18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 4, 2022 | 0008-02-077STP 2022(866)HES | Parker Fort Worth |
INSTALL FLASHING BEACONUS 180 · | $161,469 | $176,531 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | +9.3% | 4 |
| Aug 4, 2022 | 0916-35-243STP 2022(545)HES | Nueces Corpus Christi |
TRAFFIC SIGNAL IMPROVEMENTSCS · | $171,209 | $153,577 | HIGHWAY BARRICADES AND SERVICES, LLC | -10.3% | 2 |
| Aug 4, 2022 | 6397-71-001MMC - 639771001 | Randall Amarillo |
WINTER WEATHER MATERIALIH 27 · | $156,389 | $148,010 | THE BARGAIN SOURCE | -5.4% | 3 |
| Aug 4, 2022 | 0916-35-233STP 2022(773)HESG | Nueces Corpus Christi |
TRAFFIC SIGNAL IMPROVEMENTSCR · | $125,823 | $114,728 | HIGHWAY BARRICADES AND SERVICES, LLC | -8.8% | 3 |
| Aug 4, 2022 | 0155-04-060F 2022(993) | Goliad Corpus Christi |
LANDSCAPE DEVELOPMENTUS 183 · | $82,153 | $91,960 | TIGHT LINE CONSTRUCTION, LLC | +11.9% | 2 |
| Aug 4, 2022 | 6397-76-001MMC - 639776001 | Oldham Amarillo |
WINTER WEATHER MATERIALUS 385 · | $50,600 | $45,375 | SOUTHWEST ENVIROTX PARTNERS, LLC | -10.3% | 2 |
| Aug 4, 2022 | 0520-09-054F 2022(810) | Anderson Tyler |
LANDSCAPE DEVELOPMENTSL 256 · | $42,940 | $31,901 | TIGHT LINE CONSTRUCTION, LLC | -25.7% | 4 |
| Aug 3, 2022 | 0015-10-062F 2022(437) | Travis Austin |
WIDEN ROAD - ADD LANESIH 35 · | $570,810,419 | $606,855,895 | PULICE CONSTRUCTION, INC. | +6.3% | 3 |
| Aug 3, 2022 | 0188-04-035F 2022(509) | Brazoria Houston |
WIDEN ROAD - ADD LANESSH 36 · | $108,271,346 | $113,599,269 | WEBBER, LLC | +4.9% | 4 |
| Aug 3, 2022 | 0598-02-125F 2022(574) | Brazoria Houston |
CONSTRUCT BRIDGESH 288 · | $61,542,249 | $57,486,751 | GRANITE CONSTRUCTION COMPANY | -6.6% | 4 |
| Aug 3, 2022 | 0522-04-032F 2022(811) | Smith Tyler |
WIDEN ROAD - ADD LANESFM 16 · | $35,671,840 | $44,362,527 | HIGHWAY 19 CONSTRUCTION LLC | +24.4% | 4 |
| Aug 3, 2022 | 0106-04-036BR 2022(829) | Stonewall Abilene |
BRIDGE REPLACEMENTUS 380 · | $16,680,277 | $14,662,526 | EARTH BUILDERS, L.P. | -12.1% | 3 |
| Aug 3, 2022 | 0014-03-087BR 2022(867) | Johnson Fort Worth |
RECONSTRUCT EXISTING ROADWAYIH 35W · | $10,507,755 | $13,369,086 | ED BELL CONSTRUCTION COMPANY | +27.2% | 5 |
| Aug 3, 2022 | 0367-06-066F 2022(350) | Galveston Houston |
FERRY OPERATION PROJECTSSH 87 · | $7,800,675 | $10,981,668 | TEXAS GULF CONSTRUCTION COMPANY, INC. | +40.8% | 3 |
| Aug 3, 2022 | 0014-16-283C 14-16-283 | Tarrant Fort Worth |
REHABILITATE EXISTING ROADWAYIH 35W · | $9,938,744 | $10,273,783 | O. TREVINO CONSTRUCTION, LLC | +3.4% | 2 |
| Aug 3, 2022 | 0989-02-054F 2022(932) | Nueces Corpus Christi |
SURFACING/ROADWAY RESTORATIONFM 624 · | $12,650,407 | $10,116,593 | HAAS-ANDERSON CONSTRUCTION, LTD. | -20.0% | 5 |
| Aug 3, 2022 | 0101-02-039C 101-2-39 | Bee Corpus Christi |
