| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 9, 2018 | 76L44 | VariousDistrict 8 | Tree removal and mitigation at various locations throughout District 8. | — | Executed | Stutz Excavating, Inc. $141,870 · | ||
| Mar 9, 2018 | 78149 | JeffersonDistrict 9 | Removal and replacement of bridge SN 041-0036 carrying IL 37 over Atchison Creek, 8 miles south of IL 148. | — | Executed | E. T. Simonds Construction Company $1,588,926 · | ||
| Mar 9, 2018 | 78264 | WhiteDistrict 9 | Replace two single span structures with multiple barrel reinforced concrete box culverts on IL 141 2 miles west of New Haven (SN 097-0064 and SN 097-0029). | — | Executed | E. T. Simonds Construction Company $1,039,225 · | ||
| Mar 9, 2018 | 78459 | PopeDistrict 9 | 60 feet of milling, filling and diamond grinding to correct the profile at the north levee gate on IL 146 in Golconda. | — | Executed | E. T. Simonds Construction Company $56,974 · | ||
| Mar 9, 2018 | 78493 | AlexanderDistrict 9 | Repairs to the navigational and aerial lighting of the structure carrying four lanes of I-57 over the Mississippi River connecting Alexander County, IL and Mississippi County, MO (SN 002-0022) | — | Executed | Brown Electric, Inc. $435,062 · | ||
| Mar 9, 2018 | 78557 | UnionDistrict 9 | Full depth pavement replacement and ADA sidewalk upgrades at the intersection of IL 146 and Main Street in the City of Anna. | — | Executed | E. T. Simonds Construction Company $261,463 · | ||
| Mar 9, 2018 | 78579 | SalineDistrict 9 | Bridge repairs on SN 083-0048 and approach correction repairs on SN 083-0062 just north of Harrisburg. | — | Executed | E. T. Simonds Construction Company $350,766 · | ||
| Mar 9, 2018 | 78580 | WilliamsonDistrict 9 | 0.09 miles of pavement repair of the whitetopping and installation of radar detection equipment at IL 37 and Old IL 13. | — | Executed | Samron Midwest Contracting, Inc. $95,440 · | ||
| Mar 9, 2018 | 78589 | MassacDistrict 9 | Repairs to navigational and aerial lighting on bridge SN 064-0035 carrying four lanes of I-24 over the Ohio River connecting Massac County, IL and McCracken County, KY. | — | Executed | Brown Electric, Inc. $925,094 · | ||
| Mar 9, 2018 | 78628 | WilliamsonDistrict 9 | Culvert replacement across six lanes of traffic on IL 148, 1.1 miles north of IL 13 near the City of Energy (SN 100-7042). | — | Executed | Sierra Bravo Contractors, LLC $179,791 · | ||
| Mar 9, 2018 | 78629 | UnionDistrict 9 | Crack routing and sealing the centerline joint on IL 127, from the Jackson/Union county line to IL 146. | — | Executed | Huff Sealing Corporation $46,247 · | ||
| Mar 9, 2018 | 85659 | StephensonDistrict 2 | Cold-In-Place recycling at various locations. | — | Executed | Dunn Company $633,670 · | ||
| Mar 9, 2018 | 85663 | Jo DaviessDistrict 2 | Replace the existing bridge with a 3-cell box culvert to carry Stagecoach Trail over the West Branch of Clear Creek, 3 miles west of Warren. | — | Executed | M & M Concrete, Inc. $409,500 · | ||
| Mar 9, 2018 | 85664 | LeeDistrict 2 | Replace bridge carrying Amboy Road over Branch of Main Ditch, .1 mile east of IL 26. | — | Executed | Curnyn Construction Co. $311,459 · | ||
| Mar 9, 2018 | 85665 | OgleDistrict 2 | Resurfacing on S Chana Road from IL 64 to Flagg Road. | — | Executed | Martin & Company Excavating $404,593 · | ||
| Mar 9, 2018 | 85666 | OgleDistrict 2 | Resurfacing on Freeport Road from US 52 to Sterling Road. | — | Executed | Martin & Company Excavating $798,894 · | ||
| Mar 9, 2018 | 85667 | WhitesideDistrict 2 | Resurfacing on Emerson Road from US 30 to IL 2. | — | Executed | Civil Constructors, Inc. $1,242,389 · | ||
