IDOT Jobs

2019 · 936 jobs · — Sign up free
★ My Jobs

936 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Aug 2, 2019 97704 MadisonDistrict 8 Sidewalk replacement, decorative posts and patterned pavement imprinting along Ferguson Avenue betwen Old St. Louis Road and 2nd Street in Wood River. — Executed Nov 26 New RCS Construction, Inc. $456,469 ·
Aug 2, 2019 99617 WhiteDistrict 9 Replace the bridge carrying TR 412A over French Creek, 1 mile north of Calvin. — Executed Nov 26 New Samron Midwest Contracting, Inc. $348,241 ·
Aug 2, 2019 99623 JeffersonDistrict 9 Resurfacing Tolle Lane from Fairfield Road to Miller Lake Lane in Mt. Vernon. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $958,187 ·
Aug 2, 2019 99628 WhiteDistrict 9 replace the bridge carrying CH 18 over Bear Creek Tributary with a 19' X 7' box culvert, located 2 miles southwest of Norris City. — Executed Nov 26 New Sierra Bravo Contractors, LLC $184,218 ·
Sep 20, 2019 46531 VariousDistrict 7 VARIOUS LENGTHS OF PAVEMENT MARKING REHABILITATION THROUGHOUT DISTRICT 7. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $556,835 ·
Sep 20, 2019 46535 VariousDistrict 9 REPAIRING VARIOUS WIDTHS OF THERMOPLASTIC, PREFORMED PLASTIC, AND URETHANE AND POLYUREA PAVEMENT MARKING LINES, LETTERS AND SYMBOLS AND THE REMOVAL OF EXISTING PAVEMENT MARKINGS ON A WORK ORDER BASIS THROUGHOUT DISTRICT 9. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $781,385 ·
Sep 20, 2019 60K72 CookDistrict 1 BRIDGE REHAB AND PAINTING ON WESTERN AVENUE OVER CAL-SAG CHANNEL (SN 016-0777). — Executed Nov 26 New D. Construction, Inc. $10,689,369 ·
Sep 20, 2019 61D65 LakeDistrict 1 Reconstruct the intersection of Hart Road at US Route 14 in the Villages of Barrington and Barrington Hills. — Executed Nov 26 New Plote Construction, Inc. $7,965,000 ·
Sep 20, 2019 61E69 DuPageDistrict 1 Landscaping and sign installation along the Elgin O'Hare Western Access Corridor at Lake Street (US 20), Roselle Road, Plum Grove Road and Rohlwing Road. Project is located in the villages of Roselle, Itasca and Hanover Park. — Rejected Nov 26 New Alliance Contractors, Inc. $1,264,017 ·
Sep 20, 2019 61F25 LakeDistrict 1 Pavement reconstruction and the construction of a HMA pedestrian path next to Weiland Road from Aptakisic Road to Deerfield Parkway, and on Aptakistic Road from Joseph Court to Industrial Drive in the villages of Buffalo Grove and Lincolnshire. — Executed Nov 26 New Berger Excavating Contractors, Inc. $12,469,513 ·
Sep 20, 2019 61F58 McHenryDistrict 1 Reconstruct the intersection of Main Street at Crystal Lake Avenue in the city of Crystal Lake. — Executed Nov 26 New Copenhaver Construction, Inc. $4,028,645 ·
Sep 20, 2019 61F85 DuPageDistrict 1 Streetscape to include sidewalk replacement, curb and gutter replacement, lighting improvements, landscaping, pavement imprinting and resurfacing. Project is located on Prospect Avenue from Ann Street to Burlington Avenue in the Village of Clarendon Hills. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,434,658 ·
Sep 20, 2019 61F93 CookDistrict 1 Resurfacing Broadway Avenue from Division Street to North Avenue in the Village of Melrose Park. — Executed Nov 26 New J. A. Johnson Paving Company $650,700 ·