RESURFACE ROADWAYUS 181 · | $11,819,984 | $9,794,886 | HAAS-ANDERSON CONSTRUCTION, LTD. | -17.1% | 3 |
| Aug 3, 2022 | 0272-05-033STP 2022(942)HES | Lampasas Brownwood |
PREVENTIVE MAINTENANCEUS 190 · | $5,448,547 | $6,287,281 | BIG CREEK CONSTRUCTION, LTD. | +15.4% | 4 |
| Aug 3, 2022 | 0912-72-650F 2022(876) | Harris Houston |
HAZARD ELIMINATION & SAFETYVA · | $5,522,872 | $5,909,098 | SELECT MAINTENANCE, L.L.C. | +7.0% | 2 |
| Aug 3, 2022 | 0019-03-028STP 2022(886)HES | Hill Waco |
HAZARD ELIMINATION & SAFETYSH 171 · | $6,082,873 | $5,859,953 | BEAR CREEK CONTRACTING, LLC | -3.7% | 2 |
| Aug 3, 2022 | 0049-09-076F 2022(857) | Brazos Bryan |
INSTALL RAISED MEDIANBS 6-R · | $4,750,800 | $5,236,845 | BRAZOS PAVING, INC. | +10.2% | 4 |
| Aug 3, 2022 | 0285-03-062STP 2022(816)HES | Hays Austin |
WIDEN ROAD - ADD LANESRM 12 · | $4,135,673 | $5,093,343 | DAN WILLIAMS COMPANY | +23.2% | 7 |
| Aug 3, 2022 | 6401-80-001RMC - 640180001 | Dallas Dallas |
FULL DEPTH CONCRETE REPAIRUS 80 · | $4,843,400 | $4,550,330 | O. TREVINO CONSTRUCTION, LLC | -6.1% | 3 |
| Aug 3, 2022 | 1181-03-040STP 2022(873)HES | Johnson Fort Worth |
HAZARD ELIMINATION & SAFETYFM 917 · | $4,138,660 | $4,410,629 | JAY MILLS CONTRACTING, INCORPORATED | +6.6% | 4 |
| Aug 3, 2022 | 1155-04-013STP 2022(830)HES | Borden Abilene |
WIDEN ROAD - ADD SHOULDERSFM 1785 · | $3,266,877 | $4,392,391 | GILVIN-TERRILL, LTD. | +34.5% | 3 |
| Aug 3, 2022 | 0976-01-043C 976-1-43 | Harris Houston |
SURFACING/ROADWAY RESTORATIONFM 865 · | $6,489,076 | $3,261,337 | TEXAS MATERIALS GROUP, INC. | -49.7% | 3 |
| Aug 3, 2022 | 6401-78-001RMC - 640178001 | Dallas Dallas |
FULL DEPTH CONCRETE REPAIRSL 12 · | $3,508,320 | $3,251,810 | ROY JORGENSEN ASSOCIATES, INC. | -7.3% | 3 |
| Aug 3, 2022 | 0271-17-176BR 2022(925) | Harris Houston |
BRIDGE REPLACEMENTIH 610 · | $2,130,054 | $3,121,847 | HARPER BROTHERS CONSTRUCTION LLC | +46.6% | 3 |
| Aug 3, 2022 | 6412-51-001MMC - 641251001 | Liberty Beaumont |
HOT MIXFM 1009 · | $2,552,200 | $2,976,725 | TEXAS MATERIALS GROUP, INC. | +16.6% | 1 |
| Aug 3, 2022 | 6399-97-001RMC - 639997001 | Dallas Dallas |
PERFORMANCE BASED CONTRACT MANAGED LANESIH 35E · | $3,397,939 | $2,943,755 | ROY JORGENSEN ASSOCIATES, INC. | -13.4% | 3 |
| Aug 3, 2022 | 6412-10-001MMC - 641210001 | Jasper Beaumont |
HOT MIXFM 82 · | $2,559,500 | $2,934,900 | TEXAS MATERIALS GROUP, INC. | +14.7% | 1 |
| Aug 3, 2022 | 6412-61-001MMC - 641261001 | Henderson Tyler |
AGGREGATE (MATERIAL ONLY)US 175 · | $2,154,456 | $2,616,350 | TOUCHSTONE RESOURCES, LLC | +21.4% | 2 |
| Aug 3, 2022 | 6410-91-001MMC - 641091001 | Jefferson Beaumont |
HOT MIXFM 1009 · | $2,213,500 | $2,560,250 | TEXAS MATERIALS GROUP, INC. | +15.7% | 1 |
| Aug 3, 2022 | 0674-01-071STP 2022(759)HES | El Paso El Paso |