| Mar 9, 2018 | 87611 | GrundyDistrict 3 | New sidewalk construction and replacing existing sidewalks at various locations in the Village of South Wilmington. | — | Rejected | D. Construction, Inc. $284,602 · | ||
| Mar 9, 2018 | 87672 | BureauDistrict 3 | Bridge replacement located 3.5 miles northwest of Sheffield over Smith Ditch. | — | Executed | Curnyn Construction Co. $231,566 · | ||
| Mar 9, 2018 | 87677 | DeKalbDistrict 3 | Resurfacing with median replacement, sidewalk and ADA curb ramps on Barber Green Road from Illinois Route 23 to Peace Road. | — | Executed | William Charles Construction Company, LLC $1,070,502 · | ||
| Mar 9, 2018 | 87679 | LaSalleDistrict 3 | Reconstruction of FAU 6031 (4H Road) from 370 feet west of Ashbury Way to Adams Street in the City of Ottawa. | — | Executed | Advanced Asphalt Company $985,152 · | ||
| Mar 9, 2018 | 87683 | LaSalleDistrict 3 | Remove and replace both piers underneath the structure carrying CH 3 over the Fox River, 0.1 miles northwest of Millington. | — | Executed | D. Construction, Inc. $1,521,358 · | ||
| Mar 9, 2018 | 87684 | DeKalbDistrict 3 | Resurfacing with shoulder work and pavement markings on Rich Road from Glidden Road to North 1st Street, Coltonville Road from North 1st Street to IL 23, North 1st Street at Coltonville Road, and Bethany Road from 0.3 mile west of IL 23 to IL 23, within the cities of Dekalb and Sycamore. | — | Executed | William Charles Construction Company, LLC $890,772 · | ||
| Mar 9, 2018 | 89702 | MarshallDistrict 4 | Removal and replacement of the bridge carrying CH 3 over the South Branch of Crow Creek, 1 mile south of La Rose. | — | Executed | Stark Excavating, Inc. $878,127 · | ||
| Mar 9, 2018 | 89726 | StarkDistrict 4 | Bituminous surface treatment at various locations in Stark County. | — | Executed | Pavement Maintenance Services, Inc. $333,629 · | ||
| Mar 9, 2018 | 89736 | StarkDistrict 4 | Replace the bridge carrying CH 8 over an unnamed tributary of the West Fork River, 2 miles northwest of Osceola. | — | Executed | Curnyn Construction Co. $264,241 · | ||
| Mar 9, 2018 | 91566 | ChampaignDistrict 5 | Bridge replacement on FAS Route 527 (CH 16) over East Branch Embarras River, located west of Illinois Route 130. | — | Executed | Stark Excavating, Inc. $1,096,632 · | ||
| Mar 9, 2018 | 91567 | VermilionDistrict 5 | Replace the bridge carrying Vorhees Street over Stoney Creek, recontruction of May Street from Rodgers Street to Collett Street, and reconstruction of Rodgers Street from May Street south for 650 feet in the City of Danville. | — | Executed | Stark Excavating, Inc. $1,571,000 · | ||
| Mar 9, 2018 | 93662 | MacoupinDistrict 6 | Replace the bridge over Big Apple Creek, Located 2 miles north of Scottville. | — | Executed | Kinney Contractors, Inc. $950,486 · | ||
| Mar 9, 2018 | 93699 | SchuylerDistrict 6 | Removal and replacement of two structures located 4 miles southwest of Rushville at Horney Branch Creek. | — | Executed | County Contractors, Inc. $1,074,877 · | ||
| Mar 9, 2018 | 93707 | MorganDistrict 6 | Widening and resurfacing CH 19 from IL 78 to Strawn Crossing Road. | — | Executed | K. E. Vas Company $1,485,256 · | ||
| Mar 9, 2018 | 93708 | LoganDistrict 6 | Replace bridge carrying CH 22 over Sugar Creek, 4 miles west of Lincoln. | — | Executed | Otto Baum Company, Inc. $196,536 · | ||
| Mar 9, 2018 | 95819 | CrawfordDistrict 7 | Bridge replacement and approach work on TR 221A over Big Creek, 1.6 miles northeast of Pierceburg. | — | Executed | Allendale Gravel Co., Inc. $488,412 · | ||
