IDOT Jobs

All dates · 10,653 jobs · $20,005,846,000 Sign up free
★ My Jobs

10,653 jobs · $20,005,846,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 9, 2018 76L44 VariousDistrict 8 Tree removal and mitigation at various locations throughout District 8. — Executed Nov 26 New Stutz Excavating, Inc. $141,870 ·
Mar 9, 2018 78149 JeffersonDistrict 9 Removal and replacement of bridge SN 041-0036 carrying IL 37 over Atchison Creek, 8 miles south of IL 148. — Executed Nov 26 New E. T. Simonds Construction Company $1,588,926 ·
Mar 9, 2018 78264 WhiteDistrict 9 Replace two single span structures with multiple barrel reinforced concrete box culverts on IL 141 2 miles west of New Haven (SN 097-0064 and SN 097-0029). — Executed Nov 26 New E. T. Simonds Construction Company $1,039,225 ·
Mar 9, 2018 78459 PopeDistrict 9 60 feet of milling, filling and diamond grinding to correct the profile at the north levee gate on IL 146 in Golconda. — Executed Nov 26 New E. T. Simonds Construction Company $56,974 ·
Mar 9, 2018 78493 AlexanderDistrict 9 Repairs to the navigational and aerial lighting of the structure carrying four lanes of I-57 over the Mississippi River connecting Alexander County, IL and Mississippi County, MO (SN 002-0022) — Executed Nov 26 New Brown Electric, Inc. $435,062 ·
Mar 9, 2018 78557 UnionDistrict 9 Full depth pavement replacement and ADA sidewalk upgrades at the intersection of IL 146 and Main Street in the City of Anna. — Executed Nov 26 New E. T. Simonds Construction Company $261,463 ·
Mar 9, 2018 78579 SalineDistrict 9 Bridge repairs on SN 083-0048 and approach correction repairs on SN 083-0062 just north of Harrisburg. — Executed Nov 26 New E. T. Simonds Construction Company $350,766 ·
Mar 9, 2018 78580 WilliamsonDistrict 9 0.09 miles of pavement repair of the whitetopping and installation of radar detection equipment at IL 37 and Old IL 13. — Executed Nov 26 New Samron Midwest Contracting, Inc. $95,440 ·
Mar 9, 2018 78589 MassacDistrict 9 Repairs to navigational and aerial lighting on bridge SN 064-0035 carrying four lanes of I-24 over the Ohio River connecting Massac County, IL and McCracken County, KY. — Executed Nov 26 New Brown Electric, Inc. $925,094 ·
Mar 9, 2018 78628 WilliamsonDistrict 9 Culvert replacement across six lanes of traffic on IL 148, 1.1 miles north of IL 13 near the City of Energy (SN 100-7042). — Executed Nov 26 New Sierra Bravo Contractors, LLC $179,791 ·
Mar 9, 2018 78629 UnionDistrict 9 Crack routing and sealing the centerline joint on IL 127, from the Jackson/Union county line to IL 146. — Executed Nov 26 New Huff Sealing Corporation $46,247 ·
Mar 9, 2018 85659 StephensonDistrict 2 Cold-In-Place recycling at various locations. — Executed Nov 26 New Dunn Company $633,670 ·
Mar 9, 2018 85663 Jo DaviessDistrict 2 Replace the existing bridge with a 3-cell box culvert to carry Stagecoach Trail over the West Branch of Clear Creek, 3 miles west of Warren. — Executed Nov 26 New M & M Concrete, Inc. $409,500 ·
Mar 9, 2018 85664 LeeDistrict 2 Replace bridge carrying Amboy Road over Branch of Main Ditch, .1 mile east of IL 26. — Executed Nov 26 New Curnyn Construction Co. $311,459 ·
Mar 9, 2018 85665 OgleDistrict 2 Resurfacing on S Chana Road from IL 64 to Flagg Road. — Executed Nov 26 New Martin & Company Excavating $404,593 ·
Mar 9, 2018 85666 OgleDistrict 2 Resurfacing on Freeport Road from US 52 to Sterling Road. — Executed Nov 26 New Martin & Company Excavating $798,894 ·