HAZARD ELIMINATION & SAFETYFM 76 · | $2,286,929 | $2,492,426 | TRI STATE ELECTRIC, LTD. | +9.0% | 1 |
| Aug 3, 2022 | 0446-01-053STP 2022(864)HES | Lavaca Yoakum |
HAZARD ELIMINATION & SAFETYUA 90 · | $1,349,956 | $2,404,305 | HILL COUNTRY BRIDGE, INC. | +78.1% | 2 |
| Aug 3, 2022 | 6407-51-001BPM - 640751001 | Nueces Corpus Christi |
BRIDGE PREVENTATIVE MAINTENANCEUS 181 · | $675,651 | $2,402,800 | GIBSON & ASSOCIATES, INC. | +255.6% | 1 |
| Aug 3, 2022 | 0164-01-075F 2022(807) | Henderson Tyler |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREBS 31-H · | $2,036,274 | $2,266,624 | HIGHWAY 19 CONSTRUCTION LLC | +11.3% | 3 |
| Aug 3, 2022 | 0245-06-087STP 2022(809)HES | Smith Tyler |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TSH 64 · | $1,767,280 | $2,208,247 | L. S. EQUIPMENT CO., INC. | +25.0% | 4 |
| Aug 3, 2022 | 0095-05-063F 2022(826) | Kaufman Dallas |
INSTALLATION OF TRAFFIC SIGNALS AND SIDEWALKSUS 80 · | $1,628,567 | $2,155,024 | DURABLE SPECIALTIES, INC. | +32.3% | 3 |
| Aug 3, 2022 | 0167-01-126STP 2022(821)HES | El Paso El Paso |
HAZARD ELIMINATION & SAFETYUS 54 · | $1,412,597 | $2,140,781 | DEL MAR CONTRACTING, INC. | +51.5% | 6 |
| Aug 3, 2022 | 0912-72-654F 2022(875) | Harris Houston |
SURFACING/ROADWAY RESTORATIONVA · | $2,349,375 | $2,085,476 | TRP CONSTRUCTION GROUP, LLC | -11.2% | 6 |
| Aug 3, 2022 | 0231-16-035STP 2022(890)HES | Bell Waco |
HAZARD ELIMINATION & SAFETYFM 436 · | $1,891,533 | $2,084,782 | PIERCE R & B LLC | +10.2% | 5 |
| Aug 3, 2022 | 0122-03-033STP 2022(861)HES | Freestone Bryan |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TUS 287 · | $1,670,489 | $2,078,845 | BIG CREEK CONSTRUCTION, LTD. | +24.4% | 3 |
| Aug 3, 2022 | 0130-04-035STP 2022(894)HES | Hockley Lubbock |
HAZARD ELIMINATION & SAFETYSH 114 · | $1,865,723 | $1,890,330 | DIGG COMMERCIAL, LLC | +1.3% | 3 |
| Aug 3, 2022 | 1400-04-040STP 2022(697)HES | Montgomery Houston |
HAZARD ELIMINATION & SAFETYFM 1774 · | $2,662,997 | $1,870,036 | THIRD COAST SERVICES LLC | -29.8% | 7 |
| Aug 3, 2022 | 0106-07-030BR 2022(761) | Haskell Abilene |
BRIDGE MAINTENANCESH 6 · | $1,754,559 | $1,729,617 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | -1.4% | 4 |
| Aug 3, 2022 | 0931-04-034STP 2022(897)HES | Trinity Lufkin |
HAZARD ELIMINATION & SAFETYFS 357 · | $1,317,723 | $1,648,548 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +25.1% | 4 |
| Aug 3, 2022 | 0028-03-109STP 2022(468)HES | Liberty Beaumont |
HAZARD ELIMINATION & SAFETYUS 90 · | $1,982,560 | $1,615,491 | VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC | -18.5% | 4 |
| Aug 3, 2022 | 6396-31-001RMC - 639631001 | Denton Dallas |
PAVEMENT MARKINGSFM 1171 · | $1,490,209 | $1,523,932 | TRP CONSTRUCTION GROUP, LLC | +2.3% | 3 |
| Aug 3, 2022 | 0136-07-052F 2022(801) | Lamar Paris |
