejected | Stenstrom Excavation & Blacktop, Inc. $1,414,865 · | ||
| Sep 20, 2019 | 64N78 | VariousDistrict 2 | WASHING 12 BRIDGES AT VARIOUS LOCATIONS IN DISTRICT 2. | — | Rejected | All States Painting, Inc. $174,400 · | ||
| Sep 20, 2019 | 64N79 | WinnebagoDistrict 2 | WASHING 4 BRIDGES AT VARIOUS LOCATIONS. | — | Executed | M & M Concrete, Inc. $39,999 · | ||
| Sep 20, 2019 | 64N81 | VariousDistrict 2 | WASHING 19 BRIDGES AT VARIOUS LOCATIONS. | — | Rejected | Interstate Maintenance, Incorporated $159,652 · | ||
| Sep 20, 2019 | 64N82 | VariousDistrict 2 | WASHING 6 BRIDGES OVER THE ROCK RIVER AT VARIOUS LOCATIONS. | — | Executed | All States Painting, Inc. $89,410 · | ||
| Sep 20, 2019 | 64N83 | Rock IslandDistrict 2 | WASHING 2 BRIDGES OVER THE MISSISSIPPI RIVER. | — | Executed | Interstate Maintenance, Incorporated $229,992 · | ||
| Sep 20, 2019 | 64N84 | VariousDistrict 2 | WASHING 3 BRIDGES OVER THE MISSISSIPPI RIVER. | — | Executed | Interstate Maintenance, Incorporated $129,876 · | ||
| Sep 20, 2019 | 64N85 | VariousDistrict 2 | WASHING 5 BRIDGES OVER THE ROCK RIVER. | — | Executed | All States Painting, Inc. $70,960 · | ||
| Sep 20, 2019 | 64N86 | VariousDistrict 2 | WASHING 8 BRIDGES AT VARIOUS LOCATIONS. | — | Executed | All States Painting, Inc. $85,000 · | ||
| Sep 20, 2019 | 66K34 | IroquoisDistrict 3 | DRAINAGE REPAIRS 0.27 MI N OF CR 700 N ROAD. | — | Executed | Iroquois Paving Corporation $208,524 · | ||
| Sep 20, 2019 | 68758 | KnoxDistrict 4 | Replacement of structure carrying IL 78 over kickapoo creek and replacement of a box culvert. | — | Executed | Otto Baum Company, Inc. $2,245,718 · | ||
| Sep 20, 2019 | 68C57 | PeoriaDistrict 4 | SUPERSTRUCTURE REPLACEMENT TO SN 072-0073 CARRYING BELL SCHOOL RD OVER I-74 AND RESURFACE IL 78 FROM I-74 N 0.13 MI AND 0.2 MI S. | — | Executed | Stark Excavating, Inc. $2,937,974 · | ||
| Sep 20, 2019 | 68C65 | KnoxDistrict 4 | CULVERT REPLACEMENTS ON IL 167 0.1 MI SE OF US 34/IL 167, AND 1.3 MI W OF TR 146. | — | Executed | Valley Construction Co. $1,513,546 · | ||
| Sep 20, 2019 | 68E16 | PeoriaTazewellDistrict 4 | CULVERT LINING ON VARIOUS ROUTES WITHIN PEORIA AND TAZEWELL COUNTIES. | — | Executed | Hoerr Construction, Inc. $769,350 · | ||
| Sep 20, 2019 | 68E27 | TazewellDistrict 4 | BRIDGE JOINT REPAIR, BRIDGE REPAIR TO SN 090-0127 CARRYING I-155 RAMP (NB) OVER BNSF AT IL 98 AND SN 090-0131 CARRYING MAIN ST (SB) OVER I-155 1.6 MI W OF IL 98 NEAR MORTON. | — | Executed | Halverson Construction Co., Inc. $853,648 · | ||
| Sep 20, 2019 | 68E53 | PeoriaTazewellDistrict 4 | CONSTRUCTION, REPLACEMENT OR CROSSWALKS ALONG IL 29 (ADAMS and JEFFERSON ST) FROM HANCOCK ST TO WAYNE STREET IN PEORIA, IL 8 FROM CHERRY LANE TO MEADOWVIEW LN IN SUNNYLAND, IL 8 AT LEGION RD AND BUS 24 AT BONDURANT ST IN WASHINGTON. | — | Executed | Otto Baum Company, Inc. $537,618 · | ||
| Sep 20, 2019 | 70B53 | ChampaignDistrict 5 | 1.533 miles of safety improvements on US 150/University Ave. from Wright St. to Cunningham Ave. in Urbana. | — | Executed | Champaign Asphalt Company, LLC $10,394,213 · | ||