Mar 9, 2018 85667 WhitesideDistrict 2 Resurfacing on Emerson Road from US 30 to IL 2. — Executed Nov 26 New Civil Constructors, Inc. $1,242,389 ·
Mar 9, 2018 87611 GrundyDistrict 3 New sidewalk construction and replacing existing sidewalks at various locations in the Village of South Wilmington. — Rejected Nov 26 New D. Construction, Inc. $284,602 ·
Mar 9, 2018 87672 BureauDistrict 3 Bridge replacement located 3.5 miles northwest of Sheffield over Smith Ditch. — Executed Nov 26 New Curnyn Construction Co. $231,566 ·
Mar 9, 2018 87677 DeKalbDistrict 3 Resurfacing with median replacement, sidewalk and ADA curb ramps on Barber Green Road from Illinois Route 23 to Peace Road. — Executed Nov 26 New William Charles Construction Company, LLC $1,070,502 ·
Mar 9, 2018 87679 LaSalleDistrict 3 Reconstruction of FAU 6031 (4H Road) from 370 feet west of Ashbury Way to Adams Street in the City of Ottawa. — Executed Nov 26 New Advanced Asphalt Company $985,152 ·
Mar 9, 2018 87683 LaSalleDistrict 3 Remove and replace both piers underneath the structure carrying CH 3 over the Fox River, 0.1 miles northwest of Millington. — Executed Nov 26 New D. Construction, Inc. $1,521,358 ·
Mar 9, 2018 87684 DeKalbDistrict 3 Resurfacing with shoulder work and pavement markings on Rich Road from Glidden Road to North 1st Street, Coltonville Road from North 1st Street to IL 23, North 1st Street at Coltonville Road, and Bethany Road from 0.3 mile west of IL 23 to IL 23, within the cities of Dekalb and Sycamore. — Executed Nov 26 New William Charles Construction Company, LLC $890,772 ·
Mar 9, 2018 89702 MarshallDistrict 4 Removal and replacement of the bridge carrying CH 3 over the South Branch of Crow Creek, 1 mile south of La Rose. — Executed Nov 26 New Stark Excavating, Inc. $878,127 ·
Mar 9, 2018 89726 StarkDistrict 4 Bituminous surface treatment at various locations in Stark County. — Executed Nov 26 New Pavement Maintenance Services, Inc. $333,629 ·
Mar 9, 2018 89736 StarkDistrict 4 Replace the bridge carrying CH 8 over an unnamed tributary of the West Fork River, 2 miles northwest of Osceola. — Executed Nov 26 New Curnyn Construction Co. $264,241 ·
Mar 9, 2018 91566 ChampaignDistrict 5 Bridge replacement on FAS Route 527 (CH 16) over East Branch Embarras River, located west of Illinois Route 130. — Executed Nov 26 New Stark Excavating, Inc. $1,096,632 ·
Mar 9, 2018 91567 VermilionDistrict 5 Replace the bridge carrying Vorhees Street over Stoney Creek, recontruction of May Street from Rodgers Street to Collett Street, and reconstruction of Rodgers Street from May Street south for 650 feet in the City of Danville. — Executed Nov 26 New Stark Excavating, Inc. $1,571,000 ·
Mar 9, 2018 93662 MacoupinDistrict 6 Replace the bridge over Big Apple Creek, Located 2 miles north of Scottville. — Executed Nov 26 New Kinney Contractors, Inc. $950,486 ·
Mar 9, 2018 93699 SchuylerDistrict 6 Removal and replacement of two structures located 4 miles southwest of Rushville at Horney Branch Creek. — Executed Nov 26 New County Contractors, Inc. $1,074,877 ·
Mar 9, 2018 93707 MorganDistrict 6 Widening and resurfacing CH 19 from IL 78 to Strawn Crossing Road. — Executed Nov 26 New K. E. Vas Company $1,485,256 ·
Mar 9, 2018 93708 LoganDistrict 6 Replace bridge carrying CH 22 over Sugar Creek, 4 miles west of Lincoln. — Executed Nov 26 New Otto Baum Company, Inc. $196,536 ·
Mar 9, 2018 95819 CrawfordDistrict 7 Bridge replacement and approach work on TR 221A over Big Creek, 1.6 miles northeast of Pierceburg. — Executed Nov 26 New Allendale Gravel Co., Inc. $488,412 ·