| Mar 9, 2018 | 95820 | FayetteDistrict 7 | Replace the bridge carrying CR 2250 East over a tributary to Hickory Creek, located 3 miles southeast of St. Elmo. | — | Executed | Depew and Owen Builders, Inc. $199,888 · | ||
| Mar 9, 2018 | 95823 | ShelbyDistrict 7 | Replace bridge structure carrying TR 22 over Opossum Creek, 2.8 miles east of Oconee. | — | Executed | Depew and Owen Builders, Inc. $458,888 · | ||
| Mar 9, 2018 | 95825 | ClayDistrict 7 | Replace Bridge carrying Bobwhite Road over Buck Creek, 3 miles southwest of Louisville. | — | Executed | Depew and Owen Builders, Inc. $167,688 · | ||
| Mar 9, 2018 | 95828 | CumberlandDistrict 7 | Replace structure carrying TR 5 over Cottonwood Creek, 1 mile east of Janesville. | — | Executed | Depew and Owen Builders, Inc. $316,718 · | ||
| Mar 9, 2018 | 97651 | St. ClairDistrict 8 | Reconstruct the intersection of Milburn School Road and Old Collinsville Road in the City of O'Fallon. | — | Executed | Hank's Excavating & Landscaping, Inc. $518,071 · | ||
| Mar 9, 2018 | 97656 | St. ClairDistrict 8 | Resurfacing on FAS Route 841 (CH 9) from IL 158 to Douglas Road. | — | Executed | Christ Bros. Asphalt, Inc. $687,883 · | ||
| Mar 9, 2018 | 97659 | MarionDistrict 8 | Resurfacing on FAU Route 8596 (Broadway) from Pullen Blvd. to Lincoln Blvd. in the City of Centralia. | — | Executed | Howell Paving, Inc. $693,649 · | ||
| Mar 9, 2018 | 97663 | St. ClairDistrict 8 | Intersection improvement at Market Place and Plaza Drive in the City of Fairview Heights. | — | Executed | Hank's Excavating & Landscaping, Inc. $491,507 · | ||
| Mar 9, 2018 | 98820 | FranklinDistrict 9 | 2.5 miles of milling, resurfacing, culvert replacement, full depth HMA shoulders, earthwork, guardrails and tree removal on IL 37 from Wastena Street south of Benton to Yellow Banks Road. | — | Executed | E. T. Simonds Construction Company $2,770,067 · | ||
| Mar 9, 2018 | 99594 | UnionDistrict 9 | Replace the bridge carrying TR 17 over Cedar Creek, 1.4 miles northeast of Alto Pass. | — | Executed | Dees, Inc. $187,593 · | ||
| Mar 9, 2018 | 99595 | FranklinDistrict 9 | Resurfacing CJ10 from .5 mile west of Cemetary Road to IL 37, | — | Executed | E. T. Simonds Construction Company $375,421 · | ||
| Apr 27, 2018 | 46467 | VariousDistrict 2 | Replacing reflectorized guardrail markers, prismatic curb reflectors, barrier wall markers, and placing linear delineator panels as specified by indivisual work orders. | — | Rejected | Northern Contracting, Inc. $47,132 · | ||
| Apr 27, 2018 | 46494 | VariousDistrict 4 | Placing epoxy and modified urethane pavement marking lines, letters and symbols and the removal of existing pavement markings as specified by individual work orders. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,424,915 · | ||
| Apr 27, 2018 | 46495 | VariousDistrict 4 | Replacing damaged raised reflective pavement markers on various highways throughout Districts 4 and as directed by the Engineer. | — | Rejected | P & P Construction Co. $945,307 · | ||
| Apr 27, 2018 | 46901 | CassDistrict 6 | Site preparation, oil and chip treatment, and other miscellaneous items at Jim Edgar Panther Creek State Fish and Wildlife Area (IDNR) | — | Executed | IRC, Inc. $1,049,637 · | ||
| Apr 27, 2018 | 46912 | JerseyDistrict 8 | Site preparation, oil and chip treatment, and other miscellaneous items at Pere Marquette State Park. (IDNR) | — | Executed | Stutz Excavating, Inc. $185,987 · | ||
| Apr 27, 2018 | 60C48 | CookDistrict 1 | Relocation of Pump station 8 on US 14 in the City of Des Plaines. | — | Executed | Herlihy Mid-Continent Company $7,098,601 · | ||