Sep 20, 2019 61F96 CookDistrict 1 Construction of Poplar Creek Trail from east of the intersection of Shoe Factory Road and the CN Railroad to west of the intersection of IL Route 59. Project is located within the Forest Preserve of Cook County Arthur Janura Forest Preserve in the Village of Hoffman Estates. — Executed Nov 26 New Chicagoland Paving Contractors, Inc. $270,000 ·
Sep 20, 2019 61F98 McHenryDistrict 1 Sidewalk construction and culvert replacement on Main Street from Winn Road to West of Bilvin Street in the Village of Spring Grove. — Executed Nov 26 New Alliance Contractors, Inc. $443,926 ·
Sep 20, 2019 61G00 LakeDistrict 1 Reconstruction and resurfacing Rockland Road from east of the Des Plaines River bridge to St. Mary's Road, located in Libertyville Township, Lake County. — Executed Nov 26 New Berger Excavating Contractors, Inc. $1,964,385 ·
Sep 20, 2019 62G56 McHenryDistrict 1 OVERLAY, NEW SHOULDERS AND MILLED RUMBLE STRIPS ON IL 31 FROM SHAMROCK LANE TO NORTH OF EDGEWOOD ROAD IN THE CITY OF MCHENRY AND VILLAGE OF PRAIRIE GROVE. — Executed Nov 26 New Peter Baker & Son Co. $988,722 ·
Sep 20, 2019 62H74 CookDistrict 1 PAVEMENT MARKING ROOSEVELT RD TO US 1 2/20 (95TH ST). — Executed Nov 26 New A. C. Pavement Striping Co. & RoadSafe Traffic Systems & Marking Specialists Corp. $2,611,663 ·
Sep 20, 2019 62J04 CookDistrict 1 1.9 MILES OF OVERLAY AND PEDESTRIAN RAMP IMPROVEMENTS ON IL 58 FROM BASSWOOD STREET TO I-290 / IL 53 IN THE VILLAGE OF SCHAUMBURG. — Executed Nov 26 New Arrow Road Construction Co. $3,206,907 ·
Sep 20, 2019 62J18 CookDistrict 1 SUBSTRUCTURE BRIDGE REPAIR OF SN 016-1094 CARRYING MILWAUKEE AVENUE OVER THE OHIO FEEDER IN THE CITY OF CHICAGO. — Executed Nov 26 New Areatha Construction Co., Inc. $759,728 ·
Sep 20, 2019 62J19 CookDistrict 1 11.9 MILES OF PAVEMENT MARKING REMOVAL, PAVEMENT MARKING INSTALLATION AND RAISED REFLECTIVE PAVEMENT MARKERS ON I-90/94 (DAN RYAN EXPRESSWAY) FROM ROOSEVELT ROAD TO US 12/20 (95TH STREET) WITHIN THE CITY OF CHICAGO. — Executed Nov 26 New A. C. Pavement Striping Co. & RoadSafe Traffic Systems & Marking Specialists Corp. $2,714,768 ·
Sep 20, 2019 62J61 VariousDistrict 1 HIGH TENSION CABLE BARRIER REPAIRS AT VARIOUS LOCATIONS ON VARIOUS EXPRESSWAY MEDIANS THROUGHOUT DISTRICT ONE. — Executed Nov 26 New Northern Contracting, Inc. $342,330 ·
Sep 20, 2019 64L16 OgleDistrict 2 Pedestrian "ADA" ramps a various locations in Oregon and Polo. — Rejected Nov 26 New Stenstrom Excavation & Blacktop, Inc. $1,414,865 ·
Sep 20, 2019 64N78 VariousDistrict 2 WASHING 12 BRIDGES AT VARIOUS LOCATIONS IN DISTRICT 2. — Rejected Nov 26 New All States Painting, Inc. $174,400 ·
Sep 20, 2019 64N79 WinnebagoDistrict 2 WASHING 4 BRIDGES AT VARIOUS LOCATIONS. — Executed Nov 26 New M & M Concrete, Inc. $39,999 ·
Sep 20, 2019 64N81 VariousDistrict 2 WASHING 19 BRIDGES AT VARIOUS LOCATIONS. — Rejected Nov 26 New Interstate Maintenance, Incorporated $159,652 ·
Sep 20, 2019 64N82 VariousDistrict 2 WASHING 6 BRIDGES OVER THE ROCK RIVER AT VARIOUS LOCATIONS. — Executed Nov 26 New All States Painting, Inc. $89,410 ·
Sep 20, 2019 64N83 Rock IslandDistrict 2 WASHING 2 BRIDGES OVER THE MISSISSIPPI RIVER. — Executed Nov 26 New Interstate Maintenance, Incorporated $229,992 ·
Sep 20, 2019 64N84 VariousDistrict 2 WASHING 3 BRIDGES OVER THE MISSISSIPPI RIVER. — Executed Nov 26 New Interstate Maintenance, Incorporated $129,876 ·