Mar 9, 2018 95820 FayetteDistrict 7 Replace the bridge carrying CR 2250 East over a tributary to Hickory Creek, located 3 miles southeast of St. Elmo. — Executed Nov 26 New Depew and Owen Builders, Inc. $199,888 ·
Mar 9, 2018 95823 ShelbyDistrict 7 Replace bridge structure carrying TR 22 over Opossum Creek, 2.8 miles east of Oconee. — Executed Nov 26 New Depew and Owen Builders, Inc. $458,888 ·
Mar 9, 2018 95825 ClayDistrict 7 Replace Bridge carrying Bobwhite Road over Buck Creek, 3 miles southwest of Louisville. — Executed Nov 26 New Depew and Owen Builders, Inc. $167,688 ·
Mar 9, 2018 95828 CumberlandDistrict 7 Replace structure carrying TR 5 over Cottonwood Creek, 1 mile east of Janesville. — Executed Nov 26 New Depew and Owen Builders, Inc. $316,718 ·
Mar 9, 2018 97651 St. ClairDistrict 8 Reconstruct the intersection of Milburn School Road and Old Collinsville Road in the City of O'Fallon. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $518,071 ·
Mar 9, 2018 97656 St. ClairDistrict 8 Resurfacing on FAS Route 841 (CH 9) from IL 158 to Douglas Road. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $687,883 ·
Mar 9, 2018 97659 MarionDistrict 8 Resurfacing on FAU Route 8596 (Broadway) from Pullen Blvd. to Lincoln Blvd. in the City of Centralia. — Executed Nov 26 New Howell Paving, Inc. $693,649 ·
Mar 9, 2018 97663 St. ClairDistrict 8 Intersection improvement at Market Place and Plaza Drive in the City of Fairview Heights. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $491,507 ·
Mar 9, 2018 98820 FranklinDistrict 9 2.5 miles of milling, resurfacing, culvert replacement, full depth HMA shoulders, earthwork, guardrails and tree removal on IL 37 from Wastena Street south of Benton to Yellow Banks Road. — Executed Nov 26 New E. T. Simonds Construction Company $2,770,067 ·
Mar 9, 2018 99594 UnionDistrict 9 Replace the bridge carrying TR 17 over Cedar Creek, 1.4 miles northeast of Alto Pass. — Executed Nov 26 New Dees, Inc. $187,593 ·
Mar 9, 2018 99595 FranklinDistrict 9 Resurfacing CJ10 from .5 mile west of Cemetary Road to IL 37, — Executed Nov 26 New E. T. Simonds Construction Company $375,421 ·
Apr 27, 2018 46467 VariousDistrict 2 Replacing reflectorized guardrail markers, prismatic curb reflectors, barrier wall markers, and placing linear delineator panels as specified by indivisual work orders. — Rejected Nov 26 New Northern Contracting, Inc. $47,132 ·
Apr 27, 2018 46494 VariousDistrict 4 Placing epoxy and modified urethane pavement marking lines, letters and symbols and the removal of existing pavement markings as specified by individual work orders. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,424,915 ·
Apr 27, 2018 46495 VariousDistrict 4 Replacing damaged raised reflective pavement markers on various highways throughout Districts 4 and as directed by the Engineer. — Rejected Nov 26 New P & P Construction Co. $945,307 ·
Apr 27, 2018 46901 CassDistrict 6 Site preparation, oil and chip treatment, and other miscellaneous items at Jim Edgar Panther Creek State Fish and Wildlife Area (IDNR) — Executed Nov 26 New IRC, Inc. $1,049,637 ·
Apr 27, 2018 46912 JerseyDistrict 8 Site preparation, oil and chip treatment, and other miscellaneous items at Pere Marquette State Park. (IDNR) — Executed Nov 26 New Stutz Excavating, Inc. $185,987 ·
Apr 27, 2018 60C48 CookDistrict 1 Relocation of Pump station 8 on US 14 in the City of Des Plaines. — Executed Nov 26 New Herlihy Mid-Continent Company $7,098,601 ·