| Sep 20, 2019 | 72L38 | MorganDistrict 6 | PATCHING ON IL 267 FROM JUST NORTH OF I-72 TO JUST SOUTH OF I-72. | — | Executed | Kinney Contractors, Inc. $158,297 · | ||
| Sep 20, 2019 | 74922 | EffinghamDistrict 7 | TREE REMOVAL AND SEEDING ALONG I-70 FROM MILE POST 98 TO MILE POST 105 EAST OF EFFINGHAM AND ALONG I-57 FROM THE I-70 / I-57 INTERCHANGE NORTH TO MILE POST 166 NORTHEAST OF EFFINGHAM. | — | Executed | Lion Construction 1, LLC $183,380 · | ||
| Sep 20, 2019 | 76J16 | St. ClairDistrict 8 | 8.9 miles of resurfcing and ADA upgrades on IL 13/IL 15 from Roger's Drive in Freeburg to south of the Kaskasia River Bridge on IL 15. | — | Executed | Christ Bros. Asphalt, Inc. $5,948,690 · | ||
| Sep 20, 2019 | 76M16 | MadisonDistrict 8 | DECK WATERPROOFING, JOINT AND BEAM END REPAIRS ON SN 060-0226 CARRYING IL 140 OVER UPRR, 3.1 MILES WEST OF I-55 AND SN 060-0227 CARRYING IL 140 OVER NandWRR, 2.9 MILES WEST OF I-55. | — | Executed | The Kilian Corporation $512,618 · | ||
| Sep 20, 2019 | 76M37 | MadisonSt. ClairDistrict 8 | WELL TREATMENT AT VARIOUS LOCATIONS WITHIN DISTRICT 8. | — | Executed | Layne Christensen Company $723,853 · | ||
| Sep 20, 2019 | 76M38 | VariousDistrict 8 | REPAIR AND MAINTENANCE OF ELECTRICAL EQUIPMENT AT VARIOUS PUMP STATIONS THROUGHOUT DISTRICT 8. | — | Executed | Wissehr Electric, Inc. $54,758 · | ||
| Sep 20, 2019 | 76M39 | CalhounDistrict 8 | REPAIR AND MAINTENANCE OF THE ELECTRICAL EQUIPMENT AT THE JOE PAGE BRIDGE IN HARDIN. | — | Executed | Wissehr Electric, Inc. $58,366 · | ||
| Sep 20, 2019 | 78631 | FranklinDistrict 9 | ADDITION OF A NEW LANE IN EACH DIRECTION, INSTALL A MEDIAN BARRIER AND UPGRADE GUARDRAIL ON A 3.2 MILE STRETCH OF I-57 FROM SOUTH OF THE COUNTRY CLUB ROAD OVERPASS TO MILE POST 66. | — | Executed | E. T. Simonds Construction Company $20,637,943 · | ||
| Sep 20, 2019 | 78736 | JohnsonDistrict 9 | 4.3 MILES OF PATCHING ON NORTHBOUND I-57 FROM THE UNION COUNTY LINE TO THE WILLIAMSON COUNTY LINE. | — | Executed | Kinney Contractors, Inc. $95,995 · | ||
| Sep 20, 2019 | 78737 | MassacDistrict 9 | 13.2 MILES OF CENTERLINE RESURFACING ON EASTBOUND I-24 AT VARIOUS LOCATIONS FROM THE JOHNSON COUNTY LINE TO US 45. | — | Executed | E. T. Simonds Construction Company $282,286 · | ||
| Sep 20, 2019 | 78739 | UnionDistrict 9 | PAVED SHOULDER REMOVAL, PCC SHOULDERS, TIMBER CURB REMOVAL, CURB AND GUTTER, REMOVE AND REPLACE STONE RIP RAP TO REPAIR SLOPES ON US 51 AT SN 091-2002, 0.7 MILES NORTH OF ANNA. | — | Executed | Sierra Bravo Contractors, LLC $164,656 · | ||
| Sep 20, 2019 | 85687 | WinnebagoDistrict 2 | Remove guardrail and components, place HMA shoulders and install guardrail and traffic barrier terminals at various locations in Winnebago County. | — | Rejected | William Charles Construction Company, LLC $1,012,075 · | ||
| Sep 20, 2019 | 87695 | GrundyDistrict 3 | Pavement widening and reconstruction of Ridge Road from a two-lane to a four-lane with bi-directional turn lane, includes bridge rehabilitation and the construction of a new bridge span to carry the Wisconsin Central Ltd. Railway over Ridge Road. Project runs from south of McEvilly Road to Minooka Road in the village of Minooka. | — | Rejected | D. Construction, Inc. $11,963,320 · | ||