Sep 20, 2019 64N85 VariousDistrict 2 WASHING 5 BRIDGES OVER THE ROCK RIVER. — Executed Nov 26 New All States Painting, Inc. $70,960 ·
Sep 20, 2019 64N86 VariousDistrict 2 WASHING 8 BRIDGES AT VARIOUS LOCATIONS. — Executed Nov 26 New All States Painting, Inc. $85,000 ·
Sep 20, 2019 66K34 IroquoisDistrict 3 DRAINAGE REPAIRS 0.27 MI N OF CR 700 N ROAD. — Executed Nov 26 New Iroquois Paving Corporation $208,524 ·
Sep 20, 2019 68758 KnoxDistrict 4 Replacement of structure carrying IL 78 over kickapoo creek and replacement of a box culvert. — Executed Nov 26 New Otto Baum Company, Inc. $2,245,718 ·
Sep 20, 2019 68C57 PeoriaDistrict 4 SUPERSTRUCTURE REPLACEMENT TO SN 072-0073 CARRYING BELL SCHOOL RD OVER I-74 AND RESURFACE IL 78 FROM I-74 N 0.13 MI AND 0.2 MI S. — Executed Nov 26 New Stark Excavating, Inc. $2,937,974 ·
Sep 20, 2019 68C65 KnoxDistrict 4 CULVERT REPLACEMENTS ON IL 167 0.1 MI SE OF US 34/IL 167, AND 1.3 MI W OF TR 146. — Executed Nov 26 New Valley Construction Co. $1,513,546 ·
Sep 20, 2019 68E16 PeoriaTazewellDistrict 4 CULVERT LINING ON VARIOUS ROUTES WITHIN PEORIA AND TAZEWELL COUNTIES. — Executed Nov 26 New Hoerr Construction, Inc. $769,350 ·
Sep 20, 2019 68E27 TazewellDistrict 4 BRIDGE JOINT REPAIR, BRIDGE REPAIR TO SN 090-0127 CARRYING I-155 RAMP (NB) OVER BNSF AT IL 98 AND SN 090-0131 CARRYING MAIN ST (SB) OVER I-155 1.6 MI W OF IL 98 NEAR MORTON. — Executed Nov 26 New Halverson Construction Co., Inc. $853,648 ·
Sep 20, 2019 68E53 PeoriaTazewellDistrict 4 CONSTRUCTION, REPLACEMENT OR CROSSWALKS ALONG IL 29 (ADAMS and JEFFERSON ST) FROM HANCOCK ST TO WAYNE STREET IN PEORIA, IL 8 FROM CHERRY LANE TO MEADOWVIEW LN IN SUNNYLAND, IL 8 AT LEGION RD AND BUS 24 AT BONDURANT ST IN WASHINGTON. — Executed Nov 26 New Otto Baum Company, Inc. $537,618 ·
Sep 20, 2019 70B53 ChampaignDistrict 5 1.533 miles of safety improvements on US 150/University Ave. from Wright St. to Cunningham Ave. in Urbana. — Executed Nov 26 New Champaign Asphalt Company, LLC $10,394,213 ·
Sep 20, 2019 72L38 MorganDistrict 6 PATCHING ON IL 267 FROM JUST NORTH OF I-72 TO JUST SOUTH OF I-72. — Executed Nov 26 New Kinney Contractors, Inc. $158,297 ·
Sep 20, 2019 74922 EffinghamDistrict 7 TREE REMOVAL AND SEEDING ALONG I-70 FROM MILE POST 98 TO MILE POST 105 EAST OF EFFINGHAM AND ALONG I-57 FROM THE I-70 / I-57 INTERCHANGE NORTH TO MILE POST 166 NORTHEAST OF EFFINGHAM. — Executed Nov 26 New Lion Construction 1, LLC $183,380 ·
Sep 20, 2019 76J16 St. ClairDistrict 8 8.9 miles of resurfcing and ADA upgrades on IL 13/IL 15 from Roger's Drive in Freeburg to south of the Kaskasia River Bridge on IL 15. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $5,948,690 ·
Sep 20, 2019 76M16 MadisonDistrict 8 DECK WATERPROOFING, JOINT AND BEAM END REPAIRS ON SN 060-0226 CARRYING IL 140 OVER UPRR, 3.1 MILES WEST OF I-55 AND SN 060-0227 CARRYING IL 140 OVER NandWRR, 2.9 MILES WEST OF I-55. — Executed Nov 26 New The Kilian Corporation $512,618 ·
Sep 20, 2019 76M37 MadisonSt. ClairDistrict 8 WELL TREATMENT AT VARIOUS LOCATIONS WITHIN DISTRICT 8. — Executed Nov 26 New Layne Christensen Company $723,853 ·
Sep 20, 2019 76M38 VariousDistrict 8 REPAIR AND MAINTENANCE OF ELECTRICAL EQUIPMENT AT VARIOUS PUMP STATIONS THROUGHOUT DISTRICT 8. — Executed Nov 26 New Wissehr Electric, Inc. $54,758 ·
Sep 20, 2019 76M39 CalhounDistrict 8 REPAIR AND MAINTENANCE OF THE ELECTRICAL EQUIPMENT AT THE JOE PAGE BRIDGE IN HARDIN. — Executed Nov 26 New Wissehr Electric, Inc. $58,366 ·