| Apr 27, 2018 | 60K78 | CookDistrict 1 | Replace bridge SN 016-1302 carrying US Route 6/IL 83 over the little Calumet River. | — | Executed | D. Construction, Inc. $5,453,097 · | ||
| Apr 27, 2018 | 60P55 | WillDistrict 1 | Local centralized control and operation of the six movable bridges from Ruby Street to Brandon Road in the City of Joliet | — | Rejected | Meade Inc. $21,260,736 · | ||
| Apr 27, 2018 | 60T75 | LakeDistrict 1 | Reconstruct US 45 on a new alignment and re-align Grass Lake Road to create a four-legged intersection with US 45 and Millburn Road in the Villages of Old Mill Creek and Lindenhurst. | — | Executed | Berger Excavating Contractors, Inc. $15,577,444 · | ||
| Apr 27, 2018 | 60V18 | WillDistrict 1 | Resurfacing and pedestrian ramps on US 30 from Collins Street to I-80 in the City of Joliet. | — | Executed | D. Construction, Inc. $1,753,921 · | ||
| Apr 27, 2018 | 60Y26 | CookDistrict 1 | Intersection improvement, horizontal realignment and culvert replacement at US 6 and 179th Street in the village of Orland Park. | — | Executed | Iroquois Paving Corporation $2,478,965 · | ||
| Apr 27, 2018 | 60Y83 | LakeDistrict 1 | Resurfacing, pedestrian ramps and drainage work in the villages of Island Lake and Wauconda. | — | Executed | Lorig Construction Company $1,105,951 · | ||
| Apr 27, 2018 | 61B91 | CookDistrict 1 | Sidewalk construction adjacent to Ballard Road, from Bender Road to Good Avenue in the City of Des Plaines. | — | Executed | Martam Construction Incorporated $462,764 · | ||
| Apr 27, 2018 | 61C48 | LakeDistrict 1 | Reconstruction, drainage improvements, and bike/pedestrian path construction on Sayton Road from US 12 to Rollins Road, and from Rollins Road to Industrial Avenue in the Village of Fox Lake. | — | Executed | Berger Excavating Contractors, Inc. $1,769,565 · | ||
| Apr 27, 2018 | 61C86 | KaneDistrict 1 | Widening and reconstruction of Huntley Road from Sleepy Hollow Road to Elm Avenue in the Village of West Dundee. | — | Executed | Plote Construction, Inc. $7,831,951 · | ||
| Apr 27, 2018 | 61D92 | DuPageDistrict 1 | Resurfacing on Central Avenue from Gary Avenue to Roselle Road in the Village of Roselle. | — | Executed | Arrow Road Construction Co. $888,255 · | ||
| Apr 27, 2018 | 61E22 | LakeDistrict 1 | Reconstruction and widening to add one thru lane in each direction and bicycle/pedestrian accommodations on Quentin Road from IL 22 to White Pine Road. | — | Executed | Lake County Grading Company, LLC $20,129,203 · | ||
| Apr 27, 2018 | 61E34 | McHenryDistrict 1 | Resurface Pearl Street from IL 31 to North River Road, and resurfacing Lincoln Road from North River Road to Chapel Hill Road in the City of McHenry. | — | Executed | Lorig Construction Company $2,551,352 · | ||
| Apr 27, 2018 | 61E40 | DuPageDistrict 1 | Construction of a multi-use trail along Taylor Avenue from Walnut Street to Willis Street, and the Construction of a tunnel under the Union Pacific Railroad, in the Village of Glen Ellyn. | — | Executed | D. Construction, Inc. $2,745,521 · | ||
| Apr 27, 2018 | 61E42 | DuPageDistrict 1 | Resurfacing on Army Trail Bouldevard from Mill Road to Rohlwing Road in the Village of Addison. | — | Executed | R. W. Dunteman Company $3,624,672 · | ||
| Apr 27, 2018 | 61E45 | CookDistrict 1 | Platform and ramp improvements, sidewalks and pedestrian lighting at the Stone Avenue METRA Station in the Village of La Grange. | — | Executed | Kovilic Construction Company, Inc. $1,349,623 · | ||
| Apr 27, 2018 | 61E47 | WillDistrict 1 | Intersection improvement at West 167th Street and Gougar Road in the City of Lockport. | — | Executed | D. Construction, Inc. $1,576,688 · | ||