| Sep 20, 2019 | 87711 | LaSalleDistrict 3 | construction of the extension of Unytite Drive between Plank Road and Donlar Ave. in Peru. | — | Executed | Advanced Asphalt Company $1,487,056 · | ||
| Sep 20, 2019 | 87713 | LaSalleDistrict 3 | Pavement widening and resurfacing on CH 15 from I-80 to IL 71. | — | Executed | D. Construction, Inc. $2,346,622 · | ||
| Sep 20, 2019 | 89749 | TazewellDistrict 4 | Roadway reconstruction on Distillery Road from Front Street to IL 29, on Front Street from Distillery Road to Fayette Street and on Fayette Street from Front Street to IL 29 in the city of Pekin. | — | Executed | Otto Baum Company, Inc. $6,378,025 · | ||
| Sep 20, 2019 | 95860 | WayneDistrict 7 | Replace the bridge carrying TR 562 over King Creek, located 1.7 miles west of Golden Gate. | — | Executed | Samron Midwest Contracting, Inc. $229,550 · | ||
| Sep 20, 2019 | 97692 | St. ClairDistrict 8 | Reconstruction of Shiloh Station Road from South of Timberline Court to north of Johnson Road in the Village of Shiloh. | — | Executed | The Kilian Corporation $844,928 · | ||
| Sep 20, 2019 | 97707 | MarionDistrict 8 | Resurfacing, sidewalk replacement, curb and gutter on Hickory Street from 16th Street to Nolemen Street and on 16th Street from Hickory Street to Wabash Avenue in the city of Centrailia. | — | Rejected | Howell Paving, Inc. $686,751 · | ||
| Sep 20, 2019 | 99630 | JacksonDistrict 9 | Reconstruction of Oakland Avenue from West Walnut Street to Chautauqua Street in the City of Carbondale. | — | Executed | E. T. Simonds Construction Company $1,772,157 · | ||
| Sep 20, 2019 | 99631 | WilliamsonDistrict 9 | Resurfacing Paulton Road from 0.3 miles north of Grant Brick Road to Toledo Road. | — | Executed | E. T. Simonds Construction Company $477,971 · | ||
| Nov 8, 2019 | 46536 | VariousDistrict 5 | Replacing reflectors and raised pavement marker castings within the limits shown. | — | Executed | P & P Construction Co. $771,747 · | ||
| Nov 8, 2019 | 46902 | GrundyDistrict 3 | Remove and replace three span structures SN 032-7004 and SN 032-7099 carrying Price street over the IandM Canal, seal and stripe parking lots, and other associatd work at the William G. Stratton State Park in Morris. | — | Executed | D. Construction, Inc. $896,861 · | ||
| Nov 8, 2019 | 46906 | StephensonDistrict 2 | Resurfacing and reconstruction of park roads and parking lots, drainage improvements, ADA sidewalk/ramp upgrades, and all other necessary work. | — | Executed | Civil Constructors, Inc. $3,919,151 · | ||
| Nov 8, 2019 | 46909 | VermilionDistrict 5 | HMA resurfacing; campground, roadway, and parking improvements; parking lot improvements; and other miscellaneous improvements in the park. | — | Executed | Cross Construction, Inc. $4,168,427 · | ||