Apr 27, 2018 60K78 CookDistrict 1 Replace bridge SN 016-1302 carrying US Route 6/IL 83 over the little Calumet River. — Executed Nov 26 New D. Construction, Inc. $5,453,097 ·
Apr 27, 2018 60P55 WillDistrict 1 Local centralized control and operation of the six movable bridges from Ruby Street to Brandon Road in the City of Joliet — Rejected Nov 26 New Meade Inc. $21,260,736 ·
Apr 27, 2018 60T75 LakeDistrict 1 Reconstruct US 45 on a new alignment and re-align Grass Lake Road to create a four-legged intersection with US 45 and Millburn Road in the Villages of Old Mill Creek and Lindenhurst. — Executed Nov 26 New Berger Excavating Contractors, Inc. $15,577,444 ·
Apr 27, 2018 60V18 WillDistrict 1 Resurfacing and pedestrian ramps on US 30 from Collins Street to I-80 in the City of Joliet. — Executed Nov 26 New D. Construction, Inc. $1,753,921 ·
Apr 27, 2018 60Y26 CookDistrict 1 Intersection improvement, horizontal realignment and culvert replacement at US 6 and 179th Street in the village of Orland Park. — Executed Nov 26 New Iroquois Paving Corporation $2,478,965 ·
Apr 27, 2018 60Y83 LakeDistrict 1 Resurfacing, pedestrian ramps and drainage work in the villages of Island Lake and Wauconda. — Executed Nov 26 New Lorig Construction Company $1,105,951 ·
Apr 27, 2018 61B91 CookDistrict 1 Sidewalk construction adjacent to Ballard Road, from Bender Road to Good Avenue in the City of Des Plaines. — Executed Nov 26 New Martam Construction Incorporated $462,764 ·
Apr 27, 2018 61C48 LakeDistrict 1 Reconstruction, drainage improvements, and bike/pedestrian path construction on Sayton Road from US 12 to Rollins Road, and from Rollins Road to Industrial Avenue in the Village of Fox Lake. — Executed Nov 26 New Berger Excavating Contractors, Inc. $1,769,565 ·
Apr 27, 2018 61C86 KaneDistrict 1 Widening and reconstruction of Huntley Road from Sleepy Hollow Road to Elm Avenue in the Village of West Dundee. — Executed Nov 26 New Plote Construction, Inc. $7,831,951 ·
Apr 27, 2018 61D92 DuPageDistrict 1 Resurfacing on Central Avenue from Gary Avenue to Roselle Road in the Village of Roselle. — Executed Nov 26 New Arrow Road Construction Co. $888,255 ·
Apr 27, 2018 61E22 LakeDistrict 1 Reconstruction and widening to add one thru lane in each direction and bicycle/pedestrian accommodations on Quentin Road from IL 22 to White Pine Road. — Executed Nov 26 New Lake County Grading Company, LLC $20,129,203 ·
Apr 27, 2018 61E34 McHenryDistrict 1 Resurface Pearl Street from IL 31 to North River Road, and resurfacing Lincoln Road from North River Road to Chapel Hill Road in the City of McHenry. — Executed Nov 26 New Lorig Construction Company $2,551,352 ·
Apr 27, 2018 61E40 DuPageDistrict 1 Construction of a multi-use trail along Taylor Avenue from Walnut Street to Willis Street, and the Construction of a tunnel under the Union Pacific Railroad, in the Village of Glen Ellyn. — Executed Nov 26 New D. Construction, Inc. $2,745,521 ·
Apr 27, 2018 61E42 DuPageDistrict 1 Resurfacing on Army Trail Bouldevard from Mill Road to Rohlwing Road in the Village of Addison. — Executed Nov 26 New R. W. Dunteman Company $3,624,672 ·
Apr 27, 2018 61E45 CookDistrict 1 Platform and ramp improvements, sidewalks and pedestrian lighting at the Stone Avenue METRA Station in the Village of La Grange. — Executed Nov 26 New Kovilic Construction Company, Inc. $1,349,623 ·
Apr 27, 2018 61E47 WillDistrict 1 Intersection improvement at West 167th Street and Gougar Road in the City of Lockport. — Executed Nov 26 New D. Construction, Inc. $1,576,688 ·
