| 1 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 24,361 | SY |
$1.60 |
$1.25 |
$0.4100 |
$1.00 |
$5.00 |
$5.59 |
| 2 | 164-6021 |
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | 24,361 | SY |
$2.50 |
$0.7000 |
$0.4000 |
$0.7000 |
$0.6000 |
$0.7500 |
| 3 | 168-6001 |
VEGETATIVE WATERING | 380 | MG |
$17.00 |
$1.00 |
$5.36 |
$74.00 |
$190.00 |
$100.00 |
| 4 | 432-6066 |
RIPRAP (CL A) (MOW STRIP) (3 IN) | 1,031 | CY |
$510.00 |
$415.00 |
$547.17 |
$450.00 |
$515.00 |
$500.00 |
| 5 | 500-6001 |
MOBILIZATION | 1 | LS |
$144,808.61 |
$125,460.05 |
$248,357.29 |
$159,569.77 |
$106,400.00 |
$100,000.00 |
| 6 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$4,000.00 |
$14,000.00 |
$1.00 |
$25,000.00 |
$5,700.00 |
$990.50 |
| 7 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 2,137 | LF |
$4.00 |
$6.00 |
$6.53 |
$5.75 |
$4.40 |
$5.59 |
| 8 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 2,137 | LF |
$2.00 |
$1.00 |
$1.14 |
$1.00 |
$1.15 |
$1.42 |
| 9 | 543-6002 |
CABLE BARRIER SYSTEM (TL-4) | 36,295 | LF |
$20.00 |
$15.00 |
$12.46 |
$14.00 |
$14.15 |
$16.29 |
| 10 | 543-6020 |
CABLE BARRIER TERMINAL SECTION (TL-4) | 14 | EA |
$4,000.00 |
$4,400.00 |
$2,377.90 |
$3,500.00 |
$2,300.00 |
$2,011.72 |
| 11 | 658-6110 |
INSTL DEL ASSM (D-SY)SZ 1(BRF)(GF2)(BI) | 366 | EA |
$29.00 |
$27.00 |
$1.00 |
$50.00 |
$40.00 |
$28.82 |
| 12 | 6185-6002 |
TMA (STATIONARY) | 53 | DAY |
$200.00 |
$225.00 |
$1.00 |
$295.00 |
$400.00 |
$250.00 |