Sep 20, 2019 78631 FranklinDistrict 9 ADDITION OF A NEW LANE IN EACH DIRECTION, INSTALL A MEDIAN BARRIER AND UPGRADE GUARDRAIL ON A 3.2 MILE STRETCH OF I-57 FROM SOUTH OF THE COUNTRY CLUB ROAD OVERPASS TO MILE POST 66. — Executed Nov 26 New E. T. Simonds Construction Company $20,637,943 ·
Sep 20, 2019 78736 JohnsonDistrict 9 4.3 MILES OF PATCHING ON NORTHBOUND I-57 FROM THE UNION COUNTY LINE TO THE WILLIAMSON COUNTY LINE. — Executed Nov 26 New Kinney Contractors, Inc. $95,995 ·
Sep 20, 2019 78737 MassacDistrict 9 13.2 MILES OF CENTERLINE RESURFACING ON EASTBOUND I-24 AT VARIOUS LOCATIONS FROM THE JOHNSON COUNTY LINE TO US 45. — Executed Nov 26 New E. T. Simonds Construction Company $282,286 ·
Sep 20, 2019 78739 UnionDistrict 9 PAVED SHOULDER REMOVAL, PCC SHOULDERS, TIMBER CURB REMOVAL, CURB AND GUTTER, REMOVE AND REPLACE STONE RIP RAP TO REPAIR SLOPES ON US 51 AT SN 091-2002, 0.7 MILES NORTH OF ANNA. — Executed Nov 26 New Sierra Bravo Contractors, LLC $164,656 ·
Sep 20, 2019 85687 WinnebagoDistrict 2 Remove guardrail and components, place HMA shoulders and install guardrail and traffic barrier terminals at various locations in Winnebago County. — Rejected Nov 26 New William Charles Construction Company, LLC $1,012,075 ·
Sep 20, 2019 87695 GrundyDistrict 3 Pavement widening and reconstruction of Ridge Road from a two-lane to a four-lane with bi-directional turn lane, includes bridge rehabilitation and the construction of a new bridge span to carry the Wisconsin Central Ltd. Railway over Ridge Road. Project runs from south of McEvilly Road to Minooka Road in the village of Minooka. — Rejected Nov 26 New D. Construction, Inc. $11,963,320 ·
Sep 20, 2019 87711 LaSalleDistrict 3 construction of the extension of Unytite Drive between Plank Road and Donlar Ave. in Peru. — Executed Nov 26 New Advanced Asphalt Company $1,487,056 ·
Sep 20, 2019 87713 LaSalleDistrict 3 Pavement widening and resurfacing on CH 15 from I-80 to IL 71. — Executed Nov 26 New D. Construction, Inc. $2,346,622 ·
Sep 20, 2019 89749 TazewellDistrict 4 Roadway reconstruction on Distillery Road from Front Street to IL 29, on Front Street from Distillery Road to Fayette Street and on Fayette Street from Front Street to IL 29 in the city of Pekin. — Executed Nov 26 New Otto Baum Company, Inc. $6,378,025 ·
Sep 20, 2019 95860 WayneDistrict 7 Replace the bridge carrying TR 562 over King Creek, located 1.7 miles west of Golden Gate. — Executed Nov 26 New Samron Midwest Contracting, Inc. $229,550 ·
Sep 20, 2019 97692 St. ClairDistrict 8 Reconstruction of Shiloh Station Road from South of Timberline Court to north of Johnson Road in the Village of Shiloh. — Executed Nov 26 New The Kilian Corporation $844,928 ·
Sep 20, 2019 97707 MarionDistrict 8 Resurfacing, sidewalk replacement, curb and gutter on Hickory Street from 16th Street to Nolemen Street and on 16th Street from Hickory Street to Wabash Avenue in the city of Centrailia. — Rejected Nov 26 New Howell Paving, Inc. $686,751 ·
Sep 20, 2019 99630 JacksonDistrict 9 Reconstruction of Oakland Avenue from West Walnut Street to Chautauqua Street in the City of Carbondale. — Executed Nov 26 New E. T. Simonds Construction Company $1,772,157 ·
