| 1 | 100-6002 |
PREPARING ROW | 82 | STA |
$300.00 |
$320.00 |
$325.00 |
| 2 | 161-6018 |
COMPOST MANUF TOPSOIL | 114.16 | CY |
$60.00 |
$50.00 |
$40.00 |
| 3 | 170-6001 |
IRRIGATION SYSTEM | 1 | LS |
$50,000.00 |
$75,117.40 |
$45,000.00 |
| 4 | 192-6001 |
PLANT MATERIAL (4" CNTR) | 11,873 | EA |
$3.00 |
$2.20 |
$5.25 |
| 5 | 192-6002 |
PLANT MATERIAL (1-GAL) | 2,781 | EA |
$15.00 |
$11.00 |
$12.00 |
| 6 | 192-6012 |
MULCH | 175.88 | CY |
$15.00 |
$48.00 |
$45.00 |
| 7 | 192-6016 |
PLANT BED PREPARATION | 703.52 | SY |
$2.25 |
$12.00 |
$5.00 |
| 8 | 192-6024 |
PLANT MATERIAL (30 GAL) (TREE) | 30 | EA |
$250.00 |
$310.00 |
$300.00 |
| 9 | 192-6097 |
CONC LNDSCP EDG (12 IN WIDTH) | 903 | LF |
$20.00 |
$35.00 |
$35.00 |
| 10 | 193-6001 |
PLANT MAINTENANCE | 12 | MO |
$1,100.00 |
$1,800.00 |
$2,000.00 |
| 11 | 193-6007 |
IRRIGATION SYSTEM OPER AND MAINT | 12 | MO |
$1,100.00 |
$750.00 |
$500.00 |
| 12 | 500-6001 |
MOBILIZATION | 1 | LS |
$26,802.08 |
$13,913.00 |
$22,500.00 |
| 13 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 | MO |
$5,000.00 |
$1,800.00 |
$6,500.00 |
| 14 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 1,241 | LF |
$3.65 |
$1.00 |
$2.00 |
| 15 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,241 | LF |
$1.10 |
$0.5000 |
$1.00 |
| 16 | 1005-6001 |
LOOSE AGGR FOR GROUNDCOVER (TYPE I) | 46.59 | CY |
$70.00 |
$220.00 |
$350.00 |
| 17 | 6185-6002 |
TMA (STATIONARY) | 180 | DAY |
$105.00 |
$75.00 |
$250.00 |