HAZARD ELIMINATION & SAFETYUS 271 · | $1,255,719 | $1,434,042 | TI-ZACK CONCRETE, INC. | +14.2% | 3 |
| Aug 3, 2022 | 0400-03-015BR 2022(802) | Hopkins Paris |
BRIDGE REPLACEMENTSL 301 · | $1,394,680 | $1,347,539 | HIGHWAY 19 CONSTRUCTION LLC | -3.4% | 4 |
| Aug 3, 2022 | 0086-01-099F 2022(924) | Webb Laredo |
CONSTRUCT PEDESTRIAN INFRASTRUCTURESH 359 · | $1,191,957 | $1,341,138 | B & MS CONSTRUCTION, INC. | +12.5% | 2 |
| Aug 3, 2022 | 1586-01-089F 2022(934) | Hidalgo Pharr |
TRAFFIC SIGNAL IMPROVEMENTSFM 907 · | $1,249,261 | $1,313,573 | D&G ENERGY CORPORATION | +5.1% | 5 |
| Aug 3, 2022 | 0017-06-091STP 2022(882)HES | Frio San Antonio |
HAZARD ELIMINATION & SAFETYIH 35 · | $1,608,895 | $1,300,000 | DAN WILLIAMS COMPANY | -19.2% | 5 |
| Aug 3, 2022 | 0832-02-029BR 2022(945) | Wilbarger Wichita Falls |
BRIDGE REPLACEMENTFM 925 · | $983,955 | $1,277,219 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | +29.8% | 3 |
| Aug 3, 2022 | 0051-03-119STP 2022(919)HES | Galveston Houston |
HAZARD ELIMINATION & SAFETYSH 3 · | $1,281,785 | $1,131,154 | MAIN LANE INDUSTRIES LTD. | -11.8% | 2 |
| Aug 3, 2022 | 0511-03-013F 2022(817) | Hays Austin |
INTERSECTION IMPROVEMENTRM 32 · | $947,264 | $1,073,850 | LONE STAR SITEWORK, LLC | +13.4% | 5 |
| Aug 3, 2022 | 6403-24-001RMC - 640324001 | Montgomery Houston |
CONCRETE STRUCTURE REPAIRIH 45 · | $1,018,825 | $1,062,525 | MAIN LANE INDUSTRIES LTD. | +4.3% | 3 |
| Aug 3, 2022 | 6401-90-001RMC - 640190001 | Collin Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 1138 · | $1,515,460 | $927,125 | D. L. LENNON INCORPORATED - CONTRACTOR | -38.8% | 3 |
| Aug 3, 2022 | 6330-29-001RMC - 633029001 | Brazoria Houston |
CONCRETE STRUCTURE REPAIRSH 288 · | $787,367 | $925,700 | ISI CONTRACTING, INC. | +17.6% | 2 |
| Aug 3, 2022 | 0911-00-124F 2022(896) | Angelina Lufkin |
INTERSECTION IMPROVEMENTVA · | $886,598 | $899,492 | ALLSTATE SIGNAL & CONSTRUCTION, LLC | +1.5% | 2 |
| Aug 3, 2022 | 0902-20-102BR 1502(024) | Wise Fort Worth |
BRIDGE REPLACEMENTCR · | $679,389 | $883,443 | WESSON CONSTRUCTION SERVICES, LLC | +30.0% | 3 |
| Aug 3, 2022 | 0073-08-203F 2022(883) | Bexar San Antonio |
LANDSCAPE DEVELOPMENTUS 281 · | $979,127 | $880,181 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -10.1% | 4 |
| Aug 3, 2022 | 0006-18-064F 2022(970) | Taylor Abilene |
INSTALL ILLUMINATIONBI 20-R · | $989,712 | $879,468 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | -11.1% | 4 |
| Aug 3, 2022 | 0920-38-280STP 2022(538)HESG | Jefferson Beaumont |
HAZARD ELIMINATION & SAFETYCS · | $692,412 | $850,170 | VACA UNDERGROUND UTILITIES INC | +22.8% | 4 |
| Aug 3, 2022 | 6411-79-001RMC - 641179001 | Brazos Bryan |
BRIDGE RAIL UPGRADE OR REPLACEMENTSH 6 · | $752,972 | $844,250 | TALBRAN ENTERPRISES LLC | +12.1% | 5 |