| Nov 8, 2019 | 60R67 | CookDistrict 1 | Bridge deck overlay, bridge deck joint repairs and traffic signal modification on Grand Avenue over Des Plaines River Road in the Village of River Grove. (SN 016-0855). | — | Executed | Lorig Construction Company $1,091,070 · | ||
| Nov 8, 2019 | 61E52 | KaneDistrict 1 | Reconstruct the intersection of Bliss Road at Illinois Route 47 in the Village of Sugar Grove. | — | Executed | D. Construction, Inc. $1,549,240 · | ||
| Nov 8, 2019 | 61F17 | CookDistrict 1 | Construction of a 10 foot wide asphalt trail, concrete sidewalks, pipe culverts, pavement markings and landscaping. Project begins on 131st Street just west of Francisco Avenue easterly on 131st Street to Francisco Avenue, then north along Francisco Avenue continuing east on Vermont Street to Chatham Street and south to Canal Street. At Canal Street the project heads east along the south side of the Cal-Sag Channel terminating at Ashland Avenue, located in the City of Blue Island. | — | Executed | D. Construction, Inc. $855,645 · | ||
| Nov 8, 2019 | 61F63 | LakeDistrict 1 | Construction of HMA path on Riverwoods Road between Daniel Wright School and Whytegate Park and construction of a sidewalk along Westminster Way from the CDW Path west for 0.07 miles, located in the Village of Lincolnshire. | — | Executed | Chicagoland Paving Contractors, Inc. $270,000 · | ||
| Nov 8, 2019 | 61F97 | CookDistrict 1 | Sidewalk removal and replacement and the installation of pedestrian signals on Ridgeland Avenue from 110th Str Work consists of sidewalk removal and replacement and the installation of pedestrian signals on Ridgeland Avenue from 110th Street to 102nd Place with an omission from 109th Street to 107th Street, located in the Village of Chicago Ridge. | — | Executed | Landmark Contractors, Inc. $1,151,034 · | ||
| Nov 8, 2019 | 61F99 | McHenryDistrict 1 | Roadway resurfacing and vertical curve corrections on Lily Lake Road from Stone Drive to Wegner Drive in Nunda Township. | — | Rejected | Curran Contracting Company $1,294,604 · | ||
| Nov 8, 2019 | 61G03 | CookDistrict 1 | Replace the superstructure and repairs to the substructure. Project is located north of Park View Drive in the City of North Lake. | — | Executed | Alliance Contractors, Inc. $469,103 · | ||
| Nov 8, 2019 | 61G04 | CookDistrict 1 | Resurfacing Nerge Road from Mitchell Trail to Devon Avenue and IL 53 from south of Huntington Drive to north of Devon Avenue in the Village of Elk Grove Village. | — | Executed | K-Five Construction Corporation $1,255,255 · | ||
| Nov 8, 2019 | 61G07 | CookDistrict 1 | Sidewalk construction, covered bicycle shelter, bike racks and bike repair stations on Burlington Avenue west of Dubois Avenue (Congress Park Metra Station) and on Forest Avenue north of Burlington Avenue (Brookfield Metra Station) on the Village of Brookfield. | — | Executed | Landmark Contractors, Inc. $130,549 · | ||
| Nov 8, 2019 | 62F95 | CookDistrict 1 | Superstructure replacement, substructure rehabilitation, roadway lighting, underdeck lighting and drainage improvements on I-94 at Montrose Avenue. (SN 016-0852) | — | Executed | Kenny Construction Company_DO NOT USE $16,233,644 · | ||