Sep 20, 2019 99631 WilliamsonDistrict 9 Resurfacing Paulton Road from 0.3 miles north of Grant Brick Road to Toledo Road. — Executed Nov 26 New E. T. Simonds Construction Company $477,971 ·
Nov 8, 2019 46536 VariousDistrict 5 Replacing reflectors and raised pavement marker castings within the limits shown. — Executed Nov 26 New P & P Construction Co. $771,747 ·
Nov 8, 2019 46902 GrundyDistrict 3 Remove and replace three span structures SN 032-7004 and SN 032-7099 carrying Price street over the IandM Canal, seal and stripe parking lots, and other associatd work at the William G. Stratton State Park in Morris. — Executed Nov 26 New D. Construction, Inc. $896,861 ·
Nov 8, 2019 46906 StephensonDistrict 2 Resurfacing and reconstruction of park roads and parking lots, drainage improvements, ADA sidewalk/ramp upgrades, and all other necessary work. — Executed Nov 26 New Civil Constructors, Inc. $3,919,151 ·
Nov 8, 2019 46909 VermilionDistrict 5 HMA resurfacing; campground, roadway, and parking improvements; parking lot improvements; and other miscellaneous improvements in the park. — Executed Nov 26 New Cross Construction, Inc. $4,168,427 ·
Nov 8, 2019 60R67 CookDistrict 1 Bridge deck overlay, bridge deck joint repairs and traffic signal modification on Grand Avenue over Des Plaines River Road in the Village of River Grove. (SN 016-0855). — Executed Nov 26 New Lorig Construction Company $1,091,070 ·
Nov 8, 2019 61E52 KaneDistrict 1 Reconstruct the intersection of Bliss Road at Illinois Route 47 in the Village of Sugar Grove. — Executed Nov 26 New D. Construction, Inc. $1,549,240 ·
Nov 8, 2019 61F17 CookDistrict 1 Construction of a 10 foot wide asphalt trail, concrete sidewalks, pipe culverts, pavement markings and landscaping. Project begins on 131st Street just west of Francisco Avenue easterly on 131st Street to Francisco Avenue, then north along Francisco Avenue continuing east on Vermont Street to Chatham Street and south to Canal Street. At Canal Street the project heads east along the south side of the Cal-Sag Channel terminating at Ashland Avenue, located in the City of Blue Island. — Executed Nov 26 New D. Construction, Inc. $855,645 ·
Nov 8, 2019 61F63 LakeDistrict 1 Construction of HMA path on Riverwoods Road between Daniel Wright School and Whytegate Park and construction of a sidewalk along Westminster Way from the CDW Path west for 0.07 miles, located in the Village of Lincolnshire. — Executed Nov 26 New Chicagoland Paving Contractors, Inc. $270,000 ·
Nov 8, 2019 61F97 CookDistrict 1 Sidewalk removal and replacement and the installation of pedestrian signals on Ridgeland Avenue from 110th Str Work consists of sidewalk removal and replacement and the installation of pedestrian signals on Ridgeland Avenue from 110th Street to 102nd Place with an omission from 109th Street to 107th Street, located in the Village of Chicago Ridge. — Executed Nov 26 New Landmark Contractors, Inc. $1,151,034 ·
Nov 8, 2019 61F99 McHenryDistrict 1 Roadway resurfacing and vertical curve corrections on Lily Lake Road from Stone Drive to Wegner Drive in Nunda Township. — Rejected Nov 26 New Curran Contracting Company $1,294,604 ·
Nov 8, 2019 61G03 CookDistrict 1 Replace the superstructure and repairs to the substructure. Project is located north of Park View Drive in the City of North Lake. — Executed Nov 26 New Alliance Contractors, Inc. $469,103 ·