| Apr 27, 2018 | 61E51 | CookDistrict 1 | Resurfacing with curb and gutter on Custer Avenue from 47th Avenue to Ogden Avenue in the Village of Brookfield. | — | Executed | K-Five Construction Corporation $1,624,937 · | ||
| Apr 27, 2018 | 61E54 | CookDistrict 1 | Resurfacing Chicago Avenue from Thatcher Avenue to Harlem Avenue in the Village of River Forest. | — | Executed | J. A. Johnson Paving Company $1,642,246 · | ||
| Apr 27, 2018 | 61E55 | DuPageDistrict 1 | Resurfacing, sidewalk construction and roadway reconstruction on Railroad Avenue from York Avenue to Addison Street in the Village of Bensenville. | — | Executed | R. W. Dunteman Company $1,290,683 · | ||
| Apr 27, 2018 | 61E57 | CookDistrict 1 | Reconstruction of Oak Park Avenue from 167th Street to 159th Street in the Village of Tinley Park. | — | Executed | Iroquois Paving Corporation $1,655,722 · | ||
| Apr 27, 2018 | 61E58 | DuPageDistrict 1 | Resurfacing Internationale Parkway from Beaudin Boulevard to Woodward Avenue in the Village of Woodridge. | — | Executed | D. Construction, Inc. $807,962 · | ||
| Apr 27, 2018 | 61E59 | LakeDistrict 1 | Resurfacing Golf Road from Butterfield road to Milwaukee Avenue in the Village of Libertyville. | — | Executed | Peter Baker & Son Co. $1,240,026 · | ||
| Apr 27, 2018 | 61E60 | CookDistrict 1 | Construction of a multi-use trail, located east of Stony Island, from 97th Street to 103rd Street in the City of Chicago. | — | Executed | Pan-Oceanic Engineering Co., Inc. $1,393,925 · | ||
| Apr 27, 2018 | 61E61 | DuPageDistrict 1 | Resurfacing Main Street from Franklin Street to Ogden Avenue in the Village of Downers Grove. | — | Executed | J. A. Johnson Paving Company $591,945 · | ||
| Apr 27, 2018 | 61E62 | DuPageDistrict 1 | Resurfacing and ADA improvements on York Street from North Avenue to First Street in the City of Elmhurst. | — | Executed | K-Five Construction Corporation $666,667 · | ||
| Apr 27, 2018 | 61E63 | CookDistrict 1 | Resurfacing Wolf Road from North Avenue to Winters Drive in the City of Northlake. | — | Executed | Plote Construction, Inc. $1,938,532 · | ||
| Apr 27, 2018 | 61E65 | DuPageDistrict 1 | Resurfacing, curb, gutter and sidewalks on North Main Street from Seminary Avenue to Cole Avenue in the City of Wheaton. | — | Executed | R. W. Dunteman Company $892,096 · | ||
| Apr 27, 2018 | 61E66 | LakeDistrict 1 | Construction of a multi-use path adjacent to Molidor Road, from 0.5 mile west of Fish Lake Road to Fish Lake Road in Grant Township. | — | Executed | Campanella and Sons, Inc. $313,595 · | ||
| Apr 27, 2018 | 61E68 | CookDistrict 1 | Construction of a multi-use path adjacent to Roselle Road from Hillcrest Boulevard to Central Road in the Village of Schaumburg. A new structure will be constructed to carry the path over Central Road. | — | Executed | Lorig Construction Company $3,865,086 · | ||
| Apr 27, 2018 | 61E70 | LakeDistrict 1 | Sidewalk construction algon Clavey Road from Barberry Road to the Skokie Valley Bike Path in the City of Highland Park. | — | Executed | Sumit Construction Co., Inc. $54,111 · | ||
| Apr 27, 2018 | 61E71 | CookDistrict 1 | Intersection improvement at North Avenue and US 20 (Lake Street) in the Village of Streamwood. | — | Executed | Martam Construction Incorporated $809,831 · | ||
| Apr 27, 2018 | 61E72 | CookDistrict 1 | Intersection improvement, signal replacement, channelization, and reconstruction of East Avenue in the Village of Streamwood. | — | Executed | Alliance Contractors, Inc. $478,629 · | ||
| Apr 27, 2018 | 61E73 | KaneDistrict 1 | Intersection reConstruction at Huntley Road and IL 31 in the Village of Carpentersville. | — | Executed | Plote Construction, Inc. $9,637,830 · | ||