| Nov 8, 2019 | 62G94 | CookDistrict 1 | Bridge overlay and joint repair on the structure carrying IL 72 westbound over the EJandJ Railroad in the Village of Hoffman Estates. (SN 016-0502) | — | Executed | Martam Construction Incorporated $387,419 · | ||
| Nov 8, 2019 | 62H21 | CookDistrict 1 | 6.9 miles of overlay, patching with precast concrete slabs and pedestrian ramp improvements on IL 72 (Higgins Road) from Commonwealth Drive to Glen Lake Road in the Villages of Hoffman Estates, Schaumburg and South Barrington. | — | Executed | Plote Construction, Inc. $7,881,258 · | ||
| Nov 8, 2019 | 62J31 | CookDistrict 1 | Construction of a concrete retaining wall on the west side of I-290 between Van Buren and Jackson; mainline pavement near southbound I-90/94 to westbound I-290 ramp; demolition of existing Jackson Boulevard Bridge at I-90/94. (SN 016-0588). | — | Executed | Lorig Construction Company $9,989,152 · | ||
| Nov 8, 2019 | 62J37 | McHenryDistrict 1 | Pavement replacement at the culvert carrying US 14 over the ditch south of Oak Grove Road in the City of Harvard. (SN 056-0263) | — | Executed | Alliance Contractors, Inc. $148,753 · | ||
| Nov 8, 2019 | 62J56 | VariousDistrict 1 | Temporary traffic control setup on various state-maintained expressway and arterial routes throughout District 1 on a work order basis. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,556,000 · | ||
| Nov 8, 2019 | 62J58 | VariousDistrict 1 | Sweeping various expressway and arterial highways throughout District 1. | — | Rejected | |||
| Nov 8, 2019 | 62J76 | CookDistrict 1 | 3.2 miles of tree removal, selective clearing, grubbing, tree pruning, chain link and wood fence removal, sign removal and metal structure removal along Wood Street from south of 159th Street to north of 138th Street within the City of Harvey and Villages of Dixmoor and Riverdale. | — | Executed | D. Construction, Inc. $374,062 · | ||
| Nov 8, 2019 | 62K13 | WillDistrict 1 | Surveillance camera replacement on I-55 (Lorenzo Rd to Joliet Rd) and I-80 (IL 43 to US 30). | — | Executed | Meade Inc. $482,744 · | ||
| Nov 8, 2019 | 64N92 | Jo DaviessDistrict 2 | PAVEMENT PATCHING ON US 20 FROM 6TH ST IN EAST DUBUQUE TO DUNN RD. | — | Executed | G. M. Sipes Construction, Inc. $357,968 · | ||
| Nov 8, 2019 | 64N93 | OgleDistrict 2 | PAVEMENT PATCHING ON IL 38 FROM PHILL RD TO I-39 EAST OF ROCHELLE. | — | Executed | G. M. Sipes Construction, Inc. $197,462 · | ||
| Nov 8, 2019 | 64N94 | Rock IslandDistrict 2 | PAVEMENT PATCHING ON COUNTY HOME RD FROM 113TH AVE TO 175TH AVE/KNOXVILLE RD S OF COAL VALLEY. | — | Executed | G. M. Sipes Construction, Inc. $587,901 · | ||
| Nov 8, 2019 | 66E50 | DeKalbDistrict 3 | 3P milling and resurfacing on IL 38 from the Ogle County line to John Huber Parkway. Other work includes guardrail with stabilization, shoulder stone, detector loop installation, pavement marking, and raised reflectors. | — | Executed | Rock Road Companies, Inc. $2,665,406 · | ||