Nov 8, 2019 61G04 CookDistrict 1 Resurfacing Nerge Road from Mitchell Trail to Devon Avenue and IL 53 from south of Huntington Drive to north of Devon Avenue in the Village of Elk Grove Village. — Executed Nov 26 New K-Five Construction Corporation $1,255,255 ·
Nov 8, 2019 61G07 CookDistrict 1 Sidewalk construction, covered bicycle shelter, bike racks and bike repair stations on Burlington Avenue west of Dubois Avenue (Congress Park Metra Station) and on Forest Avenue north of Burlington Avenue (Brookfield Metra Station) on the Village of Brookfield. — Executed Nov 26 New Landmark Contractors, Inc. $130,549 ·
Nov 8, 2019 62F95 CookDistrict 1 Superstructure replacement, substructure rehabilitation, roadway lighting, underdeck lighting and drainage improvements on I-94 at Montrose Avenue. (SN 016-0852) — Executed Nov 26 New Kenny Construction Company_DO NOT USE $16,233,644 ·
Nov 8, 2019 62G94 CookDistrict 1 Bridge overlay and joint repair on the structure carrying IL 72 westbound over the EJandJ Railroad in the Village of Hoffman Estates. (SN 016-0502) — Executed Nov 26 New Martam Construction Incorporated $387,419 ·
Nov 8, 2019 62H21 CookDistrict 1 6.9 miles of overlay, patching with precast concrete slabs and pedestrian ramp improvements on IL 72 (Higgins Road) from Commonwealth Drive to Glen Lake Road in the Villages of Hoffman Estates, Schaumburg and South Barrington. — Executed Nov 26 New Plote Construction, Inc. $7,881,258 ·
Nov 8, 2019 62J31 CookDistrict 1 Construction of a concrete retaining wall on the west side of I-290 between Van Buren and Jackson; mainline pavement near southbound I-90/94 to westbound I-290 ramp; demolition of existing Jackson Boulevard Bridge at I-90/94. (SN 016-0588). — Executed Nov 26 New Lorig Construction Company $9,989,152 ·
Nov 8, 2019 62J37 McHenryDistrict 1 Pavement replacement at the culvert carrying US 14 over the ditch south of Oak Grove Road in the City of Harvard. (SN 056-0263) — Executed Nov 26 New Alliance Contractors, Inc. $148,753 ·
Nov 8, 2019 62J56 VariousDistrict 1 Temporary traffic control setup on various state-maintained expressway and arterial routes throughout District 1 on a work order basis. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $2,556,000 ·
Nov 8, 2019 62J58 VariousDistrict 1 Sweeping various expressway and arterial highways throughout District 1. — Rejected Nov 26 New
Nov 8, 2019 62J76 CookDistrict 1 3.2 miles of tree removal, selective clearing, grubbing, tree pruning, chain link and wood fence removal, sign removal and metal structure removal along Wood Street from south of 159th Street to north of 138th Street within the City of Harvey and Villages of Dixmoor and Riverdale. — Executed Nov 26 New D. Construction, Inc. $374,062 ·
Nov 8, 2019 62K13 WillDistrict 1 Surveillance camera replacement on I-55 (Lorenzo Rd to Joliet Rd) and I-80 (IL 43 to US 30). — Executed Nov 26 New Meade Inc. $482,744 ·
Nov 8, 2019 64N92 Jo DaviessDistrict 2 PAVEMENT PATCHING ON US 20 FROM 6TH ST IN EAST DUBUQUE TO DUNN RD. — Executed Nov 26 New G. M. Sipes Construction, Inc. $357,968 ·
Nov 8, 2019 64N93 OgleDistrict 2 PAVEMENT PATCHING ON IL 38 FROM PHILL RD TO I-39 EAST OF ROCHELLE. — Executed Nov 26 New G. M. Sipes Construction, Inc. $197,462 ·
Nov 8, 2019 64N94 Rock IslandDistrict 2 PAVEMENT PATCHING ON COUNTY HOME RD FROM 113TH AVE TO 175TH AVE/KNOXVILLE RD S OF COAL VALLEY. — Executed Nov 26 New G. M. Sipes Construction, Inc. $587,901 ·