Apr 27, 2018 61E51 CookDistrict 1 Resurfacing with curb and gutter on Custer Avenue from 47th Avenue to Ogden Avenue in the Village of Brookfield. — Executed Nov 26 New K-Five Construction Corporation $1,624,937 ·
Apr 27, 2018 61E54 CookDistrict 1 Resurfacing Chicago Avenue from Thatcher Avenue to Harlem Avenue in the Village of River Forest. — Executed Nov 26 New J. A. Johnson Paving Company $1,642,246 ·
Apr 27, 2018 61E55 DuPageDistrict 1 Resurfacing, sidewalk construction and roadway reconstruction on Railroad Avenue from York Avenue to Addison Street in the Village of Bensenville. — Executed Nov 26 New R. W. Dunteman Company $1,290,683 ·
Apr 27, 2018 61E57 CookDistrict 1 Reconstruction of Oak Park Avenue from 167th Street to 159th Street in the Village of Tinley Park. — Executed Nov 26 New Iroquois Paving Corporation $1,655,722 ·
Apr 27, 2018 61E58 DuPageDistrict 1 Resurfacing Internationale Parkway from Beaudin Boulevard to Woodward Avenue in the Village of Woodridge. — Executed Nov 26 New D. Construction, Inc. $807,962 ·
Apr 27, 2018 61E59 LakeDistrict 1 Resurfacing Golf Road from Butterfield road to Milwaukee Avenue in the Village of Libertyville. — Executed Nov 26 New Peter Baker & Son Co. $1,240,026 ·
Apr 27, 2018 61E60 CookDistrict 1 Construction of a multi-use trail, located east of Stony Island, from 97th Street to 103rd Street in the City of Chicago. — Executed Nov 26 New Pan-Oceanic Engineering Co., Inc. $1,393,925 ·
Apr 27, 2018 61E61 DuPageDistrict 1 Resurfacing Main Street from Franklin Street to Ogden Avenue in the Village of Downers Grove. — Executed Nov 26 New J. A. Johnson Paving Company $591,945 ·
Apr 27, 2018 61E62 DuPageDistrict 1 Resurfacing and ADA improvements on York Street from North Avenue to First Street in the City of Elmhurst. — Executed Nov 26 New K-Five Construction Corporation $666,667 ·
Apr 27, 2018 61E63 CookDistrict 1 Resurfacing Wolf Road from North Avenue to Winters Drive in the City of Northlake. — Executed Nov 26 New Plote Construction, Inc. $1,938,532 ·
Apr 27, 2018 61E65 DuPageDistrict 1 Resurfacing, curb, gutter and sidewalks on North Main Street from Seminary Avenue to Cole Avenue in the City of Wheaton. — Executed Nov 26 New R. W. Dunteman Company $892,096 ·
Apr 27, 2018 61E66 LakeDistrict 1 Construction of a multi-use path adjacent to Molidor Road, from 0.5 mile west of Fish Lake Road to Fish Lake Road in Grant Township. — Executed Nov 26 New Campanella and Sons, Inc. $313,595 ·
Apr 27, 2018 61E68 CookDistrict 1 Construction of a multi-use path adjacent to Roselle Road from Hillcrest Boulevard to Central Road in the Village of Schaumburg. A new structure will be constructed to carry the path over Central Road. — Executed Nov 26 New Lorig Construction Company $3,865,086 ·
Apr 27, 2018 61E70 LakeDistrict 1 Sidewalk construction algon Clavey Road from Barberry Road to the Skokie Valley Bike Path in the City of Highland Park. — Executed Nov 26 New Sumit Construction Co., Inc. $54,111 ·
Apr 27, 2018 61E71 CookDistrict 1 Intersection improvement at North Avenue and US 20 (Lake Street) in the Village of Streamwood. — Executed Nov 26 New Martam Construction Incorporated $809,831 ·
Apr 27, 2018 61E72 CookDistrict 1 Intersection improvement, signal replacement, channelization, and reconstruction of East Avenue in the Village of Streamwood. — Executed Nov 26 New Alliance Contractors, Inc. $478,629 ·
Apr 27, 2018 61E73 KaneDistrict 1 Intersection reConstruction at Huntley Road and IL 31 in the Village of Carpentersville. — Executed Nov 26 New Plote Construction, Inc. $9,637,830 ·