| Aug 3, 2022 | 6396-95-001MMC - 639695001 | Tarrant Fort Worth |
WINTER WEATHER MATERIALIH 35W · | $953,520 | $810,553 | NSG LOGISTICS, LLC | -15.0% | 3 |
| Aug 3, 2022 | 6400-71-001RMC - 640071001 | Jefferson Beaumont |
METAL BEAM GUARD FENCE REPAIRSH 73 · | $886,918 | $789,724 | BK FIELD OPERATIONS LLC | -11.0% | 1 |
| Aug 3, 2022 | 0910-00-135F 2022(965) | Smith Tyler |
BICYCLE AND PEDESTRIAN IMPROVEMENTSVA · | $653,255 | $783,828 | REYNOLDS & KAY, LTD. | +20.0% | 4 |
| Aug 3, 2022 | 6404-33-001RMC - 640433001 | Galveston Houston |
ASPHALT PAVEMENT REPAIRSH 146 · | $869,715 | $695,675 | MAIN LANE INDUSTRIES LTD. | -20.0% | 3 |
| Aug 3, 2022 | 6413-05-001MMC - 641305001 | Lubbock Lubbock |
HOT MIXIH 27 · | $805,000 | $694,694 | WEST TEXAS PAVING, INC. | -13.7% | 2 |
| Aug 3, 2022 | 0114-17-010F 2022(815) | Bastrop Austin |
CONSTRUCT PEDESTRIAN INFRASTRUCTURESL 109 · | $671,429 | $668,750 | ENCINO LANDSCAPE, INC. | -0.4% | 3 |
| Aug 3, 2022 | 0910-00-133F 2022(963) | Smith Tyler |
BICYCLE AND PEDESTRIAN IMPROVEMENTSVA · | $419,806 | $548,791 | ENCINO LANDSCAPE, INC. | +30.7% | 2 |
| Aug 3, 2022 | 6379-31-001BPM - 637931001 | Blanco Austin |
RIPRAP REPAIR AND BRIDGE RAILINGUS 281 · | $600,812 | $515,420 | RELMCO, INC. | -14.2% | 9 |
| Aug 3, 2022 | 6399-43-001RMC - 639943001 | Collin Dallas |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)SH 78 · | $672,809 | $472,114 | TRP CONSTRUCTION GROUP, LLC | -29.8% | 4 |
| Aug 3, 2022 | 0081-02-076F 2022(846) | Tarrant Fort Worth |
LANDSCAPE DEVELOPMENTUS 377 · | $416,012 | $470,872 | APEX LANDSCAPE & IRRIGATION, LLC | +13.2% | 3 |
| Aug 3, 2022 | 0910-00-134F 2022(964) | Smith Tyler |
BICYCLE AND PEDESTRIAN IMPROVEMENTSVA · | $435,667 | $470,055 | TI-ZACK CONCRETE, INC. | +7.9% | 5 |
| Aug 3, 2022 | 6411-55-001RMC - 641155001 | Brazos Bryan |
SPOT PAVEMENT MARKINGSSH 6 · | $655,425 | $458,225 | D. I. J. CONSTRUCTION, INC. | -30.1% | 5 |
| Aug 3, 2022 | 0909-00-051STP 2022(792)HES | McLennan Waco |
INTERSECTION IMPROVEMENTVA · | $480,706 | $454,340 | VACA UNDERGROUND UTILITIES INC | -5.5% | 1 |
| Aug 3, 2022 | 6390-99-001RMC - 639099001 | Taylor Abilene |
CRACK SEALIH 20 · | $922,374 | $447,458 | SCOUT 5 CONSTRUCTION LLC | -51.5% | 5 |
| Aug 3, 2022 | 6409-99-001MMC - 640999001 | Hunt Paris |
LIMESTONE ROCK ASPHALTIH 30 · | $403,750 | $446,875 | VULCAN CONSTRUCTION MATERIALS, LLC | +10.7% | 1 |
| Aug 3, 2022 | 6407-61-001MMC - 640761001 | Hunt Paris |
ROCK/RIP RAPIH 30 · | $824,000 | $439,200 | DIGG COMMERCIAL, LLC | -46.7% | 2 |
| Aug 3, 2022 | 6411-83-001RMC - 641183001 | Brazos Bryan |
METAL BEAM GUARD FENCE REPAIRSH 6 · | $521,755 | $431,845 | BK FIELD OPERATIONS LLC | -17.2% | 3 |
| Aug 3, 2022 | 6412-17-001MMC - 641217001 | Chambers Beaumont |