Nov 8, 2019 66E50 DeKalbDistrict 3 3P milling and resurfacing on IL 38 from the Ogle County line to John Huber Parkway. Other work includes guardrail with stabilization, shoulder stone, detector loop installation, pavement marking, and raised reflectors. — Executed Nov 26 New Rock Road Companies, Inc. $2,665,406 ·
Nov 8, 2019 66F60 FordDistrict 3 Remove and replace culvert SN 027-2509 that carries a tributary to Spring Creek under IL 115, located 7.2 miles S of US 24. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $432,193 ·
Nov 8, 2019 66F70 IroquoisDistrict 3 Removal and replacement of SN 038-0039, reconstruction of adjacent pavement, and associated earthwork and traffic control of US 45 over Prairie Creek. — Executed Nov 26 New Iroquois Paving Corporation $1,710,724 ·
Nov 8, 2019 66F75 LaSalleDistrict 3 Deck replacement and beam repair on SN 050-0201 carrying US 52 over Indian Creek, located 2.1 miles E of IL 23. — Executed Nov 26 New Civil Constructors, Inc. $2,219,448 ·
Nov 8, 2019 66J72 LaSalleDistrict 3 Bridge repair SN 050-0163 and 050-0164 on I-39 above BandN RR, 0.8 miles N of US 34. — Executed Nov 26 New D. Construction, Inc. $568,614 ·
Nov 8, 2019 66J86 VariousDistrict 3 Bridge deck concrete sealing at various bare concrete bridge decks. — Executed Nov 26 New All States Painting, Inc. $159,900 ·
Nov 8, 2019 66K27 FordDistrict 3 Removing and replacing expansion joints, removing and replacing bridge deck overlay and PPC I-beam repairs on SN's 027-0052 and 027-0053 carrying I-57 over Big Four Creek 2.37 miles S of IL 9. — Executed Nov 26 New Iroquois Paving Corporation $841,960 ·
Nov 8, 2019 66K43 VariousDistrict 3 District wide tree removal on state maintained routes as needed. — Rejected Nov 26 New Endrizzi Contracting, Inc $127,900 ·
Nov 8, 2019 68B62 WoodfordDistrict 4 Add shoulders, culvert extensions, and resurface IL 117 from CR 700N near Eureka to N of Raymond St in Goodfield. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $5,375,662 ·
Nov 8, 2019 68C89 TazewellDistrict 4 Deck replacement, structural steel repairs, roadway lighting, navigation lightning, decorative lighting, and scour countermeasures to SN 090-0001 (Murray Baker Bridge), carrying I-74 over the Illinois River. — Executed Nov 26 New ICC Group Inc. $42,221,000 ·
Nov 8, 2019 68F17 VariousDistrict 4 Inspection, maintenance, and repair of existing lighting and electrical facilities at various locations. — Executed Nov 26 New Bodine Electric of Decatur $459,726 ·
Nov 8, 2019 70545 DouglasDistrict 5 Bridge replacement, bridge removal/demolition on IL 130 over the Embarras River. — Executed Nov 26 New Sangamo Construction Company $5,765,527 ·
Nov 8, 2019 70E06 VermilionDistrict 5 Six spot locations of bridge painting on I-74. — Executed Nov 26 New Venus Painting Co. $1,456,964 ·
Nov 8, 2019 70E09 VermilionDistrict 5 Weigh in Motion Data Collection System on FAI-74 approximately 1.0 mile west of Oakwood. — Executed Nov 26 New Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $405,354 ·
Nov 8, 2019 70E34 VermilionDistrict 5 One mile of patching on I-74 (EB and WB) from G-Street to E of US 150/IL 1 in Danville. — Executed Nov 26 New G. M. Sipes Construction, Inc. $207,280 ·
801–900 of 936‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.