Apr 27, 2018 62A14 LakeDistrict 1 ADA ramp improvement on various routes in the villages of Deerfield and Lake Bluff and the cities of Highland park and Lake Forest. — Executed Nov 26 New Sumit Construction Co., Inc. $539,989 ·
Apr 27, 2018 62B13 CookDistrict 1 Joint reconstruction and repair of the bridge structure SN 016-0153 carrying NB I-94 over SB Stony Island Avenue in the City of Chicago. — Executed Nov 26 New Path Construction Company, Inc. $407,750 ·
Apr 27, 2018 62B45 WillDistrict 1 Shoulder widening, milled rumble strips and guardrail replacement on US 52 from Spencer Road to US 45 in the village of Manhattan and unincorporated Will County. — Executed Nov 26 New D. Construction, Inc. $1,555,085 ·
Apr 27, 2018 62B84 LakeDistrict 1 Repair culvert carrying IL 22 over East Tributary to Flint Creek, 1.2 miles West of IL 59. — Executed Nov 26 New D. Construction, Inc. $360,217 ·
Apr 27, 2018 62B94 McHenryDistrict 1 Rehabilatation of the existing culvert structures over unnamed ditches in the townships of Dunham and Hartland. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $188,777 ·
Apr 27, 2018 62C15 CookDistrict 1 Fiber optic cable and PTZ camera installation in Schaumburg. — Executed Nov 26 New Hecker and Company, Inc. $910,414 ·
Apr 27, 2018 62C17 KaneDistrict 1 Resurfacing, centerline rumble strips and pedestrian ramp upgrades on IL 72 from Reinking Road to Van Buren Street in the Villages of Pingree Grove, Gilberts, River West Dundee, Elgin and Sleepy Hollow. — Executed Nov 26 New Lorig Construction Company $2,978,656 ·
Apr 27, 2018 62C24 DuPageDistrict 1 Remove and replace bridge structure SN 022-0103 carrying I-290 over Salt Creek. — Executed Nov 26 New Dunnet Bay Construction Company $14,397,932 ·
Apr 27, 2018 62C54 CookDistrict 1 Resurfacing on Indiana Avenue within the villages of Riverdale, Dolton and South Holland. — Executed Nov 26 New D. Construction, Inc. $1,284,651 ·
Apr 27, 2018 62C61 KendallDistrict 1 Resurfacing on IL 31 and East Frontage Road in the Village of Oswego. — Executed Nov 26 New D. Construction, Inc. $295,006 ·
Apr 27, 2018 62C67 DuPageDistrict 1 Resurfacing and pedestrian ramp improvement of IL 38 in the villages of Lombard and Villa Park. — Executed Nov 26 New R. W. Dunteman Company $2,092,603 ·
Apr 27, 2018 62C75 LakeDistrict 1 Resurfacing IL 132 through the villages of Lake Villa and Lindenhurst. — Executed Nov 26 New Peter Baker & Son Co. $825,294 ·
Apr 27, 2018 62D13 CookDistrict 1 Resurfacing and pedestrian ramps onTouhy Avenue in the villages of Niles, Skokie and Lincolnwood. — Executed Nov 26 New Arrow Road Construction Co. $1,451,154 ·
Apr 27, 2018 62D18 CookDistrict 1 Resurfacing and pedestrian ramps through the cities of Park Ridge and Chicago. — Executed Nov 26 New Arrow Road Construction Co. $1,518,531 ·
Apr 27, 2018 62D19 LakeDistrict 1 Resurfacing and pedestrian ramp improvement on US 14 through the Village of Barrington. — Executed Nov 26 New Lorig Construction Company $1,371,351 ·
Apr 27, 2018 62D20 CookDistrict 1 Resurfacing and pedestrian ramps on Central Road in villages of Arlington Heights and Mount Prospect. — Executed Nov 26 New Arrow Road Construction Co. $3,279,847 ·
Apr 27, 2018 62D51 CookDistrict 1 Resurfacing on IL 72 to include ADA pedestrian ramp upgrade in the cities of Des Plaines and Rosemont. — Executed Nov 26 New Arrow Road Construction Co. $2,993,095 ·
201–300 of 10,653‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.