| Nov 8, 2019 | 66F60 | FordDistrict 3 | Remove and replace culvert SN 027-2509 that carries a tributary to Spring Creek under IL 115, located 7.2 miles S of US 24. | — | Executed | Tobey's Construction & Cartage, Inc. $432,193 · | ||
| Nov 8, 2019 | 66F70 | IroquoisDistrict 3 | Removal and replacement of SN 038-0039, reconstruction of adjacent pavement, and associated earthwork and traffic control of US 45 over Prairie Creek. | — | Executed | Iroquois Paving Corporation $1,710,724 · | ||
| Nov 8, 2019 | 66F75 | LaSalleDistrict 3 | Deck replacement and beam repair on SN 050-0201 carrying US 52 over Indian Creek, located 2.1 miles E of IL 23. | — | Executed | Civil Constructors, Inc. $2,219,448 · | ||
| Nov 8, 2019 | 66J72 | LaSalleDistrict 3 | Bridge repair SN 050-0163 and 050-0164 on I-39 above BandN RR, 0.8 miles N of US 34. | — | Executed | D. Construction, Inc. $568,614 · | ||
| Nov 8, 2019 | 66J86 | VariousDistrict 3 | Bridge deck concrete sealing at various bare concrete bridge decks. | — | Executed | All States Painting, Inc. $159,900 · | ||
| Nov 8, 2019 | 66K27 | FordDistrict 3 | Removing and replacing expansion joints, removing and replacing bridge deck overlay and PPC I-beam repairs on SN's 027-0052 and 027-0053 carrying I-57 over Big Four Creek 2.37 miles S of IL 9. | — | Executed | Iroquois Paving Corporation $841,960 · | ||
| Nov 8, 2019 | 66K43 | VariousDistrict 3 | District wide tree removal on state maintained routes as needed. | — | Rejected | Endrizzi Contracting, Inc $127,900 · | ||
| Nov 8, 2019 | 68B62 | WoodfordDistrict 4 | Add shoulders, culvert extensions, and resurface IL 117 from CR 700N near Eureka to N of Raymond St in Goodfield. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,375,662 · | ||
| Nov 8, 2019 | 68C89 | TazewellDistrict 4 | Deck replacement, structural steel repairs, roadway lighting, navigation lightning, decorative lighting, and scour countermeasures to SN 090-0001 (Murray Baker Bridge), carrying I-74 over the Illinois River. | — | Executed | ICC Group Inc. $42,221,000 · | ||
| Nov 8, 2019 | 68F17 | VariousDistrict 4 | Inspection, maintenance, and repair of existing lighting and electrical facilities at various locations. | — | Executed | Bodine Electric of Decatur $459,726 · | ||
| Nov 8, 2019 | 70545 | DouglasDistrict 5 | Bridge replacement, bridge removal/demolition on IL 130 over the Embarras River. | — | Executed | Sangamo Construction Company $5,765,527 · | ||
| Nov 8, 2019 | 70E06 | VermilionDistrict 5 | Six spot locations of bridge painting on I-74. | — | Executed | Venus Painting Co. $1,456,964 · | ||
| Nov 8, 2019 | 70E09 | VermilionDistrict 5 | Weigh in Motion Data Collection System on FAI-74 approximately 1.0 mile west of Oakwood. | — | Executed | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $405,354 · | ||
| Nov 8, 2019 | 70E34 | VermilionDistrict 5 | One mile of patching on I-74 (EB and WB) from G-Street to E of US 150/IL 1 in Danville. | — | Executed | G. M. Sipes Construction, Inc. $207,280 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.