EMULSIONSH 65 · | $795,436 | $429,373 | CLEVELAND ASPHALT PRODUCTS, INC. | -46.0% | 2 |
| Aug 3, 2022 | 0906-32-059STP 2022(637)HESG | Midland Odessa |
HAZARD ELIMINATION & SAFETYCS · | $206,088 | $418,688 | FNH CONSTRUCTION, LLC | +103.2% | 3 |
| Aug 3, 2022 | 6411-81-001RMC - 641181001 | Washington Bryan |
METAL BEAM GUARD FENCE REPAIRSH 36 · | $463,420 | $416,750 | BK FIELD OPERATIONS LLC | -10.1% | 3 |
| Aug 3, 2022 | 0013-10-089F 2022(845) | Tarrant Fort Worth |
LANDSCAPE DEVELOPMENTBU 287P · | $356,669 | $406,338 | APEX LANDSCAPE & IRRIGATION, LLC | +13.9% | 3 |
| Aug 3, 2022 | 0320-01-078STP 2022(891)HES | Bell Waco |
INSTALL PEDESTRIAN CROSSWALK, INSTALL SIDEWALKSSS 290 · | $384,701 | $384,376 | CROSS PLUS CONSTRUCTION, LLC | -0.1% | 5 |
| Aug 3, 2022 | 6411-51-001RMC - 641151001 | Angelina Lufkin |
METAL BEAM GUARD FENCE REPAIRUS 59 · | $319,280 | $341,053 | ACE CONTRACTORS, INC. | +6.8% | 3 |
| Aug 3, 2022 | 6399-90-001BPM - 639990001 | Henderson Tyler |
BRIDGE JOINT CLEANING AND SEALINGSH 31 · | $380,952 | $307,647 | PENHALL COMPANY | -19.2% | 8 |
| Aug 3, 2022 | 6399-42-001RMC - 639942001 | Collin Dallas |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)US 75 · | $323,612 | $304,788 | TRP CONSTRUCTION GROUP, LLC | -5.8% | 4 |
| Aug 3, 2022 | 0094-02-143F 2022(847) | Tarrant Fort Worth |
LANDSCAPE DEVELOPMENTSH 183 · | $294,823 | $300,691 | CENTRAL NORTH CONSTRUCTION, LLC | +2.0% | 2 |
| Aug 3, 2022 | 6386-81-001RMC - 638681001 | Williamson Austin |
CRACK SEALUS 79 · | $316,430 | $240,008 | SCOUT 5 CONSTRUCTION LLC | -24.2% | 5 |
| Aug 3, 2022 | 6411-53-001RMC - 641153001 | Nacogdoches Lufkin |
CABLE BARRIER REPAIRUS 59 · | $330,625 | $189,150 | AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC | -42.8% | 4 |
| Aug 3, 2022 | 2737-01-020STP 2022(874)HES | Parker Fort Worth |
INSTALL ILLUMINATIONFM 2257 · | $223,798 | $152,432 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | -31.9% | 5 |
| Aug 3, 2022 | 0908-33-105STP 2022(971)HES | Taylor Abilene |
HAZARD ELIMINATION & SAFETYCS · | $82,262 | $130,701 | WG ENGINEERING & CONSTRUCTION, LLC | +58.9% | 2 |
| Aug 3, 2022 | 0913-27-089STP 2022(865)HESG | Victoria Yoakum |
HAZARD ELIMINATION & SAFETYCS · | $51,910 | $62,074 | ALLSTATE SIGNAL & CONSTRUCTION, LLC | +19.6% | 3 |
| Jul 29, 2022 | 6402-61-001MMC - 640261001 | Lavaca Yoakum |
HOT-MIX COLD-LAIDUS 77 · | $296,400 | $357,200 | BRAUNTEX MATERIALS, INC. | +20.5% | 5 |
| Jul 29, 2022 | 6402-73-001MMC - 640273001 | Lavaca Yoakum |
HOT-MIX COLD-LAIDUS 77 · | $298,800 | $302,400 | BRAUNTEX MATERIALS, INC. | +1.2% | 3 |
| Jul 26, 2022 | 6412-65-001MMC - 641265001 | Kaufman Dallas |
HOT MIXFM 2728 · | $204,000 | $204,000 | FNH CONSTRUCTION, LLC | 0.0% | 2 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.