| Apr 27, 2018 | 62A14 | LakeDistrict 1 | ADA ramp improvement on various routes in the villages of Deerfield and Lake Bluff and the cities of Highland park and Lake Forest. | — | Executed | Sumit Construction Co., Inc. $539,989 · | ||
| Apr 27, 2018 | 62B13 | CookDistrict 1 | Joint reconstruction and repair of the bridge structure SN 016-0153 carrying NB I-94 over SB Stony Island Avenue in the City of Chicago. | — | Executed | Path Construction Company, Inc. $407,750 · | ||
| Apr 27, 2018 | 62B45 | WillDistrict 1 | Shoulder widening, milled rumble strips and guardrail replacement on US 52 from Spencer Road to US 45 in the village of Manhattan and unincorporated Will County. | — | Executed | D. Construction, Inc. $1,555,085 · | ||
| Apr 27, 2018 | 62B84 | LakeDistrict 1 | Repair culvert carrying IL 22 over East Tributary to Flint Creek, 1.2 miles West of IL 59. | — | Executed | D. Construction, Inc. $360,217 · | ||
| Apr 27, 2018 | 62B94 | McHenryDistrict 1 | Rehabilatation of the existing culvert structures over unnamed ditches in the townships of Dunham and Hartland. | — | Executed | Phoenix Corporation of the Quad Cities $188,777 · | ||
| Apr 27, 2018 | 62C15 | CookDistrict 1 | Fiber optic cable and PTZ camera installation in Schaumburg. | — | Executed | Hecker and Company, Inc. $910,414 · | ||
| Apr 27, 2018 | 62C17 | KaneDistrict 1 | Resurfacing, centerline rumble strips and pedestrian ramp upgrades on IL 72 from Reinking Road to Van Buren Street in the Villages of Pingree Grove, Gilberts, River West Dundee, Elgin and Sleepy Hollow. | — | Executed | Lorig Construction Company $2,978,656 · | ||
| Apr 27, 2018 | 62C24 | DuPageDistrict 1 | Remove and replace bridge structure SN 022-0103 carrying I-290 over Salt Creek. | — | Executed | Dunnet Bay Construction Company $14,397,932 · | ||
| Apr 27, 2018 | 62C54 | CookDistrict 1 | Resurfacing on Indiana Avenue within the villages of Riverdale, Dolton and South Holland. | — | Executed | D. Construction, Inc. $1,284,651 · | ||
| Apr 27, 2018 | 62C61 | KendallDistrict 1 | Resurfacing on IL 31 and East Frontage Road in the Village of Oswego. | — | Executed | D. Construction, Inc. $295,006 · | ||
| Apr 27, 2018 | 62C67 | DuPageDistrict 1 | Resurfacing and pedestrian ramp improvement of IL 38 in the villages of Lombard and Villa Park. | — | Executed | R. W. Dunteman Company $2,092,603 · | ||
| Apr 27, 2018 | 62C75 | LakeDistrict 1 | Resurfacing IL 132 through the villages of Lake Villa and Lindenhurst. | — | Executed | Peter Baker & Son Co. $825,294 · | ||
| Apr 27, 2018 | 62D13 | CookDistrict 1 | Resurfacing and pedestrian ramps onTouhy Avenue in the villages of Niles, Skokie and Lincolnwood. | — | Executed | Arrow Road Construction Co. $1,451,154 · | ||
| Apr 27, 2018 | 62D18 | CookDistrict 1 | Resurfacing and pedestrian ramps through the cities of Park Ridge and Chicago. | — | Executed | Arrow Road Construction Co. $1,518,531 · | ||
| Apr 27, 2018 | 62D19 | LakeDistrict 1 | Resurfacing and pedestrian ramp improvement on US 14 through the Village of Barrington. | — | Executed | Lorig Construction Company $1,371,351 · | ||
| Apr 27, 2018 | 62D20 | CookDistrict 1 | Resurfacing and pedestrian ramps on Central Road in villages of Arlington Heights and Mount Prospect. | — | Executed | Arrow Road Construction Co. $3,279,847 · | ||
| Apr 27, 2018 | 62D51 | CookDistrict 1 | Resurfacing on IL 72 to include ADA pedestrian ramp upgrade in the cities of Des Plaines and Rosemont. | — | Executed | Arrow Road Construction Co. $2,993,095 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.